Encino Vista Road Maintenance

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
127EAX25R0020
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Gallina, New Mexico 87017, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Agriculture Forest Service's Santa Fe National Forest is seeking road maintenance services for the Encino Vista Road Maintenance project on the Coyote Ranger District. The comprehensive scope of work includes drain dip construction involving excavation and compaction of 300 cubic yards of native material, road widening requiring 530 cubic yards of excavation to achieve 12-foot road widths, aggregate surfacing with 1,800 tons of material, road reconditioning across 6.5 miles including ditch and shoulder maintenance, and culvert replacement involving installation of one 36-inch diameter corrugated metal pipe. The project encompasses multiple National Forest System Roads (103, 103E, 103EH, 103F, 461, 461EBA, 461F, 461G, 461H, and 461J) located near Gallina, New Mexico at elevations between 7,800 and 8,800 feet. Work is scheduled for Fiscal Year 2025 and supports the Rio Chama Collaborative Forest Landscape Restoration Project with future timber cutting operations. The due date for this pre-solicitation notice is September 10, 2025, the same date it was posted.

This opportunity is designated as a Total Small Business set-aside under NAICS code 237310 (Highway, Street, and Bridge Construction). The project spans 7.9 miles of National Forest System Roads with an additional optional 0.6-mile section, and includes 33 drain dip installations across various road segments. Key deliverables include weekly status reports, construction schedules, traffic control plans, and technical documentation, with most initial documents required within 10 days of contract award. The Schedule of Items indicates an optional additional 800 tons of aggregate surfacing beyond the base 1,800 tons, and the project involves placement of 30 linear feet of 36-inch diameter round pipe for culvert replacement. The Continental Divide National Scenic Trail crosses some of the project roads, adding complexity to the maintenance requirements.

Notice text

The Santa Fe National Forest is pursuing road maintenance activities to be accomplished on the Coyote Ranger District.  Base items include drain dip construction, road widening, aggregate surfacing, road reconditioning, and culvert replacement. Drain dip construction will involve the excavation and compaction of approximately 300 cubic yards of native material. Road widening will involve the excavation and compaction of approximately 530 cubic yards of native material and will result in total road widths of twelve (12) feet. Aggregate surfacing will involve the furnishing, placement, and compaction of 1800 tons of aggregate. Road reconditioning will involve ditch maintenance, shoulder maintenance, and roadbed maintenance along a length of 6.5 miles. Lastly, culvert replacement will involve the placement of one round corrugated metal pipe with a diameter of 36 inches and a length of 30 feet on top of approximately 15 cubic feet of uncompacted bedding material.

Files

File Type Posted
EncinoVista_DrawingSet_7-16-25.pdf PDF
EncinoVista_SOI.xlsx XLSX spreadsheet
EncinoVista_SOW_Draft_7-16-25.docx DOCX document
EncinoVista_FSSS.docx DOCX document

Notice history

Notice Type Posted
Encino Vista Road Maintenance Award Award Notice
Encino Vista Road Maintenance Latest solicitation Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
New Mexico Forest Engineering and Road Maintenance (FERM) Santa Fe, New Mexico 87501, United States · NAICS 237310 Forest Service Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity