About this file

Spec 11

View the file

Other files

File Type Posted
Abstract of Offers.pdf PDF
Amend 3.pdf PDF
Amend 2 - ERIE_Moran_EWP_spp_mks Sections2 —
Amend 2 - Bid Schedule_Modified_mks.pdf PDF
Amend 2 - cs023 modified_mks.pdf PDF
Amend 2 - ERIE_Moran_EWP_spp_mks Sections3 —
Amend 2 - ERIE_Moran_EWP_spp_mks Rock Chute Details —
Amend 2 - ERIE_Moran_EWP_spp_mks Sections —
Amend 2 - SF-300.pdf PDF
Amend 2 - ERIE_Moran_EWP_spp_mks Barb Details —
Amend 2 - ERIE_Moran_EWP_spp_mks Plan View —
cs005.doc DOC document
2_ERIE_Moran_EWP_spp Plan View.pdf PDF
cs004.doc DOC document
8_ERIE_Moran_EWP_spp Rock Chute.pdf PDF
5_ERIE_Moran_EWP_spp Sections3.pdf PDF
7_ERIE_Moran_EWP_spp Barb Details.pdf PDF
Construction Specification 806 - Seeding.doc DOC document
cs023.doc DOC document
cs008.doc DOC document
3_ERIE_Moran_EWP_spp Sections.pdf PDF
Bio-Engineering.doc DOC document
6_ERIE_Moran_EWP_spp Erosion.pdf PDF
ms523.doc DOC document
cs021.doc DOC document
4_ERIE_Moran_EWP_spp Sections2.pdf PDF
8_ERIE_Moran_EWP_spp Tieback Details.pdf PDF
cs061.doc DOC document
1_ERIE_Moran_EWP_spp Cover Signed.pdf PDF
Davis Bacon Wage Rates - Erie County.pdf PDF
SF-1442 Bid Form.pdf PDF
Specifications.zip ZIP file
Solicitation Package.doc DOC document
ERIE_Moran_EWP_spp.zip ZIP file
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Construction Specification 11—Removal of Water

1.

Scope

The work consists of the removal of surface water and ground water as necessary to perform the construction required by the contract in accordance with the specifications. It shall include: (1) constructing, installing, building, and maintaining all necessary temporary water containment facilities, channels, and diversions; (2) furnishing, installing, and operating all necessary pumps, piping, and other facilities and equipment; and (3) removing all such temporary works and equipment after their intended function is no longer required.

2.

Diverting surface water

The contractor shall install, maintain, and operate all cofferdams, channels, flumes, sumps, and all other temporary diversion and protective works needed to divert streamflow and other surface water through or around the construction site. Control of surface water shall be continuous during the period that damage to construction work could occur. Unless otherwise specified and/or approved, the diversion outlet shall be into the same drainageway that the water would have reached before being diverted.

The contractor shall furnish the contracting officer, in writing, a proposed plan for diverting surface water before beginning any construction activities for which a diversion is required, unless waived in section 8 of this specification. Acceptance of this plan or the waiving of the plan requirement will not relieve the contractor of the responsibilities related to this activity during the process of completing the work as specified.

3.

Dewatering the construction site

Foundations, cutoff trenches, and all other parts of the construction site shall be dewatered and kept free of standing water and muddy conditions as necessary for the proper execution of the work. The contractor shall furnish, install, operate, and maintain all drains, sumps, pumps, casings, well points, and all other equipment required to properly dewater the site as specified. Dewatering systems that cause a loss of soil fines from the foundation areas will not be permitted.

The contractor shall furnish the contracting officer, in writing, a proposed plan for dewatering before commencing with any construction activity for which dewatering may be required, unless waived in section 8 of this specification. Acceptance of this plan or the waiving of the plan requirement will not relieve the contractor of the responsibilities for completing the specified work.

4.

Dewatering borrow areas

The contractor shall maintain all borrow areas free of surface water or otherwise provide for timely and effective removal of surface and subsurface water that accumulates within the borrow area, unless waived in section 8 of this specification. Borrow material shall be processed as necessary to achieve proper and uniform moisture content at the time of placement.

If pumping to dewater borrow areas is included as a bid item of work in the bid schedule, each pump discharge pipe shall be equipped with a water meter. The meter shall be such that the measured quantity of water is accurate within 3 percent of the true quantity. The contractor shall provide necessary support to perform accuracy tests of the water meter when requested by the contracting officer.

5.

Erosion and pollution control

Removal of water from the construction site, including the borrow areas, shall be accomplished so that erosion and the transporting of sediment and other pollutants are minimized. Dewatering activities shall be accomplished in a manner that the water table water quality is not altered. Pollution control activities shall not conflict with the requirements of Construction Specification 5, Pollution Control, if it is a part of this contract.

6.

Removal of temporary works

When temporary works are no longer needed, the contractor shall remove and return the area to a condition similar to that which existed before construction. Areas where temporary works were located shall be graded for sightly appearance with no obstruction to natural surface waterflows or the proper functioning and access to the works of improvement installed. The contractor shall exercise extreme care during the removal stages to minimize the loss of soil sediment and debris that was trapped during construction.

Pipes, casings, and any other material used to dewater the site shall be removed from temporary wells. The wells shall be filled to ground level with clean gravel or other suitable material approved by the contracting officer. The contractor shall exercise extreme care to prevent pollution of the ground water by these actions.

7.

Measurement and payment

Method 1—Items of work listed in the bid schedule for removal of water, diverting surface water, and dewatering construction sites and borrow areas are paid for at the contract lump sum prices. Such payment will constitute full compensation for all labor, equipment, tools, and all other items necessary and incidental to the completion of the work.

Method 2—Items of work listed in the bid schedule for removal of water, diverting surface water, dewatering construction sites, and dewatering borrow areas are paid for at the contract lump sum prices. Such payment will constitute full compensation for furnishing, installing, operating, and maintaining the necessary trenches, drains, sumps, pumps, and piping and for all labor, equipment, tools, and all other items necessary and incidental to the completion of the work. The exception is that additional payment for pumping to dewater borrow areas and the removal of water will be made as described in the following paragraph.

If pumping to dewater borrow areas is a contract bid item, payment is made at the contract unit price, which shall be the price per 1,000 gallons shown in the bid schedule. Such payment will constitute full compensation for pumping only. Compensation for equipment and preparation and for other costs associated with pumping is included in the lump sum payment for removal of water or the lump sum payment for dewatering the borrow areas. Payment is made only for pumping that is necessary to dewater borrow areas that cannot be effectively drained by gravity or that must have the water table lowered to be usable as a suitable borrow source. Pumping for other purposes will not be included for payment under this item.

All Methods—The following provisions apply to all methods of measurement and payment. Compensation for any item of work described in the contract, but not listed in the bid schedule is included in the payment for the contract line item to which it is made subsidiary. Such items and the items to which they are made subsidiary are identified in section 8 of this specification.

8.

ITEMS OF WORK AND CONSTRUCTION DETAILS

Items of work to be performed in conformance with this specification and the construction details therefore are:

A. Bid Item 3, Removal of Water

1. This item shall consist of the removal of all surface and subsurface water necessary to perform the required excavations, Earthfill and rock placement.

2. Any stream flow shall be diverted and the ground water level drawn down and maintained so that Earthfill, bedding, and riprap are not placed in flowing or standing water.

3. The contractor must submit a Dewatering/Erosion and Sediment Control Plan to NRCS for acceptance prior to commencing any work on the site. Such plan must indicate the method to be used for diverting surface water from the work area and include the method for removing water from the toe trench excavation.

4. In Section 7, MEASUREMENT AND PAYMENT, payment for this item shall be by Method 1, contract lump sum price. Such payment shall constitute full compensation for all labor, equipment, tools and all other items necessary and incidental to the completion of the work.

5. Items of work subsidiary to this Bid Item are:

a. Pollution Control – Construction Specification 5

NY-MORAN NRCS-NEH-20 11-1