This is a solicitation for a federal construction contract to reconstruct a toe ditch and install relief wells at Arkabutla Lake Dam in DeSoto County, Mississippi. The work includes removing an existing concrete toe ditch and structures, installing new relief wells, demolishing existing relief wells, and constructing a new concrete toe ditch and structures. It also involves mobilization, demolition, excavation, concrete placement, erosion control, stormwater prevention, and environmental protection. A pre-bid conference was scheduled for January 14, 2020 at the USACE field office, with a site visit to follow. The solicitation is issued by the U.S. Army Corps of Engineers Vicksburg District for offers due by February 6, 2020.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Reference Solicitation W912EE20B0003, for DESOTO COUNTY, MS, ARKABUTLA LAKE DAM RECONSTRUCTION OF TOE DITCH FC/MR&T, YAZOO RIVER BASIN COLDWATER RIVER, ARKABUTLA LAKE, is amended as follow s. Please see continuation pages for changes.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Jan-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EE20B0003

X 9B. DATED (SEE ITEM 11)

30-Dec-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Jan-2020

CODE

VICKSBURG CONTRACTING OFFICE

4155 CLAY ST

VICKSBURG MS 39183-3435

W912EE 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EE20B0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

A NEW BID OPENING DATE AND TIME OF 6 FEBRUARY 2020 AT 2:00 PM IS HEREBY

ESTABLISHED.

SPECIFICATIONS: SF 1442, Section 01 00 00.00 09, Submittal Register, Section 01 22 00.00 09, Section 01 57 23.00 09, Section 02 50 02.00 09, and Section 33 26 00.00 12 are revised and replaced.

DRAWINGS:

Sheet G-004: Riser lengths and well screen lengths were added to the Tabulation of Relief Well Locations.

Sheets B-601 and B-602: Piezometer Reading data format was changed, Lowest Ditch Elevation annotations were revised.

Sheet C-502: Length of Riser and Length of Well Screen values were revised in Relief Well Schedule.

Pre-Bid Conference Attendance Roster and Pre-Bid Meeting Questions and Answers are hereby added to this solicitation.

Specifications revised by this amendment have the notation "Revised by Amendment 0001" at the bottom of the page. Text added by this amendment is shown as underlined. Text deleted by this amendment is shown as overstruck.

Drawings revised by this amendment have the notation “Revised by Amendment 0001” in the title block.

Pages added by this amendment have the notation “Added by Amendment 0001” at the bottom of the page.

Arkabutla Relief Wells and Toe Ditch Pre-Bid Meeting Summary

January 14, 2020

General: A scope of work review was provided by U.S. Army Corps of Engineers (USACE) representatives. The importance of following the specified order of work and drilling method for the wells was emphasized. The specification requirements are designed to minimize dam safety risks associated with construction of this project.

IMPORTANT NOTE --- The requirements in the solicitation regarding pumping of the newly installed relief wells to lower water level readings in adjacent piezometers to 5 ft below the bottom of the ditch excavation during ditch construction were reviewed during the prebid meeting. However, subsequent to the prebid meeting, the requirement to pump from the relief wells during ditch construction has been reevaluated. It has been determined that the risk to dam safety is manageable during ditch construction at the specified lake levels that ditch construction will occur. The newly installed relief wells shall NOT be plugged during construction of the ditch and may be flowing, but are not expected to require any pumping. The contractor shall still be required to manage water during ditch construction whether it be from seepage, surface runoff, wells flowing, etc…, but no additional pumping of relief wells is required. As an emergency contingency plan, the contractor is required to plan for the possibility of installing temporary pumps in the new relief wells if so directed by the Contracting Officer.

However, payment for installation, operation, maintenance, and removal of the temporary pumps if directed will be paid for under the changes clause of the contract.

The specific requirements for the temporary pumping plan and response capabilities are addressed in this amendment.

Questions:

1. Can all wells be installed at one time, before toe ditch demolition?

Yes, all wells can be installed at one time before toe ditch demolition. At the pre-bid meeting, the contractors were reminded that you are limited by the specifications to only demolishing the minimum amount of ditch necessary to install the well.

2. If lake stages get above 225, is the contractor reimbursed for time?

This would be considered an excusable delay and the contractor will receive a time only extension when lake stages prohibit well and toe ditch work. The contractor will not receive monetary compensation for this delay. Furthermore, it is intended to complete ongoing work in advance of lake levels rising about 225, but if any wells are incomplete or a section of ditch is removed and under construction when lake levels rise above 225, work should continue and be completed as soon as possible regardless of lake stages unless directed otherwise.

Added by Amendment 0001

3. If all contract options are awarded, can all wells for the entire project be installed prior to ditch demolition?

Yes, all wells can be installed prior to toe ditch demolition. As stated in Question 1 above, you are limited to only demolishing the minimum amount of ditch necessary to install the well.

4. Is it the contractor’s responsibility to monitor piezometer levels?

Unless the contractor is directed under the changes clause to install temporary pumps in the new relief wells, no monitoring of the piezometers shall be required.

However, monitoring of the static water levels in the newly installed relief wells shall be performed as specified in paragraph 3.5, Foundation Pressure Relief, of Section 02 50 02.00 09.

5. Are there any restrictions for working on federal holidays?

No. However, the contractor shall notify the Contracting Officer Representative (COR) prior to working federal holidays and weekends so that USACE can plan and coordinate their staff.

6. Will well points be required?

USACE does not anticipate a well point system being required.

7. Is much subsurface water anticipated?

Piezometer plots are provided in the contract drawings (Sheets B-601 through B- 603). Please note that the new relief wells can also be used as piezometers to monitor subsurface water levels during construction, and may provide some reduction in pressures at higher lake stages once installed.

8. Are there any security authorizations and/or classes required?

No classes are required. However, the contractor will be required to provide information on each worker for an additional background check as specified in the solicitation. These checks take approximately 2 weeks to process and must be completed prior to the individuals working on site.

9. After drilling, can filter sand be raised to reduce the amount of temporary casing used?

Use of temporary casings is not mandatory with the use of drilling mud as specified.

If the contractor’s drilling method involves use of temporary casings, it should be identified and addressed in the appropriate drilling plan submittals. The specified filter elevations and bentonite seals must be met regardless of the use of casings or additional filter sand. If this does not adequately address this topic, please submit a question in PROJNET per instructions in the solicitation.

10. Will drill pads be required?

Use of drill pads is not required by the specifications. If the contractor’s drilling plan requires incorporation of pads for access to drill the holes, this shall be submitted for approval in the appropriate drilling plan submittals. With proper use of the specified drilling mud, pads should not be required to increase head pressures during drilling

11. Can new relief wells be used to monitor pressures?

Yes, new relief wells can be used to monitor pressures.

12. Clarify the wooden rods that may be in some of the existing wells that are to be grouted and abandoned.

Some of the existing relief wells were producing sand, and were plugged with wooden stakes or dowels to stop the movement of materials. Additionally, some wells and drain piping may be plugged with soil or other debris. The top of the wells are not visible, but the lateral drains into the side of the existing ditch are generally visible. Contractor must locate the existing wells and clean out risers and drain piping of any obstructions, including the wooden plugs, as necessary to allow proper grouting.

13. What lay down areas are available for contractor’s use during construction?

There are sufficient grassed areas adjacent to the project site, across the road from the toe ditch, that can be made available to the contractor for use. Specific area(s) will be coordinated with the contractor after contract award. The contractor is responsible for security of his materials and equipment and must return any disturbed areas to preconstruction condition upon completion of the contract.

14. What is available for water supply during construction?

There are no water lines available for connection between the roadway and the dam. Water service is located across the roadway on the southern most end near the outlet structure. The contractor may need to plan on use of water tanks or a water truck during construction. If so, a supply source for filling such tanks/trucks can be coordinated in close proximity to the site.

15. Will a mud box be required for the mud drilling operation?

Yes, a suitable mud box or portable containment must be provided. No pits can be excavated for the mud containment.

16. Who is responsible for obtaining the storm water permit for this project, and is silt fencing required along the ditch?

Reference Section 01 57 23.00 09. All construction activities shall be performed in full compliance with the latest version of the State of Mississippi Small Construction Storm Water General Permit for storm water discharges from construction activities.

Minimum control measures and best practices are identified on the contract drawings and specifications. However, additional controls may be required to meet the required level of control based upon the contractor’s construction methods and site conditions. Regarding silt fencing, see notes on drawings C-114 through C-

117. Silt fencing shall be used on the downhill side of the ditch “as needed” to obtain the required minimum control.

17. Can the existing drain pipes tied into the existing ditch be capped off during construction of the new ditch?

No. Existing drainage and seepage pipes must remain functional during construction. The new relief wells must also remain operational once installed.

Existing relief wells shall remain undisturbed until the new relief wells are installed.

W807PM90705348

DESOTO COUNTY, MS, ARKABUTLA LAKE DAM

RECONSTRUCTION OF TOE DITCH

FC/MR&T, YAZOO RIVER BASIN

COLDWATER RIVER, ARKABUTLA LAKE

DESCRIPTION OF WORK: The work consists of furnishing all plant, labor, materials and equipment for removing the existing concrete toe ditch with headwalls and reinforced concrete pipe, installing the new relief wells, demolishing abandon the existing relief wells, and constructing the new concrete toe ditch with headwalls and reinforced concrete pipe. Principal features of the work include mobilization and demobilization, concrete removal, demolition, excavation and backfill, control of water, concrete placement, grouted riprap placement, placement of graded stone, engineering fabric, installation of relief wells, erosion control, storm water pollution prevention, and environmental protection.

The estimated value of the proposed work is between $1,000,000 and $5,000,000.

ANDREW MCCASKILL (601)631-5248

NOTE: In this request for proposal, "bid" and "bidder" mean "offer" and "offeror".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

30 December 2019

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

SEE SPECIAL NOTICES TO BIDDERS

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by

GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance within 10 calendar days and complete it within 430 calendar days after receiving award, X Notice to proceed. This performance period is X mandatory, negotiable. ( See Section 00 80 00.00 09

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X

YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original to perform the work required are due at the place specified in Item 8 BY 06 February 2020 @ 02:00 p.m.

If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______ 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

VICKSBURG CONTRACTING OFC

4155 CLAY ST

VICKSBURG MS 39183-3435

W912EE

PAGE

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

(601)631-7261 FAX: TEL: TEL: FAX:

W912EE20B0003

X

B4EDGDML

Cross-Out

W912EE-20-B-0003

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 00 00.00 09

GENERAL CONTRACT REQUIREMENTS

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 PARTNERING

1.4 RIGHTS-OF-WAY

1.5 PRE-BID CONFERENCE

1.6 PRECONSTRUCTION CONFERENCE

1.7 SUBMITTAL OF SUBCONTRACTING PLAN

1.8 NOTIFICATION OF AREA ENGINEER BEFORE BEGINNING WORK

1.9 ORDER OF WORK

1.10 WORK SCHEDULE DIAGRAM

1.11 DESIGNATED BILLING OFFICE

1.12 PAYMENT INVOICES

1.13 TEMPORARY PROJECT FENCING

1.14 AS-BUILT DRAWINGS

1.15 PROJECT SIGN

1.16 MINIMUM REQUIRED INSURANCE

1.17 CERTIFICATES OF COMPLIANCE

1.18 PROCESS FOR OBTAINING CURRENT REQUIREMENTS OF THE U.S. ARMY CORPS

OF ENGINEERS SAFETY AND HEALTH REQUIREMENTS MANUAL (EM 385-1-1)

1.19 SAFETY SIGN

1.20 ACCIDENT PREVENTION PLAN

1.21 DAILY INSPECTIONS

1.22 ACCIDENT INVESTIGATIONS AND REPORTING

1.23 MACHINERY AND MECHANIZED EQUIPMENT

1.24 VEHICLE WEIGHT LIMITATIONS

1.25 PUBLIC AND PRIVATE UTILITIES

1.26 DAMAGE TO WORK

1.27 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER

1.28 CONTROL OF ACCESS TO CONSTRUCTION AREAS

1.29 MAINTENANCE OF TRAFFIC

1.30 LAKE OPERATIONS

1.31 ACCEPTANCE OF COMPLETED WORK

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION (Not Applicable)

-- End of Section Table of Contents --

SECTION 01 00 00.00 09 Page 1 Revised By Amendment 0001

SECTION 01 00 00.00 09

GENERAL CONTRACT REQUIREMENTS

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

33 CFR 156 Oil and Hazardous Material Transfer Operations

1.2 SUBMITTALS

Government approval is required for all submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Accident Prevention Plan; G, GA

1.3 PARTNERING

The Government encourages formation of informal project partnerships on all projects. A project partnership strives to utilize a cooperative working relationship to jointly establish and effectively reach mutual project execution goals. The partnering process will in no way relax or stiffen the requirements of the contract, but will enhance the likelihood of success through improved working relationships. The possibility of an informal partnership may be discussed at the Pre-construction Conference for this project.

1.4 RIGHTS-OF-WAY

a. The rights-of-way for Contractor performance under this contract, within the limits indicated on the drawings, will be provided by the Government without cost to the Contractor. It is the Contractor's responsibility to carefully review and determine the scope of the rights-of-way. Any questions should be clarified with the Government prior to use. If these rights-of-way are used by the Contractor, he shall, at his own expense, do all work necessary to make such rights-of-way suitable for safe travel to and from the worksite. Upon completion of the Contractor's work, any such rights-of-way furnished

SECTION 01 00 00.00 09 Page 2 by the Government shall be left in a condition satisfactory to the Contracting Officer.

b. When so directed by the Contracting Officer, the Contractor shall, without expense to the Government, promptly vacate and clean up any part of the Government grounds or rights-of-way that have been allotted to or have been in use by the Contractor.

c. The Contractor shall not obstruct any existing roads or any other means of existing ingress or egress on lands controlled by the United States except with written permission of the Contracting Officer and shall maintain such roads and other means of ingress or egress in as good condition as exists at the time of commencement of work performance under this contract.

d. The Contractor shall procure, without expense to the Government, all additional lands, access roads, rights-of-way, and any other property rights necessary for his use in the performance of the work or as required by his method of operation. The Contractor shall provide the Contracting Officer with an authenticated copy of the conveyance under which the Contractor acquired such property rights, prepared and executed in accordance with the laws of the State in which the land is located. The Contractor shall also obtain from the property owners and present to the Contracting Officer a release of all claims against the Government which may result from the Contractor's use or possession of such real estate or property rights. The written conveyance and release shall be provided to the Contracting Officer prior to the Contractor's use of Contactor obtained real estate or property rights.

If temporary rights-of-way are obtained by the Contractor the period of time for those rights shall coincide with Section 00 80 00.00 09 SPECIAL CONTRACT REQUIREMENTS, paragraph COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK, plus a reasonable time for any extension granted for the completion of the work. Any agreements or permits with levee boards, counties, parishes, municipalities, or other political subdivisions for moving material and equipment will be the responsibility of the Contractor and shall be obtained at no expense to the Government. Any delays to the Contractor resulting from delays in procuring access roads, rights-of-way, permits, or other real estate and property rights necessary for moving material and equipment for his work under this contract will not be a basis for any claim for increase in the cost of this contract. The Contractor shall make his own investigations to determine the conditions, restrictions and difficulties which may be encountered in acquiring such real estate, rights-of-way, or other property rights and in the transportation of material and equipment. In addition, the Contractor shall be solely liable for any and all damages and claims of any nature whatsoever arising from, related to, or growing out of the acquisition and use of this real estate, rights-of-way, property rights, etc.

e. The Contractor shall repair at no expense to the Government, any and all damage to any existing roads or other means of existing ingress or egress when such damage is a result of his operations under this contract.

1.5 PRE-BID CONFERENCE

A pre-bid conference will be held on [date and time] at the project site.

POC for the pre-bid conference is Mr. Jason Overstreet at 662-453-5531.

SECTION 01 00 00.00 09 Page 3

1.6 PRECONSTRUCTION CONFERENCE

a. A preconstruction conference will be arranged by the Area Engineer as soon after contract award as possible, and the conference will be conducted before work is allowed to commence. The Area Engineer will notify the Contractor of the time, date, and location for the meeting.

At this conference, the Contractor will be oriented with respect to contract administration procedures, lines of authority, and construction matters. All known subcontractors performing at least 20 percent of the contract are required to attend this conference.

Additional conferences may be established by the Area Engineer for any major subcontractors unknown at the time of the initial conference.

b. Submission by the Contractor of the items listed below will determine the date of the conference. The following items shall be submitted to the Area Engineer in hard copy and electronic (pdf) format for review at least seven (7) calendar days prior to the preconstruction conference:

(1) Accident Prevention Plan

(2) Quality Control Plan

(3) Environmental Protection Plan

(4) Six copies of the certified Large Construction Notice of Intent (LCNOI) for each site

(5) Work Schedule Diagram

c. The Contractor shall bring to this conference, in completed form, the following:

(1) Letter of superintendent appointment and authority

(2) List of subcontractors

d. The Contractor should bring to this conference, or at least be prepared to discuss, the following:

(1) Submittal register

(2) Progress chart or Network Analysis System (as applicable)

e. Minutes of this conference will be taken and prepared by the Area Engineer and sent to the Contractor for his concurrence and signature.

1.7 SUBMITTAL OF SUBCONTRACTING PLAN

a. This paragraph does not apply to small business concerns.

b. After bid opening, and within 7 days, the apparent low bidder, upon telephone notification by the Small and Disadvantaged Business Utilization Specialist, shall submit a Small and Disadvantaged Business Subcontracting Plan. The plan shall be submitted in accordance with the Contract Clauses SMALL BUSINESS SUBCONTRACTING PLAN - ALTERNATE I.

The person responsible for administering the plan shall be named in paragraph AGENT FOR SUBMITTING SMALL BUSINESS SUBCONTRACTING PLAN of the Representations and Certifications.

SECTION 01 00 00.00 09 Page 4

1.8 NOTIFICATION OF AREA ENGINEER BEFORE BEGINNING WORK

At least 7 days before beginning work, and at least one day before resuming work after a period of 7 days or more when no work has been performed, the Contractor shall notify U.S. Army Corps of Engineers, Mr. Jason Overstreet, Area Engineer, Greenwood Area Office, 100 Moore Street, Greenwood, Mississippi 38930-4512, telephone (662)455-5531 .

1.9 ORDER OF WORK

The work shall be carried on in accordance with the Work Schedule Diagram and Progress Chart (schedule) required by paragraph (a) of the Contract Clause SCHEDULES FOR CONSTRUCTION CONTRACTS. This order of work specified below applies also to Options 1 and/or 2 if exercised. In preparing the Work Schedule Diagram (schedule), the Contractor shall adhere to the following order of work:

(1) Work shall progress opposite of the direction of toe ditch flow.

(2) The Contractor shall install the new relief wells as specified in Section 33 25 00.00 12 RELIEF WELLS prior to removal of any given toe ditch section. However, the Contractor shall remove the minimum amount of concrete toe ditch bottom slab as required to install the well.

This small section of slab shall not be removed more than 3 days in advance of installing the well in that location. If, in the opinion of the Contracting Officer, conditions indicate Dam Safety concerns, the Contracting Officer may impose additional restrictions.

(3) Upon completion of a reach of wells, the Contractor may remove the entire toe ditch section in the completed reach for distances up to 300 feet but no longer than reaches that can be excavated, formed, and re-poured, within 10 days.

( 43) After the new relief wells are installed for the working section, and prior to toe ditch reconstruction, the Contractor shall abandon and plug the existing relief wells in accordance to the plans , and specifications , and State of Mississippi requirements .

(4) Upon completion of a reach of wells, the Contractor may remove the entire toe ditch section in the completed reach for distances up to 300 feet but no longer than reaches that can be excavated, formed, and re-poured, within 10 days. One relief well beyond the limit of ditch removal shall be completed prior to ditch removal.

1.10 WORK SCHEDULE DIAGRAM

The Contractor shall furnish a Work Schedule Diagram for the base contract and for each contract option awarded.

a. Work Schedule Diagram

(1) The progress chart required by provisions of paragraph (a) of the Contract Clause SCHEDULES FOR CONSTRUCTION CONTRACTS, shall be prepared in the form of a Work Schedule Diagram. FIVE (5) COPIES OF THE WORK SCHEDULE DIAGRAM WILL BE REQUIRED. The use of a computer is at the Contractor's option.

(2) The Work Schedule Diagram shall be in either the I-J or

SECTION 01 00 00.00 09 Page 5

Precedent Diagramming method. The diagram shall show the order and interdependence of activities and the sequence in which the work is to be accomplished. The diagram shall include, in addition to construction activities, the submittal and approval of materials, samples and shop drawings, the procurement of all materials and equipment, and preparatory and initial quality control inspections. All activities of the Government that affect progress and contract required dates for completion of all or part of the work shall be shown. No activity with a duration of more than thirty (30) calendar days will be allowed. The diagram shall be drafted to show a continuous flow from left to right with no flow from right to left. The following information shall be shown on the diagram for each activity: preceding and following event numbers, description, estimated cost, and duration of calendar days. Numbering shall be assigned so that preceding event numbers are smaller numerically than the following event numbers.

Skip-numbering should be used on the network to allow addition of subsequent activities for change order and logic changes. The submittal of the diagram shall include a listing of standard abbreviations used by the Contractor.

(3) The diagram shall be submitted in time to be received by the Government seven (7) days prior to the scheduled Preconstruction Conference. The diagram will be used to determine Contractor's progress on the project. The Contractor shall at least monthly or with each pay estimate submit actual progress and remaining duration on each activity, which will be agreed to by the Contracting Officer. If there are no changes on the diagram logic, the Contractor may submit these updates in a narrative form. If any changes are made to the diagram logic, the Contractor shall submit a revised work schedule diagram along with a narrative explaining those logic changes. Five (5) copies of any revised diagrams will be required.

1.11 DESIGNATED BILLING OFFICE

The designated billing office for this contract shall be U.S. Army Corps of Engineers, Greenwood Area Office, 100 Moore Street, Greenwood, Mississippi 38930-4512 .

1.12 PAYMENT INVOICES

a. The Federal Acquisition Regulation requires that the "REMIT TO" address on the invoice match the "REMIT TO" address on the contract or a proper notice of assignment. The Payment Office will verify a match of the "REMIT TO" address in the contract and Contractor’s invoice prior to payment. If the addresses do not match, the invoice will be determined improper and returned to the Contractor for correction and resubmission. If an invoice is improperly returned, the original invoice receipt date shall be used as the basis for determining interest to be paid in accordance with the PROMPT PAYMENT ACT.

b. Among other things, the Contract Clause PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS requires that a proper invoice for payment include substantiation of the amounts requested. As required in Office of Management and Budget, 5 CFR Part 1315, September 29, 1999, PROMPT PAYMENT, substantiation of the amount requested for progress payments under construction contracts includes the following:

SECTION 01 00 00.00 09 Page 6

(1) An itemization of the amounts requested related to the various elements of work required by the contract covered by the payment request;

(2) A listing of the amount included for work performed by each subcontractor under the contract;

(3) A listing of the total amount of each subcontract under the contract;

(4) A listing of the amounts previously paid to each such subcontractor under the contract; and,

(5) Additional supporting data in a form and detail required by the Contracting Officer.

c. Failure to include the above information in a Contractor’s invoice will result in the invoice being considered defective under the provisions of the PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS clause of the contract, and it will be returned to the Contractor for correction and resubmission.

1.13 TEMPORARY PROJECT FENCING

Temporary project fencing as required by Section 4, "Temporary Facilities", paragraph 04.A.04 of EM 385-1-1, U.S. Army Corps of Engineers Safety and Health Requirements Manual, is not required on this project.

1.14 AS-BUILT DRAWINGS

This paragraph supplements the Contract Clause SPECIFICATIONS AND DRAWINGS

FOR CONSTRUCTION.

a. As-Built Contract Drawings. The Contractor shall maintain two (2) full-size sets of blueline prints of the contract drawings depicting in red a record of as-built conditions. These drawings shall be maintained in current condition at all times during the entire contract period. The blueline drawings shall be updated daily by the Contractor showing all changes from the contract plans which are made in the work, additional information which might be uncovered in the course of construction, and information for future construction reference (such as debris disposed by burying). This information shall be recorded on the blueline prints accurately and neatly by means of details and notes. Each month, prior to submitting a request for progress payment, the Contractor shall review the blueline as-built drawings with the Contracting Officer, and the Contractor shall certify that the as-built drawings are accurate and up-to-date before progress payment is made.

The Contractor shall deliver to the Contracting Officer the two (2) original full-size completed sets of as-built marked blueline prints at the time of the final inspection of the project. In addition, the Contractor shall provide two CD-ROM's, each containing a full-size, 400 dpi PDF (portable document format) set of as-built drawings, to the Contracting Officer at the time of final inspection. The as-built drawings shall be identified by entering the words "AS-BUILT DRAWINGS" in letters at least 3/16-inch high, placed in the lower right corner of each drawing.

b. No separate measurement or payment will be made for providing as-built drawings, electronic drawings and plates, or for any of the

SECTION 01 00 00.00 09 Page 7 work required by this clause, and all costs therefor shall be included in the applicable contract prices contained in the Bidding Schedule.

1.15 PROJECT SIGN

The Contractor shall fabricate, erect and maintain one sign for project identification. The sign shall be displayed and positioned for reading by passing viewers. The exact location is subject to Contracting Officer's approval. Information for the right side of the project sign shall be as follows:

Project Title: DESOTO COUNTY, MS, ARKABUTLA LAKE DAM

RECONSTRUCTION OF TOE DITCH

FC/MR&T, YAZOO RIVER BASIN

COLDWATER RIVER, ARKABUTLA LAKE

Contract No: W912EE-20-C-0XXX

Contractor: (Contractor's name and city)

The project identification sign shall meet the requirements specified in the U.S. Army Corps of Engineers Sign (USACES) Standards Manual, EP 310-1-6a and EP 310-1-6b. A copy of the sign standards manual is available for review at the office of the Vicksburg District Sign Program Manager and questions concerning manufacture and installation of the project identification sign may be addressed to:

Vicksburg District Sign Program Manager (Aaron Posner)

ATTN: CEMVK-OD-FS

4155 Clay Street Vicksburg, MS 39183-3435 Telephone: (601) 631-5287

1.16 MINIMUM REQUIRED INSURANCE

The following paragraph is applicable if the services involved are performed on a Government Installation. Government Installation is defined as property where the Government holds by fee simple title, by construction rights-of-way, or perpetual easement, etc., an interest in real property.

See the Contract Clause INSURANCE-WORK ON A GOVERNMENT INSTALLATION.

a. Workmen's Compensation and Employer's Liability Insurance. The Contractor shall comply with all applicable workmen's compensation Statutes of the State of Mississippi and shall furnish evidence of Employer's Liability Insurance in an amount of not less than $100,000.

b. General Liability Insurance. Bodily injury liability insurance in the minimum limits of $500,000 per occurrence on the comprehensive form of policy.

c. Automobile Liability Insurance. Minimum limits of $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage. This insurance shall be on the comprehensive form of policy and shall cover the operation of all automobiles used in performance of the contract.

1.17 CERTIFICATES OF COMPLIANCE

Any certificates required for demonstrating proof of compliance of material

SECTION 01 00 00.00 09 Page 8 with specification requirements shall be executed in accordance with Section 01 33 00 SUBMITTAL PROCEDURES. Each certificate shall be signed by an official authorized to certify on behalf of the manufacturing company and shall contain the name and address of the Contractor, the project name and location, and the quantity and date or dates of shipment or delivery to which the certificates apply. Copies of laboratory test reports submitted with certificates shall contain the name and address of the testing laboratory and the date or dates of the tests to which the report applies.

Certification shall not be construed as relieving the Contractor from furnishing satisfactory material, if, after tests are performed on selected samples, the material is found not to meet the specific requirements.

1.18 PROCESS FOR OBTAINING CURRENT REQUIREMENTS OF THE U.S. ARMY CORPS OF

ENGINEERS SAFETY AND HEALTH REQUIREMENTS MANUAL (EM 385-1-1)

Contractors are required to comply with the latest version, and all posted changes, of the U.S. Army Corps of Engineers Safety and Health Requirements Manual in effect on the issue date of this solicitation. EM 385-1-1 version 2014 and changes are available on the Internet at http://www.publications.usace.army.mil/USACEPublications/EngineerManuals.aspx, Search for EM_385-1-1, then click on EM_385-1-1 2014 english version.

Prior to making an offer, offerors should check the referenced website for the latest changes. No separate payment will be made for compliance with the requirements of this paragraph, or for compliance with other safety requirements of the contract.

1.19 SAFETY SIGN

The Contractor shall fabricate, erect and maintain a safety sign at the site, as located by the Contracting Officer. The sign shall be erected as soon as practicable, but not later than 15 calendar days after the date established for commencement of work. The data required shall be current.

The safety sign shall meet the requirements specified in the U.S. Army Corps of Engineers Sign (USACES) Standards Manual, EP 310-1-6a and EP 310-1-6b. A copy of the sign standards manual is available for review at the office of the Vicksburg District Sign Program Manager and questions concerning manufacture and installation of the safety sign may be addressed to:

Vicksburg District Sign Program Manager (Aaron Posner)

ATTN: CEMVK-OD-FS

4155 Clay Street Vicksburg, MS 39183-3435 Telephone: (601) 631-5287

1.20 ACCIDENT PREVENTION PLAN

Refer to the Contract Clause ACCIDENT PREVENTION (Alternate I). Within 15 days after receipt of award of the contract, an Accident Prevention Plan shall be submitted to the Contracting Officer for review and acceptance.

The plan shall be prepared as specified in Appendix A, "Minimum Basic Outline for Accident Prevention Plans" of EM 385-1-1. In addition to the requirements listed, the Contractor shall also submit the required information on the forms outlined below, which can be found on the Vicksburg District Construction Division home page, http://www.mvk.usace.army.mil/Missions/EngineeringandConstructionDivision.aspx, click on Construction Services Branch, then click on Forms.

a. An executed LMV Form 358-R, "Administrative Plan".

SECTION 01 00 00.00 09 Page 9

b. An executed MVK Form 385-359-R, "Hazard Analysis" for each definable feature of work.

c. When marine plant and equipment are in use under a contract, the method of fuel oil transfer shall be submitted on LMV Form 414R, "Fuel Oil Transfer-Floating Plant". (Refer to 33 CFR 156 .)

d. The Contractor shall not commence physical work at the site until the plan has been accepted by the Contracting Officer, or his authorized representative. At the Contracting Officer's discretion, the Contractor may submit his Hazard Analysis only for the first phase of construction provided that it is accompanied by an outline of the remaining phases of construction. All remaining phases shall be submitted and accepted prior to the beginning of work in each phase.

Also, refer to Section 1, "Program Management", paragraph 01.B, "Indoctrination and Training" of EM 385-1-1.

1.21 DAILY INSPECTIONS

Refer to Section 01 45 04.00 09 CONTRACTOR QUALITY CONTROL and the Contract Clause INSPECTION OF CONSTRUCTION. The Contractor shall perform daily safety inspections and record them on the forms approved by the Contracting Officer. Reports of daily inspections shall be maintained at the job site.

The reports shall be records of the daily inspections and resulting actions. As a minimum each report shall include the following:

a. Phase(s) of construction underway during the inspection.

b. Locations or areas inspections were made.

c. Results of inspection, including nature of deficiencies observed and corrective actions taken, or to be taken, date, and signature of the person responsible for its contents.

1.22 ACCIDENT INVESTIGATIONS AND REPORTING

Refer to EM 385-1-1, Section 1, "Program Management", paragraph 01.D, "Accident Reporting and Recordkeeping". Accidents shall be investigated and reports completed by the immediate supervisor of the employee(s) involved and reported in writing to the Contracting Officer or his representative within one working day after the accident occurs.

1.23 MACHINERY AND MECHANIZED EQUIPMENT

Machinery and mechanized equipment used under this contract shall comply with the following:

b. The stability of crawler, truck, and wheel-mounted cranes shall be assured.

(1) The manufacturer's load-rating chart may be used to determine the maximum allowable working load for each particular crane's boom angle provided a test load, with a boom angle of 20 degrees, confirms the manufacturer's load-rating table.

(2) Stability tests are required if:

(i) there is no manufacturer's load-rating chart securely fixed

SECTION 01 00 00.00 09 Page 10 to the operator's cab;

(ii) there has been a change in boom or other structural member;

or

(iii) there has been a change in the counterweight.

The test shall consist of lifting a load with the boom in the least stable undercarriage position and at an angle of 20 degrees above the horizontal. The test shall be conducted under close supervision on a firm, level surface. The load that tilts the machine shall be identified as the test load. The test load moment (in ft-lbs) shall then be calculated by multiplying the horizontal distance (in feet) from the center of rotation of the machine to the test load, times the test load (in lbs).

Three-fourths of this test-load moment shall then be used to compute the maximum allowable operating loads for the boom at 20, 40, 60, and 80 degrees above horizontal. From these maximum allowable operating loads, curve shall be plotted and posted in the cab of the machine in sight of the operator. These values shall not be exceeded except in the performance test described below. The test load shall never exceed 100 percent of the manufacturer's maximum rated capacity.

(3) In lieu of the test and computations above, the crane may be load tested for stability at each of the four boom positions listed above.

c. Performance tests shall be performed in accordance with Section 18.G, "Machinery and Mechanized Equipment" of EM 385-1-1, U.S. Army Corps of Engineers Safety and Health Requirements Manual, except as specified below. Performance tests shall be conducted after each stability test, when the crane is placed in service on a project, and at least every 12 months.

(1) When conducting a performance load test which is required of a new crane or a crane in which load sustaining parts have been altered, replaced, or repaired (excluding replacement of the rope), the test load shall be as specified in ASME/ANSI B30 Series. That is, for overhead, gantry, portal, pillar, tower, monorail, and underhung cranes, the test load shall not exceed 125 percent of the manufacturer's load rating capacity chart at the configuration of the test; and for hammerhead tower, mobile, and floating cranes and boom trucks, the test load shall not exceed 110 percent of the manufacturer's load rating capacity chart at the configuration of the test.

(2) When conducting a performance load test which is required because a crane is reconfigured, or reassembled after disassembly, or because the crane requires an annual load test, the test loads shall not exceed 100 percent of the manufacturer's load rating capacity chart at the configuration of the test.

(3) All load tests are required to be conducted in accordance with the manufacturer's recommendations.

d. Inspections shall be made which will ensure a safe and economical operation of both cranes and draglines with inspection documented.

Copies of the inspections and tests shall be available at the job site

SECTION 01 00 00.00 09 Page 11 for review. All stability and performance tests on cranes and all complete dragline inspections shall be witnessed by the Contracting Officer or his authorized representative.

e. A complete dragline inspection shall be made:

(1) at least annually;

(2) prior to the dragline being placed in operation; and

(3) after the dragline has been out of service for more than 6 months.

f. All heavy equipment moved onto the worksite shall be inspected for compliance with this contract. The CEMVK-SO Inspection forms attached at the end of this section shall be completed by the Contractor. All completed forms, including abatement schedule of any violations, shall be maintained at the job site for continued review and update as needed.

1.24 VEHICLE WEIGHT LIMITATIONS

Vehicle weight limitations for operation on rural roads and bridges may affect the prosecution of work in this contract. The Contractor will be responsible for obtaining all necessary licenses and permits in accordance with the Contract Clause PERMITS AND RESPONSIBILITIES. Current information regarding road and bridge weight limits may be obtained by contacting the Mississippi Department of Transportation and the president of the county Board of Supervisors for the counties through which equipment and materials will be transported as a result of this contract.

1.25 PUBLIC AND PRIVATE UTILITIES

a. Unless otherwise specified, shown on the drawings, or stated in writing by the Contracting Officer, the Contractor shall not remove or disturb any public or private utilities. Such removals, alterations, and relocations, where necessary, will be made by others. The locations, if any, shown on the drawings for underground utilities are approximate only. The exact locations of such utilities shall be determined by the Contractor in the field prior to commencing construction operations in their vicinity.

b. The attention of the Contractor is directed to the possibility that he may encounter, within the right-of-way limits, utilities, some of which may be buried, and the existence of which is presently not known.

Should any such utilities be encountered, the Contractor shall immediately notify the Contracting Officer so that he may determine whether they shall be removed, relocated, or altered. After such determination is made, the Contractor shall, if so directed by the Contracting Officer, remove, relocate, or alter them as required, and an equitable adjustment will be made in accordance with the Contract Clause CHANGES. In event the Contracting Officer arranges for such removals, alterations, or relocations to be performed by others, the Contractor shall cooperate with such others during the latter's removal, alteration, or relocation operations in accordance with the Contract Clause OTHER CONTRACTS.

1.26 DAMAGE TO WORK

a. The responsibility for damage to any part of the permanent work

SECTION 01 00 00.00 09 Page 12 shall be as set forth in the Contract Clause PERMITS AND RESPONSIBILITIES. However, if, in the judgment of the Contracting Officer, any part of the permanent work performed by the Contractor is damaged by flood (see Section 00 80 00.00 09 SPECIAL CONTRACT REQUIREMENTS, paragraph PHYSICAL DATA, subparagraph FLOODS) or earthquake, which damage is not due to the failure of the Contractor to take reasonable precautions or to exercise sound engineering and construction practices in the conduct of the work, the Contractor shall make repairs as ordered by the Contracting Officer and full compensation for such repairs to permanent work will be made at the applicable contract unit or lump sum prices as fixed and established in the contract. If, in the opinion of the Contracting Officer, for any part of such damaged permanent work, there is no applicable contract unit or lump sum price, then an equitable adjustment pursuant to the Contract Clause CHANGES will be made as full compensation for the repairs for that part of the permanent work for which there is no applicable contract unit or lump sum price.

b. Except as herein provided, damage to all work (including temporary construction), utilities, materials, equipment, and plant shall be repaired to the satisfaction of the Contracting Officer, at the Contractor's expense, regardless of the cause of such damage.

1.27 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER

a. This provision specifies the procedure for determination of time extensions for unusually severe weather in accordance with the Contract Clause DEFAULT (FIXED PRICE CONSTRUCTION). In order for the Contracting Officer to award a time extension under this paragraph, the following conditions must be satisfied:

(1) The weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.

(2) The unusually severe weather must actually cause a delay to the completion of…