Davis fire fence repair

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
140L3925Q0047
Agency
Nevada Region Bureau of Land Management, Department of the Interior
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
238990 All Other Specialty Trade Contractors
PSC
Y1PZ Construction Of Other Non-Building Facilities
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Bureau of Land Management Nevada Region is seeking a contractor to remove and install approximately 23,492 linear feet of barbed wire fencing damaged by the 2024 Davis Fire across four separate areas in the Carson City District. The project involves comprehensive fence repair and replacement work including removal of existing damaged fencing, installation of new 4-wire barbed wire configuration with specific technical requirements, and construction of various steel panels, gates, and corner assemblies. The solicitation requires contractors to demonstrate technical capability and past performance in similar fence construction projects, with evaluation based on a best-value, trade-off process where technical capability and past performance are more important than price. An organized site visit is scheduled for July 2, 2025 at 11:00 AM at the Chocolate Nugget Candy Factory parking lot in New Washoe City, Nevada, with RSVP required. Quotes must be submitted by July 10, 2025 at 5:00 PM, and the contract will be awarded as a firm fixed-price arrangement.

This opportunity is designated as a Total Small Business set-aside under NAICS code 238990 (All Other Specialty Trade Contractors) with a $19 million size standard, though no specific contract value or incumbent information is provided in the solicitation materials. The work encompasses four distinct fencelines: North Davis (2,198 feet), East Davis (10,031 feet), South Davis (5,751 feet), and West Davis (5,512 feet), structured as an "All or None" procurement requiring bidders to quote on all line items. The performance period is scheduled from October 1, 2025 to November 15, 2025, providing a 45-calendar day window for completion. Work will be performed approximately 15 miles north of Carson City, Nevada within Washoe County, near Washoe Lake State Park, with the BLM providing specific materials such as steel pipe posts, wire, brace rails, and gate components while contractors handle installation and labor under Davis-Bacon Act prevailing wage requirements.

Notice text

DAVIS FIRE FENCE REPAIR

Attachments

Files attached to this notice, newest first
File Type Posted
A06_Specifications.doc DOC document
A06_Maps.pdf PDF
A04_SOW.docx DOCX document
B03_DBA_Wage_Determination.pdf PDF
A06_Drawings.pdf PDF
Bid_Schedule.docx DOCX document
Sol_140L3925Q0047.pdf PDF

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Davis fire fence repair Award Award Notice
Davis fire fence repair This notice · Latest solicitation Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity