Fire Alarm System Replacement, Mountain Home AFB
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- FA489725R0008
- Agency
-
Air Combat Command
Air Force, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Mountain Home AFB, Idaho 83648, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Air Force Air Combat Command seeks design-build services to replace the antiquated fire alarm system at the Sagebrush Inn (Building 2320) at Mountain Home Air Force Base in Idaho with a new addressable Honeywell Silent Knight fire alarm system. The contract requires comprehensive design services including specifications, analysis, and construction scheduling, followed by construction services encompassing demolition, new installation, and system commissioning in accordance with Unified Facility Criteria and National Fire Protection Association standards. Contractors must demonstrate specialized technical competence by having a Fire Protection Engineer with Honeywell Fire Alarm systems knowledge, a senior electrical engineer, and an architectural engineer on staff or through an established relationship with an architecture and engineering firm. The evaluation will be based on three criteria: past performance (100 points), delivery timeline (10 points), and specialized technical competence (pass/fail), with award made to the lowest-priced offeror meeting minimum requirements, though the government reserves the right to select a higher-priced proposal within 10 percent of the lowest price if it demonstrates superior past performance or shorter duration. Proposals are due by 12:00 PM Mountain Time on January 28, 2026, with questions accepted until January 12, 2026, and a mandatory site visit scheduled for January 6, 2026.
This solicitation carries no set-aside designation and is open to all qualified contractors. The estimated project value ranges from $1,000,000 to $5,000,000, with a total period of performance of 407 calendar days from Notice to Proceed, consisting of a 212-day design phase, 180-day construction phase, and 15 days for demobilization and close-out. Construction is scheduled to begin no earlier than June 1, 2026, and the project must minimize disruption to Airmen occupants of the building by working one floor at a time. The work is classified under NAICS code 236220 (Commercial and Institutional Building Construction) with a small business size standard of $45 million in annual receipts. The place of performance is Mountain Home Air Force Base in Mountain Home, Idaho, with the building housing approximately 55 guests in temporary lodging capacity.
Notice text
9 versions
Update #9 · Latest ·
Amendment 0003 (04 in SAM)
-Solicitation has been extended one final time to allow adequate time for responses to RFI Responses (03)
-SOW has been updated to reflect responses to RFIs and site visit remarks.
-PSC has been updated.
-RFI Responses (03) has been uploaded.
The United States Government (USG) has a requirement for design-build services set forth under this contract at Mountain Home Air Force Base (MHAFB) to replace the antiquated fire alarm system at the Sagebrush Inn, building 2320, with a new addressable fire alarm system, as required by the Fire Prevention Engineer. The design-build services shall develop a complete design with supporting specifications, analysis (without hazardous material survey for asbestos and lead-based paints, as per the MHAFB environmental office.), and proposed construction project schedule; followed by construction services to include demolition; new installation, and commissioning fire alarm systems in accordance with Unified Facility Criteria (UFC); design drawings and specifications; and other design standards and guidance.
Building 2320 has an outdated fire alarm panel and devices which violate the Fire Code requirements. There are no replacement parts available for what is currently installed, which is driving the requirement for a replacement and upgraded system.
It is anticipated that the period of performance will be 407 calendar days from the Notice to Proceed. Design phase being limited to 212 days and construction phase to 180 with the remaining days being used for De-mobilization and Close-out.
Building 2320 will be occupied with Airmen and the everyday mission of those airmen should be minimally disrupted as much as possible. This project will be broken up into 3 phases. Phase 1 will be dedicated to the design of the project and result in the 65% design package being submitted to USG. At the same time the 65% design is delivered Phase 2, which is dedicated to construction, will kick off. Phase 3 will involve tasks finishing up construction, testing, demobilizing, etc.
See attachments below for all relevant documents.
For the proposal, all "if applicable" items shall be priced as if they are all applicable. Any proposals with these items not priced will be deemed unacceptable.
Site Visit:
A site visit for any interested parties will be held on January 6th, 2026 at 2:00 PM MST to walk through the facility and have any questions related to the design-build or technical aspects answered. This site visit is not mandatory, and all relevant questions will be recorded and posted to the solicitation after.
All interested parties will need to meet at the visitor's center at 1:30 PM local (MST) to acquire day passes if you do not have base access already. The visitor's center is located just north of the main gate, on the west side of the highway. If you stay to the right as you approach the base, you can turn into the visitor center's parking lot about 100ft before the manned gate. Attempting to enter the base without a pass will result in a lengthy delay. We will be leaving the visitor's center at 2:00 PM local time (MST).
Per the evaluation factors,
Questions must be submitted no later than 3:00 PM local (Mountain), Jan 12th, 2026
Proposals must be submitted no later than 12:00 PM local (Mountain), Jan 28th, 2026
Questions shall be directed to both POCs.
Update #8 ·
Amendment #3 (RFI's answered, SOW adjusted)
Additional drawings have been uploaded as PDF - "(09) B2320 Drawing"
No other drawings are available.
Construction start date: No earlier than 1 June, 2026
The incongruency between the SF1442 solicitation number and the number on SAM is an error we cannot fix. Submissions with the SF1442 solicitation number is correct. E-mails with either number will be accepted and responded to.
Contact info: The phone number for SSgt Smith was input incorrectly on the solicitation document. His contact number is 208-828-0743
The United States Government (USG) has a requirement for design-build services set forth under this contract at Mountain Home Air Force Base (MHAFB) to replace the antiquated fire alarm system at the Sagebrush Inn, building 2320, with a new addressable fire alarm system, as required by the Fire Prevention Engineer. The design-build services shall develop a complete design with supporting specifications, analysis (without hazardous material survey for asbestos and lead-based paints, as per the MHAFB environmental office.), and proposed construction project schedule; followed by construction services to include demolition; new installation, and commissioning fire alarm systems in accordance with Unified Facility Criteria (UFC); design drawings and specifications; and other design standards and guidance.
Building 2320 has an outdated fire alarm panel and devices which violate the Fire Code requirements. There are no replacement parts available for what is currently installed, which is driving the requirement for a replacement and upgraded system.
It is anticipated that the period of performance will be 407 calendar days from the Notice to Proceed. Design phase being limited to 212 days and construction phase to 180 with the remaining days being used for De-mobilization and Close-out.
Building 2320 will be occupied with Airmen and the everyday mission of those airmen should be minimally disrupted as much as possible. This project will be broken up into 3 phases. Phase 1 will be dedicated to the design of the project and result in the 65% design package being submitted to USG. At the same time the 65% design is delivered Phase 2, which is dedicated to construction, will kick off. Phase 3 will involve tasks finishing up construction, testing, demobilizing, etc.
See attachments below for all relevant documents.
For the proposal, all "if applicable" items shall be priced as if they are all applicable. Any proposals with these items not priced will be deemed unacceptable.
Site Visit:
A site visit for any interested parties will be held on January 6th, 2026 at 2:00 PM MST to walk through the facility and have any questions related to the design-build or technical aspects answered. This site visit is not mandatory, and all relevant questions will be recorded and posted to the solicitation after.
All interested parties will need to meet at the visitor's center at 1:30 PM local (MST) to acquire day passes if you do not have base access already. The visitor's center is located just north of the main gate, on the west side of the highway. If you stay to the right as you approach the base, you can turn into the visitor center's parking lot about 100ft before the manned gate. Attempting to enter the base without a pass will result in a lengthy delay. We will be leaving the visitor's center at 2:00 PM local time (MST).
Per the evaluation factors,
Questions must be submitted no later than 3:00 PM local (Mountain), Jan 12th, 2026
Proposals must be submitted no later than 3:00 PM local (Mountain), Jan 20th, 2026
Questions shall be directed to both POCs.
Update #7 ·
Amendment #2: (Clerical errors corrected on 04 Dec, 2025)
This solicitation has been extended in order to allow for sufficient time for any interested party to submit a proposal as well as attend a site visit.
Please see below for pertinent information.
RFIs: RFI responses will be uploaded as soon as possible, but are not ready yet. When the questions are uploaded, another amendment will likely follow to update evaluation factors. We want to make this solicitation as competitive as possible, so there will likely be changes to evaluation factors C
Nov 3rd Site Visit sign-in included in attachments
Additional CAD drawings are available upon request. SAM will not allow for uploading of these documents.
Construction start date: No earlier than 1 June, 2026
Contact info: The phone number for SSgt Smith was input incorrectly on the solicitation document. His contact number is 208-828-0743
Mountain Home AFB, Idaho has a NAF requirement for a design-build service to replace the antiquated fire alarm system at the Sagebrush Inn, building 2320, with a new addressable fire alarm system, as required by the Fire Prevention Engineer. The design-build services shall develop a complete design with supporting specifications, analysis (with hazardous material survey for asbestos and lead-based paints), and proposed construction project schedule; followed by construction services to include demolition (to include abatement of any asbestos and lead-based paint if present); new installation, and commissioning fire alarm systems in accordance with Unified Facility Criteria (UFC); design drawings and specifications; and other design standards and guidance.
Building 2320 has an outdated fire alarm panel and devices which violate the Fire Code requirements. There are no replacement parts available for what is currently installed, which is driving the requirement for a replacement and upgraded system.
It is anticipated that the period of performance will be 407 calendar days from the Notice to Proceed. Design phase being limited to 212 days and construction phase to 180 with the remaining days being used for De-mobilization and Close-out.
Building 2320 will be occupied with Airmen and the everyday mission of those airmen should be minimally disrupted as much as possible. This project will be broken up into 3 phases. Phase 1 will be dedicated to the design of the project and result in the 65% design package being submitted to USG. At the same time the 65% design is delivered Phase 2, which is dedicated to construction, will kick off. Phase 3 will involve tasks finishing up construction, testing, demobilizing, etc.
See attachments below for all relevant documents.
For the proposal, all "if applicable" items shall be priced as if they are all applicable. Any proposals with these items not priced will be deemed unacceptable.
Site Visit:
A site visit for any interested parties will be held on January 6th, 2026 at 2:00 PM MST to walk through the facility and have any questions related to the design-build or technical aspects answered. This site visit is not mandatory, and all relevant questions will be recorded and posted to the solicitation after.
All interested parties will need to meet at the visitor's center at 1330 local (MST) to acquire day passes if you do not have base access already. The visitor's center is located just north of the main gate, on the west side of the highway. If you stay to the right as you approach the base, you can turn into the visitor center's parking lot about 100ft before the manned gate. Attempting to enter the base without a pass will result in a lengthy delay. We will be leaving the visitor's center at 1400 local time (MST).
Per the evaluation factors,
Questions must be submitted no later than 3:00 PM local (Mountain), Jan 12th, 2026
Proposals must be submitted no later than 3:00 PM local (Mountain), Jan 20th, 2026
Questions shall be directed to both POCs.
Update #6 ·
Amendment #2:
This solicitation has been extended in order to allow for sufficient time for any interested party to submit a proposal as well as attend a site visit.
Please see below for pertinent information.
RFIs: RFI responses will be uploaded as soon as possible, but are not ready yet. When the questions are uploaded, another amendment will likely follow to update evaluation factors. We want to make this solicitation as competitive as possible, so there will likely be changes to evaluation factors C
Nov 3rd Site Visit sign-in included in attachments
Additional CAD drawings are available upon request. SAM will not allow for uploading of these documents.
Construction start date: No earlier than 1 June, 2026
Contact info: The phone number for SSgt Smith was input incorrectly on the solicitation document. His contact number is 208-828-0743
Mountain Home AFB, Idaho has a NAF requirement for a design-build service to replace the antiquated fire alarm system at the Sagebrush Inn, building 2320, with a new addressable fire alarm system, as required by the Fire Prevention Engineer. The design-build services shall develop a complete design with supporting specifications, analysis (with hazardous material survey for asbestos and lead-based paints), and proposed construction project schedule; followed by construction services to include demolition (to include abatement of any asbestos and lead-based paint if present); new installation, and commissioning fire alarm systems in accordance with Unified Facility Criteria (UFC); design drawings and specifications; and other design standards and guidance.
Building 2320 has an outdated fire alarm panel and devices which violate the Fire Code requirements. There are no replacement parts available for what is currently installed, which is driving the requirement for a replacement and upgraded system.
It is anticipated that the period of performance will be 407 calendar days from the Notice to Proceed. Design phase being limited to 212 days and construction phase to 180 with the remaining days being used for De-mobilization and Close-out.
Building 2320 will be occupied with Airmen and the everyday mission of those airmen should be minimally disrupted as much as possible. This project will be broken up into 3 phases. Phase 1 will be dedicated to the design of the project and result in the 65% design package being submitted to USG. At the same time the 65% design is delivered Phase 2, which is dedicated to construction, will kick off. Phase 3 will involve tasks finishing up construction, testing, demobilizing, etc.
See attachments below for all relevant documents.
For the proposal, all "if applicable" items shall be priced as if they are all applicable. Any proposals with these items not priced will be deemed unacceptable.
Site Visit:
A site visit for any interested parties will be held on January 6th, 2025 at 2:00 PM MST to walk through the facility and have any questions related to the design-build or technical aspects answered. This site visit is not mandatory, and all relevant questions will be recorded and posted to the solicitation after.
All interested parties will need to meet at the visitor's center at 1330 local (MST) to acquire day passes if you do not have base access already. The visitor's center is located just north of the main gate, on the west side of the highway. If you stay to the right as you approach the base, you can turn into the visitor center's parking lot about 100ft before the manned gate. Attempting to enter the base without a pass will result in a lengthy delay. We will be leaving the visitor's center at 1400 local time (MST).
Per the evaluation factors,
Questions must be submitted no later than 3:00 PM local (Mountain), Jan 12th, 2026
Proposals must be submitted no later than 3:00 PM local (Mountain), Jan 20th, 2026
Questions shall be directed to both POCs.
Update #5 ·
Notice:
Due to a number of RFIs and the government working to clarify the requirement, a new proposal due date, RFI due date, and a secondary site visit will be provided within the week. The new proposal due date will be no earlier than 05 Jan 2026.
Amendment:
RFIs: RFI responses uploaded as an attachment.
Site Visit: All interested parties will need to meet at the visitor's center at 1330 local (MST) to acquire day passes and we will go to the site afterwards. The visitor's center is located just north of the main gate, on the west side of the highway. If you stay to the right as you approach the base, you can turn into the visitor center's parking lot about 100ft before the manned gate. Attempting to enter the base without a pass will result in a lengthy delay. We will be leaving the visitor's center at 1400 local time (MST).
Idaho Contractor Registration: Removed this requirement.
Construction start date: No earlier than 1 June, 2026
Contact info: The phone number for SSgt Smith was input incorrectly. His phone contact number is 208-828-0743
Mountain Home AFB, Idaho has a NAF requirement for a design-build service to replace the antiquated fire alarm system at the Sagebrush Inn, building 2320, with a new addressable fire alarm system, as required by the Fire Prevention Engineer. The design-build services shall develop a complete design with supporting specifications, analysis (with hazardous material survey for asbestos and lead-based paints), and proposed construction project schedule; followed by construction services to include demolition (to include abatement of any asbestos and lead-based paint if present); new installation, and commissioning fire alarm systems in accordance with Unified Facility Criteria (UFC); design drawings and specifications; and other design standards and guidance.
Building 2320 has an outdated fire alarm panel and devices which violate the Fire Code requirements. There are no replacement parts available for what is currently installed, which is driving the requirement for a replacement and upgraded system.
It is anticipated that the period of performance will be 407 calendar days from the Notice to Proceed. Design phase being limited to 212 days and construction phase to 180 with the remaining days being used for De-mobilization and Close-out.
Building 2320 will be occupied with Airmen and the everyday mission of those airmen should be minimally disrupted as much as possible. This project will be broken up into 3 phases. Phase 1 will be dedicated to the design of the project and result in the 65% design package being submitted to USG. At the same time the 65% design is delivered Phase 2, which is dedicated to construction, will kick off. Phase 3 will involve tasks finishing up construction, testing, demobilizing, etc.
See attachments below for all relevant documents.
For the proposal, all "if applicable" items shall be priced as if they are all applicable. Any proposals with these items not priced will be deemed unacceptable.
A site visit for any interested parties will be held on November 3rd, 2025 at 2:00 PM MST to walk through the facility and have any questions related to the design-build or technical aspects answered. This site visit is not mandatory, and all relevant questions will be recorded and posted to the solicitation after.
Per the evaluation factors,
Questions must be submitted no later than 3:00 PM local (Mountain), Nov 17, 2025.
Proposals must be submitted no later than 3:00 PM local (Mountain), Dec 1, 2025.
Questions shall be directed to both POCs.
Update #4 ·
Amendment:
RFIs: RFI responses uploaded as an attachment.
Site Visit: All interested parties will need to meet at the visitor's center at 1330 local (MST) to acquire day passes and we will go to the site afterwards. The visitor's center is located just north of the main gate, on the west side of the highway. If you stay to the right as you approach the base, you can turn into the visitor center's parking lot about 100ft before the manned gate. Attempting to enter the base without a pass will result in a lengthy delay. We will be leaving the visitor's center at 1400 local time (MST).
Idaho Contractor Registration: Removed this requirement.
Construction start date: No earlier than 1 June, 2026
Contact info: The phone number for SSgt Smith was input incorrectly. His phone contact number is 208-828-0743
Mountain Home AFB, Idaho has a NAF requirement for a design-build service to replace the antiquated fire alarm system at the Sagebrush Inn, building 2320, with a new addressable fire alarm system, as required by the Fire Prevention Engineer. The design-build services shall develop a complete design with supporting specifications, analysis (with hazardous material survey for asbestos and lead-based paints), and proposed construction project schedule; followed by construction services to include demolition (to include abatement of any asbestos and lead-based paint if present); new installation, and commissioning fire alarm systems in accordance with Unified Facility Criteria (UFC); design drawings and specifications; and other design standards and guidance.
Building 2320 has an outdated fire alarm panel and devices which violate the Fire Code requirements. There are no replacement parts available for what is currently installed, which is driving the requirement for a replacement and upgraded system.
It is anticipated that the period of performance will be 407 calendar days from the Notice to Proceed. Design phase being limited to 212 days and construction phase to 180 with the remaining days being used for De-mobilization and Close-out.
Building 2320 will be occupied with Airmen and the everyday mission of those airmen should be minimally disrupted as much as possible. This project will be broken up into 3 phases. Phase 1 will be dedicated to the design of the project and result in the 65% design package being submitted to USG. At the same time the 65% design is delivered Phase 2, which is dedicated to construction, will kick off. Phase 3 will involve tasks finishing up construction, testing, demobilizing, etc.
See attachments below for all relevant documents.
For the proposal, all "if applicable" items shall be priced as if they are all applicable. Any proposals with these items not priced will be deemed unacceptable.
A site visit for any interested parties will be held on November 3rd, 2025 at 2:00 PM MST to walk through the facility and have any questions related to the design-build or technical aspects answered. This site visit is not mandatory, and all relevant questions will be recorded and posted to the solicitation after.
Per the evaluation factors,
Questions must be submitted no later than 3:00 PM local (Mountain), Nov 17, 2025.
Proposals must be submitted no later than 3:00 PM local (Mountain), Dec 1, 2025.
Questions shall be directed to both POCs.
Update #3 ·
Mountain Home AFB, Idaho has a NAF requirement for a design-build service to replace the antiquated fire alarm system at the Sagebrush Inn, building 2320, with a new addressable fire alarm system, as required by the Fire Prevention Engineer. The design-build services shall develop a complete design with supporting specifications, analysis (with hazardous material survey for asbestos and lead-based paints), and proposed construction project schedule; followed by construction services to include demolition (to include abatement of any asbestos and lead-based paint if present); new installation, and commissioning fire alarm systems in accordance with Unified Facility Criteria (UFC); design drawings and specifications; and other design standards and guidance.
Building 2320 has an outdated fire alarm panel and devices which violate the Fire Code requirements. There are no replacement parts available for what is currently installed, which is driving the requirement for a replacement and upgraded system.
It is anticipated that the period of performance will be 407 calendar days from the Notice to Proceed. Design phase being limited to 212 days and construction phase to 180 with the remaining days being used for De-mobilization and Close-out.
Building 2320 will be occupied with Airmen and the everyday mission of those airmen should be minimally disrupted as much as possible. This project will be broken up into 3 phases. Phase 1 will be dedicated to the design of the project and result in the 65% design package being submitted to USG. At the same time the 65% design is delivered Phase 2, which is dedicated to construction, will kick off. Phase 3 will involve tasks finishing up construction, testing, demobilizing, etc.
See attachments below for all relevant documents.
For the proposal, all "if applicable" items shall be priced as if they are all applicable. Any proposals with these items not priced will be deemed unacceptable.
A site visit for any interested parties will be held on November 3rd, 2025 at 2:00 PM MST to walk through the facility and have any questions related to the design-build or technical aspects answered. This site visit is not mandatory, and all relevant questions will be recorded and posted to the solicitation after.
Per the evaluation factors,
Questions must be submitted no later than 3:00 PM local (Mountain), Nov 17, 2025.
Proposals must be submitted no later than 3:00 PM local (Mountain), Dec 1, 2025.
Questions shall be directed to both POCs.
Update #2 ·
Mountain Home AFB, Idaho has a NAF requirement for a design-build service to replace the antiquated fire alarm system at the Sagebrush Inn, building 2320, with a new addressable fire alarm system, as required by the Fire Prevention Engineer. The design-build services shall develop a complete design with supporting specifications, analysis (with hazardous material survey for asbestos and lead-based paints), and proposed construction project schedule; followed by construction services to include demolition (to include abatement of any asbestos and lead-based paint if present); new installation, and commissioning fire alarm systems in accordance with Unified Facility Criteria (UFC); design drawings and specifications; and other design standards and guidance.
Building 2320 has an outdated fire alarm panel and devices which violate the Fire Code requirements. There are no replacement parts available for what is currently installed, which is driving the requirement for a replacement and upgraded system.
It is anticipated that the period of performance will be 407 calendar days from the Notice to Proceed. Design phase being limited to 212 days and construction phase to 180 with the remaining days being used for De-mobilization and Close-out.
Building 2320 will be occupied with Airmen and the everyday mission of those airmen should be minimally disrupted as much as possible. This project will be broken up into 3 phases. Phase 1 will be dedicated to the design of the project and result in the 65% design package being submitted to USG. At the same time the 65% design is delivered Phase 2, which is dedicated to construction, will kick off. Phase 3 will involve tasks finishing up construction, testing, demobilizing, etc.
See attachments below for all relevant documents.
For the proposal, all "if applicable" items shall be priced as if they are all applicable. Any proposals with these items not priced will be deemed unacceptable.
A site visit for any interested parties will be held on October 31st, 2025 at 2:00 PM MST to walk through the facility and have any questions related to the design-build or technical aspects answered. This site visit is not mandatory, and all relevant questions will be recorded and posted to the solicitation after.
Per the evaluation factors,
Questions must be submitted no later than 3:00 PM local (Mountain), Nov 17, 2025.
Proposals must be submitted no later than 3:00 PM local (Mountain), Dec 1, 2025.
Questions shall be directed to both POCs.
Update #1 ·
Mountain Home AFB, Idaho has a NAF requirement for a design-build service to replace the antiquated fire alarm system at the Sagebrush Inn, building 2320, with a new addressable fire alarm system, as required by the Fire Prevention Engineer. The design-build services shall develop a complete design with supporting specifications, analysis (with hazardous material survey for asbestos and lead-based paints), and proposed construction project schedule; followed by construction services to include demolition (to include abatement of any asbestos and lead-based paint if present); new installation, and commissioning fire alarm systems in accordance with Unified Facility Criteria (UFC); design drawings and specifications; and other design standards and guidance.
Building 2320 has an outdated fire alarm panel and devices which violate the Fire Code requirements. There are no replacement parts available for what is currently installed, which is driving the requirement for a replacement and upgraded system.
It is anticipated that the period of performance will be 407 calendar days from the Notice to Proceed. Design phase being limited to 212 days and construction phase to 180 with the remaining days being used for De-mobilization and Close-out.
Building 2320 will be occupied with Airmen and the everyday mission of those airmen should be minimally disrupted as much as possible. This project will be broken up into 3 phases. Phase 1 will be dedicated to the design of the project and result in the 65% design package being submitted to USG. At the same time the 65% design is delivered Phase 2, which is dedicated to construction, will kick off. Phase 3 will involve tasks finishing up construction, testing, demobilizing, etc.
See attachments below for all relevant documents.
For the proposal, all "if applicable" items shall be priced as if they are all applicable. Any proposals with these items not priced will be deemed unacceptable.
A site visit for any interested parties will be held on October 31st, 2025 at 2:00 PM MST to walk through the facility and have any questions related to the design-build or technical aspects answered. This site visit is not mandatory, and all relevant questions will be recorded and posted to the solicitation after.
Per the evaluation factors,
Questions must be submitted no later than 3:00 PM local (Mountain), Nov 7, 2025.
Proposals must be submitted no later than 3:00 PM local (Mountain), November 28, 2025.
Questions shall be directed to both POCs.
Files
Show all 29
Notice history
| Notice | Type | Posted |
|---|---|---|
| Fire Alarm System Replacement, Mountain Home AFB | Award Notice | |
| This notice | Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| 2-STEP SEALED BID - TINKER AFB WWYK250019 Remove and Replace Fire Sprinkler in Plasma Booth Dust Collectors and Replace the Building F/A System, B3221 | Air Force Sustainment Center | Total Small Business | |
| Fire Alarm/Suppression Inspection, Testing, and Maintenance | Air Force Research Laboratory | No set-aside | |
| SACN Replace Fire Alarms and Intrusions Systems | — | Total Small Business | |
| Fire alarm replacement IDIQ | Office of Acquisition Management | Total Small Business | |
| Z1DA--Upgrade Fire Alarm System Construction 676-22-110 | Veterans Integrated Service Network 12 | Service-Disabled Veteran-Owned Small Business |