Desoto county, MS, arkabutla lake DAM reconstruction of TOE ditch FC/MR&T, yazoo river basin coldwater river, arkabutla lake
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W912EE20B0003
- Agency
-
ENDIST Vicksburg
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Hernando, Mississippi 38632, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks construction services for the reconstruction of a toe ditch and installation of relief wells at Arkabutla Lake Dam in DeSoto County, Mississippi. The scope of work includes removing an existing concrete toe ditch and headwalls, installing new relief wells, demolishing old relief wells, and constructing a new concrete toe ditch with headwalls and reinforced concrete pipe. Mobilization, demolition, excavation, concrete and grouted riprap placement, grading, engineering fabric installation, erosion control, stormwater prevention, and environmental protection are required. A pre-bid conference was held on January 14, 2020 with site visit, and bids are due February 20, 2020. The soliciting agency is the U.S. Army Corps of Engineers Vicksburg District.
This is a total small business set-aside. The primary NAICS code is 237110 and PSC code is C211. The place of performance is Hernando, MS. The independent government estimate totals $5.7 million to complete all work over three reaches in the base year and two option years. Three contractors submitted bids ranging from $4.1 million to $6.6 million. The low bidder was Riverside Construction Co. of Vicksburg, MS.
Notice text
DESCRIPTION OF WORK: The work consists of furnishing all plant, labor, materials and equipment for removing the existing concrete toe ditch with headwalls and reinforced concrete pipe, installing the new relief wells, demolishing the existing relief wells, and constructing the new concrete toe ditch with headwalls and reinforced concrete pipe. Principal features of the work include mobilization and demobilization, concrete removal, demolition, excavation and backfill, control of water, concrete placement, grouted riprap placement, placement of graded stone, engineering fabric, installation of relief wells, erosion control, storm water pollution prevention, and environmental protection.
PRE-BID CONFERENCE WILL BE HELD ON-SITE AT THE USACE FIELD OFFICE AT ARKABUTLA LAKE ON 14 JANUARY 2020 AT 10:30 AM, WITH A SITE VISIT TO FOLLOW.
COORDINATES FOR THE FIELD OFIICE ARE 34°46'47.87"N 90° 6'55.47"W.
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| Desoto county, MS, arkabutla lake DAM reconstruction of TOE ditch FC/MR&T, yazoo river basin coldwater river, arkabutla lake | Award Notice | |
| This notice | Solicitation | |
| Desoto county, MS, arkabutla lake DAM reconstruction of TOE ditch FC/MR&T, yazoo river basin coldwater river, arkabutla lake | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity