Solicitation Amendment FA489726R00020003 SF 30.pdf
PDF 1 MB Posted
- Attached to
- Fire Alarm System Replacement, Mountain Home AFB
- Solicitation number
- FA489725R0008
About this file
This is an Amendment of Solicitation (Standard Form 30) for a NAF Fire Alarm Design-Build project. The solicitation (FA489726R0002) is being amended to extend the offer due date to 28 January 2026 at 12:00 MST, update the Statement of Work based on RFI responses and site visit remarks, add the most recent Davis Bacon Wage Determination, and adjust the Product Service Code to Z2FZ (Repair or Alteration of Other Residential Buildings).
The contract requires a design-build fire alarm system with specific technical competence requirements, including having a Fire Protection Engineer with Honeywell Fire Alarm system knowledge, a senior electrical engineer, and an architectural engineer. The evaluation criteria include 100 points for past performance, 10 points for delivery timeline, and a pass/fail assessment of specialized experience. Award will be made to the lowest offeror with acceptable specialized experience, a minimum past performance score of 20, and potentially a higher-scored proposal within 10% of the lowest price. A site visit is scheduled for 6 January 2026, questions are due by 12 January 2026, and proposals must be submitted by 28 January 2026. Construction is expected to begin no earlier than 1 June 2026.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The purpose of this modification is to extend the offeror due date to 28 January 2026 at 12:00 MST, update Block 14 (Description of Amendment/Modification):
the SOW in accordance to RFI responses and site visit remarks, add the most recent Davis Bacon Wage Determination to section J, and adjust the PSC to a more accurate code (Z2FZ, Repair or Alteration of Other Residential Buildings).
Additionally, the second site visit sign-in sheet along with answers/information provided during the site visit will be added to the SAM.gov solicitation.
Lastly, the government believes we have exhausted efforts to clarify/describe the requirements further and this will be the last extension and no other RFIs will be considered.
All other terms and conditions to remain the same.
Section A - Solicitation/Contract Form
The following modifications were made:
Information From To Product Service Code N063 Z2FZ Response Due Time 03:00 PM 12:00 PM Response Due Date 20 Jan 2026 28 Jan 2026
Section J - List of Attachments
Header Miscellaneous Text (Modified):
Attachments:
(02) Statement of Work plus attachments
(03) Justification and Approval for Brand Name purchase
(04) AEC Graphics Standard 2019
(05) USACE AECCAD Standard 2019
(06) USACE Advanced Modeling BIM/CIM Object Standard2019
(07) SDSFIE-V Specification Document 2016
(08) USACE Design Submission Requirements Manual 2009
(09) Upgrade Dormitory PDF
(10) B2320 Drawings
(11, 11-1) Air Force Forms 3000, 3064
(12) Davis-Bacon Act WD # ID20260020
Section M - Evaluation Factors for Award
Header Miscellaneous Text (Modified):
NAF Fire Alarm Design-Build
Evaluation Criteria
FA4897-25-R0008
EVALUATION
FA489726R00020003
1.Self-Evaluation
2. Evaluation Criteria
Each firm's proposal will be evaluated in accordance with the criteria below, which are based on the procedures found in FAR subpart36.6.
The evaluation criteria and points of each criterion is as follows:
a) Past Performance - 100 Points
b) Delivery Timeline - 10 Points
c) Specialized/Technical Competence - Pass/Fail
3. Award Selection
Total possible points - 110
1.Self-Evaluation
This evaluation will be self-graded by each offeror. Each evaluation must adequately show reasoning for the apparent scores, including CPARS reports, and any documentation for relevancy. Additional documentation related to the scored components of the evaluation will be accepted, but may not be evaluated if it is not deemed relevant. This documentation will not grant any offeror a competitive advantage or grant any additional points to the evaluation criteria.
2.Selection Criteria Descriptions
The evaluation criteria descriptions and the points described in 2.a are provided below:
[a.] (Maximum 100 points) Past performance on relevant contracts with government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules.
The Government will evaluate the past performance of the firm on its three most recent and relevant DoD or other contracts using Contractor Performance Assessment Rating System (CPARS) categories: Quality, Schedule, Cost Control, Management, and Regulatory (see provided table below for definitions). Each company may submit 3 projects for review. The government reserves the right to review additional CPARS to ensure recent and relevant contracts with poor ratings were not excluded in an attempt to buffer a companies score more than 1 full point. If this is found to be the case, the government may choose to disqualify that company. Each category will be rated with one of the following: Exceptional, Very Good, Satisfactory, Marginal, or Unsatisfactory (see provided table below for definitions and scores). Relevancy will also be rated on the same point scale as noted below.
Based on the ratings that have been assigned to each category, scores will be averaged, providing an average score between 0and 4. Points will then be assigned based on this average score. Any criteria not scored will not be included in the factoring a score.
Category: Definition:
Quality
Quality reflects the Contractor's management of the quality control program, as well as the quality of the work itself. Questions which should be addressed are as follows: Has a quality product been provided? For example:
- Ability to maintain quality control
- Ability to address and review comments
- Independent Technical Review
- Whether plans are coordinated with specifications
- Coordination between disciplines
- Compliance with design criteria
Schedule The timeliness of the Contractor against the completion of the contract, task orders, milestones, delivery schedules, and administrative requirements (e.g., efforts that contribute to or affect the schedule variance).
Cost Control
The Contractor's effectiveness in forecasting, managing, and controlling contract or order cost.
For contracts or orders where task or contract sizing is based upon contractor-provided person hour estimates, the relationship of these estimates to ultimate task cost should be assessed. In addition, the extent to which the Contractor demonstrates a sense of cost responsibility, through the efficient use of resources, in each work effort should be assessed.
Management
The integration and coordination of all activity needed to execute the contract or order, specifically the timeliness, completeness and quality of problem identification, corrective action plans, proposal submittals, the Contractor's history of reasonable and cooperative behavior (to include timely identification of issues in controversy), customer satisfaction, timely award and management of subcontracts.
Regulatory Compliance with all terms and conditions in the contract/order relating to applicable regulations and codes. Considering aspects of performance such as compliance with financial, environmental (example: Clean Air Act, Clean Water Act), safety, and labor regulations as well as any other reporting requirements in the contract terms and conditions.
Relevancy Firms have completed projects of similar magnitude with related aspects to this RFP's SOW.
Same-type projects with similar magnitude or similar projects are considered relevant.
Rating: Definition: Point Value:
Exceptional
Performance meets contractual requirements and exceeds many to the Government's benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective.
Very Good
Performance meets contractual requirements and exceeds some to the Government's benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the Contractor were effective.
Satisfactory Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the Contractor appear or were satisfactory.
Marginal
Performance does not meet some contractual requirements.
The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the Contractor has not yet identified corrective actions. The Contractor's proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the Contractor's corrective actions appear or were ineffective.
Relevancy: Point Value:
Design-Build Fire Alarm with similar magnitude 4
Design-Build Construction of Similar Magnitude 3
Fire Alarm Construction only of Similar Magnitude 2
Construction of Similar Magnitude 1
Non relevant or no CPARS 0
Example Calculation
Project #1 Project #2 Project #3
Quality Exceptional (4) Exceptional (4) Satisfactory (2)
Schedule Very Good (3) Very Good (3) Marginal (1)
Cost Control Satisfactory (2) Very Good (3) Satisfactory (2)
Management Marginal (1) Exceptional (4) Marginal (1)
Regulatory Unsatisfactory (0) Very Good (3) Satisfactory (2)
Relevancy (2) (4) (1)
Project Average 2 3.5 1.5
Past Performance Score = 2.33 (20pts)
0points - 0.0 < Past Performance Score < 2.0
5points - 2.0 Past Performance Score 2.1< <
10points - 2.1 < Past Performance Score 2.2<
15points - 2.2 < Past Performance Score 2.3<
20points - 2.3 < Past Performance Score 2.4<
25points - 2.4 < Past Performance Score 2.5<
30points - 2.5 < Past Performance Score 2.6<
35points - 2.6 < Past Performance Score 2.7<
40points - 2.7 < Past Performance Score 2.8<
45points - 2.8 < Past Performance Score 2.9<
50points - 2.9 < Past Performance Score 3.0<
55points - 3.0 < Past Performance Score 3.1<
60points - 3.1 < Past Performance Score 3.2<
65points - 3.2 < Past Performance Score 3.3<
70points - 3.3 < Past Performance Score 3.4<
75points - 3.4 < Past Performance Score 3.5<
80points - 3.5 < Past Performance Score 3.6<
85points - 3.6 < Past Performance Score 3.7<
90points - 3.7 < Past Performance Score 3.8<
95points - 3.8 < Past Performance Score 3.9<
100points - 3.9 < Past Performance Score 4.0<
TOTAL POINTS AWARDED:_______________________
[b.] (Maximum 10 points) Delivery Timeline. The proposed period of performance for the design-build project is faster than the government's estimated timeline.
Points will be assigned, per the below metric, for a proposed completion time that exceeds the governments estimated timeline.
For every day below the estimated period of performance (PoP), .05 points will be awarded, 20 days will net 1 point. (Ex. a proposed PoP of 270 days would result in 6.85 points. The maximum points would result in a PoP of 207 days.)
TOTAL POINTS AWARDED:_______________________
[c.] (Pass/Fail) Specialized experience and technical competence. The contractor has in-house capability or sub-contracted with an architect & engineering (A&E) firm with experience in Fire Alarm System design. The firm(s) must have at least- (one) Fire Protection Engineer with working knowledge of Honeywell Fire Alarm systems, (one) senior electrical engineer, and (one) architectural engineer. The proposal must also show that the prime or subs have completed at least 2 fire alarm system designs within the past 5 years (each sub must have completed at least one, with a total of 2 for the entire team), on either DoD installations or in the private sector.
The subcontracted firm's qualifications must be submitted along with the proposal. Qualifications must include the firm's name and the names/ qualifications of the members that will be working on the design, at a minimum. If the firm's capability cannot be reasonably established, the proposal will be considered non-responsive, and discussions will not be held to rectify the issue.
PASS / FAIL
3. Award Selection
The Award will be made to the lowest offeror with acceptable (pass) , and acceptable specialized experience and technical competence (minimum score of 20) . The government reserves the right to award to a higher priced, acceptable technical capability offeror with higher past performance scored past performance or shorter PoP if within 10% of the lowest priced offer.
An offer with a shorter PoP and higher price will not be considered if past performance shows that timeliness is not highly rated.
--- END OF EVALUATION CRITERIA---
Instructions.
Proposal files shall be submitted by e-mail. DoD SAFE may be used for sensitive documents, if applicable, if coordinated with the Contracting Officer sufficiently in advance of the due date and time for submission. No other method will be used for submission. Upon submission, notify the points of contact under the General Information section below in a separate e-mail. A response from a POC will be provided to inform you of receipt of the proposal.
Submit a complete proposal and the support documentation for the evaluation criteria (Ex. -Resumes, CPARS/PPQs, A&E Firm qualifications). Firms shall also use section M of this Request for Proposal document to self-evaluate under each selection criteria and total of points. Include the self-evaluation with the other support documentation or as part of the submitted 1442.
For any aspects of the proposal that do not have a set format requirement, any format will be accepted. The only format required is a minimum font size of 11 on 8.5x11" paper. Drawings that require additional space beyond 8.5x11" will be accepted.
The entire proposal is limited to 100 pages.
General Information.
Questions regarding this RFP must be submitted via email to:
Procuring Contracting Officer: cameron.smith.16@us.af.mil
Contracting Specialist: taylor.inman.1@us.af.mil
Reference the solicitation number and title in the email subject line.
A site visit will be held at 2:00 PM local (Mountain), January 6th, 2026
Questions must be submitted no later than 3:00 PM local (Mountain), January 12th, 2026.
Proposals must be submitted no later than 12:00 PM local (Mountain), January 28th, 2026.
Construction for this project will begin no earlier than 1 June, 2026
| SUMMARY OF CHANGES |
| Solicitation/Contract Form |
| List of Attachments |
| Evaluation Factors for Award |
| IDCode: J |
| Page: 1 |
| Pages: 8 |
| AmendNo: 0003 |
| EffDate: 14 Jan 2026 |
| ReqNo: |
| ProjNo: 26RN001 |
| IssCode: FA4897 |
| AdmCode: |
| IssuedBy: FA4897 366 CONS LGCP |
366 GUNFIGHTER ST STE 498, ADMINISTRATIVE ONLY NO REQUISITIONS
MOUNTAIN HOME AFB, ID 83648-5296
UNITED STATES
TAYLOR INMAN, Email: taylor.inman.1@us.af.mil Telephone: 728-0313 Cameron Smith, Email: cameron.smith.16@us.af.mil Telephone: 2088280743 AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: FA489726R0002 |
| SolDate: 16 Oct 2025 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: 1 |
| OffrNoEx: Off |
| NoCopies: 1 |
| ApprData: See Section G - Contract Administration Data |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: See Schedule |
| ContNameTitle: |
| CoNameTitle: Cameron A. Smith |
| ContDate: |
| CODate: 14 Jan 2026 |
File details come from the government source that posted it. Updated .