This document is a solicitation for the Lions Lake Dam Rehabilitation project located on the Flathead National Forest in Hungry Horse, Montana. The project involves rehabilitating the south dam embankment and raising the north dam embankment. Work includes re-contouring slopes, adding riprap, modifying the outlet structure, replacing downstream piping, installing erosion controls, and repairing parking areas. The period of performance is 100 calendar days with an estimated price range of $500,000 to $1,000,000. Offerors must attend a pre-proposal meeting on May 11, 2021 and submit pricing by the response date. The agency is the USDA Forest Service and evaluation will consider capability, technical approach, past performance, and price.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend2_ Notes_PreProposal Mtg_v2.pdf | ||
| Amend2_VolumeEstimation.xlsx | XLSX spreadsheet | |
| Amend2_SF30_1240LU21R0002.pdf | ||
| Amend 2_LionLakeContours.png | PNG image | |
| Amend1_1240LU21R0002.pdf | ||
| SF1442_1240LU21R0002.pdf | ||
| Lion Lake Dam and Platform Plans.pdf | ||
| Lion Lake Dam and PlaformFSSS.pdf | ||
| FoodStorageOrderNorthernCDEcosystemCG Btrt Fltd BD Koot HLF.pdf | ||
| WageDecisionMT20210079.pdf | ||
| Past Performance evaluation (optional).docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No: 1240LU21R002, Lions Lake Dam Rehab Page 45
Insert SF1442, 3 pages
TABLE OF CONTENTS
PART I – THE SCHEDULE
Section B – Supplies or Services and Prices/Costs
| B.1 Schedule of Items | 6-8 |
| B.2 Payment for Bond Premium | 8 |
| B.3 Additive Items | 8 |
Section C – Description/Specifications/Statement of Work
| C.1 Scope of Project | 9 |
| C.2 Project Location | 9 |
| C.3 Magnitude of Construction Project | 9 |
| C.4 Restrictions | 9 |
| C.5 Standard Specifications | 9 |
| C.6 Clauses | 10 |
Section E – Inspection and Acceptance E.1 Clauses 11
Section F – Deliveries or Performance F.1 Clauses 12
Section G – Contract Administration Data G.1 Clauses 13
Section H – Special Contract Requirements H.1 Clauses 14
PART II CONTRACT CLAUSES
Section I – Contract Clauses I.1 Clauses 15-26
PART III – LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
Section J – Attachments
| J.1 Wage Determination | 27 |
| J.2 Supplemental Specifications (FSSS) list Lion Lake Dam Rehab | 27-28 |
| J.3 Drawings list Lion Lake Dam Rehab | 28 |
| J.4 Supplemental Specifications (FSSS) list Lion Lake Fishing Platform | 29 |
| J-5 Drawings list Lion Lake Fishing Platform | 29 |
| J.6 Food Storage Order | 29 |
PART IV REPRESENTATIONS AND INSTRUCTIONS
Section K Representations, Certifications and Other Statements of Offerors or Respondents K.1 Provisions 30-36
Section L – Instructions, Conditions, and Notices to Offeror or Respondents L.1 Provisions 37-43
Section M Evaluation Factors for Award
| M.1 Provisions | 44 |
| M.2 Proposal Evaluation | 44 |
| M.3 Technical Evaluation Factors | 44-45 |
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
B.1 SCHEDULE OF ITEMS
BASE PAY ITEM NO.
DESCRIPTION
| Method Measure |
| PAY |
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
15101 Mobilization
LSQ
| LS |
| 1 |
| 15201 |
| Construction Survey & Stakingg |
LSQ
| LS |
| 1 |
| 20101 |
| Clearing & Grubbing of South Dam |
CQ
SY
| 20102 |
| Clearing & Grubbing of North Dam |
AQ
| SY |
| 1000 |
| 20301 |
| Removal & Disposal of Existing Outlet Pipe, slide gate & downstream concrete structure |
LSQ
| LS |
| 1 |
| 20401 |
| Partial Excavation of Embankment (removal of existing embankment South Dam |
| LS |
| 1 |
| 20402 |
| Disposal of Unsuitable Excavated Embankment Material (South Dam) |
AQ
| CY |
| 2000 |
| 20403 |
| Select Soil Borrow for |
South Dam
AQ
| CY |
| 3500 |
| 20404 |
| Select Soil Borrow for |
North Dam
CQ
| CY |
| 750 |
| 20405 |
| AASHTO M6 or ASTM C33 |
Filter Sand
CQ
| CY |
| 400 |
| 20406 |
| Hauling and Handling of Potentially Hydrocarbon Impacted Soils to Borrow Area |
| CY |
| 100 |
| 20407 |
| Culvert Foundation Preparation |
LSQ
| LS |
| 1 |
| 25101 |
| Placed Riprap Class 1 |
CQ
| CY |
| 101 |
| 25102 |
| Placed Riprap Class 2 |
CQ
| CY |
| 10 |
| 25103 |
| Salvage & Place Riprap/Boulder |
LSQ
| LS |
| 1 |
BASE PAY ITEM NO.
DESCRIPTION
| Method Measure |
| PAY |
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
| 30101 |
| Road Surfacing Aggregate for North Dam |
CQ
| CY |
| 75 |
| 30102 |
| 1.5-inch minus Base Course |
CQ
| CY |
| 150 |
| 30103 |
| 3-inch minus Subbase Course-Import |
CQ
| CY |
| 215 |
| 30403 |
| 3-inch minus Subbase Course –-Salvaged Material |
CQ
| CY |
| 125 |
| 40301 |
| Asphalt |
CQ
| SY |
| 850 |
| 41001 |
| Asphalt Slurry Seal Coat |
CQ
| SY |
| 1315 |
| 41801 |
| Asphalt Patching – Existing Parkingg Lot |
AQ
| SY |
| 100 |
| 60101 |
| Concrete, Placed (RCPcradle) |
AQ
| LF |
| 86 |
| 60501 |
| Pipe for Toe Drain |
CQ
| LF |
| 530 |
| 61901 |
| Salvage Road Gate for Reuse |
LSQ
| LS |
| 1 |
| 62401 |
| Topsoil Stripping, Stockpile, and Replacement |
CQ
| CY |
| 545 |
| 62501 |
| Seeding, Fertilizing, and Mulching, Hydraulic Method |
CQ
| AC |
| 1.25 |
| 63001 |
| Control of Water |
LSQ
| LS |
| 1 |
| 64001 |
| 36-inch dia Control Gate |
CQ
| EA |
| 2 |
| 64002 |
| 36-inch RCP |
CQ
| LF |
| 86 |
| 64003 |
| Slipline Existing 36-inch RCP Upstream Outlet Pipe – |
32 inch HDPE
CQ
| LF |
| 40 |
| 64004 |
| Core 6-inch Hole in Tower Wall |
LSQ
| LS |
| 1 |
| 64005 |
| Concrete Surface Restoration |
LSQ
| LS |
| 1 |
| 64006 |
| Handrail Restoration |
LSQ
| LS |
| 1 |
| 65001 |
| Field Screening of Potentially Hydrocarbon-Impacted Soils |
AQ
| HR |
| 16 |
BASE PAY ITEM NO.
DESCRIPTION
| Method Measure |
| PAY |
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
| 65002 |
| Analytical Testing of Potentially Hydrocarbon-Impacted Soils |
AQ
| EA |
| 10 |
| 65003 |
| Handling & Hauling of Potentially Hydrocarbon-Impacted Soils to Landfill |
| CY |
| 100 |
Total All Base Items
ADDITIVE ITEMS.
Additive PAY ITEM NO.
DESCRIPTION
| Method Measure |
| PAY |
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
| A1 |
| Earthwork, Clearing, Grubbing Grading & Shaping |
LSQ
| LS |
| 1 |
| A2 |
| Pier Footings, Structural Steel Framework, Concrete Slab, Headwalls, Accessible Fishing Platfomr |
| LS |
| 1 |
| A3 |
| Guardrails & Fastener |
Hardware
CQ
| LF |
| 54 |
Total Additive Items
Total All Base and Additive
B- 2 Payment for Bond Premiums Note: Payment for bond premiums in accordance with FAR Clause 52.232-5, Payments Under Fixed-Price Construction Contracts, shall not be in addition to the contract price.
B-3 Additive Items The Government may require the delivery of the numbered line items, identified in the Schedule as an Additive item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the Additive items at time of award. Delivery of added items shall continue at the same rate items are called for under the contract, unless the parties otherwise agree. It is the unilateral right of the Government to exercise Additive at the price agreed upon. Award of additive items is contingent on the best interest of the Government. Except when it is determined not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all additive items to the total price for the basic requirement. Evaluation of additive items will not obligate the Government to exercise the additive items.
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 SCOPE OF CONTRACT
This contract involves rehabilitation of the Lion Lake south dam and raising the embankment on the north dam. Work at the south dam includes rehabilitation of the upstream embankment slope to re-contour and smooth the grading and adding riprap for wave action erosion protection. The outlet shaft/spillway structure will be modified to core a weir into the wall, replace vertical slide gate, add new upstream vertical slide gate, rehabilitate exposed concrete surfaces, and rehabilitate existing handrail. Work at the Outlet Pipe requires replacement of the downstream outlet pipe, removal and disposing of concrete retaining structure at the downstream end of the outlet pipe, adding rock riprap erosion control downstream of the outlet pipe, and slipline the interior upstream outlet pipe. The Contractor will need to raise the embankment crest of the dam, shifting the centerline of the embankment crest downstream. The Downstream Embankment will be rebuilt with a flatter embankment fill slope and have toe drains and chimney drains installed. The Parking Lot will have existing damaged areas patched and repaired, and a slurry seal coat will be added.
The north will be rehabilitated by raising the embankment crest to same elevation as south dam.
C.2 PROJECT LOCATON
This project is located 1.5 miles south of Hungry Horse, Montana. The project site can be reached by turning south off or US Hwy 2 on to MT State RTE 15516 (the paved road to Hungry Horse Dam) for 1.5 miles. The road is also known locally as Forest Service primary road #895 and is named the “Westside Reservoir Road”.
C.3 MAGNITUDE OF CONSTRUCTION PROJECT
Between $500,000 and $1,000,000
C.4 RESTRICTIONS . A State of Montana 124 permit will govern water quality impact & mitigation measures for this project
C.5 STANDARD SPECIFICATIONS. "FHWA FP-14 STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS” are included in this solicitation by reference only. The requirements contained in these Specifications are hereby made a part of this Solicitation and any resultant contract.
Copies of the "FHWA FP-14 STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS" are available for download at the following URL:
https://flh.fhwa.dot.gov/resources/specs/
C.6 CLAUSES
452.211-72 Statement of Work/Specifications (FEB 1988) The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
452.211-73 Attachments to Statement of Work/Specifications (FEB 1988) The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
SECTION E--INSPECTION AND ACCEPTANCE
E.1 CLAUSES
52.246-12 Inspection of Construction (AUG 1996)
SECTION F--DELIVERIES OR PERFORMANCE
| F.1 | CLAUSES |
| 52.211-18 | Variation in Estimated Quantity (APR 1984) |
| 52.242-14 | Suspension of Work (APR 1984) |
52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 100 calendar days after the date the contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.
Estimated Start Work: July 15, 2021
SECTION G--CONTRACT ADMINISTRATION DATA
G.1 CLAUSES
452.215-73 Post Award Conference (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled within 10 days after the date of contract award. The conference will be held at to be determined as agreed upon.
SECTION H--SPECIAL CONTRACT REQUIREMENTS
H.1 CLAUSES
452.237-74 Key Personnel (FEB 1988)
(a) The Contractor shall assign to this contract the following key personnel:
Project Manager and/or Superintendent
(b) During the first ninety (90) days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.
(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
I.1 CLAUSES
52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
Federal Acquisition Regulation (FAR) Clauses: https://www.acquisition.gov/browse/index/far (FAR clauses begin with 52) Department of Agriculture Acquisition Regulation (AGAR) Clauses: https://www.acquisition.gov/agar (AGAR clauses begin with 452) Deviations to clauses may be viewed at: https://www.dm.usda.gov/procurement/policy/FARClassDeviations.htm
| 52.202-1 | Definitions (JUN 2020) |
| 52.203-3 | Gratuities (APR 1984) |
| 52.203-5 | Covenant against Contingent Fees (MAY 2014) |
| 52.203-6 | Restrictions on Subcontractor Sales to the Government (JUN 2020) |
| 52.203-7 | Anti-Kickback Procedures (JUN 2020) |
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (MAY 2014) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (MAY 2014)
| 52.203-12 | Limitation on Payments to Influence Certain Federal Transactions (JUN 2020) |
| 52.203-17 | Contractor Employee Whistleblower Rights & Requirements to Inform Employees of Whistleblower Rights (JUN 2020) |
| 52.203-19 | Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) |
| 52.204-4 | Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (MAY 2011) |
| 52.204-10 | Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) |
| 52.204-13 | System for Award Management Maintenance (OCT 2018) |
| 52.204-14 | Service Contract Reporting Requirements (OCT 2016) |
| 52.204-18 | Commercial and Government Entity Code Maintenance (AUG 2020) |
| 52.204-19 | Incorporation by Reference of Representations and Certifications (DEC 2014) |
| 52.204-23 | Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (JUL 2018) |
| 52.204-25 | Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (AUG 2020) |
52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (JUN 2020)
| 52.209-9 | Updates of Publicly Available Information Regarding Responsibility Matters (OCT 2018) |
| 52.209-10 | Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015) |
| 52.215-2 | Audit and Records -- Negotiation (JUN 2020) |
| 52.215-8 | Order of Precedence—Uniform Contract Format (OCT 1997) |
| 52.219-6 | Notice of Total Small Business Set-Aside (NOV 2020) |
| 52.219-8 | Utilization of Small Business Concerns (OCT 2018) |
| 52.219-28 | Post Award Small Business Program Rerepresentation (NOV 2020) |
| 52.222-3 | Convict Labor (JUN 2003) |
| 52.222-4 | Contract Work Hours and Safety Standards -- Overtime Compensation (MAY 2018) |
| 52.222-6 | Construction Wage Rate Requirement (AUG 2018) |
| 52.222-7 | Withholding of Funds (MAY 2014) |
| 52.222-8 | Payrolls and Basic Records (AUG 2018) |
| 52.222-9 | Apprentices and Trainees (JUL 2005) |
| 52.222-10 | Compliance with Copeland Act Requirements (FEB 1988) |
| 52.222-11 | Subcontracts (Labor Standards) (MAY 2014) |
| 52.222-12 | Contract Termination - Debarment (MAY 2014) |
| 52.222-13 | Compliance with Construction Wage Rate Requirements and Related Regulations (MAY 2014) |
| 52.222-14 | Disputes Concerning Labor Standards (FEB 1988) |
| 52.222-15 | Certification of Eligibility (MAY 2014) |
| 52.222-21 | Prohibition of Segregated Facilities (APR 2015) |
| 52.222-26 | Equal Opportunity (APR 2016) |
| 52.222-27 | Affirmative Action Compliance Requirements for Construction (APR 2015) |
| 52.222-35 | Equal Opportunity for Veterans (JUN 2020) |
| 52.222-36 | Equal Opportunity for Workers with Disabilities (JUN 2020) |
| 52.222-37 | Employment Reports on Veterans (JUN 2020) |
| 52.222-40 | Notification of Employee Rights Under National Labor Relations Act (DEC 2010) |
| 52.222-50 | Combating Trafficking in Persons (OCT 2020) |
| 52.222-54 | Employment Eligibility Verification (OCT 2015) |
| 52.222-55 | Minimum Wages under Executive Order 13658 (NOV 2020) |
| 52.222-62 | Paid Sick Leave under Executive Order 13706 (JAN 2017) |
| 52.223-2 | Affirmative Procurement of Biobased Products under Service and Construction Contracts (SEP 2013) |
| 52.223-6 | Drug-Free Workplace (MAY 2001) |
| 52.223-11 | Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Jun 2016) |
| 52.223-12 | Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (JUN 2016) |
| 52.223-18 | Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020) |
| 52.225-13 | Restrictions on Certain Foreign Purchases (FEB 2021) |
| 52.227-1 | Authorization and Consent (JUN 2020) |
| 52.227-2 | Notice and Assistance Regarding Patent and Copyright Infringement (JUN 2020) |
| 52.227-4 | Patent Indemnity -- Construction Contracts (DEC 2007) |
| 52.228-2 | Additional Bond Security (OCT 1997) |
| 52.228-12 | Prospective Subcontractor Requests for Bonds (MAY 2014) |
| 52.228-14 | Irrevocable Letter of Credit (NOV 2014) |
| 52.229-3 | Federal, State, and Local Taxes (FEB 2013) |
| 52.229-4 | Federal, State, and Local Taxes (State and Local Adjustments) (FEB 2013) |
| 52.232-5 | Payments under Fixed-Price Construction Contracts (MAY 2014) |
| 52.232-17 | Interest (MAY 2014) |
| 52.232-23 | Assignment of Claims (MAY 2014) |
52.232-27 Prompt Payment for Construction Contracts (JAN 2017)
| 52.232-33 | Payment by Electronic Funds Transfer – System for Award Management (OCT 2018) |
| 52.232-39 | Unenforceability of Unauthorized Obligations (JUN 2013) |
| 52.233-1 | Disputes (MAY 2014) Alt 1 (DEC 1991) |
| 52.233-3 | Protest after Award (AUG 1996) |
| 52.233-4 | Applicable Law for Breach of Contract Claim (OCT 2004) |
| 52.236-2 | Differing Site Conditions (APR 1984) |
| 52.236-3 | Site Investigation and Conditions Affecting the Work (APR 1984) |
| 52.236-5 | Material and Workmanship (APR 1984) |
| 52.236-6 | Superintendence by the Contractor (APR 1984) |
| 52.236-7 | Permits and Responsibilities (NOV 1991) |
| 52.236-8 | Other Contracts (APR 1984) |
| 52.236-9 | Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR 1984) |
| 52.236-10 | Operations and Storage Areas (APR 1984) |
| 52.236-11 | Use and Possession Prior to Completion (APR 1984) |
| 52.236-12 | Cleaning Up (APR 1984) |
| 52.236-13 | Accident Prevention (NOV 1991) |
| 52.236-15 | Schedules for Construction Contracts (APR 1984) |
| 52.236-17 | Layout of Work (APR 1984) |
| 52.236-21 | Specifications and Drawings for Construction (FEB 1997) Alt II (APR 1984) |
| 52.242-13 | Bankruptcy (JUL 1995) |
| 52.243-4 | Changes (JUN 2007) |
| 52.244-6 | Subcontracts for Commercial Items (NOV 2020) (DEVIATION APR 2020) |
| 52.246-21 | Warranty of Construction (MAR 1994) |
| 52.248-3 | Value Engineering – Construction (OCT 2020) |
| 52.249-2 | Termination for Convenience of the Government (Fixed-Price) (APR 2012)--Alternate I (SEP 1996) |
| 52.249-10 | Default (Fixed-Price Construction) (APR 1984) |
| 52.253-1 | Computer Generated Forms (JAN 1991) |
| 452.232-70 | Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV 1996) |
| 452.236-72 | Use of Premises (NOV 1996) |
| 452.236-73 | Archeological or Historic Sites (FEB 1988) |
| 452.236-74 | Control of Erosion, Sedimentation and Pollution (NOV 1996) |
| 452.236-76 | Samples and Certificates (FEB 1988) |
| 452.236-77 | Emergency Response (NOV 1996) |
52.219-14 Limitations on Subcontracting (MAR 2020)
(a) This clause does not apply to the unrestricted portion of a partial set-aside.
(b) Applicability. This clause applies only to—
(1) Contracts that have been set aside for small business concerns or 8(a) participants;
(2) Part or parts of a multiple-award contract that have been set aside for small business concerns or 8(a) participants;
(3) Orders set aside for small business concerns or 8(a) participants under multiple-award contracts as described in 8.405-5 and 16.505(b)(2)(i)(F); and
(4) Orders issued directly to small business concerns or 8(a) participants under multiple-award contracts as described in 19.504(c)(1)(ii).
(c) Limitations on subcontracting. By submission of an offer and execution of a contract, the Contractor agrees that in performance of the contract in the case of a contract for—
(1) Services (except construction). At least 50 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern.
(2) Supplies (other than procurement from a non-manufacturer of such supplies). The concern shall perform work for at least 50 percent of the cost of manufacturing the supplies, not including the cost of materials.
(3) General construction. The concern will perform at least 15 percent of the cost of the contract, not including the cost of materials, with its own employees.
(4) Construction by special trade contractors. The concern will perform at least 25 percent of the cost of the contract, not including the cost of materials, with its own employees.
(d) The Contractor shall comply with the limitations on subcontracting as follows:
(1) For contracts, in accordance with paragraph (b)(1) and (2) of this clause— [Contracting Officer check as appropriate.] ☒By the end of the base term of the contract and then by the end of each subsequent option period; or ☐By the end of the performance period for each order issued under the contract.
(2) For orders, in accordance with paragraphs (b)(3) and (4) of this clause, by the end of the performance period for the order.
or entity confidential, unless prohibited by law or agency procedure.
52.225-9 Buy American Act-Construction Materials (FEB 2021)
(a) Definitions. As used in this clause- Commercially available off-the-shelf (COTS) item-
(1) Means any item of supply (including construction material) that is-
(i) A commercial item (as defined in paragraph (1) of the definition at Federal Acquisition Regulation (FAR) 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Cost of components means-
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Domestic construction material means-
(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-
(i) An unmanufactured construction material mined or produced in the United States; or
(ii) A construction material manufactured in the United States, if-
(A) The cost of its components mined, produced, or manufactured in the United States exceeds 55 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or
(B) The construction material is a COTS item; or
(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".
Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.
Foreign construction material means a construction material other than a domestic construction material.
Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.
Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.
Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.
"United States" means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference. (1) This clause implements 41 U.S.C.chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:
NONE
[Contracting Officer to list applicable excepted materials or indicate "none"]
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute. (1) (i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
Construction Material Description Unit of Measure Quantity Price (dollars)* Item1:
| Foreign construction material | _______ | _______ | _______ | ||
| Domestic construction material | _______ | _______ | _______ |
Item2:
| Foreign construction material | _______ | _______ | _______ | |
| Domestic construction material | _______ | _______ | _______ |
[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued)].
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.]
52.228-1 Bid Guarantee (SEP 1996) (DEVIATION APR 2020)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds –
(1) To unsuccessful bidders as soon as practicable after the opening of bids, and (2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be 20 percent of the bid price.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
52.228-11 Individual Surety - Pledge of Assets (FEB 2021) (DEVIATION APR 2020)
(a) The Contractor shall obtain from each person acting as an individual surety on a performance bond or a payment bond - (1)A pledge of assets that meets the eligibility, valuation, and security requirements described in the Federal Acquisition Regulation (FAR) 28.203-1; and
(2) Standard Form 28, Affidavit of Individual Surety, [except that the words “being duly sworn, depose and say” on the Standard Form 28 are replaced with the word “affirm” and the Standard Form 28 is not required to be sworn and notarized in block 12].
(b)The Contracting Officer may release a portion of the security interest on the individual surety's assets based upon substantial performance of the Contractor's obligations under its performance bond. The security interest in support of a performance bond shall be maintained—
(1) Contracts for the construction, alteration, or repair of any public building or public work of the Federal Government exceeding $150,000 (40 U.S.C. 3131). Until completion of any warranty period, or for 1 year following final payment, whichever is later.
(2) Contracts subject to alternative payment protection (see FAR 28.102-1(b)(1)). For the full contract performance period plus 1 year.
(3) Other contracts not subject to the requirements of paragraph (b)(1) of this clause. Until completion of any warranty period, or for 90 days following final payment, whichever is later.
(c)A surety's assets pledged in support of a payment bond may be released to a subcontractor or supplier upon Government receipt of a Federal district court judgment, or a sworn statement by the subcontractor or supplier that the claim is correct along with a notarized authorization of the release by the surety stating that it approves of such release. The security interest on the individual surety's assets in support of a payment bond shall be maintained—
(1) Contracts for the construction, alteration, or repair of any public building or public work of the Federal Government exceeding $150,000 which require performance and payment bonds (40 U.S.C. 3131). For 1 year following final payment, or until resolution of all pending claims filed against the payment bond during the 1-year period following final payment, whichever is later.
(2) Contracts subject to alternative payment protection (see FAR 28.102-1(b)(1)). For the full contract performance period plus 1 year.
(3) Other contracts not subject to the requirements of paragraph (c)(1) of this clause. For 90 days following final payment.
(d)The Contracting Officer may allow the Contractor to substitute an individual surety, for a performance or payment bond, after contract award. The Contractor shall comply with the requirements of paragraph (a) of this clause within the timeframe established by the Contracting Officer.
52.228-15 Performance and Payment Bonds -- Construction (JUN 2020) (DEVIATION APR 2020) (a)Definitions. As used in this clause -- “Original contract price” means the award price of the contract; or, for requirements contracts, the price payable for the estimated total quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not include the price of any options, except those options exercised at the time of contract award.
(b) Amount of required bonds. Unless the resulting contract price is valued at or below the threshold specified in Federal Acquisition Regulation 28.102-1(a) on the date of award of this contract, the successful offeror shall furnish performance and payment bonds to the Contracting Officer as follows:
(1) Performance Bonds (Standard Form 25, EXCEPT THAT A SEAL IS NOT REQUIRED). The penal amount of performance bonds at the time of contract award shall be 100 percent of the original contract price.
(2) Payment Bonds (Standard Form 25-A, EXCEPT THAT A SEAL IS NOT REQUIRED). The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.
(3) Additional bond protection.
(i) The Government may require additional performance and payment bond protection if the contract price is increased. The increase in protection generally will equal 100 percent of the increase in contract price.
(ii) The Government may secure the additional protection by directing the Contractor to increase the penal amount of the existing bond or to obtain an additional bond.
(c) Furnishing executed bonds. The Contractor shall furnish all executed bonds, including any necessary reinsurance agreements, to the Contracting Officer, within the time period specified in the Bid Guarantee provision of the solicitation, or otherwise specified by the Contracting Officer, but in any event, before starting work.
(d) Surety or other security for bonds. The bonds shall be in the form of firm commitment, supported by corporate sureties whose names appear on the list contained in Treasury Department Circular 570, individual sureties, or by other acceptable security such as postal money order, certified check, cashier’s check, irrevocable letter of credit, or, in accordance with Treasury Department regulations, certain bonds or notes of the United States. Treasury Circular 570 is published in the Federal Register or may be obtained from the:
U.S. Department of Treasury Financial Management Service Surety Bond Branch 3700 East West Highway, Room 6F01 Hyattsville, MD 20782 Or via the internet at http://www.fms.treas.gov/c570/.
(e) Notice of subcontractor waiver of protection (40 U.S.C. 3133(c)). Any waiver of the right to sue on the payment bond is void unless it is in writing, signed by the person whose right is waived, and executed after such person has first furnished labor or material for use in the performance of the contract.
52.228-17 Individual Surety – Pledge of Assets (Bid Guarantee) (FEB 2021) (a)Offerors shall obtain from each person acting as an individual surety on a bid guarantee—
(1) A pledge of assets that meets the eligibility, valuation, and security requirements described in the Federal Acquisition Regulation (FAR) 28.203-1; and
(2) Standard Form 28, Affidavit of Individual Surety.
(b)The Offeror shall include with its offer the information required at paragraph (a) of this provision within the timeframe specified in the provision at FAR 52.228-1, Bid Guarantee, or as otherwise established by the Contracting Officer.
(c)The Contracting Officer may release the security interest on the individual surety's assets in support of a bid guarantee based upon evidence that the offer supported by the individual surety will not result in contract award.
52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013) (DEVIATION APR 2020) (a)[(1) In accordance with 31 U.S.C. 3903 and 10 U.S.C. 2307, upon receipt of accelerated payments from the Government, the Contractor shall make accelerated payments to its small business subcontractors under this contract, to the maximum extent practicable and prior to when such payment is otherwise required under the applicable contract or subcontract, [with a goal of 15 days] after receipt of a proper invoice and all other required documentation from the small business subcontractor.
(2) The Contractor agrees to make such payments to its small business subcontractors without any further consideration from or fees charged to the subcontractor.
(b) The acceleration of payments under this clause does not provide any new rights under the Prompt Payment Act.
(c) Include the substance of this clause, including this paragraph (c), in all subcontracts with small business concerns, including subcontracts with small business concerns for the acquisition of commercial items.
52.236-4 Physical Data (APR 1984)
Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor. (a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by Visual Observation and subsurface investigation by Allied Engineering as reported in FSSS, Appendices A, B, C.
52.252-6 Authorized Deviations in Clauses (NOV 2020)
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the clause.
(b) The use in this solicitation or contract of any Agriculture Acquisition Regulation (48 CFR __4___) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation.
452.211-71 Equal Products Offered (NOV 1996)
(a) Offerors proposing to furnish an "equal" product, in accordance with the "Brand Name or Equal" provision of this solicitation, shall provide the following information for each offered "equal" product:
Contract Line Item Number (if any): _____________________________ Brand Name or Equal Product identified by the Government in this solicitation:_ :_________________________________ Offered Product Name:___________________________________________ Catalog Description or part number:_________________________________ Manufacturer's Name:____________________________________________ Manufacturer's Address:__________________________________________
(b) Offerors are responsible for submitting all additional information on the above product necessary for the Contracting Officer to determine whether the product offered meets the "brand name or equal" product's salient characteristics listed in the solicitation.
PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J--LIST OF ATTACHMENTS
J.1 ATTACHMENTS
Wage Decision Number MT20210079, dated 01/01/2021
J-2 SUPPLEMENTAL SPECIFICATIONS.
The following sections of “FHWA FP-14 STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS” have been supplemented for this solicitation. The requirements contained in these Specifications are hereby made a part of this solicitation and any resultant contract. The Supplemental Specifications applicable to this contract and are physically included in the following section:
FSSS # Title Lion Dam Rehabilitation Page(s)
| Preface |
| 4 |
| FSSS 101 – Terms, Format, and Definitions |
| 5 -7 |
| FSSS 102 – Bid, Award, and Execution of Contract |
| 8 |
| FSSS 103 – Scope of Work |
| 9 |
| FSSS 104 – Control of Work |
| 10 |
| FSSS 105 – Control of Material |
| 11 |
| FSSS 106 – Acceptance of Work |
| 12 -13 |
| FSSS 107 – Legal Relations and Responsibility to the Public |
| 14 |
| FSSS 108 – Prosecution and Progress |
| 15 |
| FSSS 109 – Measurement and Payment |
| 16 |
| FSSS 151 – Mobilization |
| 17 |
| FSSS 152 – Construction Survey and Staking |
| 18 |
| FSSS 153 – Contractor Quality Control |
| 19 -20 |
| FSSS 155 – Schedules for Construction Contracts |
| 21 |
| FSSS 156 – Public Traffic |
| 22-23 |
| FSSS 157 – Soil Erosion Control |
| 24 |
| FSSS 201 – Clearing and Grubbing |
| 25 |
| FSSS 203 – Removal of Structures and Obstructions |
| 26 |
| FSSS 204 – Excavation and Embankment |
| 27-29 |
| FSSS 251 – Riprap |
| 30-31 |
| FSSS 619 – Fences, Gates, Cattle Guards and Bollard Posts |
| 32 |
| FSSS 624 – Topsoil |
| 33 |
| FSSS 625 – Turf Establishment |
| 34-35 |
| FSSS 630 – Control of Water |
| 36-37 |
| FSSS 640 – Outlet Works |
| 38-42 |
| FSSS 641 – Sliplining of Upstream Outlet Pipe |
| 43-45 |
| FSSS 645 – Slide Gates & Appurtenances |
| 46-49 |
| FSSS 650 – Handling and Removal of Potentially Hydrocarbon-Impacted Soils |
| 50 |
| FSSS 655 – Concrete Tower Exterior Treatment |
| 51 |
| FSSS 704 – Soil |
| 52 |
| FSSS 705 – Rock |
| 53 |
| Appendices A, B, C, D, E |
| 54-81 |
J-3 DRAWINGS.
Lion Lake Dam Rehabilitation
| Cover | Sheet 1 | ||||
| Materials and General Notes | Sheet 2 | ||||
| Existing Conditions and Survey Control | Sheet 3 | ||||
| Site Layout | Sheet 4 | ||||
| Design Plan | Sheet 5 | ||||
| Grading Plan | Sheet 6 | ||||
| Typical Embankment Cross Section | Sheet 7 | ||||
| Typical Embankment Cross Section | Sheet 8 | ||||
| Outlet Pipe Plan & Profile | Sheet 9 | ||||
| Embankment Plan & Profile | Sheet 10 | ||||
| Embankment Cross Sections | Sheet 11 | ||||
| Embankment Cross Sections | Sheet 12 | ||||
| Details | Sheet 13 | ||||
| Details | Sheet 14 | ||||
| Details | Sheet 15 | ||||
| Alignment Coordinates Tables | Sheet 16 |
| J-4 | FSSS Lion Lake Fishing Platform | ||||
| Section 01 10 00 | Summary | 2 | |||
| Section 03 00 00 | Concrete | 6 | |||
| Section 03 11 00 | Concrete Forming | 8 | |||
| Section 03 30 00 | Cast In Place Concrete | 9 | |||
| Section 05 00 00 | Metals | 24 | |||
| Section 05 50 00 | Metal Fabrication | 26 | |||
| Section 07 90 00 | Joint Protection | 27 | |||
| Section 09 00 00 | Finishes | 28 | |||
| Section 09 90 00 | Painting and Coating | 29 | |||
| Section 09 96 60 | Powder Coaating Finish | 31 |
| J-5 | Drawings Lion Lake Fishing Platform | |||
| Cover-Vicinity Map | Sheet G1.0 | |||
| Civil Site Plan | Sheet C1.0 | |||
| Civil Points & Layout View | Sheet C2.0 | |||
| Slab and Handrail Details | Sheet C2.1 | |||
| General Notes | Sheet S1.0 | |||
| Structural Plan View | Sheet S2.0 | |||
| Elevation View | Sheet S4.0 | |||
| End Elevation with Details | Sheet S4.0 | |||
| Structural Details | Sheet S5.0 |
J-6 Food Storage Order
PART IV--REPRESENTATIONS AND INSTRUCTIONS
SECTION K--REPRESENTATIONS, CERTIFICATIONS, AND
OTHER STATEMENTS OF OFFERORS OR RESPONDENTS
K.1 PROVISIONS
52.236-28 Preparation of Proposals – Construction (OCT 1997) 52.204-8 Annual Representations and Certifications (MAR 2020) (DEVIATION JUL 2020)
(a) (1) The North American Industry Classification System (NAICS) code for this acquisition is 237990 Other Heavy and Civil Engineering.
(2) The small business size standard is $39.5 million.
(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
(b) (1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.
(2) If the provision at 52.204-7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:
(i) ☐ Paragraph (d) applies.
(ii) ☐ Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
(c) (1) The following representations or certifications in SAM are applicable to this solicitation as indicated:
(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless–
(A) The acquisition is to be made under the simplified acquisition procedures in part 13;
(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or
(C) The solicitation is for utility services for which rates are set by law or regulation.
(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.
(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements-Representation. This provision applies to all solicitations.
(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.
(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that-
(A) Are not set aside for small business concerns;
(B) Exceed the simplified acquisition threshold; and
(C) Are for contracts that will be performed in the United States or its outlying areas.
(vi) 52.204-26, Covered Telecommunications Equipment or Services-Representation. This provision applies to all solicitations.
(vii) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations-Representation.
(viii) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.
(ix) 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law. This provision applies to all solicitations.
(x) 52.214-14, Place of Performance-Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.
(xi) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.
(xii) 52.219-1, Small Business Program Representations (Basic, Alternates I, and II). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.
(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.
(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.
(C) The provision with its Alternate II applies to solicitations that will result in a multiple-award contract with more than one NAICS code assigned.
(xiii) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.
(xiv) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.
(xv) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.
(xvi) 52.222-38, Compliance with Veterans’ Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.
(xvii) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA–designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.
(xviii) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA–designated items.
(xix) 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals-Representation. This provision applies to solicitations that include the clause at 52.204-7.)
(xx) 52.225-2, Buy American Certificate. This provision applies to solicitations containing the clause at 52.225-1.
(xxi) 52.225-4, Buy American-Free Trade Agreements-Israeli Trade Act Certificate. (Basic, Alternates I, II and III.) This provision applies to solicitations containing the clause at 52.225-3.
(A) If the acquisition value is less than $25,000 $50,000, the basic provision applies.
(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .