Emergency Watershed Protection Program (EWP) - Streambank Stabilization - Moran Site - Erie County, New York

Award Notice Posted

Solicitation number
AG-2C31-S-09-0009
Agency
Awarded
to Buffalo Creek, Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
AG-2C31-C-09-0003 Federal contract award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record
Place of performance
Town of Boston Erie County, New York, United States

Notice details come from SAM.gov. Updated .

Notice text

6 versions

Update #6 · Latest ·

Amendment 3 - Modifies performance time from 30 calendar days to 50 calendar days.

Update #5 ·

Amendment 1 - Provides documents (specifications and drawings ) in unzipped format.



Amendment 2 - Provides revised drawings and specifications as oulined in attached SF-30.

Update #4 ·

Provide documents in unzipped format.

Update #3 ·

Solicitation package posted August 14, 2009 - Site showing scheduled for Monday, August 31, 2009; 10:30 a.m. at the site - 8013 Back Creek Road, Town of Boston, Erie County, NY. Bid Opending scheduled for Monday, September 14, 2009 at 10:30 a.m.

Update #2 ·

Please note the posting of the solicitation has been delayed. It is expected that the solicitation package, construction drawings and specifications will be posted and available within the next 30 days. A pre-bid site showing will be held. Information on exact dates and times will be made available with the solicitation at this site.

Update #1 ·

The USDA NRCS in New York is preparing to issue a solicitation for work authorized under the Emergency Watershed Protection Program due to recent heavy rain with resultant flooding conditions. The work is to relieve imminent hazards to life and property. The work consists of site dewatering, the installation of approximately 3,300 tons of rock rip-rap, installation of 5 stream barbs, and 2,500 cy of excavation and fill to stabilize the stream bed and banks along Eighteenmile Creek near 8013 Back Creek Road in the Town of Boston, Erie County, New York.



A bid guarantee will be required with all bids. Performance and Payment Bonds in the amount of 100% will be required within 5 calendar days of award of contract. The location of the work sites will be within the flooded areas and as described in the solicitations. All necessary permits and land rights have been acquired.



A firm-fixed price award is anticipated under the Small Business Competitiveness Demonstration Program. The solicitation package, construction drawings and specifications will be posted and available from this site on or about July 7, 2009. Estimated dates for bid opening will be on or about August 6, 2009, and project completion by September 30, 2009. A pre-bid site showing is being planned and will be specified in the solicitation package.



Price Range is between $100,000 to $250,000.

Files

File Type Posted
Abstract of Offers.pdf PDF
Amend 3.pdf PDF
Amend 2 - ERIE_Moran_EWP_spp_mks Sections2 —
Amend 2 - Bid Schedule_Modified_mks.pdf PDF
Amend 2 - cs023 modified_mks.pdf PDF
Amend 2 - ERIE_Moran_EWP_spp_mks Sections3 —
Amend 2 - SF-300.pdf PDF
Amend 2 - ERIE_Moran_EWP_spp_mks Sections —
Amend 2 - ERIE_Moran_EWP_spp_mks Rock Chute Details —
Amend 2 - ERIE_Moran_EWP_spp_mks Plan View —
Amend 2 - ERIE_Moran_EWP_spp_mks Barb Details —
cs008.doc DOC document
Bio-Engineering.doc DOC document
ms523.doc DOC document
cs005.doc DOC document
5_ERIE_Moran_EWP_spp Sections3.pdf PDF
7_ERIE_Moran_EWP_spp Barb Details.pdf PDF
Construction Specification 806 - Seeding.doc DOC document
cs023.doc DOC document
8_ERIE_Moran_EWP_spp Tieback Details.pdf PDF
3_ERIE_Moran_EWP_spp Sections.pdf PDF
6_ERIE_Moran_EWP_spp Erosion.pdf PDF
cs021.doc DOC document
4_ERIE_Moran_EWP_spp Sections2.pdf PDF
2_ERIE_Moran_EWP_spp Plan View.pdf PDF
cs004.doc DOC document
8_ERIE_Moran_EWP_spp Rock Chute.pdf PDF
1_ERIE_Moran_EWP_spp Cover Signed.pdf PDF
cs061.doc DOC document
cs011.doc DOC document
Specifications.zip ZIP file
SF-1442 Bid Form.pdf PDF
Davis Bacon Wage Rates - Erie County.pdf PDF
Solicitation Package.doc DOC document
ERIE_Moran_EWP_spp.zip ZIP file
Show all 35

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors