Flathead NF, Hungry Horse RD, Lions Lake Dam Rehab

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
1240LU21R0002
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Hungry Horse MT 59919 USA

Notice details come from SAM.gov. Updated .

About this opportunity

This pre-solicitation notice is for the rehabilitation of Lions Lake Dam located on the Flathead National Forest in Hungry Horse, Montana. The Forest Service seeks a contractor to rehabilitate the south dam embankment and spillway structure, replace the outlet pipe, and raise the embankment crest of the north dam. The successful offeror must have experience rehabilitating dams and modifying spillway structures. Proposals will be evaluated based on technical approach, past performance and price. The question deadline is May 14, 2021, with the solicitation expected to be issued on or around April 14, 2021.

This is a total small business set-aside advertised under NAICS 237310 and PSC C211. The estimated period of performance is July 15 to October 30, 2021, with an anticipated award value between $500,000 to $1,000,000. Key aspects of the work include re-contouring and armoring the south dam slope, modifying the spillway structure, replacing and lining portions of the outlet pipe, and raising the embankment crest of the north dam.

Notice text

Flathead NF, Hungry Horse Ranger District, Lions Lake Dam Rehabilitation involves rehabilitation of the Lion Lake south dam and raising the embankment on the north dam. Work at the south dam includes rehabilitation of the upstream embankment slope to re-contour and smooth the grading and adding riprap for wave action erosion protection. The outlet shaft/spillway structure will be modified to core a weir into the wall, replace vertical slide gate, add new upstream vertical slide gate, rehabilitate exposed concrete surfaces, and rehabilitate existing handrail. Work at the Outlet Pipe requires replacement of the downstream outlet pipe, removal and disposing of concrete retaining structure at the downstream end of the outlet pipe, adding rock riprap erosion control downstream of the outlet pipe, and slipline the interior upstream outlet pipe. The Contractor will need to raise the embankment crest of the dam, shifting the centerline of the embankment crest downstream. The Downstream Embankment will be rebuilt with a flatter embankment fill slope and have toe drains and chimney drains installed. The Parking Lot will have existing damaged areas patched and repaired, and a slurry seal coat will be added. The north will be rehabilitated by raising the embankment crest to same elevation as south dam. Project is located 1.5 miles south of Hungry Horse, Montana. The project site can be reached by turning south off or US Hwy 2 on to MT State RTE 15516 (the paved road to Hungry Horse Dam) for 1.5 miles. The road is also known locally as Forest Service primary road no. 895 and is named the Westside Reservoir Road. Period of Performance estimated July 15 – October 30, 2021. Estimated price range between $500,000 - $1,000,000.  Solicitation expected to be issued on or around April 14, 2021.

Notice history

Notice Type Posted
Flathead NF, Hungry Horse RD, Lions Lake Dam Rehab Award Award Notice
Flathead NF, Hungry Horse RD, Lions Lake Dam Rehab Latest solicitation Solicitation
This notice Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity