N68335-17-R-0094.docx
DOCX document 177 KB Posted
- Attached to
- Environmental Control Units (ECUs)
- Solicitation number
- N68335-17-R-0094
About this file
N68335-17-R-0094 Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Technical_Manual_Placeholder.docx | DOCX document | |
| General_Requirement_and_Test_Specification_for_ECU_030617.docx | DOCX document | |
| ECU_Logistics_Statement_of_Work_2017.doc | DOC document | |
| ECU_2017_Contract_SOW_030617.docx | DOCX document | |
| CDRLs_A001-A008.PDF | ||
| CDRLs_L001-L003.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N6833517R0094
Section A - Solicitation/Contract Form
SECTION A
The Government Contracts Point of Contact is:
Mr. Keith Welge
CODE: 2.5.2.1.1
Phone: (732) 323-7213 Email: keith.welge@navy.mil
| Mail Proposals to: | NAWCAD Contracts Department | |
| Attn: Mr. Keith Welge, Code 2.5.2.1.1 | ||
| HWY 547, BLDG 562-3 | ||
| Joint Base MDL, NJ 08733-5000 |
In accordance with Section L, sealed offers with original and three (3) copies of the Technical and Past Performance Volumes and one (1) copy of the Price/Cost Volume for furnishing the supplies or services in the Schedule are due by 4:00 PM Eastern Time on July 26, 2017. Proposals are not to be submitted via facsimile or electronically via e-mail.
NOTE: Attachment 4, Drawing Package 1559AS400-1, will be provided separately on a CD-ROM.
VIEWING: An opportunity to view the ECU will be provided on 20 June 2017 between 13:00 and 15:00. The ECU will not be opened or dismantled. The ECU will not be operated. As this is a competitive solicitation no questions about the ECU or the solicitation will be entertained or answered. The location for the viewing will be at Joint Base MDL in Lakehurst, NJ. Interested parties should contact Keith Welge (keith.welge@navy.mil) no later than 14 June 2017 for restrictions and access information.
ADDITIONAL ITEMS OF NOTE:
1. THE ISSUEANCE OF PRODUCTION DELIVERY ORDERS AND RELEASE FOR PRODUCTION ARE SEPARATE EVENTS. BOTH MUST HAVE OCCURRED BEFORE PRODUCTION MAY COMMENCE. IN NO CASE WILL RELEASE FOR PRODUCTION BE GRANTED PRIOR TO SUCCESSFUL COMPLETION OF FIRST ARTICLE TEST (fat) UNIT TESTING AND TECHNICAL EVALUATION.
2. PILOT PRODUCTION UNITS (PPUs) ARE SEPARATE FROM PRODUCTION UNITS AND WILL NOT BE COUNTED AS PRODUCTION UNITS.
3. BOTH PILOT PRODUCTION UNITS (CLIN 0001) SHALL BE DUE 90 DAYS AFTER RECEIPT OF ORDER FOR THE COMMENCEMENT OF CONTRACTOR PILOT PRODUCTION UNITS QUALIFICATION TESTING IN ACCORDANCE WITH THE STATEMENT OF WORK.
4. DELIVERY ORDERS FOR THE PILOT PRODUCTION UNITS AND DATA ITEMS MAY BE ISSUED FROM THE DATE OF AWARD THROUGH GOVERNMENT RELEASE FOR PRODUCTION.
DELIVERY ORDERS FOR PRODUCTION YEAR ONE (CLIN 0101) MAY BE ISSUED FROM GOVERNMENT RELEASE FOR PRODUCTION THROUGH 365 DAYS AFTER GOVERNMENT RELEASE FOR PRODUCTION.
DELIVERY ORDERS FOR PRODUCTION YEAR TWO (CLIN 0201) MAY BE ISSUED FROM GOVERNMENT RELEASE FOR PRODUCTION THROUGH 730 DAYS AFTER GOVERNMENT RELEASE FOR PRODUCTION.
DELIVERY ORDERS FOR PRODUCTION YEAR THREE (CLIN 0301) MAY BE ISSUED FROM GOVERNMENT RELEASE FOR PRODUCTION THROUGH 1,095 DAYS AFTER GOVERNMENT RELEASE FOR PRODUCTION.
DELIVERY ORDERS FOR PRODUCTION YEAR FOUR (CLIN 0401) MAY BE ISSUED FROM GOVERNMENT RELEASE FOR PRODUCTION THROUGH 1,460 DAYS AFTER GOVERNMENT RELEASE FOR PRODUCTION.
DELIVERY ORDERS FOR PRODUCTION YEAR FIVE (CLIN 0501) MAY BE ISSUED FROM GOVERNMENT RELEASE FOR PRODUCTION THROUGH 1,825 DAYS AFTER GOVERNMENT RELEASE FOR PRODUCTION.
Section B - Supplies or Services and Prices
INFORMATIONAL NOTE
The minimum order for this contract is two (2) each CLIN 0001 Pilot Production Units (PPUs) Environmental Control Unit (ECUs).
The maximum order for this contract is 1,000 ECU Production units (CLINs 0101,0201, 0301, 0401 & 0501) and associated data items (CLINs 0002-0012, 0102-0107, 0202-0207, 0302-0307, 0402-0407 & 0502-0507).
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2 |
| Each |
Pilot Production Unit (PPU) ECU
FFP
Pilot Production Units (PPUs) for functional testing in accordance with Section J, Attachment 1, "Statement of Work (SOW) for the A/E 32C-45A Environmental Control Units (ECU)" dated July 2016; Attachment 2, "Integrated Logistics Support SOW"; Attachment 3, "General Requirement and Test Specification"; and Exhibits A and L "DD Form 1423, Contract Data Requirements List" FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Program Schedule
IAW SOW Paragraph 3.1 and Exhibit A, CDRL A001
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Bill of Materials
IAW SOW Paragraph 3.2 / 3.3 and Exhibit A, CDRL A002
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Test Plan
IAW SOW Paragraph 3.4 and Exhibit A, CDRL A003
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Test Report
IAW SOW Paragraph 3.6 and Exhibit A, CDRL A004
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Meeting Minutes
IAW SOW Paragraph 3.3 and Exhibit A, CDRL A005
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Engineering Change Proposal (ECP)
IAW SOW Paragraph 3.9 and Exhibit A, CDRL A006
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Request for Deviation (RFD)
IAW SOW Paragraph 3.9 and Exhibit A, CDRL A007
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Request for Waiver (RFW)
IAW SOW Paragraph 3.9 and Exhibit A, CDRL A008
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Design Change Notice
IAW Integrated Logistics Support SOW Paragraph 2.3 and Exhibit B, CDRL L001
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Technical Manual Changes
IAW Integrated Logistics Support SOW Paragraph 2.1 and Exhibit B, CDRL L002
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Item Unique Identifier (IUID)
IAW Integrated Logistics Support SOW Paragraph 2.6 and Exhibit B, CDRL L003
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 200 |
| Each |
ECU Production Unit (Production Year 1)
ECU Production Unit (Production Year One (1)) in accordance with Statement of Work (SOW) Paragraph 1.1, 4.4 and Integrated Logistics Support SOW.
1-20 EA
21-50 EA
51-75 EA
76-100 EA
101-200 EA
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Program Schedule
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Engineering Change Proposal (ECP)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Request for Deviation (RFD)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Request for Waiver (RFW)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Design Change Notice
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Technical Manual Changes
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 200 |
| Each |
ECU Production Unit (Production Year 2)
ECU Production Unit (Production Year Two (2)) in accordance with Statement of Work (SOW) Paragraph 1.1, 4.4 and Integrated Logistics Support SOW.
1-20 EA
21-50 EA
51-75 EA
76-100 EA
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Program Schedule
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Engineering Change Proposal (ECP)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Request for Deviation (RFD)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Request for Waiver (RFW)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Design Change Notice
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Technical Manual Changes
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 200 |
| Each |
ECU Production Unit (Production Year 3)
ECU Production Unit (Production Year Three (3)) in accordance with Statement of Work (SOW) Paragraph 1.1, 4.4 and Integrated Logistics Support SOW.
1-20 EA
21-50 EA
51-75 EA
76-100 EA
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Program Schedule
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Engineering Change Proposal (ECP)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Request for Deviation (RFD)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Request for Waiver (RFW)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Design Change Notice
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Technical Manual Changes
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 200 |
| Each |
ECU Production Unit (Production Year 4)
ECU Production Unit (Production Year Four (4)) in accordance with Statement of Work (SOW) Paragraph 1.1, 4.4 and Integrated Logistics Support SOW.
1-20 EA
21-50 EA
51-75 EA
76-100 EA
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Program Schedule
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Engineering Change Proposal (ECP)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Request for Deviation (RFD)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Request for Waiver (RFW)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Design Change Notice
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Technical Manual Changes
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 200 |
| Each |
ECU Production Unit (Production Year 5)
ECU Production Unit (Production Year Five (5)) in accordance with Statement of Work (SOW) Paragraph 1.1, 4.4 and Integrated Logistics Support SOW.
1-20 EA
21-50 EA
51-75 EA
76-100 EA
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Program Schedule
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Engineering Change Proposal (ECP)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Request for Deviation (RFD)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Request for Waiver (RFW)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Design Change Notice
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Technical Manual Changes
NET AMT
Section C - Descriptions and Specifications
STATEMENT OF WORK
Manufacturing and Delivery of A/E32C-45A Environmental Control Units (ECU) Statement of Work (SOW) July 2016
1.0 Introduction
1.0 Scope:
This acquisition is structured for the contractor to identify parts obsolescence and integrity of the drawing package prior to full production We intend to procure two (2) Pilot Production Units (PPUs) for functional testing by the contractor. In the process of producing the PPUs, the contractor will be responsible to identify part substitutions and provide technical information to support the substitutions as defined below. At the completion of the two PPUs, the contractor will be responsible to conduct and document a functional test to insure the unit still meets its top performance requirements as per Enclosure (1). With the successful completion of the test program, the government will provide a release for production for the units awarded through the life of the contract. The ECU shall be manufactured in accordance with a government data package and Enclosure (1). Any modifications of the data package shall meet the General Requirement and Test Specification for A/E32C-45A.
1.1 Purpose:
This SOW defines and describes the requirements for the contractor to manufacture A/E32C-45A ECU’s in accordance with government drawing package (3003) 1559AS400-1. Delivery of the PPUs is required within 90 Days After Contract (DAC) award. The evaluation will last for a period of 90 days. Upon approval of the test report and Release for Production, the Government may place orders for the first production year. Another four ordering years will be available to place orders beyond that. Delivery shall be 120 Days After Receipt of Order (ARO).
1.2 Objective:
Contractor shall provide a design that satisfies requirements of SOW, Logistics Support SOW and Enclosure (1).
1.3 Background:
NAVAIR is seeking to procure ECU’s to be installed in Mobile Facilities (MF’s). The MF is a mobile habitable shelter that is 8 feet wide by 20 feet long by 8 feet high. The ECU is a heat pump that provides heating and cooling to maintain the MF at a suitable temperature for the inhabitants and the equipment installed in the shelter. Operationally, MF’s are setup in a complex austere expeditionary environment. The ECU will take standard 60Hz utility power from either a plant grid or Mobile Electric Power Plant (MEPP), a diesel engine driven generator set.
2.0 Applicable Documents:
a. Drawing Package (3003) 1559AS400-1, which defines the manufacturing and assembly of the ECU.
b. Manual NAVAIR _17-1-573, Operation and Maintenance with Illustrated Parts Breakdown.
c. Enclosure (1) General Requirement and Test Specification for A/E32C-45A ECU.
3.0 Task Requirements:
3.1 Program schedule: Within 30 DAC, a program schedule will be delivered in accordance with CDRL A001. The program schedule will outline all steps in the manufacturing, testing and delivery of the ECU.
3.2 Bill of Materials: Within 60 DAC, a complete bill of materials will be delivered in accordance with CDRL A002. The bill of materials will be based on the components listed in the drawing package and shall list the drawing numbers, part numbers and vendors for all purchased parts as listed on the drawings. If the drawing’s suggested source will be used no further information is needed. If an alternate source for any component is proposed that are form, fit, and function interchangeable with the parts on the drawings, the list shall be annotated with the alternate vendor and part number, reason for substitution and catalog specification sheet and other supporting information showing interchangeability. Alternate parts that are not form, fit, and function substitutes will not be accepted unless the part from suggested source is no longer available and no interchangeable part can be found after reasonable research. In this case, the bill of materials shall be annotated as such and in addition to the information described above, all other changes necessary to use the substitute shall be provided. Identification of these changes shall be through ‘redline’ mark-ups of all drawings as well as mark-up of the technical manual pages affected by the substitution.
3.3 Technical Interchange Meetings: The government intends to conduct at least two technical interchange meetings prior to the manufacturing of the PPUs. The first will be the Post Award Conference occurring on or about 30 DAC. The purpose of the meeting will be to review the drawing package to address any questions and concerns on the performance of the contract. The second meeting will be held after the delivery of CDRL A002 to review the parts substitution and address any issues and concerns with the bill of materials. The contractor will be responsible for hosting the meeting (approximately 5 government attendees), preparing any review material and for recording and delivering the minutes of the meeting in accordance with CDRL A005.
3.4 Acceptance Test Plan: Within 60 DAC, an acceptance test plan shall be provided in accordance with CDRL A003. This data item shall describe each of the tests/inspections that are needed to demonstrate that the PPUs meet all the top performance requirements outlined in Enclosure (1). The test plan shall include all check lists, data sheets and procedures to perform the inspections and functional tests. The plan shall also list all equipment and measurement tools (with calibration certifications as required) that will be used during testing. Note: This test plan will be used for production testing/inspections for acceptance of each production unit.
3.5 PPU Testing: Within 90 DAC, the contractor shall have two PPUs ready for inspection and testing as per Enclosure (1) and demonstration in accordance with the acceptance test plan. The contractor shall notify the government at least 14 days prior to the test event to allow for witnessing of the event. PPUs will remain with the contractor and all testing will be performed at the contractor’s location.
3.6 PPU Testing Report: Within 180 DAC a test report shall be delivered in accordance with CDRL A004. The test report shall document the results of all testing. If any failures occurred during the testing the contractor shall provide a detailed description of the failure, steps taken to correct it, any changes to the unit design that will be necessary to correct the underlying cause of failure (this information can be communicated through mark-ups of the drawing package and or technical manual) and results of the retest.
3.7 Release for production: With approval of the test report, the government shall release the contractor to begin the production of any production units that may be ordered under the contract. Prior to this, all purchase of materials and manufacturing shall be at the contractor’s expense and risk. Delivery of Production Units, if ordered, shall be made within 120 days after receipt of order provided that release for production has been authorized. Each unit shall be subjected to the subset of production tests/inspections as identified in CDRL A003. Test report and completed data sheets for each unit shall be maintained at the contractor’s facility and delivered in accordance with CDRL A003 30 days after the delivery of the last production unit.
3.8 Preservation/Packaging and Marking:
Preservation: No additional preservation is required to the manufactured end article prior to packing.
Packing: Each unit is to be packed in a skidded, wood box conforming to ASTM D6251, type III, class 1 with the following additional requirements:
· Box is to be completely demountable using fasteners described in ASTM D6251.
· Units shall be secured properly to the base of the box.
· Units are to be packed individually and strapped together as sets of two for shipping.
· Acceptance Test Report shall be placed in envelope and attached to each production unit.
Marking: Each item marked shall be in accordance with MIL-STD-130N, Military Marking for Shipment and Storage current at the date of award. Units and Linear Bar Code marking for individual units are detailed on ID Plate drawing 1559AS593.
3.9 Configuration Control: (CDRLs A006, A007, A008): The contractor shall submit Engineering Change Proposals (ECPs), see CDRL A006, and all minor, major and critical Request for Deviation/Waiver (see CDRLs A007 and A008). The procuring activity will assume configuration control of the ECU.
3.10 Quality Assurance: The contractor shall continually manage and improve the quality of all products and services delivered under this contract and the processes by which they are realized. The system used by the contractor to manage quality shall be compliant with all requirements of, and at a minimum be functionally equal to, a current version of the ANSI/ISO/ASQ Q9001-2008 compliance. The Government shall have access, for review and analysis purposes, to contractor QMS documents; raw data that have not been subjected to processing or any other manipulation; summarized, tabularized, or graphical depictions of the data; and records under this contract.
3.11 Unique Identification Requirement: Unique Identification (UID) is a Department of Defense (DoD) program that will enable easy access to information about DoD possessions that will make acquisition, repair, and deployment of items faster and more efficient. In accordance with DFARS Clause 252.211-7003 Item Identification and valuation, the contractor is required to mark and register all end items and their components meeting the requirements called out in MIL-STD-130M. UID Data is encoded into Data Matrix symbols that are applied directly to parts. The UID for these items shall be created in accordance with NAVAIR drawings and MIL-STD-130M. UID plates will be located in accordance with the NAVAIR drawings.
| 3.11.1 | UID Registration. The prime Contractor has the responsibility to furnish IUID data to the IUID registry. Data submission of IUID data and acquisition cost should be submitted via Wide Area Work Flow (WAWF), IUID XML file, IUID flat file or web entry. Additional information regarding data submission as well as the actual marking can be found at <http://www.acq.osd.mil/dpap/pdi/uid/index.html>. |
| 3.11.2 | UID Records. The Contractor shall maintain an accurate, current list of IUIDs for all manufactured items on this contract. This shall be supplied to the Government periodically and upon request. The list shall include Part Number, Serial #, CAGE, IUID Location, Construct used, how it was marked and the registration method used. If a third party is utilized they shall be identified. |
Section D - Packaging and Marking
CLAUSES INCORPORATED BY FULL TEXT
| 5252.223-9502 | HAZARDOUS MATERIAL (NAVAIR) (APR 2009) |
| (a) Packaging, Packing, Marking, Labeling and Certification of Hazardous materials for shipment by any mode or combination of transportation modes shall be prepared (properly classed, described, packaged, marked, labeled, transport vehicle placarded, etc.) for shipment in accordance with MIL-STD-129 and Title 49 Code of Federal Regulations (CFR), Part 100-199 as applicable. In the event of any contradictions between the documents, 49 CFR shall govern or the applicable modal transport regulation. | |
| (b) In the event of a conflict between specific requirements in the contract or order and existing applicable modal transport regulations, the regulations shall take precedence. Under no circumstances shall the contractor knowingly use materials, markings or procedures that are not in accordance with laws and regulations applicable to the mode of transportation employed. | |
| (c) To ascertain which Department of Defense, or local installation regulations, concerning hazardous materials may have impact on this contract, the contractor should contact: |
Paul Mahon, Hazardous Material Manager
(732) 323-5319 Route 547, Building 5 Joint Base MDL, NJ 08733-5000
| 5252.247-9503 | MARKING OF WARRANTED ITEMS (NAVAIR) (OCT 2005) | |
| (a) Each item covered by a warranty shall be stamped or marked in accordance with MIL-STD-129, Marking for Shipment and Storage, and MIL-STD-130, Identification Marking of U.S. Military Property, current at the date of award. Where this is impracticable, written notice shall be attached to or furnished with the warranted item. | ||
| (b) Each item covered by a warranty shall have a written notice attached to or furnished with the warranted item, and marked with the following: | ||
| (1) National stock number or manufacturer's part number. | ||
| (2) Serial number or other item identifier (if the warranty applies to uniquely identified items). | ||
| (3) Contract number. | ||
| (4) Indication that a warranty applies. | ||
| (5) Manufacturer or entity (if other than the contractor) providing the warranty. | ||
| (6) Date or time when the warranty expires. | ||
| (7) Indication of whether or not attempted on-site repair by Government personnel will void the warranty. |
| 5252.247-9507 | PACKAGING AND MARKING OF REPORTS (NAVAIR)(OCT 2005) | |
| (a) All unclassified data shall be prepared for shipment in accordance with best commercial practice. Classified reports, data and documentation, if any, shall be prepared for shipment in accordance with the National Industry Security Program Operating Manual, DoD 5220.22-M. | ||
| (b) The contractor shall prominently display on the cover of each report the following information: | ||
| (1) Name and business address of contractor. | ||
| (2) Contract Number/Delivery/Task order number. | ||
| (3) Contract/Delivery/Task order dollar amount. | ||
| (4) Whether the contract was competitively or non-competitively awarded. | ||
| (5) Name of sponsoring individual. | ||
| (6) Name and address of requiring activity. |
| 5252.247-9508 | PROHIBITED PACKING MATERIALS (NAVAIR)(JUN 1998) |
| The use of asbestos, excelsior, newspaper or shredded paper (all types including waxed paper, computer paper and similar hydroscopic or non-neutral material) is prohibited. In addition, loose fill polystyrene is prohibited for shipboard use. |
| 5252.247-9514 | TECHNICAL DATA PACKING INSTRUCTIONS (NAVAIR)(SEP 1999) |
| Technical Data and Information shall be packed and packaged for domestic shipment in accordance with best commercial practices. The package or envelope should be clearly marked with any special markings specified in this contract (or delivery/task order), e.g., Contract Number, CLIN, Device No., and document title must be on the outside of the package. Classified reports, data and documentation, if applicable, shall be prepared for shipment in accordance with Defense Industrial Manual for Safeguarding Classified Information, DoD 5220.22M. |
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
| CLIN |
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| 0001 |
| Destination |
| Government |
| Destination |
| Government |
| 0002 |
| Destination |
| Government |
| Destination |
| Government |
| 0003 |
| Destination |
| Government |
| Destination |
| Government |
| 0004 |
| Destination |
| Government |
| Destination |
| Government |
| 0005 |
| Destination |
| Government |
| Destination |
| Government |
| 0006 |
| Destination |
| Government |
| Destination |
| Government |
| 0007 |
| Destination |
| Government |
| Destination |
| Government |
| 0008 |
| Destination |
| Government |
| Destination |
| Government |
| 0009 |
| Destination |
| Government |
| Destination |
| Government |
| 0010 |
| Destination |
| Government |
| Destination |
| Government |
| 0011 |
| Destination |
| Government |
| Destination |
| Government |
| 0012 |
| Destination |
| Government |
| Destination |
| Government |
| 0101 |
| Origin |
| Government |
| Origin |
| Government |
| 0102 |
| Destination |
| Government |
| Destination |
| Government |
| 0103 |
| Destination |
| Government |
| Destination |
| Government |
| 0104 |
| Destination |
| Government |
| Destination |
| Government |
| 0105 |
| Destination |
| Government |
| Destination |
| Government |
| 0106 |
| Destination |
| Government |
| Destination |
| Government |
| 0107 |
| Destination |
| Government |
| Destination |
| Government |
| 0201 |
| Origin |
| Government |
| Origin |
| Government |
| 0202 |
| Destination |
| Government |
| Destination |
| Government |
| 0203 |
| Destination |
| Government |
| Destination |
| Government |
| 0204 |
| Destination |
| Government |
| Destination |
| Government |
| 0205 |
| Destination |
| Government |
| Destination |
| Government |
| 0206 |
| Destination |
| Government |
| Destination |
| Government |
| 0207 |
| Destination |
| Government |
| Destination |
| Government |
| 0301 |
| Origin |
| Government |
| Origin |
| Government |
| 0302 |
| Destination |
| Government |
| Destination |
| Government |
| 0303 |
| Destination |
| Government |
| Destination |
| Government |
| 0304 |
| Destination |
| Government |
| Destination |
| Government |
| 0305 |
| Destination |
| Government |
| Destination |
| Government |
| 0306 |
| Destination |
| Government |
| Destination |
| Government |
| 0307 |
| Destination |
| Government |
| Destination |
| Government |
| 0401 |
| Origin |
| Government |
| Origin |
| Government |
| 0402 |
| Destination |
| Government |
| Destination |
| Government |
| 0403 |
| Destination |
| Government |
| Destination |
| Government |
| 0404 |
| Destination |
| Government |
| Destination |
| Government |
| 0405 |
| Destination |
| Government |
| Destination |
| Government |
| 0406 |
| Destination |
| Government |
| Destination |
| Government |
| 0407 |
| Destination |
| Government |
| Destination |
| Government |
| 0501 |
| Origin |
| Government |
| Origin |
| Government |
| 0502 |
| Destination |
| Government |
| Destination |
| Government |
| 0503 |
| Destination |
| Government |
| Destination |
| Government |
| 0504 |
| Destination |
| Government |
| Destination |
| Government |
| 0505 |
| Destination |
| Government |
| Destination |
| Government |
| 0506 |
| Destination |
| Government |
| Destination |
| Government |
| 0507 |
| Destination |
| Government |
| Destination |
| Government |
CLAUSES INCORPORATED BY REFERENCE
| 52.246-2 |
| Inspection Of Supplies--Fixed Price |
| AUG 1996 |
| 52.246-16 |
| Responsibility For Supplies |
| APR 1984 |
| 252.246-7000 |
| Material Inspection And Receiving Report |
| MAR 2008 |
| 5252.246-9512 | INSPECTION AND ACCEPTANCE (NAVAIR)(OCT 2005) |
| (a) Inspection and acceptance of the supplies or services to be furnished hereunder shall be performed by [insert the accepting authority]. | |
| (b) Acceptance of all Contract Line Items/Sub Line Items (CLINs/SLINs) shall be made by signature of the accepting authority on a DD 250 submitted through the WAWF system. Acceptance will only occur when the accepting authority is sure that inspections performed demonstrate compliance with contract requirements. |
| 5252.246-9514 | INSPECTION AND ACCEPTANCE OF TECHNICAL DATA AND INFORMATION (NAVAIR)(FEB 1995) |
| Inspection and acceptance of technical data and information will be performed by the Procuring Contracting Officer (PCO) or his duly authorized representative. Inspection of technical data and information will be performed by ensuring successful completion of the requirements set forth in the DD Form 1423, Contract Data Requirements List (CDRL) and incorporation/resolution of Government review comments on the data items. Acceptance will be evidenced by execution of an unconditional DD Form 250, Material Inspection and Receiving Report, as appropriate, and/or upon receipt of a second endorsement acceptance by the PCO on the attachment to this contract entitled [insert title of attachment, e.g., NAWCTSD 4330/60 Data Item Transmittal/Acceptance/ Rejection Form]. The attached form will not be used for high cost data such as drawings, specifications, and technical manuals. |
Section F - Deliveries or Performance
| 52.211-17 |
| Delivery of Excess Quantities |
| SEP 1989 |
| 52.242-15 |
| Stop-Work Order |
| AUG 1989 |
| 52.242-17 |
| Government Delay Of Work |
| APR 1984 |
| 52.247-34 |
| F.O.B. Destination |
| NOV 1991 |
| 52.211-8 | TIME OF DELIVERY (JUN 1997) | |
| (a) The Government requires delivery to be made according to the following schedule: | ||
| REQUIRED DELIVERY SCHEDULE |
| ITEM NUMBER |
| MAX QTY |
| WITHIN DATE AFTER DELIVERY ORDER |
| DELIVERY ADDRESS |
| 0001 |
| 2 Each |
| Contractor Pilot Production Unit (PPU) Testing shall commence within 90 days After Date of Contract (ADC) in accordance with (IAW) FAR 52.209-3. |
The draft Pilot Production Unit Acceptance Test Plan shall be submitted within 60 days ADC IAW CDRL A003.
The Pilot Production Unit Test Report shall be submitted within 180 days ADC IAW CDRL A004.
(Pilot Production Units are separate from production units and will not be counted as production units.)
PPU Testing at Contractor’s facility
After PPU testing ship to:
MCLB BDG 814
RADFORD BLVD
BLDG 1230 BAY 1 (M94631)
ALBANY, GA 31704-5000
JAY CLANTON 229-639-9060
FOB: Destination
| 0002-0012 |
| 1 Lot |
| In accordance with the applicable Contract Data Requirements List (CDRL), DD Form 1423, Exhibits A and L. |
In accordance with the applicable Contract Data Requirements List (CDRL), DD Form 1423, Exhibits A and L.
FOB: Destination.
| 0101 |
| 200 Each Max |
| Production Year One ECUs, if ordered, delivery shall be made within 120 DAYS ARO, provided that release for production has been authorized. |
Production Year One shall be from Government Release for Production through 365 days after Government Release for Production.
MCLB BDG 814
RADFORD BLVD
BLDG 1230 BAY 1 (M94631)
ALBANY, GA 31704-5000
JAY CLANTON 229-639-9060
FOB: Destination
| 0102-0107 |
| 1 Lot |
| In accordance with the applicable Contract Data Requirements List (CDRL), DD Form 1423, Exhibits A and L. |
In accordance with the applicable Contract Data Requirements List (CDRL), DD Form 1423, Exhibits A and L.
| 0201 |
| 200 Each Max |
| Production Year Two ECUs, if ordered, delivery shall be made within 120 DAYS ARO, provided that release for production has been authorized. |
Production Year Two shall be from Government Release for Production through 730 days after Government Release for Production.
MCLB BDG 814
RADFORD BLVD
BLDG 1230 BAY 1 (M94631)
ALBANY, GA 31704-5000
JAY CLANTON 229-639-9060
FOB: Destination
| 0202-0207 |
| 1 Lot |
| In accordance with the applicable Contract Data Requirements List (CDRL), DD Form 1423, Exhibits A and L. |
In accordance with the applicable Contract Data Requirements List (CDRL), DD Form 1423, Exhibits A and L.
| 0301 |
| 200 Each Max |
| Production Year Three ECUs, if ordered, delivery shall be made within 120 DAYS ARO, provided that release for production has been authorized. |
Production Year Three shall be from Government Release for Production through 1095 days after Government Release for Production.
MCLB BDG 814
RADFORD BLVD
BLDG 1230 BAY 1 (M94631)
ALBANY, GA 31704-5000
JAY CLANTON 229-639-9060
FOB: Destination
| 0302-0307 |
| 1 Lot |
| In accordance with the applicable Contract Data Requirements List (CDRL), DD Form 1423, Exhibits A and L. |
In accordance with the applicable Contract Data Requirements List (CDRL), DD Form 1423, Exhibits A and L.
| 0401 |
| 200 Each Max |
| Production Year Four ECUs, if ordered, delivery shall be made within 120 DAYS ARO, provided that release for production has been authorized. |
Production Year Four shall be from Government Release for Production through 1460 days after Government Release for Production.
MCLB BDG 814
RADFORD BLVD
BLDG 1230 BAY 1 (M94631)
ALBANY, GA 31704-5000
JAY CLANTON 229-639-9060
| 0402-0407 |
| 1 Lot |
| In accordance with the applicable Contract Data Requirements List (CDRL), DD Form 1423, Exhibits A and L. |
In accordance with the applicable Contract Data Requirements List (CDRL), DD Form 1423, Exhibits A and L.
| 0501 |
| 200 Each Max |
| Production Year Five ECUs, if ordered, delivery shall be made within 120 DAYS ARO, provided that release for production has been authorized. |
Production Year Five shall be from Government Release for Production through 1825 days after Government Release for Production.
MCLB BDG 814
RADFORD BLVD
BLDG 1230 BAY 1 (M94631)
ALBANY, GA 31704-5000
JAY CLANTON 229-639-9060
FOB: Destination
| 0502-0507 |
| 1 Lot |
| In accordance with the applicable Contract Data Requirements List (CDRL), DD Form 1423, Exhibits A and L. |
In accordance with the applicable Contract Data Requirements List (CDRL), DD Form 1423, Exhibits A and L.
The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.
OFFEROR'S PROPOSED DELIVERY SCHEDULE
| WITHIN DAYS AFTER | ||
| ITEM NO. | QUANTITY | DATE OF CONTRACT |
(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor’s date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or (2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term “working day” excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.
| 5252.216-9506 | MINIMUM AND MAXIMUM QUANTITIES (NAVAIR)(MAR 1999) |
| As referred to in paragraph (b) of FAR 52.216-22 " Indefinite Quantity" of this contract, the contract minimum quantity is Two (2) each CLIN 0001 Pilot Production Units; the maximum quantity is Two (2) each CLIN 0001 Pilot Production Units; 1,000 ECU Production Units over five (5) ordering years; (CLINs 0101, 0201, 0301, 0401, and 0501) and associated data items (CLINs 0002-0012, 0102-0107, 0202-0207, 0302-0307, 0402-0407, and 0502-0507). |
The maximums provided in this contract for production units are only an estimate; there is no guarantee that delivery orders will be placed in any given ordering year.
| 5252.247-9505 | TECHNICAL DATA AND INFORMATION (NAVAIR)(FEB 1995) | |
| Technical Data and Information shall be delivered in accordance with the requirements of the Contract Data Requirements List, DD Form 1423, Exhibit A001-A008 and L001-L003, attached hereto, and the following: | ||
| (a) The contractor shall concurrently deliver technical data and information per DD Form 1423, Blocks 12 and 13 (date of first/subsequent submission) to all activities listed in Block 14 of the DD Form 1423 (distribution and addresses) for each item. Complete addresses for the abbreviations in Block 14 are shown in paragraph (g) below. Additionally, the technical data shall be delivered to the following cognizant codes, who are listed in Block 6 of the DD Form 1423. | ||
| (1) PCO, Code 2.5.2.1.1. | ||
| (2) ACO, Code [TBD]. | ||
| (b) Partial delivery of data is not acceptable unless specifically authorized on the DD Form 1423, or unless approved in writing by the PCO. | ||
| (c) The Government review period provided on the DD Form 1423 for each item commences upon receipt of all required data by the technical activity designated in Block 6. | ||
| (d) A copy of all other correspondence addressed to the Contracting Officer relating to data item requirements (i.e., status of delivery) shall also be provided to the codes reflected above and the technical activity responsible for the data item per Block 6, if not one of the activities listed above. | ||
| (e) The PCO reserves the right to issue unilateral modifications to change the destination codes and addresses for all technical data and information at no additional cost to the Government. | ||
| (f) Unless otherwise specified in writing, rejected data items shall be resubmitted within thirty (30) days after receipt of notice of rejection. | ||
| (g) DD Form 1423, Block 14 Mailing Addresses: See CDRLs |
Section G - Contract Administration Data
| 252.204-7006 |
| Billing Instructions |
| OCT 2005 |
| 252.232-7003 | ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS (JUN 2012) | |
| (a) Definitions. As used in this clause-- | ||
| (1) Contract financing payment and invoice payment have the meanings given in section 32.001 of the Federal Acquisition Regulation. | ||
| (2) Electronic form means any automated system that transmits information electronically from the initiating system to all affected systems. Facsimile, e-mail, and scanned documents are not acceptable electronic forms for submission of payment requests. However, scanned documents are acceptable when they are part of a submission of a payment request made using Wide Area WorkFlow (WAWF) or another electronic form authorized by the Contracting Officer. | ||
| (3) Payment request means any request for contract financing payment or invoice payment submitted by the Contractor under this contract. | ||
| (4) Receiving report means the data required by the clause at 252.246-7000, Material Inspection and Receiving Report. | ||
| (b) Except as provided in paragraph (c) of this clause, the Contractor shall submit payment requests and receiving reports using WAWF, in one of the following electronic formats that WAWF accepts: Electronic Data Interchange, Secure File Transfer Protocol, or World Wide Web input. Information regarding WAWF is available on the Internet at https://wawf.eb.mil/ . | ||
| (c) The Contractor may submit a payment request and receiving report using other than WAWF only when-- | ||
| (1) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor. In such cases, the Contractor shall include a copy of the Contracting Officer's determination with each request for payment; | ||
| (2) DoD makes payment for commercial transportation services provided under a Government rate tender or a contract for transportation services using a DoD-approved electronic third party payment system or other exempted vendor payment/invoicing system (e.g., PowerTrack, Transportation Financial Management System, and Cargo and Billing System); | ||
| (3) DoD makes payment for rendered health care services using TRICARE Encounter Data System (TEDS) as the electronic format; or | ||
| (4) When the Governmentwide commercial purchase card is used as the method of payment, only submission of the receiving report in electronic form is required. | ||
| (d) The Contractor shall submit any non-electronic payment requests using the method or methods specified in Section G of the contract. | ||
| (e) In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payments requests. |
| 252.232-7006 | WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013) | |
| (a) Definitions, as used in this clause-- | ||
| "Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization. | ||
| "Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF). | ||
| "Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system. | ||
| (b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports. | ||
| (c) WAWF access. To access WAWF, the Contractor shall-- | ||
| (1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and | ||
| (2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site. | ||
| (d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/. | ||
| (e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol. | ||
| (f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order: | ||
| (1) Document type. The Contractor shall use the following document type(s). | ||
| ___________________________________________________________________________ | ||
| (Contracting Officer: Insert applicable document type(s). Note: If a "Combo" document type is identified but not supportable by the Contractor's business systems, an "Invoice" (stand-alone) and "Receiving Report" (stand-alone) document type may be used instead.) | ||
| (2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer. | ||
| ___________________________________________________________________________ | ||
| (Contracting Officer: Insert inspection and acceptance locations or "Not applicable.") | ||
| (3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system. |
| Routing Data Table* | ||||
| Field Name in WAWF | Data to be entered in WAWF | |||
| Pay Official DoDAAC: | ___TBD_________________ | |||
| Issue By DoDAAC: | ___N68335_______________ | |||
| Admin DoDAAC: | ___TBD__________________ | |||
| Inspect By DoDAAC: | ___TBD__________________ | |||
| Ship To Code: | ___M64631__________________ | |||
| Ship From Code: | _________________________ | |||
| Mark For Code: | ___TBD__________________ | |||
| Service Approver (DoDAAC): | _________________________ | |||
| Service Acceptor (DoDAAC): | _________________________ | |||
| Accept at Other DoDAAC: | _________________________ | |||
| LPO DoDAAC: | _________________________ | |||
| DCAA Auditor DoDAAC: | _________________________ | |||
| Other DoDAAC(s): | _________________________ | |||
| (*Contracting Officer: Insert applicable DoDAAC information or "See schedule" if multiple ship to/acceptance locations apply, or "Not applicable.") | ||||
| (4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request. | ||||
| (5) WAWF email notifications. The Contractor shall enter the email address identified below in the "Send Additional Email Notifications" field of WAWF once a document is submitted in the system. |
_______TBD_____________________________________________________________________
(Contracting Officer: Insert applicable email addresses or "Not applicable.")
| (g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact. For Navy WAWF questions call DFAS Customer Care 1-800-756-4571 option 6 | |
| (2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988. |
| 5252.201-9500 | TECHNICAL POINT OF CONTACT (TPOC)(NAVAIR)(SEP 2012) | |
| (a) The Technical Point of Contact (TPOC) for this contract is: | ||
| Rodney Davis, Code 1.3.1.8.1 | ||
| NAWCAD Lakehurst | ||
| Route 547, Mail Stop 562-2 | ||
| Joint Base MDL, NJ 08733-5000 | ||
| Phone: (732) 323-2770 | ||
| Email: rodney.o.davis@navy.mil |
| (b) This individual is not a Contracting Officer nor a Contracting Officer's Representative (COR)/Task Order COR (TOCOR) and has no authority to make changes, verbally or otherwise, to the existing contract or order. Further, no authority has been delegated to this individual by the Procuring Contracting Officer (PCO). |
| (c) The contractor may use this technical POC for technical questions related to the existing contract or order. Also, as a representative of the requiring activity, the TPOC may perform or assist in such areas as: base access forms, security related issues, IT access requirements, Contractor Performance Assessment Reporting System (CPARS), clarification of technical requirements, and statement of work inquires. |
| (d) The contractor shall immediately notify the Procuring Contracting Officer in writing if the contractor interprets any action by the TPOC to be a change to the existing contract. |
| 5252.204-9503 | EXPEDITING CONTRACT CLOSEOUT (NAVAIR) (JAN 2007) |
| (a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $1,000 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party might be considered to the extent permitted by law. | |
| (b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered. |
| 5252.242-9511 | CONTRACT ADMINISTRATION DATA (NAVAIR)(SEP 2012) | |
| (a) Contract Administration Office. | ||
| (1) Contract administration functions (see FAR 42.302(a) and DFARS 242.302(a)) are assigned to: See the ADMINISTERED BY Block on the face page of the contract, modification, or order. | ||
| (b) Special Instructions (see FAR 42.202(b) and (c)): | ||
| (1) The following contract administration functions are retained (see FAR 42.302(a) and DFARS 242.302(a)): | ||
| Functions Retained | ||
| Retained for Performance By: |
(2) The following additional contract administration functions are assigned (see FAR 42.302(b)):
| Additional Functions |
| Retained for Performance By: |
(c) Inquiries regarding payment should be referred to: MyInvoice at https://myinvoice.csd.disa.mil//index.html.
Section H - Special Contract Requirements
CONTRACTOR FURNISHED PROPERTY
Contractor-Furnished Property
(First Article (Pilot Production) Testing)
(a) The Contractor shall deliver to the Government, at the time and locations stated in this contract, the Contractor-furnished property described in Federal Acquisition Regulation 52.209-4, First Article Approval – Government Testing and the Statement of Work.
(b) Title to Contractor-furnished property shall remain in the Contractor. The Government shall use the Contractor-furnished property only in connection with this contract in accordance with Federal Regulation 52.209-4, First Article Approval – Government Testing.
(c) Upon delivery of Contractor-furnished property to the Government, the Government assumes the risk and responsibility for its loss or damage, except –
i. For reasonable wear and tear
ii. Consumables provided by the contractor; and
iii. As otherwise provided for by the provisions of this contract.
(d) In the event of loss or irreparable damage to the Contractor-furnished property, the maximum liability of the Government shall not exceed the price for the property as proposed by the Contractor in this solicitation.
(e) Upon completion of First Article (Pilot Production) Testing, and approval, in accordance with Federal Acquisition Regulation 52.209-4, First Article Approval – Government Testing, title to the Contractor-furnished propoerty will pass to and vest in the Government.
| 5252.216-9512 |
| PAPERLESS CONTRACTING |
| JUN 2009 |
| 5252.211-9502 | GOVERNMENT INSTALLATION WORK SCHEDULE (NAVAIR)(DEC 2014) |
| (a) The Holidays applicable to this contract are: New Year's Day, Martin Luther King's Birthday, Presidents' Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran's Day, Thanksgiving Day, and Christmas Day. | |
| (b) In the event that any of the above holidays occur on a Saturday or Sunday, or alternate Friday, then such holiday shall be observed as they are by the assigned Government employees at the using activity. | |
| (c) The Naval Air Warfare Center Weapons Division works a 4/5/9 work schedule. Therefore alternate Fridays are not a part of the normal workweek for work performed on-site at a Naval Air Warfare Center Weapons Division site. The majority of the Government offices are closed on alternate Fridays. | |
| (d) No deviation in the normal workweek will be permitted without express advance approval by the designated Contracting Officer with coordination of the using departments. |
| 5252.211- 9510 | CONTRACTOR EMPLOYEES (NAVAIR)(MAY 2011) | |
| (a) In all situations where contractor personnel status is not obvious, all contractor personnel are required to identify themselves to avoid creating an impression to the public, agency officials, or Congress that such contractor personnel are Government officials. This can occur during meeting attendance, through written (letter or email) correspondence or verbal discussions (in person or telephonic), when making presentations, or in other situations where their contractor status is not obvious to third parties. This list is not exhaustive. Therefore, the contractor employee(s) shall: |