Construction Specification 5—Pollution Control
1.
Scope
The work consists of installing measures or performing work to control erosion and minimize the production of sediment and other pollutants to water and air from construction activities.
2.
Material
All material furnished shall meet the requirements of the material specifications listed in section 8 of this specification.
3.
Erosion and sediment control measures and works
The measures and works shall include, but are not limited to, the following:
Staging of earthwork activities—The excavation and moving of soil materials shall be scheduled to minimize the size of areas disturbed and unprotected from erosion for the shortest reasonable time.
Seeding—Seeding to protect disturbed areas shall occur as soon as reasonably possible following completion of that earthwork activity.
Mulching—Mulching to provide temporary protection of the soil surface from erosion.
Diversions—Diversions to divert water from work areas and to collect water from work areas for treatment and safe disposition. They are temporary and shall be removed and the area restored to its near original condition when the diversions are no longer required or when permanent measures are installed.
Stream crossings—Culverts or bridges where equipment must cross streams. They are temporary and shall be removed and the area restored to its near original condition when the crossings are no longer required or when permanent measures are installed.
Sediment basins—Sediment basins collect, settle, and eliminate sediment from eroding areas from impacting properties and streams below the construction site(s). These basins are temporary and shall be removed and the area restored to its original condition when they are no longer required or when permanent measures are installed.
Sediment filters—Straw bale filters or geotextile sediment fences trap sediment from areas of limited runoff. Sediment filters shall be properly anchored to prevent erosion under or around them. These filters are temporary and shall be removed and the area restored to its original condition when they are no longer required or when permanent measures are installed.
Waterways—Waterways for the safe disposal of runoff from fields, diversions, and other structures or measures. These works are temporary and shall be removed and the area restored to its original condition when they are no longer required or when permanent measures are installed.
Other—Additional protection measures as specified in section 8 of this specification or required by Federal, State, or local government.
4.
Chemical pollution
The contractor shall provide watertight tanks or barrels or construct a sump sealed with plastic sheets to dispose of chemical pollutants, such as drained lubricating or transmission fluids, grease, soaps, concrete mixer washwater, or asphalt, produced as a by-product of the construction activities. At the completion of the construction work, sumps shall be removed and the area restored to its original condition as specified in section 8 of this specification. Sump removal shall be conducted without causing pollution.
Sanitary facilities, such as chemical toilets, or septic tanks shall not be located next to live streams, wells, or springs. They shall be located at a distance sufficient to prevent contamination of any water source. At the completion of construction activities, facilities shall be disposed of without causing pollution as specified in section 8 of this specification.
5.
Air pollution
The burning of brush or slash and the disposal of other materials shall adhere to state and local regulations.
Fire prevention measures shall be taken to prevent the start or spreading of wildfires that may result from project activities. Firebreaks or guards shall be constructed and maintained at locations shown on the drawings.
All public access or haul roads used by the contractor during construction of the project shall be sprinkled or otherwise treated to fully suppress dust. All dust control methods shall ensure safe construction operations at all times. If chemical dust suppressants are applied, the material shall be a commercially available product specifically designed for dust suppression and the application shall follow manufacturer's requirements and recommendations. A copy of the product data sheet and manufacturer's recommended application procedures shall be provided to the engineer 5 working days before the first application.
6.
Maintenance, removal, and restoration
All pollution control measures and temporary works shall be adequately maintained in a functional condition for the duration of the construction period. All temporary measures shall be removed and the site restored to near original condition.
7.
Measurement and payment
Method 1—For items of work for which specific unit prices are established in the contract, each item is measured to the nearest unit applicable. Payment for each item is made at the contract unit price for that item. For water or chemical suppressant items used for dust control for which items of work are established in section 8 of this specification, measurement for payment will not include water or chemical suppressants that are used inappropriately or excessive to need. Such payment will constitute full compensation for the completion of the work.
Method 2—For items of work for which lump sum prices are established in the contract, payment is made as the work proceeds and supported by invoices presented by the contractor that reflect actual costs. If the total of all progress payments is less than the lump sum contract price for this item, the balance remaining for this item will be included in the final contract payment. Payment of the lump sum contract price will constitute full compensation for completion of the work.
Method 3—For items of work for which lump sum prices are established in the contract, payment will be prorated and provided in equal amounts on each monthly progress payment estimate. The number of months used for prorating shall be the number estimated to complete the work as outlined in the contractor's approved construction schedule. The final month's prorate amount will be provided with the final contract payment. Payment as described will constitute full compensation for completion of the work.
All Methods—The following provisions apply to all methods of measurement and payment. Compensation for any item of work described in the contract, but not listed in the bid schedule is included in the payment for the item of work to which it is made subsidiary. Such items, and the items to which they are made subsidiary, are identified in section 8 of this specification.
8.
ITEMS OF WORK AND CONSTRUCTION DETAILS
Items or work to be performed in conformance with this specification and the construction details therefore are:
A. Subsidiary Item, Pollution Control
1. This item shall consist of applying and performing all construction activities in a manner that will minimize water pollution, air pollution, and soil erosion. It shall include maintenance and installation of the following:
a. Temporary stream crossings.
b. Sediment basins to receive outflows from pumps used to remove water.
c. Diversions and/or coffer dams.
2. Special precautions shall be taken in the scheduling and use of construction equipment to minimize erosion. The crossing of live streams by fording will not permitted. Temporary stream crossing such as culverts or bridges shall be installed and maintained as necessary, to allow equipment to cross without entering the stream.
3. Stabilized construction entrances shall be maintained in a condition that will prevent tracking or flowing of sediment onto public right-of-ways, including cleanout and paving with additional stone as conditions demand. All sediment spilled, dropped, washed or tracked onto public right-of-ways shall be removed immediately.
4. Excavation and Clearing operations shall not be started until pollution control measures are in place to control runoff and the sediment from respective work area.
5. In Section 2, MATERIALS, the following material specifications shall be followed:
a. Stone pavement for stabilized construction entrance shall be Type 2 or Type 4 as specified in NYS DOT Specification Section 304 and shall be crushed.
b. Culverts used for temporary stream crossing shall be of sufficient strength and durability to withstand the loadings of the equipment that will be crossing. Damaged culverts shall be replaced immediately.
6. In Section 5, AIR POLLUTION, firebreaks or guards shall not be required. Burning of any material shall not be permitted.
7. In Section 7, MEASUREMENT AND PAYMENT, no separate payment shall be made for pollution control. Compensation for Pollution Control shall be included in the payment of Bid Item 3, Removal of Water.