This document is a Construction Site Visit Minutes record for Solicitation No. FA4897138Q0006, dated 1/6/76, detailing key specifications and requirements for a construction project. The document provides critical installation guidelines for fire alarm systems, including panel placement restrictions (cannot be placed over expansion joints), and clarifies that permanent fixtures may be removed to accommodate panel installation, except for the electrical box.

The minutes also specify additional technical and procedural requirements, such as a 14-day completion window for patch and paint work on each floor, and flexibility in fire alarm strobe placement (wall or ceiling), with the mandate that old strobes/alarms must be patched and painted. The document includes two attendance tables listing participants from various companies and departments, suggesting this is a collaborative site visit involving multiple stakeholders in the construction process.

View the file

Other files

File Type Posted
Solicitation Amendment - FA489726R00020003.pdf PDF
Solicitation Amendment FA489726R00020003 SF 30.pdf PDF
02_Bldg 2320_SOW (Updated 14Jan26).pdf PDF
RFI Responses (3).xlsx XLSX spreadsheet
Panel Location Area (Images).pdf PDF
12_Davis-Bacon Act WD No.ID20260020.txt TXT text file
(10) B2320 Drawing.pdf PDF
RFI Responses (2).xlsx XLSX spreadsheet
(11) AF3064-example.pdf PDF
02_Bldg 2320_SOW (Updated).pdf PDF
(11-1) AF3000-Blank.pdf PDF
Solicitation Amendment FA489726R00020002 SF 30.pdf PDF
Solicitation Amendment - FA489726R00020002.pdf PDF
Solicitation Amendment - FA489726R00020002.pdf PDF
(10) Solicitation Amendment FA489726R00020001 SF 30.pdf PDF
Solicitation Amendment FA489726R00020002 SF 30.pdf PDF
09_UPGRADE DORMITORY.pdf PDF
Nov 3rd Site Visit Sign-In Sheet.pdf PDF
RFI Responses.pdf PDF
Solicitation Amendment FA489726R00020001 SF 30.pdf PDF
02_Bldg 2320_SOW.pdf PDF
05_USACE_AEC_Graphics_Standards_2019.pdf PDF
Solicitation - FA489726R0002.pdf PDF
06_USACE_Advanced_Modeling_BIMCIM_Object_Standard_2019.pdf PDF
04_USACE_AEC_CAD_Standard_2019.pdf PDF
07_SDSFIE_V_Specification_Document_2016.pdf PDF
03_Justification and Approval Fire Alarm Panels 17 Dec 21.pdf PDF
08_USACE_Design_Submission_Requirements_Manual_2009.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The fire alarm panel shall be in the designated location. Any permanent fixtures may be removed to allow the panel to be installed, except the electrical box. Cannot be placed over expansion joint.

The brand name is for standardization

The 14-day requirement has been clarified to “Patch and paint work must be completed for a floor to be considered complete, and must be completed within 14 days of all other work on that floor.”

Fire alarm strobes may be placed on wall or ceiling, and the old strobes/alarms must be patched/painted.

File details come from the government source that posted it. Updated .