This solicitation is for reconstruction work on the toe ditch and relief wells at Arkabutla Lake Dam in DeSoto County, Mississippi. The scope of work includes removing the existing concrete toe ditch and headwalls, demolishing old relief wells, installing new relief wells, and constructing a new concrete toe ditch with reinforced pipe. Mobilization, excavation, concrete and grouted riprap placement, erosion control measures, and environmental protection are also required. A pre-bid conference will be held on-site on January 14, 2020 at 10:30 AM with a follow-up site visit. The issuing agency is the U.S. Army Corps of Engineers Vicksburg District. Responses are due through the Federal Business Opportunities website.