ESG - New Mexico-Arizona (NM-AZ) Performance-Based Remediation (PBR)
Award Notice Posted
- Solicitation number
- FA8903-12-R-0050
- Agency
-
Air Force Installation Contracting Agency
Air Force Installation and Mission Support Center, Department of Defense
- Awarded
- to FPM Remediations, Inc.
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- FA890313C0008 Federal contract award
- NAICS code
- 562910 Remediation Services
- PSC
- Not on record
- Place of performance
- Cannon Afb Nm, Holloman Afb Nm, Kirtland Afb Nm, and Luke Afb Az, United States
Notice details come from SAM.gov. Updated .
Notice text
6 versions
Update #6 · Latest ·
This modification is being issued to post additional Q&As submitted.
******************************************
This modification is being issued to post the final set of Final RFP Q&As for the NM-AZ PBR.
******************************************
This modification is being issued to post additional Q&As for the NM-AZ PBR. The final set of Q&As will be posted tomorrow.
******************************************
This modification is being issued to post a Draft copy of the Revised SOO while the Revised SOO is undergoing business clearance for release. The changes have been highlighted in yellow for your convenience. Once we receive business clearance, the Draft copy will be made Final and posted here as Final. A synopsis of the changes are as follows:
"The MPO for three (3) of the sites have been revised and the time lengthened in which the contractor will have to achieve the MPOs. Five (5) of the MMRP sites will remain at an MPO of SC, but they will now have 5 years to achieve the MPO. Three (3) of the MMRP sites will change to an MPO of RC, but they will now have 7 years to achieve the MPO; these 3 sites are the ones with the largest acreage and more munitions to address."
At this time, we do not anticipate extending the proposal due date.
**************************************************
The 772d Enterprise Sourcing Squadron, Base Realignment and Closure Branch (772 ESS/PKJ), JBSA-Lackland AFB, TX 78236-9861, is issuing a Request for Proposal (RFP) for the NM-AZ PBR requirement. This is a major source selection for performance-based remediation in support of AFCEC and its customers on DoD installations in New Mexico (Cannon AFB, Holloman AFB, and Kirtland AFB) and Arizona (Luke AFB), United States.
The Air Force is required to implement remedies as necessary to protect human health and the environment. The intent of this PBR effort is to maximize the number of Site Closeouts (SCs) or advance sites as close to SC as practicable during the Period of Performance (POP) in a cost-effective manner for eighty-Eight (88) Installation Restoration Program (IRP) sites, and twenty-one (21) Military Munitions Response Program (MMRP) sites at the installations listed above. It is desirable to the Air Force that Life-Cycle Costs (LCC) be reduced.
Source selection procedures will be followed as prescribed in FAR part 15 and FAR supplements thereto. This procurement will be solicited as a Total Small Business Set-Aside. The resultant contract is contemplated to be a stand-alone "C" contract with a Firm-Fixed-Price (FFP) pricing arrangement. The Government anticipates awarding one (1) contract with a ROM of $35 - $42 million, and a POP of 120 months. The North American Industry Classification System (NAICS) Code for this Acquisition is 562910.
The cut-off time/date for questions is 1200 hrs CDT on 08 April 2013. Please submit questions to both POCs listed above.
This is the Final RFP with proposals due by 1600 hrs CDT on 29 April 2013.
Update #5 ·
This modification is being issued to post the final set of Final RFP Q&As for the NM-AZ PBR.
******************************************
This modification is being issued to post additional Q&As for the NM-AZ PBR. The final set of Q&As will be posted tomorrow.
******************************************
This modification is being issued to post a Draft copy of the Revised SOO while the Revised SOO is undergoing business clearance for release. The changes have been highlighted in yellow for your convenience. Once we receive business clearance, the Draft copy will be made Final and posted here as Final. A synopsis of the changes are as follows:
"The MPO for three (3) of the sites have been revised and the time lengthened in which the contractor will have to achieve the MPOs. Five (5) of the MMRP sites will remain at an MPO of SC, but they will now have 5 years to achieve the MPO. Three (3) of the MMRP sites will change to an MPO of RC, but they will now have 7 years to achieve the MPO; these 3 sites are the ones with the largest acreage and more munitions to address."
At this time, we do not anticipate extending the proposal due date.
**************************************************
The 772d Enterprise Sourcing Squadron, Base Realignment and Closure Branch (772 ESS/PKJ), JBSA-Lackland AFB, TX 78236-9861, is issuing a Request for Proposal (RFP) for the NM-AZ PBR requirement. This is a major source selection for performance-based remediation in support of AFCEC and its customers on DoD installations in New Mexico (Cannon AFB, Holloman AFB, and Kirtland AFB) and Arizona (Luke AFB), United States.
The Air Force is required to implement remedies as necessary to protect human health and the environment. The intent of this PBR effort is to maximize the number of Site Closeouts (SCs) or advance sites as close to SC as practicable during the Period of Performance (POP) in a cost-effective manner for eighty-Eight (88) Installation Restoration Program (IRP) sites, and twenty-one (21) Military Munitions Response Program (MMRP) sites at the installations listed above. It is desirable to the Air Force that Life-Cycle Costs (LCC) be reduced.
Source selection procedures will be followed as prescribed in FAR part 15 and FAR supplements thereto. This procurement will be solicited as a Total Small Business Set-Aside. The resultant contract is contemplated to be a stand-alone "C" contract with a Firm-Fixed-Price (FFP) pricing arrangement. The Government anticipates awarding one (1) contract with a ROM of $35 - $42 million, and a POP of 120 months. The North American Industry Classification System (NAICS) Code for this Acquisition is 562910.
The cut-off time/date for questions is 1200 hrs CDT on 08 April 2013. Please submit questions to both POCs listed above.
This is the Final RFP with proposals due by 1600 hrs CDT on 29 April 2013.
Update #4 ·
This modification is being issued to post additional Q&As for the NM-AZ PBR. The final set of Q&As will be posted tomorrow.
******************************************
This modification is being issued to post a Draft copy of the Revised SOO while the Revised SOO is undergoing business clearance for release. The changes have been highlighted in yellow for your convenience. Once we receive business clearance, the Draft copy will be made Final and posted here as Final. A synopsis of the changes are as follows:
"The MPO for three (3) of the sites have been revised and the time lengthened in which the contractor will have to achieve the MPOs. Five (5) of the MMRP sites will remain at an MPO of SC, but they will now have 5 years to achieve the MPO. Three (3) of the MMRP sites will change to an MPO of RC, but they will now have 7 years to achieve the MPO; these 3 sites are the ones with the largest acreage and more munitions to address."
At this time, we do not anticipate extending the proposal due date.
**************************************************
The 772d Enterprise Sourcing Squadron, Base Realignment and Closure Branch (772 ESS/PKJ), JBSA-Lackland AFB, TX 78236-9861, is issuing a Request for Proposal (RFP) for the NM-AZ PBR requirement. This is a major source selection for performance-based remediation in support of AFCEC and its customers on DoD installations in New Mexico (Cannon AFB, Holloman AFB, and Kirtland AFB) and Arizona (Luke AFB), United States.
The Air Force is required to implement remedies as necessary to protect human health and the environment. The intent of this PBR effort is to maximize the number of Site Closeouts (SCs) or advance sites as close to SC as practicable during the Period of Performance (POP) in a cost-effective manner for eighty-Eight (88) Installation Restoration Program (IRP) sites, and twenty-one (21) Military Munitions Response Program (MMRP) sites at the installations listed above. It is desirable to the Air Force that Life-Cycle Costs (LCC) be reduced.
Source selection procedures will be followed as prescribed in FAR part 15 and FAR supplements thereto. This procurement will be solicited as a Total Small Business Set-Aside. The resultant contract is contemplated to be a stand-alone "C" contract with a Firm-Fixed-Price (FFP) pricing arrangement. The Government anticipates awarding one (1) contract with a ROM of $35 - $42 million, and a POP of 120 months. The North American Industry Classification System (NAICS) Code for this Acquisition is 562910.
The cut-off time/date for questions is 1200 hrs CDT on 08 April 2013. Please submit questions to both POCs listed above.
This is the Final RFP with proposals due by 1600 hrs CDT on 29 April 2013.
This modification is being issued to post Final Revision 1 SOO (NOTE: Draft Revision 1 SOO was posted on 04 April 2013). The changes have been highlighted in yellow for your convenience. An additional synopsis of the changes are as follows:
These 3 sites were moved from achieve SC in 3 years to achieve RC in 7 years.
. FI857: Former Bunker
. ML866: Former Bombing Range
. SR867: Possible Firing Range
These 5 sites had the MPO changed from achieve SC in 3 years to achieve SC in 5 years.
. TS851: Former Skeet Range
. XU853: Missile Test Stands Area
. XU854: Able 51 Area
. SR858: Former Small Arms Range
. SR863: 1000 Inch Range
At this time, we do not anticipate extending the proposal due date.
Update #3 ·
This modification is being issued to post Final Revision 1 SOO (NOTE: Draft Revision 1 SOO was posted on 04 April 2013). The changes have been highlighted in yellow for your convenience. An additional synopsis of the changes are as follows:
These 3 sites were moved from achieve SC in 3 years to achieve RC in 7 years.
. FI857: Former Bunker
. ML866: Former Bombing Range
. SR867: Possible Firing Range
These 5 sites had the MPO changed from achieve SC in 3 years to achieve SC in 5 years.
. TS851: Former Skeet Range
. XU853: Missile Test Stands Area
. XU854: Able 51 Area
. SR858: Former Small Arms Range
. SR863: 1000 Inch Range
At this time, we do not anticipate extending the proposal due date.
Update #2 ·
This modification is being issued to post a Draft copy of the Revised SOO while the Revised SOO is undergoing business clearance for release. The changes have been highlighted in yellow for your convenience. Once we receive business clearance, the Draft copy will be made Final and posted here as Final. A synopsis of the changes are as follows:
"The MPO for three (3) of the sites have been revised and the time lengthened in which the contractor will have to achieve the MPOs. Five (5) of the MMRP sites will remain at an MPO of SC, but they will now have 5 years to achieve the MPO. Three (3) of the MMRP sites will change to an MPO of RC, but they will now have 7 years to achieve the MPO; these 3 sites are the ones with the largest acreage and more munitions to address."
At this time, we do not anticipate extending the proposal due date.
**************************************************
The 772d Enterprise Sourcing Squadron, Base Realignment and Closure Branch (772 ESS/PKJ), JBSA-Lackland AFB, TX 78236-9861, is issuing a Request for Proposal (RFP) for the NM-AZ PBR requirement. This is a major source selection for performance-based remediation in support of AFCEC and its customers on DoD installations in New Mexico (Cannon AFB, Holloman AFB, and Kirtland AFB) and Arizona (Luke AFB), United States.
The Air Force is required to implement remedies as necessary to protect human health and the environment. The intent of this PBR effort is to maximize the number of Site Closeouts (SCs) or advance sites as close to SC as practicable during the Period of Performance (POP) in a cost-effective manner for eighty-Eight (88) Installation Restoration Program (IRP) sites, and twenty-one (21) Military Munitions Response Program (MMRP) sites at the installations listed above. It is desirable to the Air Force that Life-Cycle Costs (LCC) be reduced.
Source selection procedures will be followed as prescribed in FAR part 15 and FAR supplements thereto. This procurement will be solicited as a Total Small Business Set-Aside. The resultant contract is contemplated to be a stand-alone "C" contract with a Firm-Fixed-Price (FFP) pricing arrangement. The Government anticipates awarding one (1) contract with a ROM of $35 - $42 million, and a POP of 120 months. The North American Industry Classification System (NAICS) Code for this Acquisition is 562910.
The cut-off time/date for questions is 1200 hrs CDT on 08 April 2013. Please submit questions to both POCs listed above.
This is the Final RFP with proposals due by 1600 hrs CDT on 29 April 2013.
Update #1 ·
The 772d Enterprise Sourcing Squadron, Base Realignment and Closure Branch (772 ESS/PKJ), JBSA-Lackland AFB, TX 78236-9861, is issuing a Request for Proposal (RFP) for the NM-AZ PBR requirement. This is a major source selection for performance-based remediation in support of AFCEC and its customers on DoD installations in New Mexico (Cannon AFB, Holloman AFB, and Kirtland AFB) and Arizona (Luke AFB), United States.
The Air Force is required to implement remedies as necessary to protect human health and the environment. The intent of this PBR effort is to maximize the number of Site Closeouts (SCs) or advance sites as close to SC as practicable during the Period of Performance (POP) in a cost-effective manner for eighty-Eight (88) Installation Restoration Program (IRP) sites, and twenty-one (21) Military Munitions Response Program (MMRP) sites at the installations listed above. It is desirable to the Air Force that Life-Cycle Costs (LCC) be reduced.
Source selection procedures will be followed as prescribed in FAR part 15 and FAR supplements thereto. This procurement will be solicited as a Total Small Business Set-Aside. The resultant contract is contemplated to be a stand-alone "C" contract with a Firm-Fixed-Price (FFP) pricing arrangement. The Government anticipates awarding one (1) contract with a ROM of $35 - $42 million, and a POP of 120 months. The North American Industry Classification System (NAICS) Code for this Acquisition is 562910.
The cut-off time/date for questions is 1200 hrs CDT on 08 April 2013. Please submit questions to both POCs listed above.
This is the Final RFP with proposals due by 1600 hrs CDT on 29 April 2013.
Files
| File | Type | Posted |
|---|---|---|
| NM-AZ_PBR_Final_RFP_Q A_041713.doc | DOC document | |
| NM-AZ_PBR_Final_RFP_Q As_041613.doc | DOC document | |
| NM-AZ_PBR_Final_RFP_Q As.doc | DOC document | |
| FA8903-12-R-0050_0001.pdf | ||
| QA_4Apr2013.docx | DOCX document | |
| QA_2Apr2013.docx | DOCX document | |
| NM-AZ_PBR_Atch_1_SOO_Revision_1_DRAFT_-_03_Apr_13.doc | DOC document | |
| QA_2Apr2013.docx | DOCX document | |
| Attachment_L-4_Subcontractor_Consent_Letter_Sample.doc | DOC document | |
| NM-AZ_PBR_Final_RFP_28_Mar_2013.pdf | ||
| RFP_FA8903-12-R-0050_Sched_B_-_Word_Doc.doc | DOC document | |
| Attachment_L-3_Past_Performance_Questionnaire.doc | DOC document | |
| NM-AZ_PBR_Final_SECTION_M_Evaluation_Criteria_11_Mar_13.doc | DOC document | |
| Attachment_L-2_MilestonePaymentSchedule_with_price_19_Mar_13.xls | XLS spreadsheet | |
| Attachment_L-1_MilestonePaymentSchedule_without_price.xls | XLS spreadsheet | |
| Attachment_L-5_Client_Authorization_Letter_Sample_NM-AZ.doc | DOC document | |
| Attachment_L-6_CLIN_MPS_IMS_Guidance_Template_and_SubCLIN_Structure_NM-AZ_PBR_19_Mar_13.doc | DOC document |
Show all 17
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Award Notice | |
| ESG - New Mexico - Arizona Performance-Based Remediation (PBR) | Award Notice | |
| New Mexico-Arizona (NM-AZ) Performance Based Remediation (PBR) - Cannon, Holloman, Kirtland and Luke AFBs | Award Notice |