Environmental Control Units (ECUs)

Award Notice Posted

Solicitation number
N68335-17-R-0094
Agency
Awarded
to Snowbird Technologies Inc.
Set-aside
Total Small Business

Opportunity facts

Contract number
N6833518D0017 Federal IDV award
PSC
Not on record
Place of performance
Nawcad Contracts Department Attn: Mr. Keith Welge, Code 2.5.2.1.1 HWY 547, Bldg 562-3 Joint Base MDL, New Jersey 08733, United States

Notice details come from SAM.gov. Updated .

Notice text

14 versions

Update #14 · Latest ·

AMENDMENT 06
52.204-8 Annual Representations and Certifications has been corrected to read:

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is NAICS 333415.


(2) The small business size standard is 1,250 employees.

.

Update #13 ·

Added: Aug 18, 2017 2:13 pm AMENDMENT 06
52.204-8 Annual Representations and Certifications has been corrected to read:  

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is NAICS 333415.


        (2) The small business size standard is 1,250 employees.

Update #12 ·

AMENDMENT 05

All ECU Specification Control/Vendor Item Control drawings shall have the following note: "Identification of the Suggested Source(s) of Supply hereon is not to be construed as a guarantee of present of continued availability as a source of supply of the item(s)."


Specification Control/Vendor Item Control drawings permit alternative sources of supply than those listed on the drawing provided the item meets the specifications detailed on the drawing. When proposing alternative source items the manufacturer's name and part number shall be provided.


For Source Control Drawings, an additional source not listed will need to conform to form, fit, and function and the Offeror must provide the details and, if applicable, test results that fully indicates the proposed item is an adequate source. Additionally, the Offeror must be cognizant of and comply with ECU performance requirements as detailed in the "General Requirements and Test Specification For A/E 32C-45A Environment Control Unit" found on sheet 4 of the 1559AS400 drawing (and in the WORD DOC entitled "General Requirement and Test Specification for ECU (July2010)" found in the Data Package). Any Source Control Drawing part substitution shall not have adverse impact on ECU performance which is to be demonstrated as part of Preproduction and Individual Acceptance Testing. The Offeror must also identify the manufacturer and applicable part number for the additional source.


The proposal must include information evidencing the form, fit, and function/interchangeability of the proposed substitute components, this information should be separately attached to the Technical Volume of the proposal and will not count against the 15 page limit provided in Section L of the Solicitation for the Technical Volume.

.

Update #11 ·

Added: Aug 09, 2017 4:00 pm AMENDMENT 05

All ECU Specification Control/Vendor Item Control drawings shall have the following note:  "Identification of the Suggested Source(s) of Supply hereon is not to be construed as a guarantee of present of continued availability as a source of supply of the item(s)." 


Specification Control/Vendor Item Control drawings permit alternative sources of supply than those listed on the drawing provided the item meets the specifications detailed on the drawing.  When proposing alternative source items the manufacturer's name and part number shall be provided.


For Source Control Drawings, an additional source not listed will need to conform to form, fit, and function and the Offeror must provide the details and, if applicable, test results that fully indicates the proposed item is an adequate source.  Additionally, the Offeror must be cognizant of and comply with ECU performance requirements as detailed in the "General Requirements and Test Specification For A/E 32C-45A Environment Control Unit" found on sheet 4 of the 1559AS400 drawing (and in the WORD DOC entitled "General Requirement and Test Specification for ECU (July2010)" found in the Data Package). Any Source Control Drawing part substitution shall not have adverse impact on ECU performance which is to be demonstrated as part of Preproduction and Individual Acceptance Testing.  The Offeror must also identify the manufacturer and applicable part number for the additional source.


The proposal must include information evidencing the form, fit, and function/interchangeability of the proposed substitute components, this information should be separately attached to the Technical Volume of the proposal and will not count against the 15 page limit provided in Section L of the Solicitation for the Technical Volume.

Update #10 ·


AMENDMENT 04


This is to confirm that in accordance with SOW paragraph 3.2 offerors are permitted to propose an alternate source (i.e. source other than those listed in the Solicitation (including the Solicitation Amendments and drawings)) for any component if the substitute components are detailed in the proposal and are form, fit, and function interchangeable with the components listed in the Solicitation. Those firms submitting substitute components that are form, fit, and function interchangeable with the components listed in the Solicitation will not be disqualified or negatively evaluated.

.

Update #9 ·

Added: Aug 01, 2017 2:50 pm  

AMENDMENT 04


This is to confirm that in accordance with SOW paragraph 3.2 offerors are permitted to propose an alternate source (i.e. source other than those listed in the Solicitation (including the Solicitation Amendments and drawings)) for any component if the substitute components are detailed in the proposal and are form, fit, and function interchangeable with the components listed in the Solicitation.  Those firms submitting substitute components that are form, fit, and function interchangeable with the components listed in the Solicitation will not be disqualified or negatively evaluated.

Update #8 ·

AMENDMENT 03
The purpose of this amendment is to update the following information:

From:
12. 1559AS525-1/2. Source Control Drawing: Current end item OEM purchases the impellers from Hightech and is then modified. There are NSNs for these items, namely 4140-01-592-4133 and 4140-01-592-4132.


Is changed to:
12. 1559AS525-1/2. Source Control Drawing: Current end item OEM purchases the impellers from Hi-Tech Blowers and is then modified. There are NSNs for these items, namely 4140-01-592-4133 and 4140-01-592-4132.

.

Update #7 ·

Added: Jul 14, 2017 12:38 pm AMENDMENT 03
The purpose of this amendment is to update the following information: 

From:
12. 1559AS525-1/2.  Source Control Drawing: Current end item OEM purchases the impellers from Hightech and is then modified.  There are NSNs for these items, namely 4140-01-592-4133 and 4140-01-592-4132.


Is changed to:
12. 1559AS525-1/2.  Source Control Drawing: Current end item OEM purchases the impellers from Hi-Tech Blowers and is then modified.  There are NSNs for these items, namely 4140-01-592-4133 and 4140-01-592-4132.

Update #6 ·

AMENDMENT 02

The purpose of this amendment is to (A) extend the proposal due date, (B) announce ECU viewing, (C) attach a placeholder for the Technical Manual and (D) provide NSNs for selected drawings/part numbers:


(A) The proposal due date has been extended from 26 July 2017 to 07 September 2017.


(B) VIEWING: An opportunity to view the ECU will be provided on 10 August 2017 between 12:30 and 15:00. The ECU will have the side and back panels removed. Photographs of the ECU may be taken. The ECU will not be operated. As this is a competitive solicitation no questions about the ECU or the solicitation will be entertained or answered. The location for the viewing will be at Joint Base MDL at MALS 49. Interested parties should contact Keith Welge (keith.welge@navy.mil) no later than 27 July 2017 for restrictions and access information.


(C) ATTACHMENT: The Technical Manual placeholder has been added as an attachment.


(D) NATIONAL STOCK NUMBERS


1. 1559AS438-1: Source Control Drawing: Current end item OEM purchases the coil blank from Heatcraft Refrigeration Products and is then modified. There is a NSN 4130-01-592-2294.


2. 1559AS439-1: Source Control Drawing: Current end item OEM purchases the coil blank from Heatcraft Refrigeration Products and modified. There is a NSN 4130-01-592-2480.


3. 1559AS237-1. Specification Control Drawing: Current end item OEM purchases the heating element blank from Warren Technologies and then is modified. There is a NSN 4520-01-592-2684.


4. 1559AS445-1. Specification Control Drawing: Current end item OEM purchases the valve from WILSPEC and is then modified. Next higher assembly PN 1559AS444-1 has a NSN 4820-01-593-4934.


5. 1559AS500-1. Source Control Drawing: Current end item OEM manufactures this item. There is a NSN 5945-01-592-3379.


6. 1559AS521-1. Source Control Drawing: Current end item OEM fabricates item formed from sheet metal. Drawing has most details necessary to fabricate the item and other manufacturers can use the drawing as a basic guide for the dimensions and either reverse engineer or produce a Waiver/Deviation to the drawing to ensure form, fit, and function.


7. 1559AS531-1. Source Control Drawing: Current end item OEM fabricates item formed from sheet metal. Drawing has most details necessary to fabricate the item and other manufacturers can use the drawing as a basic guide for the dimensions and either reverse engineer or produce a Waiver/Deviation to the drawing to ensure form, fit, and function.


8. 1559AS596-1. Source Control Drawing: Current end item OEM makes this thermostat specifically for this end item. If an alternative is proposed then it needs to be demonstrated that it functions properly.


9. 1559AS529-1. Source Control Drawing: Current end item OEM purchases the motor from Fasco and is then modified. There is a NSN 6105-01-592-4134.


10. 1559AS548-1. Source Control Drawing: Current end item OEM purchases the motor from Fasco and is then modified. There is a NSN 6105-01-592-2582.


11. 1559AS430-1. Source Control Drawing: Current end item OEM purchases the compressor from Copeland via special part number for this unit that is configured with rotolock fittings. There is a NSN 4130-01-592-2303.


12. 1559AS525-1/2. Source Control Drawing: Current end item OEM purchases the impellers from Hightech and is then modified. There are NSNs for these items, namely 4140-01-592-4133 and 4140-01-592-4132.


All other terms and conditions remain unchanged.


The Government Point of Contact is: Keith Welge


keith.welge@navy.mil


(732) 323-7213

.

Update #5 ·

Added: Jul 10, 2017 3:29 pm AMENDMENT 02

The purpose of this amendment is to (A) extend the proposal due date, (B) announce ECU viewing, (C) attach a placeholder for the Technical Manual and (D) provide NSNs for selected drawings/part numbers:


(A) The proposal due date has been extended from 26 July 2017 to 07 September 2017.


(B) VIEWING:  An opportunity to view the ECU will be provided on 10 August 2017 between 12:30 and 15:00.  The ECU will have the side and back panels removed.  Photographs of the ECU may be taken.  The ECU will not be operated.  As this is a competitive solicitation no questions about the ECU or the solicitation will be entertained or answered.  The location for the viewing will be at Joint Base MDL at MALS 49.  Interested parties should contact Keith Welge (keith.welge@navy.mil) no later than 27 July 2017 for restrictions and access information.


(C) ATTACHMENT:  The Technical Manual placeholder has been added as an attachment.


(D) NATIONAL STOCK NUMBERS


1.  1559AS438-1: Source Control Drawing: Current end item OEM purchases the coil blank from Heatcraft Refrigeration Products and is then modified.  There is a NSN 4130-01-592-2294.


2. 1559AS439-1: Source Control Drawing: Current end item OEM purchases the coil blank from Heatcraft Refrigeration Products and modified.  There is a NSN 4130-01-592-2480.


3. 1559AS237-1. Specification Control Drawing: Current end item OEM purchases the heating element blank from Warren Technologies and then is modified.  There is a NSN 4520-01-592-2684.


4. 1559AS445-1. Specification Control Drawing:  Current end item OEM purchases the valve from WILSPEC and is then modified.  Next higher assembly PN 1559AS444-1 has a NSN 4820-01-593-4934.


5. 1559AS500-1. Source Control Drawing:  Current end item OEM manufactures this item.  There is a NSN 5945-01-592-3379.


6. 1559AS521-1. Source Control Drawing: Current end item OEM fabricates item formed from sheet metal.  Drawing has most details necessary to fabricate the item and other manufacturers can use the drawing as a basic guide for the dimensions and either reverse engineer or produce a Waiver/Deviation to the drawing to ensure form, fit, and function.


7. 1559AS531-1.  Source Control Drawing: Current end item OEM fabricates item formed from sheet metal.  Drawing has most details necessary to fabricate the item and other manufacturers can use the drawing as a basic guide for the dimensions and either reverse engineer or produce a Waiver/Deviation to the drawing to ensure form, fit, and function.


8. 1559AS596-1. Source Control Drawing: Current end item OEM makes this thermostat specifically for this end item.  If an alternative is proposed then it needs to be demonstrated that it functions properly.


9. 1559AS529-1. Source Control Drawing: Current end item OEM purchases the motor from Fasco and is then modified.  There is a NSN 6105-01-592-4134.


10. 1559AS548-1. Source Control Drawing: Current end item OEM purchases the motor from Fasco and is then modified.  There is a NSN 6105-01-592-2582.


11. 1559AS430-1. Source Control Drawing: Current end item OEM purchases the compressor from Copeland via special part number for this unit that is configured with rotolock fittings.  There is a NSN 4130-01-592-2303.


12. 1559AS525-1/2.  Source Control Drawing: Current end item OEM purchases the impellers from Hightech and is then modified.  There are NSNs for these items, namely 4140-01-592-4133 and 4140-01-592-4132.


All other terms and conditions remain unchanged.


The Government Point of Contact is:   Keith Welge


                                                            keith.welge@navy.mil


                                                            (732) 323-7213

Update #4 ·

AMENDMENT 1
NOTE: This solicitation for the Environmental Control Units is on hold for an indeterminate period of time while the data package is being reviewed. Updates for this solicitation will be posted on FBO.gov.


VIEWING: The viewing of the ECU has been cancelled.

.

Update #3 ·

Added: Jun 19, 2017 12:57 pm

AMENDMENT 1

NOTE:
  This solicitation for the Environmental Control Units is on hold for an indeterminate period of time while the data package is being reviewed.  Updates for this solicitation will be posted on FBO.gov.


VIEWING:  The viewing of the ECU has been cancelled.

Update #2 ·

The Environmental Control Units (ECUs) are to be installed in Mobile Facilities (MFs). The MF is a mobile habitable shelter that is eight (8) feet wide by twenty (20) feet long by eight (8) feet high. The ECU is a heat pump that provides heating or cooling to maintain the MF at a suitable temperature for the inhabitants and the equipment installed in the shelter. Operationally, MFs are setup in a complex austere expeditionary environment.


NOTE: A Drawing Package will be provided separately on a CD-ROM.


VIEWING: An opportunity to view the ECU will be provided on 20 June 2017 between 13:00 and 15:00. The ECU will not be opened or dismantled. The ECU will not be operated. As this is a competitive solicitation no questions about the ECU or the solicitation will be entertained or answered. The location for the viewing will be at Joint Base MDL in Lakehurst, NJ. Interested parties should contact Keith Welge (keith.welge@navy.mil) no later than 14 June 2017 for restrictions and access information.

.

Update #1 ·

Added: Jun 07, 2017 9:01 am

The Environmental Control Units (ECUs) are to be installed in Mobile Facilities (MFs).  The MF is a mobile habitable shelter that is eight (8) feet wide by twenty (20) feet long by eight (8) feet high.  The ECU is a heat pump that provides heating or cooling to maintain the MF at a suitable temperature for the inhabitants and the equipment installed in the shelter.  Operationally, MFs are setup in a complex austere expeditionary environment. 


NOTE:  A Drawing Package will be provided separately on a CD-ROM.


VIEWING:  An opportunity to view the ECU will be provided on 20 June 2017 between 13:00 and 15:00.  The ECU will not be opened or dismantled.  The ECU will not be operated.  As this is a competitive solicitation no questions about the ECU or the solicitation will be entertained or answered.  The location for the viewing will be at Joint Base MDL in Lakehurst, NJ.  Interested parties should contact Keith Welge (keith.welge@navy.mil) no later than 14 June 2017 for restrictions and access information. 

Files

File Type Posted
Technical_Manual_Placeholder.docx DOCX document
CDRLs_A001-A008.PDF PDF
CDRLs_L001-L003.PDF PDF
General_Requirement_and_Test_Specification_for_ECU_030617.docx DOCX document
ECU_Logistics_Statement_of_Work_2017.doc DOC document
N68335-17-R-0094.docx DOCX document
ECU_2017_Contract_SOW_030617.docx DOCX document

Notice history

Notice Type Posted
This notice Latest Award Notice
Environmental Control Units (ECUs) Original Award Notice

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity