This document is a Technical Requirement Document (TRD) for the integration of a fire suppression system in Building 90 of the Anechoic Chamber at Eglin Air Force Base in Florida. The key requirements include:

The government has a 30-day performance window from the contract award to integrate the existing fire suppression system in the Anechoic Chamber with the building system in Building 90. This includes connecting the fire alarm panel to a 120V AC power source, integrating the fire suppression system for alarm, supervisory, and trouble monitoring, and installing HVAC damper interrupt relays to enable damper closure before agent discharge. The vendor must also commission the system, conduct training, and perform pre-tests and a final test with the base fire marshal. The installed system must be 100% compatible with the existing fire suppression equipment on-site.

The related federal contract opportunity, Solicitation Number FA282324QA042, is a pre-solicitation for this fire suppression system installation project, which the Air Force Test Center has been working on for approximately two years. Interested vendors capable of providing these services are requested to respond.

View the file

Other files

File Type Posted
DRAWINGS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5 August 2024

Government Technical Requirement Document (TRD)

Integration of the Fire Suppression System to the System in Building 90 for the Anechoic Chamber

Technical Requirement:

The government has a requirement to integrate the fire suppression system of the Anechoic Chamber to building system in Building 90. The performance window is 30 days from the award. with a guarantee that the work will be free from defects in materials and workmanship for a period of 12 months from the day it was done, provided normal usage and maintenance conditions are met as well as business instructions.

Connect Fire Alarm Panel to 120V AC power on a dedicated circuit Fire Suppression System is currently plumbed and charged o System needs to be Integrate into Building 90 for Alarm, Supervisory, and Trouble system.

o There are no door closers In Accordance With (IAW) the approved shop drawings.

HVAC dampers were installed and connected to supply and return, but interrupt relays are not present to enable closing the dampers before agent discharge.

o HVAC Dampers relays need to be purchase and install to enable closing the dampers before agent discharge.

Commission the system, Program the system, Preform a Pre-Test, Training of the System, and

Final Test with Base Fire Marshall.

The vendor must conduct an on-site fire suppression system training session.

Location B90 Eglin AFB, FL 32542

Government requirement is for a form, fit and function product to be connect to the building. The install required must be 100% compatible to on hand fire suppression system.