B03_DBA_Wage_Determination.pdf

PDF 2 MB Posted

Attached to
DAVIS FIRE FENCE REPAIR
Solicitation number
140L3925Q0047
Issued by

About this file

This document is a Davis-Bacon wage determination for heavy construction projects in Washoe County, Nevada, effective February 14, 2025. The document specifies prevailing wage rates for multiple construction job classifications, including:

Carpenter rates at $44.06 with $17.36 in fringes, Electrician rates at $48.50 with $23.04 in fringes, and Power Equipment Operator rates ranging from $42.72 to $52.35 depending on equipment group. Other job classifications include Ironworkers (Reinforcing at $50.70, Structural at $46.20), Laborers with rates between $32.08 and $34.45, and Cement Mason/Concrete Finishers at $40.61. The wage determination also includes provisions for Executive Order 13706 on Paid Sick Leave, which applies to federal contracts subject to the Davis-Bacon Act, requiring contractors to provide 1 hour of paid sick leave for every 30 hours worked, up to 56 hours per year.

View the file

Other files

File Type Posted
A06_Specifications.doc DOC document
A06_Maps.pdf PDF
Sol_140L3925Q0047.pdf PDF
A06_Drawings.pdf PDF
Bid_Schedule.docx DOCX document
A04_SOW.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .