Demolish the mini mart and NSA chapel at naval support activity annapolis, MD
Closed Solicitation Posted
- Solicitation number
- SR23567618
- Agency
-
Naval Facilities Engineering Command
Department of the Navy, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 238910 Site Preparation Contractors
- PSC
- P400 Salvage- Demolition Of Buildings
- Place of performance
- Annapolis, Maryland 21402, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Navy Naval Facilities Engineering Command is seeking bids for the demolition of the existing Mini Mart and NSA Chapel buildings, utilities, parking lot, and concrete pad at the Naval Support Activity Annapolis in Maryland. The work includes returning the site to a green space, capping utility lines, and protecting any trees on the property. The solicitation, numbered SR23567618, specifies the required demolition, hazardous material abatement, and site restoration activities. Proposals are due by August 12, 2024, and the contract will be a firm-fixed-price award with a 300-day period of performance. The evaluation will be based on the total evaluated price, including options.
This solicitation does not include a set-aside. The current incumbents are not identified. The estimated value of the contract is not provided, but the work includes the demolition of the Mini Mart under CLIN 0001 and an option for the demolition of the NSA Chapel under CLIN 0002. The place of performance is the Naval Academy in Annapolis, Maryland.
Notice text
2 versions
Update #2 · Latest ·
The work includes the demolition of the existing buildings, utilities, parking lot, and concrete pad,
returning the site back to a green site. Utility branches shall be demolished but not limited to electric,
potable water, and sanitary from the building back to the main line and capped. Any trees currently
around the building will need to be protected in place. Once all building elements have been removed
the site will be re-sod and incidental related work.
AMENDMENT 0002 ISSUED ON 8.8.2024. PLEASE SEE REVISED PRICE SCHEDULE
Update #1 ·
The work includes the demolition of the existing buildings, utilities, parking lot, and concrete pad,
returning the site back to a green site. Utility branches shall be demolished but not limited to electric,
potable water, and sanitary from the building back to the main line and capped. Any trees currently
around the building will need to be protected in place. Once all building elements have been removed
the site will be re-sod and incidental related work.