A04_SOW.docx

DOCX document 49 KB Posted

Attached to
DAVIS FIRE FENCE REPAIR Federal contract opportunity
Solicitation number
140L3925Q0047
Issued by
Department of the Interior Bureau of Land Management Nevada Region

About this file

This Statement of Work (SOW) details a fence repair project for the Bureau of Land Management (BLM) Carson City District following the 2024 Davis Fire. The project involves removing and reconstructing approximately 23,492 linear feet of fencing across four separate areas: North Davis Fire Fence (2,198 linear feet), East Davis Fire Fence (10,031 linear feet), South Davis Fire Fence (5,751 linear feet), and West Davis Fire Fence (5,512 linear feet). The project is located approximately 15 miles north of Carson City, Nevada, within Washoe County.

The SOW specifies detailed requirements for fence reconstruction, including removing existing fence materials, reusing some stress panels, and installing new wire, posts, and gates. The BLM will provide specific materials such as steel pipe posts, wire, brace rails, and gate components. The contractor is responsible for careful installation, including driving posts, stretching wire, and constructing corner and end panels. The project has a 45-calendar day performance period, with work to be completed using minimal ground disturbance and following strict environmental guidelines. The solicitation is structured as a "Total Offer - All or None" procurement, meaning all line items must be bid on, with unit pricing required for each component.

View the file

Other files for this federal contract opportunity

Other files attached to DAVIS FIRE FENCE REPAIR, newest first.
File Type Posted
A06_Specifications.doc DOC document
A06_Maps.pdf PDF
B03_DBA_Wage_Determination.pdf PDF
A06_Drawings.pdf PDF
Bid_Schedule.docx DOCX document
Sol_140L3925Q0047.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TABLE OF CONTENTS

TABLE OF CONTENTS 1

DIVISION 01 – GENERAL REQUIREMENTS

SECTION 01100 SUMMARY5
SECTION 016400- GOVERNMENT FURNISHED PRODUCTS8

DIVISION 02 – FENCE REMOVAL, REPLACEMENT

SECTION 02837 FENCE REMOVAL, REPLACEMENT………………………………………………………………….10

DIVISION 32 – FENCES AND GATES

SECTION 323100 FENCES AND GATES 10

SECTION 011000 - SUMMARY

DAVIS FIRE FENCE REPAIRS

PART 1: GENERAL

1.1 SUMMARY

A. Description of Work: Furnishing labor and equipment to remove and install a total of approximately 23,492 linear feet of fence between four separate projects; North Davis Fire Fence, East Davis Fire Fence, South Davis Fire Fence, and West Davis Fire Fence. All projects are within lands administered by the BLM Carson City District, and were damaged or destroyed by the 2024 Davis Fire.

Overview of Fence Condition and Type – Existing fence type within the project area is variable depending on location. Portions consist of four or five strand type with woven wire mesh along the bottom. Line posts are a combination of standard t-posts and wooden posts, with existing spacing of approximately 8’ to 16.5’. Stress panels and corner panels include cemented steel posts, non-cemented steel posts, wood, and welded steel drill pipe. General condition varies from completely non-functional to standing, and has been impacted by wildfire.

North Davis Fire Fence – Removal of all existing fence materials. Reconstruct fencing within original footprint as shown on the project specifications drawings. Approximately 2,198 linear feet of reconstruction.

East Davis Fire Fence – Removal of all existing wire (barbed, smooth, and mesh), line posts (t-posts and wood posts), fence clips, stays, and gates. Reconstruct by replacing wire, line posts, fence clips, stays, and gates as shown on the project specifications drawing. All existing stress panels (constructed of welded drill pipe) as shown on the project specifications drawings are to be reused as is. Approximately 10,031 linear feet of reconstruction.

South Davis Fire Fence – Removal of all existing fence materials. Reconstruct fencing within original footprint as shown on the project specifications drawings. Approximately 5,751 linear feet of reconstruction.

West Davis Fire Fence – Removal of all existing fence materials. Reconstruct fencing within original footprint as shown on the project specifications drawings. Approximately 5,512 linear feet of reconstruction.

B. Location: The project site is located approximately 15 miles north of Carson City, Nevada, within Washoe County. The work location is more specifically shown on the area and location maps provided.

C. Work Data Sheet: Designates the type and quantity of work required at each project location, and dimensions required for typical drawings.

1.2 REFERENCES

A. N/A

1.3 QUALITY ASSURANCE

A. Codes and Standards: The work shall comply with codes and standards applicable to each type of work and as listed in the individual sections of these specifications. This contract incorporates materials, applications, and tests by reference, with the same force and effect as when they were given in full text.

B. Conflict: Where a conflict occurs between reference documents and project specifications, the project specifications shall govern.

1.4 DELIVERY, STORAGE, HANDLING, AND WASTE

A. Delivery: Protect products incorporated into the work from damage while in transit to the site. Products must be delivered in original unopened containers with manufacturer's name, brand designation, and contents legibly indicated.

B. Storage: Provide temporary storage facilities for products. Storage shall comply with the manufacturer's instructions. The storage area shall permit access for inspection and handling.

C. Handling: Load and unload products protecting them from damage.

D. Waste: All waste fence material generated from fence removal or construction shall be recycled or taken an authorized land fill site. Proper disposal is the responsibility of the contractor.

1.5 PROJECT/SITE CONDITIONS

A. Access to the Work: Access roads are shown on the Work Location Maps. Cross country travel on Bureau of Land Management administered land with wheeled or tracked vehicles shall be permitted to and along fence lines within 8 feet on each side of the fence. In cases where the topography along the fence line may limit or prevent travel, exceptions may be made upon prior approval by the Contracting Officer Representative.

B. Environmental Considerations: No blading or scraping of the ground along the fence line or on any Bureau of Land Management administered land is permitted.

C. Rocky Ground: The project site includes some rock formations which may prevent posts from being driven. A rock drill may be required at these work sites to assure proper installation of posts. A pre-bid site visit is strongly encouraged.

1.6 SEQUENCING AND SCHEDULING

A. Work Schedule: The schedule shall be submitted at the pre-work conference. When requested, submit an updated schedule within 3 calendar days. As a minimum, the estimated start and completion dates shall be shown in the estimate.

B. Period of Performance: 45 Calendar days TOTAL OFFER - ALL OR NONE: A unit price and extended amount must be set forth for each individual item shown herein as well as the total of all items. As stated herein the term ‘Total Offer, All or None’ means that all items (without exception) MUST be offered. Offers that do not reflect individual unit prices and extended amounts for each and every item and a total of all items may be considered non-responsive and may not be considered for award.

PART 2: PRODUCTS

(There are no applicable requirements.)

PART 3: EXECUTION

3.1 PROJECT MEETINGS

A. Pre-Work Conference:

1. Will be held prior to the start of work. The Contractor will be notified in advance of meeting time, date and place. The purpose will be to review required work, project drawings and specifications, construction schedules, payroll and payments, and administrative provisions of the contract.

2. The Contractor, Subcontractors and the persons responsible for coordination of the work shall be present at the meeting.

3. Be prepared to summarize and explain procedures planned for the project.

B. Progress Meetings:

1. To be held at the project sites, or as determined by the Contracting Officer.

2. May be called by either the Contracting Officer or the Contractor. Request shall state who should attend and include an agenda.

C. Final Inspection:

1. To be held at each project site or as determined by the Contracting Officer.

2. Notify the Contracting Officer Representative in writing at least 3 working days before the completion date so the Government can schedule final inspections.

3. The Superintendent shall be present during these inspections.

3.2 PREPARATION

A. Work Layout: The locations of the fences, gates, end panels, and corner panels will be shown on the work location maps and drawings. All of these existing features may also be flagged to be visible on the ground, if requested.

END OF SECTION

GENERAL INFORMATION AND REQUIREMENTS

BRAVO AND DRAW FENCES

02/2018

SECTION 016400 – GOVERNMENT FURNISHED PRODUCTS

PART 1: GENERAL

1.1 SUMMARY:

A. Section Includes: Materials to be furnished by the Government and their locations.

1.2 DELIVERY, STORAGE, AND HANDLING:

A. Location: The Government-furnished property will be provided by the Bureau of Land Management, Carson City District Office, 5665 Morgan Mill Road, Carson City, NV 89701.

B. Time: Property will be available Monday through Friday, 7:30 AM through 3:30 PM except on holidays.

C. Return of Unused Property: Return unused material to Bureau of Land Management, Carson City Field Office, 5665 Morgan Mill Road, Carson City, NV 89701.

D. Loading, Offloading, and Transporting Property: The Contractor shall be responsible for providing the necessary material-handling equipment and personnel to load and offload materials. The Contractor shall be responsible to transport materials to work sites.

PART 2: PRODUCTS

2.1 MATERIALS:

A. Materials to be Furnished by the Government:

Materials Description Unit

Quantity

2 3/8” Steel Pipe Posts
each
100
1 5/8” Steel Pipe Brace Rails
each
65
2 3/8” Brace Bands
each
130
1 5/8” Brace Rail cups
each
130
2 3/8” Steel Post Caps
each
100
3/8” X 1 ½” carriage bolts & nuts
50/box
3
5’ 6” Steel T Posts
each
1,424
Wire Stays
100/bundle
15
Barbless wire
Rolls (1320 ft.)
18
Barbed wire
Rolls (1320 ft.)
54
Wood Gate Stays
each
20
Fence Clips
50/bag
114

PART 3: EXECUTION

There are no applicable requirements

SECTION 02837- FENCE REMOVAL, RELOCATION

PART 1: GENERAL

1.1 SUMMARY:

A. Section Includes: Removing fences, panels, corners, and gates.

B. Related Sections: General Information and Requirements

1.2 PROJECT/SITE CONDITIONS:

A. Requirements: Access roads shall not be constructed along fence lines or to the jobsite unless written approval is granted by the Contracting Officer. Crosscountry travel with wheeled or tracked vehicles shall be only to and along fence lines.

PART 2: PRODUCTS

2.1 MATERIALS:

1. Requirements: Furnish equipment required to remove fence wire, steel fence posts, misc. material, all wood and wood panels, etc. All fence materials salvaged from fence removal shall become property of the contractor and disposal shall be according to Section 011000 General Information and Requirements

PART 3: EXECUTION

3.1 REMOVAL:

A. Removal of Existing Fence Wire, T-posts, and Easy fence panels: Remove all fence wires and wood material.

PART 4: MEASUREMENT AND PAYMENT

4.1 METHOD OF MEASUREMENT:

A. Units: The work described in this section will be measured and paid for by the foot for each type of fence as measured along the ground surface next to the completed fence.

SECTION 323100 – BARBED WIRE FENCES AND GATES

PART 1: GENERAL

1.1 SUMMARY

A. Section Includes: Installing wire fences and gates.

B. Related Sections: Section 011000 - Summary. Section 016400 - Government Furnished Products

PART 2: PRODUCTS

2.1 GOVERNMENT-FURNISHED MATERIALS

A. Requirements: See Section 016400 - Government Furnished Products.

PART 3: EXECUTION

3.1 PREPARATION

A. Clearing: All fence line routes have not been cleared of vegetation and must be hand cleared or with hand-held power tools. Maximum clearing width is 8 feet on each side of the fence line. Provide minimum disturbance to existing grass and sod. Travel will be limited to existing roads and 8 feet on each side of the fence line.

3.2 INSTALLATION

A. General: Construct wire fence in accordance with the drawings.

B. Setting Posts: Set steel pipe posts by driving into the ground or into undersize drilled holes. Driven steel pipe posts that are split by driving, twisted, bent, or have broomed tops will not be accepted. Driven posts shall be set to the depths as shown on the drawing. Set posts plumb and to the spacing and depths as shown on the drawing, unless staked otherwise. All posts shall be capped.

C. Driving Steel T Posts: Drive into the ground to the depth shown on the drawings or until the anchor plate is slightly below the ground surface. Posts shall be driven plumb. When rock formations prevent driving remove anchor plate and excavate or drill holes a minimum of 18 inches deep and slightly larger than the diameter of the post. Place posts in the holes and grout the post solidly in position.

D. Corner Post, Gate Post, Corner Panel, Brace, and End Panel (Stress Panel) Assemblies: Construct as shown on the drawings or as staked in the field. Rock jacks shall not be substituted for these items. Construct stress panels on crests of hills if indicated, and a maximum of 1320 feet center-to-center for barbed wire sections. Construct end panels at the end of fence runs unless shown otherwise on the drawings.

E. Wire: Stretch tightly and staple to posts or securely attach to steel pipe posts with ties wire and steel or fiberglass T posts with standard wire clips. Wire is properly stretched when it is springy to the touch. The wire shall be free to move through the clips as it expands and contracts. Terminate wire at each end post, gate post, corner post, or stress panel. Wrap wire around the post two times and tie off by wrapping around the incoming wire a minimum of four times.

F. Brace Wire: Double-loop and twist tight with a stick. For steel pipe panels, each wrap shall be looped once around the post. Leave one end of the stick long enough to fasten behind the horizontal brace to prevent wire from unwinding or wire vertically to the rail to prevent unwinding.

G. Gates: Shall be installed according to the drawings.

H. Wire Gate Closers: Adjust wire gate closer after installation so that the closer does not require excessive force to latch and the gate will still hang properly.

I. Foot Access Gap: Are a three linear foot break in fence lines bound on both ends by panel features as identified on the project specification maps. Note- these items are not considered Pay Items.

PART 4: MEASUREMENT AND PAYMENT

4.1 METHOD OF MEASUREMENT

A. Units: The work described in this section will be measured and paid for by the foot for each type of fence as measured along the ground surface next to the completed fence, including distance across gate openings, end, stress, and corner panels; cattle guards and drainage crossings. The quantities of end panels, corner panels, and gates to be paid for will be the actual number of these items. Note: Gates do not include adjacent end or corner panels. These are separate items. Note: Stress panels are not considered separate bid/pay items unless specifically identified on the drawings.

4.2 BASIS OF PAYMENT

A. Payment: Prices and payment will be full compensation for the work described in this section. Payment will be made under:

Pay Item
Pay Unit

Drawing #

NV-02824(6). . . . . . . Barbed Wire Gate Type A
Each
NV-02824(53). . . . . . Barbed Wire Fence (4-wire X 16 1/2’)
Foot
NV-02824(14). . . . . . Two Post Steel End Panel
Each
NV-02824(13). . . . . . Three Post Steel Corner Panel
Each
NV-02824(14). . . . . . Three Post Steel End Panel
Each
NV-02826(14). . . . . . Four Post Steel Corner Panel
Each