Drydocking of The Steam Paddle Tug EPPLETON HALL

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
140P8624Q0049
Agency
National Park Service Department of the Interior
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
336611 Ship Building and Repairing
PSC
J020 Maint/Repair/Rebuild Of Equipment- Ship And Marine Equipment
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The National Park Service is seeking proposals to perform drydocking services on the historic steam paddle tug Eppleton Hall located at the San Francisco Maritime National Historical Park. The work includes routine ship husbandry that cannot be performed while the vessel is in the water, such as hull inspection and repair, surface preparation and painting, and maintenance of the ship's systems and components. This is a full and open competition under NAICS code 336611. Quotes are due by 12:00 pm Pacific Daylight Time on September 3, 2024 and will be evaluated on technical approach, relevant experience, past performance, and qualifications of key personnel. A pre-proposal site visit is strongly encouraged on August 8, 2024.

This is a firm-fixed price contract with a period of performance from September 23, 2024 through April 1, 2025. There is no set-aside designation, and the estimated value is unknown. The work will be performed at the San Francisco Maritime National Historical Park in California. The incumbent contractor is unknown.

Notice text

5 versions

Update #5 · Latest ·

Drydocking of The Steam Paddle Tug EPPLETON HALL, San Francisco Maritime National Historical Park, San Francisco, California, PMIS NO. 255876, 215099, 215044, 165428

Amendment 0004 is to extend RFQ due date from Friday, August 30, 2024, to Tuesday, September 3, 2024, at 3:30pm Pacific Time. All other terms and conditions remain unchanged.

(i) This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Federal Acquisition Regulations (FAR) Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a separate solicitation will not be issued.

(ii) This solicitation is issued as Request for Quote #140P8624Q0049

(iii) The solicitation, provisions and clauses are those in effect through Federal Acquisition Circular 2024-05

(iv) The proposed contract is Full and Open Competition. NAICS code: 336611.

(v) Refer to the price schedule for a list of line item number(s) and items, quantities, and units of measure, (including option(s), if applicable).

(vi) Description of requirements for each line item: Reference the attached Technical Specifications and attachments.

This Request for Quote consists of the following attached documents:
Number Description
01 Price Schedule
02 Technical Specifications
03 Steam Tug Eppleton Hall Docking Plan, 2000
04 International Inspection, Inc. UT Report, 2013
05 NPS Drawings
06 Appendix A, SAFR Material Process Specifications
07 United States Coast Guard Navigation and Inspection Circular 7-01 Procedures for Hull Inspection and Repair on Vessels built of Riveted Construction dated 9 October 2001.
08 United States Coast Guard Marine Safety and Security Information Bulletin (MSIB) 13- 01, Dead Ship Tow Guidelines
09 ABS RULES FOR CLASSIFICATION AND CONSTRUCTION OF STEEL VESSELS (1862- 1969) SECTION 25
10 WEST COAST LUMBER INSPECTION BUREAU GRADING RULES
11 AMERICAN WOOD PROTECTION ASSOCIATION STANDARDS FOR SODIUM BORATE PRESERVATIVES, P5
12 STEEL STRUCTURES PAINTING COUNCIL STANDARD (SSPC)
13 Wage Determination No. 2015-5637 Revision No.26, dated 5/2/2024


(vii) Date(s) and place(s) of delivery and acceptance and FOB point:

Period of Performance: September 23, 2024 through April 1, 2025.

(viii) FAR provision 52.212-1, Instructions to Offerors -- Commercial Products and Commercial Services, applies to this acquisition. The provision can be accessed at https://www.acquisition.gov/browsefar. In addition to the requirements noted in 52.212-1; quotes shall contain the documents and information in the RFQ.

(ix) FAR provision 52.212-2, Evaluation -- Commercial Products and Commercial Services, applies to this acquisition. The provision can be accessed at https://www.acquisition.gov/browsefar. The specific evaluation criteria to be included in paragraph (a) of the provision are noted in the RFQ.

(x) FAR provision 52.212-3, Offeror Representations and Certifications -- Commercial Products and Commercial Services, applies to this acquisition. Quoters shall complete provision 52.212-3 at the Government's System for Award Management (SAM), https://www.sam.gov/content/home.

(xi) FAR clause 52.212-4, Contract Terms and Conditions -- Commercial Products and Commercial Services, applies to this acquisition. Refer to attachment for a full listing of clauses applicable to this RFQ and the resultant purchase order.

(xii) FAR clause 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders -- Commercial Products and Commercial Services, applies to this acquisition. Refer to attachment for a full listing of clauses applicable to this RFQ and the resultant purchase order.

(xiii) Additional contract requirement(s) or terms and conditions:

a) Contract Type: Firm fixed price

b) Applicable FAR Parts: This acquisition is being conducted per the procedures authorized by FAR Parts 12 and 13.

c) Wage determination:

The attached wage determination WD 2015-5637 (Rev. 26) dated 5/2/2024 applies to this RFQ and the subsequent contract.

d) Clauses: The attached contract clauses apply to this RFQ and the subsequent contract.

e) Pre-proposal Site Visit:


The Government strongly encourages, but does not require, Quoters to visit the work site prior to submitting a proposal. The Government will conduct only the one site visit and quoters that miss the scheduled site visit will have no other opportunities to visit the work site prior to the date quotes are due.

Date & Time: Thursday, August 8, 2024, at 1:00pm PT

Location: Attendees shall meet at Hyde Street Pier, 2905 Hyde Street, San Francisco CA 94109

RSVP: All attendees must RSVP in writing to Contract Specialist, Tonia Gladen at Tonia_Gladen@nps.gov by no later than 3 business days prior to the date of the scheduled site visit. RSVP shall include company name, primary contact name, contact's phone number, contact's e-mail address, anticipated number of attendees.

Other Information:
The Government strongly encourages contractors who will be attending the pre-proposal site visit check weather & road conditions before leaving their home office.

f) Required Quote Submittal Contents:
1) Signed acknowledgement of SF 1449
2) Signed amendments if applicable
3) Completed Provisions (including FAR 52.204-24, FAR52.212-3(v)(2)(i), and others as applicable)
4) Technical approach submission in accordance with the award selection requirement
5) Relevant Experience submission in accordance with the award selection requirement
7) Past Performance submission in accordance with the award selection requirement
8) Qualifications and Experience of Key Personnel and subcontractors
9)Schedule
9) Quoters must provide representation and certification of provision 52.229-11, Tax on Certain Foreign Procurements-Notice and Representation
10) In accordance with FAR Subpart 19.702 and clause 52.219-9 of this solicitation, the apparently successful offeror that is a large business will be required to submit an acceptable subcontracting plan.
11) Contract Price Schedule

g) Evaluation Criteria: Refer to the evaluation factors and methods noted in the RFQ.

(xiv) The Defense Priorities and Allocations System (DPAS) is not applicable to this RFQ.

(xv) The date, time and place Quotes are due:

Submit to: Tonia Gladen at Tonia_Gladen@nps.gov.
Due Date / Time: Submit to ensure Government receipt by 3:30 pm Pacific Daylight Time, 9/3/2024

(xvi) Please contact Tonia Gladen at tonia_gladen@nps.gov if you have any questions regarding this RFQ.

Update #4 ·

Drydocking of The Steam Paddle Tug EPPLETON HALL, San Francisco Maritime National Historical Park, San Francisco, California, PMIS NO. 255876, 215099, 215044, 165428

Amendment 0003 is to extend RFQ due date from Monday, August 26, 2024, to Friday, August 30, 2024, at 12:00pm Pacific Time . All other terms and conditions remain unchanged.

(i) This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Federal Acquisition Regulations (FAR) Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a separate solicitation will not be issued.

(ii) This solicitation is issued as Request for Quote #140P8624Q0049

(iii) The solicitation, provisions and clauses are those in effect through Federal Acquisition Circular 2024-05

(iv) The proposed contract is Full and Open Competition. NAICS code: 336611.

(v) Refer to the price schedule for a list of line item number(s) and items, quantities, and units of measure, (including option(s), if applicable).

(vi) Description of requirements for each line item: Reference the attached Technical Specifications and attachments.

This Request for Quote consists of the following attached documents:
Number Description
01 Price Schedule
02 Technical Specifications
03 Steam Tug Eppleton Hall Docking Plan, 2000
04 International Inspection, Inc. UT Report, 2013
05 NPS Drawings
06 Appendix A, SAFR Material Process Specifications
07 United States Coast Guard Navigation and Inspection Circular 7-01 Procedures for Hull Inspection and Repair on Vessels built of Riveted Construction dated 9 October 2001.
08 United States Coast Guard Marine Safety and Security Information Bulletin (MSIB) 13- 01, Dead Ship Tow Guidelines
09 ABS RULES FOR CLASSIFICATION AND CONSTRUCTION OF STEEL VESSELS (1862- 1969) SECTION 25
10 WEST COAST LUMBER INSPECTION BUREAU GRADING RULES
11 AMERICAN WOOD PROTECTION ASSOCIATION STANDARDS FOR SODIUM BORATE PRESERVATIVES, P5
12 STEEL STRUCTURES PAINTING COUNCIL STANDARD (SSPC)
13 Wage Determination No. 2015-5637 Revision No.26, dated 5/2/2024


(vii) Date(s) and place(s) of delivery and acceptance and FOB point:

Period of Performance: September 23, 2024 through April 1, 2025.

(viii) FAR provision 52.212-1, Instructions to Offerors -- Commercial Products and Commercial Services, applies to this acquisition. The provision can be accessed at https://www.acquisition.gov/browsefar. In addition to the requirements noted in 52.212-1; quotes shall contain the documents and information in the RFQ.

(ix) FAR provision 52.212-2, Evaluation -- Commercial Products and Commercial Services, applies to this acquisition. The provision can be accessed at https://www.acquisition.gov/browsefar. The specific evaluation criteria to be included in paragraph (a) of the provision are noted in the RFQ.

(x) FAR provision 52.212-3, Offeror Representations and Certifications -- Commercial Products and Commercial Services, applies to this acquisition. Quoters shall complete provision 52.212-3 at the Government's System for Award Management (SAM), https://www.sam.gov/content/home.

(xi) FAR clause 52.212-4, Contract Terms and Conditions -- Commercial Products and Commercial Services, applies to this acquisition. Refer to attachment for a full listing of clauses applicable to this RFQ and the resultant purchase order.

(xii) FAR clause 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders -- Commercial Products and Commercial Services, applies to this acquisition. Refer to attachment for a full listing of clauses applicable to this RFQ and the resultant purchase order.

(xiii) Additional contract requirement(s) or terms and conditions:

a) Contract Type: Firm fixed price

b) Applicable FAR Parts: This acquisition is being conducted per the procedures authorized by FAR Parts 12 and 13.

c) Wage determination:

The attached wage determination WD 2015-5637 (Rev. 26) dated 5/2/2024 applies to this RFQ and the subsequent contract.

d) Clauses: The attached contract clauses apply to this RFQ and the subsequent contract.

e) Pre-proposal Site Visit:


The Government strongly encourages, but does not require, Quoters to visit the work site prior to submitting a proposal. The Government will conduct only the one site visit and quoters that miss the scheduled site visit will have no other opportunities to visit the work site prior to the date quotes are due.

Date & Time: Thursday, August 8, 2024, at 1:00pm PT

Location: Attendees shall meet at Hyde Street Pier, 2905 Hyde Street, San Francisco CA 94109

RSVP: All attendees must RSVP in writing to Contract Specialist, Tonia Gladen at Tonia_Gladen@nps.gov by no later than 3 business days prior to the date of the scheduled site visit. RSVP shall include company name, primary contact name, contact's phone number, contact's e-mail address, anticipated number of attendees.

Other Information:
The Government strongly encourages contractors who will be attending the pre-proposal site visit check weather & road conditions before leaving their home office.

f) Required Quote Submittal Contents:
1) Signed acknowledgement of SF 1449
2) Signed amendments if applicable
3) Completed Provisions (including FAR 52.204-24, FAR52.212-3(v)(2)(i), and others as applicable)
4) Technical approach submission in accordance with the award selection requirement
5) Relevant Experience submission in accordance with the award selection requirement
7) Past Performance submission in accordance with the award selection requirement
8) Qualifications and Experience of Key Personnel and subcontractors
9)Schedule
9) Quoters must provide representation and certification of provision 52.229-11, Tax on Certain Foreign Procurements-Notice and Representation
10) In accordance with FAR Subpart 19.702 and clause 52.219-9 of this solicitation, the apparently successful offeror that is a large business will be required to submit an acceptable subcontracting plan.
11) Contract Price Schedule

g) Evaluation Criteria: Refer to the evaluation factors and methods noted in the RFQ.

(xiv) The Defense Priorities and Allocations System (DPAS) is not applicable to this RFQ.

(xv) The date, time and place Quotes are due:

Submit to: Tonia Gladen at Tonia_Gladen@nps.gov.
Due Date / Time: Submit to ensure Government receipt by 12:00 pm Pacific Daylight Time, 8/30/2024

(xvi) Please contact Tonia Gladen at tonia_gladen@nps.gov if you have any questions regarding this RFQ.

Update #3 ·

Drydocking of The Steam Paddle Tug EPPLETON HALL, San Francisco Maritime National Historical Park, San Francisco, California, PMIS NO. 255876, 215099, 215044, 165428

Amendment 0002 is to provide Site Visit Sign-In Sheet and Answers to Questions brought up during Site Visit. All other terms and conditions remain unchanged.

(i) This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Federal Acquisition Regulations (FAR) Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a separate solicitation will not be issued.

(ii) This solicitation is issued as Request for Quote #140P8624Q0049

(iii) The solicitation, provisions and clauses are those in effect through Federal Acquisition Circular 2024-05

(iv) The proposed contract is Full and Open Competition. NAICS code: 336611.

(v) Refer to the price schedule for a list of line item number(s) and items, quantities, and units of measure, (including option(s), if applicable).

(vi) Description of requirements for each line item: Reference the attached Technical Specifications and attachments.

This Request for Quote consists of the following attached documents:
Number Description
01 Price Schedule
02 Technical Specifications
03 Steam Tug Eppleton Hall Docking Plan, 2000
04 International Inspection, Inc. UT Report, 2013
05 NPS Drawings
06 Appendix A, SAFR Material Process Specifications
07 United States Coast Guard Navigation and Inspection Circular 7-01 Procedures for Hull Inspection and Repair on Vessels built of Riveted Construction dated 9 October 2001.
08 United States Coast Guard Marine Safety and Security Information Bulletin (MSIB) 13- 01, Dead Ship Tow Guidelines
09 ABS RULES FOR CLASSIFICATION AND CONSTRUCTION OF STEEL VESSELS (1862- 1969) SECTION 25
10 WEST COAST LUMBER INSPECTION BUREAU GRADING RULES
11 AMERICAN WOOD PROTECTION ASSOCIATION STANDARDS FOR SODIUM BORATE PRESERVATIVES, P5
12 STEEL STRUCTURES PAINTING COUNCIL STANDARD (SSPC)
13 Wage Determination No. 2015-5637 Revision No.26, dated 5/2/2024


(vii) Date(s) and place(s) of delivery and acceptance and FOB point:

Period of Performance: September 23, 2024 through April 1, 2025.

(viii) FAR provision 52.212-1, Instructions to Offerors -- Commercial Products and Commercial Services, applies to this acquisition. The provision can be accessed at https://www.acquisition.gov/browsefar. In addition to the requirements noted in 52.212-1; quotes shall contain the documents and information in the RFQ.

(ix) FAR provision 52.212-2, Evaluation -- Commercial Products and Commercial Services, applies to this acquisition. The provision can be accessed at https://www.acquisition.gov/browsefar. The specific evaluation criteria to be included in paragraph (a) of the provision are noted in the RFQ.

(x) FAR provision 52.212-3, Offeror Representations and Certifications -- Commercial Products and Commercial Services, applies to this acquisition. Quoters shall complete provision 52.212-3 at the Government's System for Award Management (SAM), https://www.sam.gov/content/home.

(xi) FAR clause 52.212-4, Contract Terms and Conditions -- Commercial Products and Commercial Services, applies to this acquisition. Refer to attachment for a full listing of clauses applicable to this RFQ and the resultant purchase order.

(xii) FAR clause 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders -- Commercial Products and Commercial Services, applies to this acquisition. Refer to attachment for a full listing of clauses applicable to this RFQ and the resultant purchase order.

(xiii) Additional contract requirement(s) or terms and conditions:

a) Contract Type: Firm fixed price

b) Applicable FAR Parts: This acquisition is being conducted per the procedures authorized by FAR Parts 12 and 13.

c) Wage determination:

The attached wage determination WD 2015-5637 (Rev. 26) dated 5/2/2024 applies to this RFQ and the subsequent contract.

d) Clauses: The attached contract clauses apply to this RFQ and the subsequent contract.

e) Pre-proposal Site Visit:


The Government strongly encourages, but does not require, Quoters to visit the work site prior to submitting a proposal. The Government will conduct only the one site visit and quoters that miss the scheduled site visit will have no other opportunities to visit the work site prior to the date quotes are due.

Date & Time: Thursday, August 8, 2024, at 1:00pm PT

Location: Attendees shall meet at Hyde Street Pier, 2905 Hyde Street, San Francisco CA 94109

RSVP: All attendees must RSVP in writing to Contract Specialist, Tonia Gladen at Tonia_Gladen@nps.gov by no later than 3 business days prior to the date of the scheduled site visit. RSVP shall include company name, primary contact name, contact's phone number, contact's e-mail address, anticipated number of attendees.

Other Information:
The Government strongly encourages contractors who will be attending the pre-proposal site visit check weather & road conditions before leaving their home office.

f) Required Quote Submittal Contents:
1) Signed acknowledgement of SF 1449
2) Signed amendments if applicable
3) Completed Provisions (including FAR 52.204-24, FAR52.212-3(v)(2)(i), and others as applicable)
4) Technical approach submission in accordance with the award selection requirement
5) Relevant Experience submission in accordance with the award selection requirement
7) Past Performance submission in accordance with the award selection requirement
8) Qualifications and Experience of Key Personnel and subcontractors
9)Schedule
9) Quoters must provide representation and certification of provision 52.229-11, Tax on Certain Foreign Procurements-Notice and Representation
10) In accordance with FAR Subpart 19.702 and clause 52.219-9 of this solicitation, the apparently successful offeror that is a large business will be required to submit an acceptable subcontracting plan.
11) Contract Price Schedule

g) Evaluation Criteria: Refer to the evaluation factors and methods noted in the RFQ.

(xiv) The Defense Priorities and Allocations System (DPAS) is not applicable to this RFQ.

(xv) The date, time and place Quotes are due:

Submit to: Tonia Gladen at Tonia_Gladen@nps.gov.
Due Date / Time: Submit to ensure Government receipt by 12:00 pm Pacific Daylight Time, 8/26/2024

(xvi) Please contact Tonia Gladen at tonia_gladen@nps.gov if you have any questions regarding this RFQ.

Update #2 ·

Drydocking of The Steam Paddle Tug EPPLETON HALL, San Francisco Maritime National Historical Park, San Francisco, California, PMIS NO. 255876, 215099, 215044, 165428

Amendment 0001 is to correct CLINs on line 0010. All other terms and conditions remain unchanged.

(i) This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Federal Acquisition Regulations (FAR) Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a separate solicitation will not be issued.

(ii) This solicitation is issued as Request for Quote #140P8624Q0049

(iii) The solicitation, provisions and clauses are those in effect through Federal Acquisition Circular 2024-05

(iv) The proposed contract is Full and Open Competition. NAICS code: 336611.

(v) Refer to the price schedule for a list of line item number(s) and items, quantities, and units of measure, (including option(s), if applicable).

(vi) Description of requirements for each line item: Reference the attached Technical Specifications and attachments.

This Request for Quote consists of the following attached documents:
Number Description
01 Price Schedule
02 Technical Specifications
03 Steam Tug Eppleton Hall Docking Plan, 2000
04 International Inspection, Inc. UT Report, 2013
05 NPS Drawings
06 Appendix A, SAFR Material Process Specifications
07 United States Coast Guard Navigation and Inspection Circular 7-01 Procedures for Hull Inspection and Repair on Vessels built of Riveted Construction dated 9 October 2001.
08 United States Coast Guard Marine Safety and Security Information Bulletin (MSIB) 13- 01, Dead Ship Tow Guidelines
09 ABS RULES FOR CLASSIFICATION AND CONSTRUCTION OF STEEL VESSELS (1862- 1969) SECTION 25
10 WEST COAST LUMBER INSPECTION BUREAU GRADING RULES
11 AMERICAN WOOD PROTECTION ASSOCIATION STANDARDS FOR SODIUM BORATE PRESERVATIVES, P5
12 STEEL STRUCTURES PAINTING COUNCIL STANDARD (SSPC)
13 Wage Determination No. 2015-5637 Revision No.26, dated 5/2/2024


(vii) Date(s) and place(s) of delivery and acceptance and FOB point:

Period of Performance: September 23, 2024 through April 1, 2025.

(viii) FAR provision 52.212-1, Instructions to Offerors -- Commercial Products and Commercial Services, applies to this acquisition. The provision can be accessed at https://www.acquisition.gov/browsefar. In addition to the requirements noted in 52.212-1; quotes shall contain the documents and information in the RFQ.

(ix) FAR provision 52.212-2, Evaluation -- Commercial Products and Commercial Services, applies to this acquisition. The provision can be accessed at https://www.acquisition.gov/browsefar. The specific evaluation criteria to be included in paragraph (a) of the provision are noted in the RFQ.

(x) FAR provision 52.212-3, Offeror Representations and Certifications -- Commercial Products and Commercial Services, applies to this acquisition. Quoters shall complete provision 52.212-3 at the Government's System for Award Management (SAM), https://www.sam.gov/content/home.

(xi) FAR clause 52.212-4, Contract Terms and Conditions -- Commercial Products and Commercial Services, applies to this acquisition. Refer to attachment for a full listing of clauses applicable to this RFQ and the resultant purchase order.

(xii) FAR clause 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders -- Commercial Products and Commercial Services, applies to this acquisition. Refer to attachment for a full listing of clauses applicable to this RFQ and the resultant purchase order.

(xiii) Additional contract requirement(s) or terms and conditions:

a) Contract Type: Firm fixed price

b) Applicable FAR Parts: This acquisition is being conducted per the procedures authorized by FAR Parts 12 and 13.

c) Wage determination:

The attached wage determination WD 2015-5637 (Rev. 26) dated 5/2/2024 applies to this RFQ and the subsequent contract.

d) Clauses: The attached contract clauses apply to this RFQ and the subsequent contract.

e) Pre-proposal Site Visit:


The Government strongly encourages, but does not require, Quoters to visit the work site prior to submitting a proposal. The Government will conduct only the one site visit and quoters that miss the scheduled site visit will have no other opportunities to visit the work site prior to the date quotes are due.

Date & Time: Thursday, August 8, 2024, at 1:00pm PT

Location: Attendees shall meet at Hyde Street Pier, 2905 Hyde Street, San Francisco CA 94109

RSVP: All attendees must RSVP in writing to Contract Specialist, Tonia Gladen at Tonia_Gladen@nps.gov by no later than 3 business days prior to the date of the scheduled site visit. RSVP shall include company name, primary contact name, contact's phone number, contact's e-mail address, anticipated number of attendees.

Other Information:
The Government strongly encourages contractors who will be attending the pre-proposal site visit check weather & road conditions before leaving their home office.

f) Required Quote Submittal Contents:
1) Signed acknowledgement of SF 1449
2) Signed amendments if applicable
3) Completed Provisions (including FAR 52.204-24, FAR52.212-3(v)(2)(i), and others as applicable)
4) Technical approach submission in accordance with the award selection requirement
5) Relevant Experience submission in accordance with the award selection requirement
7) Past Performance submission in accordance with the award selection requirement
8) Qualifications and Experience of Key Personnel and subcontractors
9)Schedule
9) Quoters must provide representation and certification of provision 52.229-11, Tax on Certain Foreign Procurements-Notice and Representation
10) In accordance with FAR Subpart 19.702 and clause 52.219-9 of this solicitation, the apparently successful offeror that is a large business will be required to submit an acceptable subcontracting plan.
11) Contract Price Schedule

g) Evaluation Criteria: Refer to the evaluation factors and methods noted in the RFQ.

(xiv) The Defense Priorities and Allocations System (DPAS) is not applicable to this RFQ.

(xv) The date, time and place Quotes are due:

Submit to: Tonia Gladen at Tonia_Gladen@nps.gov.
Due Date / Time: Submit to ensure Government receipt by 12:00 pm Pacific Daylight Time, 8/26/2024

(xvi) Please contact Tonia Gladen at tonia_gladen@nps.gov if you have any questions regarding this RFQ.

Update #1 ·

Drydocking of The Steam Paddle Tug EPPLETON HALL, San Francisco Maritime National Historical Park, San Francisco, California, PMIS NO. 255876, 215099, 215044, 165428

(i) This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Federal Acquisition Regulations (FAR) Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a separate solicitation will not be issued.

(ii) This solicitation is issued as Request for Quote #140P8624Q0049

(iii) The solicitation, provisions and clauses are those in effect through Federal Acquisition Circular 2024-05

(iv) The proposed contract is Full and Open Competition. NAICS code: 336611.

(v) Refer to the price schedule for a list of line item number(s) and items, quantities, and units of measure, (including option(s), if applicable).

(vi) Description of requirements for each line item: Reference the attached Technical Specifications and attachments.

This Request for Quote consists of the following attached documents:
Number Description
01 Price Schedule
02 Technical Specifications
03 Steam Tug Eppleton Hall Docking Plan, 2000
04 International Inspection, Inc. UT Report, 2013
05 NPS Drawings
06 Appendix A, SAFR Material Process Specifications
07 United States Coast Guard Navigation and Inspection Circular 7-01 Procedures for Hull Inspection and Repair on Vessels built of Riveted Construction dated 9 October 2001.
08 United States Coast Guard Marine Safety and Security Information Bulletin (MSIB) 13- 01, Dead Ship Tow Guidelines
09 ABS RULES FOR CLASSIFICATION AND CONSTRUCTION OF STEEL VESSELS (1862- 1969) SECTION 25
10 WEST COAST LUMBER INSPECTION BUREAU GRADING RULES
11 AMERICAN WOOD PROTECTION ASSOCIATION STANDARDS FOR SODIUM BORATE PRESERVATIVES, P5
12 STEEL STRUCTURES PAINTING COUNCIL STANDARD (SSPC)
13 Wage Determination No. 2015-5637 Revision No.26, dated 5/2/2024


(vii) Date(s) and place(s) of delivery and acceptance and FOB point:

Period of Performance: September 23, 2024 through April 1, 2025.

(viii) FAR provision 52.212-1, Instructions to Offerors -- Commercial Products and Commercial Services, applies to this acquisition. The provision can be accessed at https://www.acquisition.gov/browsefar. In addition to the requirements noted in 52.212-1; quotes shall contain the documents and information in the RFQ.

(ix) FAR provision 52.212-2, Evaluation -- Commercial Products and Commercial Services, applies to this acquisition. The provision can be accessed at https://www.acquisition.gov/browsefar. The specific evaluation criteria to be included in paragraph (a) of the provision are noted in the RFQ.

(x) FAR provision 52.212-3, Offeror Representations and Certifications -- Commercial Products and Commercial Services, applies to this acquisition. Quoters shall complete provision 52.212-3 at the Government's System for Award Management (SAM), https://www.sam.gov/content/home.

(xi) FAR clause 52.212-4, Contract Terms and Conditions -- Commercial Products and Commercial Services, applies to this acquisition. Refer to attachment for a full listing of clauses applicable to this RFQ and the resultant purchase order.

(xii) FAR clause 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders -- Commercial Products and Commercial Services, applies to this acquisition. Refer to attachment for a full listing of clauses applicable to this RFQ and the resultant purchase order.

(xiii) Additional contract requirement(s) or terms and conditions:

a) Contract Type: Firm fixed price

b) Applicable FAR Parts: This acquisition is being conducted per the procedures authorized by FAR Parts 12 and 13.

c) Wage determination:

The attached wage determination WD 2015-5637 (Rev. 26) dated 5/2/2024 applies to this RFQ and the subsequent contract.

d) Clauses: The attached contract clauses apply to this RFQ and the subsequent contract.

e) Pre-proposal Site Visit:


The Government strongly encourages, but does not require, Quoters to visit the work site prior to submitting a proposal. The Government will conduct only the one site visit and quoters that miss the scheduled site visit will have no other opportunities to visit the work site prior to the date quotes are due.

Date & Time: Thursday, August 8, 2024, at 1:00pm PT

Location: Attendees shall meet at Hyde Street Pier, 2905 Hyde Street, San Francisco CA 94109

RSVP: All attendees must RSVP in writing to Contract Specialist, Tonia Gladen at Tonia_Gladen@nps.gov by no later than 3 business days prior to the date of the scheduled site visit. RSVP shall include company name, primary contact name, contact's phone number, contact's e-mail address, anticipated number of attendees.

Other Information:
The Government strongly encourages contractors who will be attending the pre-proposal site visit check weather & road conditions before leaving their home office.

f) Required Quote Submittal Contents:
1) Signed acknowledgement of SF 1449
2) Signed amendments if applicable
3) Completed Provisions (including FAR 52.204-24, FAR52.212-3(v)(2)(i), and others as applicable)
4) Technical approach submission in accordance with the award selection requirement
5) Relevant Experience submission in accordance with the award selection requirement
7) Past Performance submission in accordance with the award selection requirement
8) Qualifications and Experience of Key Personnel and subcontractors
9)Schedule
9) Quoters must provide representation and certification of provision 52.229-11, Tax on Certain Foreign Procurements-Notice and Representation
10) In accordance with FAR Subpart 19.702 and clause 52.219-9 of this solicitation, the apparently successful offeror that is a large business will be required to submit an acceptable subcontracting plan.
11) Contract Price Schedule

g) Evaluation Criteria: Refer to the evaluation factors and methods noted in the RFQ.

(xiv) The Defense Priorities and Allocations System (DPAS) is not applicable to this RFQ.

(xv) The date, time and place Quotes are due:

Submit to: Tonia Gladen at Tonia_Gladen@nps.gov.
Due Date / Time: Submit to ensure Government receipt by 12:00 pm Pacific Daylight Time, 8/26/2024

(xvi) Please contact Tonia Gladen at tonia_gladen@nps.gov if you have any questions regarding this RFQ.

Attachments

Show all 20

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Drydocking of The Steam Paddle Tug EPPLETON HALL Award Award Notice
Drydocking of The Steam Paddle Tug EPPLETON HALL This notice · Latest solicitation Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity