About this file

This document package includes drawings and specifications for a federal construction contract opportunity with the U.S. Army Corps of Engineers. The scope of work involves removing an existing concrete toe ditch and installing a new toe ditch with reinforced concrete pipe at the Arkabutla Lake Dam in Desoto County, Mississippi. Key aspects of the project include demolishing and removing the existing ditch and pipe, excavating and backfilling, installing relief wells, placing concrete, grouted riprap, graded stone and engineering fabric, and implementing erosion control measures. The pre-bid conference will be held on-site on January 14, 2020 at 10:30 AM with a follow-up site visit. Bids for the W912EE20B0003 solicitation are due in accordance with the specified terms.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCALE: 1" = 2'-0"

SCALE: 1" = 2'-0"

SCALE: 1" = 2'-0"

SCALE: 1" = 2'-0"

SCALE: 1" = 2'-0"

SCALE: 1" = 2'-0"

STA 10+64.62 TO STA 53+00, STA 57+88.88 TO STA 63+19

MAIN COLLECTING DITCH TYPICAL SECTION

STA 10+64.62 TO STA 53+00, STA 57+88.88 TO STA 63+19, 2" OUTLET

MAIN COLLECTING DITCH TYPICAL SECTION

STA 10+64.62 TO STA 53+00, STA 57+88.88 TO STA 63+19, 12" OUTLET

MAIN COLLECTING DITCH TYPICAL SECTION

STA 8+00 TO STA 10+48.10

OPTION 2: REACH 1 TYPICAL SECTION

STA 8+00 TO STA 10+48.10, 2" OUTLET

OPTION 2: REACH 1 TYPICAL SECTION

STA 8+00 TO STA 10+48.10, 12" OUTLET

OPTION 2: REACH 1 TYPICAL SECTION

D .L .W

E C D

IV

IS

IO

N

S T

R U

C T

U R

E S S

E C

T

IO

N

Iv a n E s q u il in -D ia z

IE

D

J H

:1

C-301

Y C -1

-3

C -3

M a in T y p ic a l S e c ti o n s .d g n

T Y

P

IC

A L S

E C

T

IO

N S

M A

IN

C

O L L E

C T

IN

G D

IT

C H

A C -3

A C -3

8. ALL EXPOSED EDGES OF CONCRETE PAVED DITCH SHALL HAVE TOOLED ROUNDED EDGE WITH 1/2" RADIUS.

7. ALL EXPOSED EDGES OF CONCRETE HEADWALL SHALL HAVE A 3/4" CHAMFER.

ADDITIONAL DETAILS.

6. EXISTING 2" WROUGHT IRON PIPE SHALL BE GROUTED IN PLACE AFTER CUTTING OFF AT EXCAVATION. SEE SHEET C-305 FOR

5. CONSTRUCTION JOINTS SHALL BE CONSTRUCTED AS NECESSARY WHERE CONCRETE PLACEMENT HAS TO BE TERMINATED.

4. EXPANSION JOINTS SHALL BE CONSTRUCTED AT A MAXIMUM SPACING OF 30' AND WHERE SHOWN.

PER SPECIFICATIONS.

3. ALL GRAVEL "C" MATERIAL SHALL BE SHAPED TO REQUIRED CROSS SECTION, BROUGHT TO LONGITUDINAL GRADE AND COMPACTED

FABRIC.

MATERIAL AT EDGE OF TRENCH, TYP. AT BOTH SIDES. SEE DETAIL IN SHEET C-501, AND SEE SPECIFICATIONS FOR ENGINEERING

2. ALL GRAVEL "C" SHALL BE UNDERLAID WITH ENGINEERING FABRIC. WRAP ENGINEERING FABRIC TO CONTAIN GRAVEL "C"

1. ALL CONCRETE DITCHES, INCLUDING TRANSITIONS AND SLOPE DRAIN OUTLETS SHALL BE REINFORCED. SEE SPECIFICATIONS.

NOTES:

R E

V

IS

E D B

Y A

M E

N D

M E

N T

/1

/2

4 4

4 4

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

V

IC

K S

B U

R G D

IS

T R

IC

T

V

IC

K S

B U

R G

M

IS

S

IS

S

IP

P I

A N

S I

D

D E

S

IG

N B

R A

N C

H

/1

/2

/1

/2

IDENTIFICATION

SHEET

Y C -1

-3

D a v id L

W a ll a c e P .E

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

Vicksburg District

C O

L D

W A

T E

R R

IV

E R

A R

K A

B U

T L

A L

A K

E

F C /M

R

T

Y A

Z O

O R

IV

E R B

A S

IN

R E

C O

N S

T R

U C

T

IO

N O

F T

O E D

IT

C H

D E

S O

T O C

O U

N T

Y

M S

A R

K A

B U

T L

A L

A K

E D

A M

W E E -2

-B -0

W E E -2

-X -X

X X

X

VARIES6'-0"4'-0"6'-0"VARIES

SOLID SOD

DAM TOE ROAD

SOLID SOD

H2:V1

H2:

V1

C/L

1V :1

H

TYP

1'- 0"

SEE NOTE 2

SEE NOTE 3

GRADE

PLAN

REQUIRED, SEE SPECIFICATIONS

CONCRETE REINFORCEMENT

ENGINEERING FABRIC

(TYP)

EXCAVATION

REQUIRED

C/LH2:

V1 H2:V1

SOLID SOD SOLID SOD

DAM TOE ROAD

TYP

T Y

P

1V :1H

1V :1

H

VARIES3'-0"2'-0"3'-0"VARIES

REQUIRED, SEE SPECIFICATIONS

CONCRETE REINFORCEMENT

GRADE

PLAN

(TYP)

EXCAVATION

REQUIRED

ENGINEERING FABRIC

1'- 0"

SEE NOTE 3

SEE NOTE 2

VARIES6'-0"4'-0"6'-0"VARIES

SOLID SOD

H2:

V1

C/L H2:V1

DAM

1V :1H

1V :1H

TYP

1V :1

H

TOE ROAD

SOLID SOD

" 1'-

0"

SEE NOTE 2

SEE NOTE 3

SEE NOTE 7

GRADE

PLAN

(TYP)

EXCAVATION

REQUIRED

REQUIRED, SEE SPECIFICATIONS

CONCRETE REINFORCEMENT

ENGINEERING FABRIC

TO BE REMOVED

SLOPE PAVEMENT

EXISTING CONCRETE

C/L

H2:V1

SOLID SOD SOLID SOD

H2:

V1

DAM

1V :1H

T Y

P

TOE ROAD

TYP

1V :1

H

1V :1H

VARIES3'-0"2'-0"3'-0"VARIES

REQUIRED, SEE SPECIFICATIONS

CONCRETE REINFORCEMENT

GRADE

PLAN

(TYP)

EXCAVATION

REQUIRED

ENGINEERING FABRIC

SEE NOTE 3

SEE NOTE 2

TO BE REMOVED

SLOPE PAVEMENT

EXISTING CONCRETE

SEE NOTE 7

1'-

0"

C/L

SOLID SOD SOLID SOD

H2:

V1

H2:V1

TYP

1V :1

H

T Y

P

1'- 0"

VARIES6'-0" 4'-0" 11'-0"VARIES

GRADE

PLAN

(TYP)

EXCAVATION

REQUIRED

VAPOR BARRIER

ENGINEERING FABRIC

REQUIRED, SEE SPECIFICATIONS

CONCRETE REINFORCEMENT

SEE NOTE 3

SEE NOTE 2

5'-0"

DITCH TO COLLAR FACE

DAM

BY OTHERS

REPLACED

PIPE TO BE

CONCRETE

EXISTING 12"

IN SHEET C-501

SEE DETAIL

REQUIRED,

CONCRETE COLLAR

PIPE

CONCRETE

NEW 12"

12" PIPE

FABRIC TO FIT

ENGINEERING

CUT HOLE IN

1V :1

H1V :1H

6"

ROAD

TOE

(TYP)

EXCAVATION

REQUIRED

C/L H2:V1

SOLID SOD SOLID SOD

H2:

V1

VARIES3'-0"2'-0"8'-0"VARIES TOE ROAD

1V :1

H

TYP

T Y

P

REQUIRED, SEE SPECIFICATIONS

CONCRETE REINFORCEMENT

1'- 0"

GRADE

PLAN

(TYP)

EXCAVATION

REQUIRED

VAPOR BARRIER

ENGINEERING FABRIC

SEE NOTE 3

SEE NOTE 2

5'-0"

DITCH TO COLLAR FACE

DAM

BY OTHERS

REPLACED

PIPE TO BE

CONCRETE

EXISTING 12"

IN SHEET C-501

SEE DETAIL

REQUIRED,

CONCRETE COLLAR

PIPE

CONCRETE

NEW 12"

12" PIPE

FABRIC TO FIT

ENGINEERING

CUT HOLE IN

1V :1

H1V :1H

6"

(TYP)

EXCAVATION

REQUIRED

A

C-301SCALE: 1" = 2'-0"

SCALE: 1"=2'

2' 4'

SCALE: 1" = 2'-0"

SCALE: 1" = 2'-0"

SCALE: 1" = 2'-0"

12" CONCRETE PIPE, TYPICAL ELEVATION A

C-303

STA 53+00 TO STA 54+20, STA 55+57.69 TO STA 57+88.88

REACH 3 TYPICAL SECTION

STA 53+00 TO STA 54+20, STA 55+57.69 TO STA 57+88.88, 2" OUTLET

REACH 3 DITCH TYPICAL SECTION

STA 53+00 TO STA 54+20, STA 55+57.69 TO STA 57+88.88, 12" OUTLET

REACH 3 DITCH TYPICAL SECTION

.L .W

E C D

IV

IS

IO

N

S T

R U

C T

U R

E S S

E C

T

IO

N

Iv a n E s q u il in -D ia z

IE

D

J H

:1

C-303

Y C -1

-3

C -3

A d d tn l S e c ti o n s i n c h P ip e D e ta il .d g n

A C -3

T Y

P

IC

A L E

L E

V A

T

IO

N S

E C

T

IO

N S

C O

N C

R E

T E P

IP

E

D

IT

IO

N A

L R

E A

C H D

IT

C H T

Y P

IC

L

8. ALL EXPOSED EDGES OF CONCRETE PAVED DITCH SHALL HAVE TOOLED ROUNDED EDGE WITH 1/2" RADIUS.

7. ALL EXPOSED EDGES OF CONCRETE HEADWALL SHALL HAVE A 3/4" CHAMFER.

ADDITIONAL DETAILS.

6. EXISTING 2" WROUGHT IRON PIPE SHALL BE GROUTED IN PLACE AFTER CUTTING OFF AT EXCAVATION. SEE SHEET C-305 FOR

5. CONSTRUCTION JOINTS SHALL BE CONSTRUCTED AS NECESSARY WHERE CONCRETE PLACEMENT HAS TO BE TERMINATED.

4. EXPANSION JOINTS SHALL BE CONSTRUCTED AT A MAXIMUM SPACING OF 30' AND WHERE SHOWN.

PER SPECIFICATIONS.

3. ALL GRAVEL "C" MATERIAL SHALL BE SHAPED TO REQUIRED CROSS SECTION, BROUGHT TO LONGITUDINAL GRADE AND COMPACTED

FABRIC.

MATERIAL AT EDGE OF TRENCH, TYP. AT BOTH SIDES. SEE DETAIL IN SHEET C-501, AND SEE SPECIFICATIONS FOR ENGINEERING

2. ALL GRAVEL "C" SHALL BE UNDERLAID WITH ENGINEERING FABRIC. WRAP ENGINEERING FABRIC TO CONTAIN GRAVEL "C"

1. ALL CONCRETE DITCHES, INCLUDING TRANSITIONS AND SLOPE DRAIN OUTLETS SHALL BE REINFORCED. SEE SPECIFICATIONS.

NOTES:

/1

/2

R E

V

IS

E D B

Y A

M E

N D

M E

N T

4 4

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

V

IC

K S

B U

R G D

IS

T R

IC

T

V

IC

K S

B U

R G

M

IS

S

IS

S

IP

P I

A N

S I

D

D E

S

IG

N B

R A

N C

H

/1

/2

/1

/2

IDENTIFICATION

SHEET

Y C -1

-3

D a v id L

W a ll a c e P .E

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

D A

T E

A P

P R

®of Engineers

US Army Corps of Engineers

US Army Corps

Vicksburg District

C O

L D

W A

T E

R R

IV

E R

A R

K A

B U

T L

A L

A K

E

F C /M

R

T

Y A

Z O

O R

IV

E R B

A S

IN

R E

C O

N S

T R

U C

T

IO

N O

F T

O E D

IT

C H

D E

S O

T O C

O U

N T

Y

M S

A R

K A

B U

T L

A L

A K

E D

A M

W E E -2

-B -0

W E E -2

-X -X

X X

X

C/L

SOLID SOD SOLID SOD

H2:

H2:V1

T Y

P

TOE ROAD

V :1

H 1V :1

H

TYP

VARIES4'-0"2'-0"4'-0"VARIES

REQUIRED, SEE SPECIFICATIONS

CONCRETE REINFORCEMENT

GRADE

PLAN

(TYP)

EXCAVATION

REQUIRED

ENGINEERING FABRIC

1'- 0"

SEE NOTE 3

SEE NOTE 2

C/L

SOLID SOD SOLID SOD

H2:

H2:V1

1V :1H

DAM

T Y

P

TOE ROAD

1V :1H

1V :1

H

TYP

VARIES4'-0"2'-0"4'-0"VARIES

REQUIRED, SEE SPECIFICATIONS

CONCRETE REINFORCEMENT

GRADE

PLAN

(TYP)

EXCAVATION

REQUIRED

ENGINEERING FABRIC

TO BE REMOVED

SLOPE PAVEMENT

EXISTING CONCRETE

1'- 0"

SEE NOTE 7

SEE NOTE 3

SEE NOTE 2

C/L

SOLID SOD SOLID SOD

H2:

V1

H2:V1

VARIES4'-0"2'-0"8'-0"VARIES TOE ROAD

T Y

P

1V :1H

1V :1

H

TYP

REQUIRED, SEE SPECIFICATIONS

CONCRETE REINFORCEMENT

GRADE

PLAN

(TYP)

EXCAVATION

REQUIRED

VAPOR BARRIER

ENGINEERING FABRIC

1'- 0"

BY OTHERS

REPLACED

PIPE TO BE

CONCRETE

EXISTING 12"

IN SHEET C-501

SEE DETAIL

REQUIRED,

CONCRETE COLLAR

PIPE

CONCRETE

NEW 12"

DAM

12" PIPE

FABRIC TO FIT

ENGINEERING

CUT HOLE IN

SEE NOTE 2

SEE NOTE 3

5'-0"

DITCH TO COLLAR FACE

1V :1

H

6"

(TYP)

EXCAVATION

REQUIRED

4'-0"2'-0"4'-0"

V A

R

IA

B L E

PIPE

CONCRETE

NEW 12"

V A

R

IA

B L E

V :2

H

V :2

H

V :2

H

PAVED DITCH

LIMITS OF CONCRETE

C/L DITCH

GRADE

FINISHED

GRADE

FINISHED

OUTLET LOCATIONS IN THE TOE DITCH TO MATCH SLOPE SURFACE.

2. NEW 12" CONCRETE PIPE SHOWN IS ROUND. SHAPE SHOWN IS THE PIPE CUT AT THE

AS SHOWN IN THE TYPICAL SECTIONS.

1. SLOPES SHOWN ON CONCRETE SURFACE TO MATCH FINISHED GRADE ELEVATION,

ELEVATION NOTES:

DAM

File details come from the government source that posted it. Updated .