Fire Suppression System Install
Closed Pre-Solicitation Posted
- Solicitation number
- FA282324QA042
- Agency
-
Air Force Test Center
Air Force Materiel Command, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- Not on record
- PSC
- Not on record
- Place of performance
- Eglin AFB, Florida 32542, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Air Force Materiel Command Test Center is issuing a pre-solicitation notice for the installation of a fire suppression system at Eglin Air Force Base. The project involves integrating the existing fire suppression system in the Anechoic Chamber with the building system in Building 90, including connecting the fire alarm panel to a power source, integrating the system for monitoring, and installing HVAC damper interrupt relays. The vendor must also commission the system, conduct training, and perform pre-tests and a final test with the base fire marshal. The installed system must be 100% compatible with the existing fire suppression equipment on-site.
The contract opportunity is set aside for small businesses, and has a 30-day performance window from the contract award. No further details are provided on potential award values, budget ranges, or incumbent contractors. Interested vendors capable of providing these services are requested to respond by August 22, 2024.
Notice text
Please see the attached TRD and Drawings of an installation of a Fire Suppression System. This porject was started about two years ago and is now looking to be finished. if this is something that you ae capable of providing please let me know.
Files
| File | Type | Posted |
|---|---|---|
| TRD_Redacted.pdf | ||
| DRAWINGS.pdf |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Fire apparatus intercom system uplift and installation | Air Force Test Center | Total Small Business | |
| Fire Alarm/Suppression Inspection, Testing, and Maintenance | Air Force Research Laboratory | No set-aside | |
| Inspection of Fire Extinguishers and Suppression Systems for AMXG at Hill AFB, Utah | Air Force Sustainment Center | Total Small Business | |
| 2-STEP SEALED BID - TINKER AFB WWYK250019 Remove and Replace Fire Sprinkler in Plasma Booth Dust Collectors and Replace the Building F/A System, B3221 | Air Force Sustainment Center | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity