ECU_Logistics_Statement_of_Work_2017.doc
DOC document 26 KB Posted
- Attached to
- Environmental Control Units (ECUs)
- Solicitation number
- N68335-17-R-0094
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Technical_Manual_Placeholder.docx | DOCX document | |
| CDRLs_A001-A008.PDF | ||
| CDRLs_L001-L003.PDF | ||
| ECU_2017_Contract_SOW_030617.docx | DOCX document | |
| General_Requirement_and_Test_Specification_for_ECU_030617.docx | DOCX document | |
| N68335-17-R-0094.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INTEGRATED LOGISTICS SUPPORT
STATEMENT OF WORK
Statement of work (SOW) for the Environmental Control Unit, (ECU), A/E32C-45A, P/N 1559AS400-1
1.0 PURPOSE: This SOW establishes the Logistics Requirements to develop, update, and maintain logistics support for the A/E32C-45A ECU. The Technical Manual, Training requirements, Maintenance Plan, and spare parts are already in place with the previously awarded ECU contract and shall be updated accordingly.
2.0 REQUIREMENTS: The requirements listed herein apply to all logistics deliverables to be provided under the contract.
2.1 TECHNICAL MANUAL CHANGES (CDRL LOO2): The contractor shall provide change pages to the existing Technical Manual NAVAIR 17-1-573 as required, based upon approved ECP’s, DCN’s, and any text changes deemed necessary to keep the manual current.
2.2 STYLE AND FORMAT: This manual will support the equipment throughout the life of the ECU. Change pages to the manual will be an update in accordance with specifications utilized to develop the current version of NAVAIR 17-1-573. Reference MIL-STD-3001-1.
2.3 DESIGN CHANGE NOTICES (DCN’s)(CDRL L001): The contractor shall process DCN’s as required based upon approved ECP’s and other parts changed due to non availability of parts identified in drawing package 1559AS400-1. All DCN’s must have accompanying Supplementary Provisioning Technical Documentation /vendor catalogue data sheets to identify new recommended parts.
2.4 MAINTENANCE PLANNING/PROVISIONING DOCUMENTATION: The A/E32C-45A ECU is used and at the Organizational (O) Level and repaired at the Intermediate (I) Maintenance Level of Navy and Marine Corps activities. All defective components within the ECU will be removed/replaced at the I-Level.
2.5 ITEM UNIQUE IDENTIFICATION (IUID) MARKING OF US MILITARY PROPERTY (CDRL L003). In accordance with DFARS Clause 252.211-7003, the contractor is required to mark and register all end items and their components meeting the requirements call out in MIL-STD-130N. These include components for which the Governments unit acquisition cost is $5,000 or greater, or any component, subassembly or embedded part that is serially managed, mission essential, or a controlled inventory item.
2 .6 Logistics Point of Contact: The Logistics portion of the Program is managed by the individual listed below. All Logistics-related questions should be addressed accordingly.
Jamie McDonald
NAVAIR Code 6.7.6.2
Pax River, MD Phone: 301-757-4851
File details come from the government source that posted it. Updated .