B03_DBA_Wage_Determination.pdf
PDF 2 MB Posted
- Attached to
- DAVIS FIRE FENCE REPAIR Federal contract opportunity
- Solicitation number
- 140L3925Q0047
About this file
This document is a Davis-Bacon wage determination for heavy construction projects in Washoe County, Nevada, effective February 14, 2025. The document specifies prevailing wage rates for multiple construction job classifications, including:
Carpenter rates at $44.06 with $17.36 in fringes, Electrician rates at $48.50 with $23.04 in fringes, and Power Equipment Operator rates ranging from $42.72 to $52.35 depending on equipment group. Other job classifications include Ironworkers (Reinforcing at $50.70, Structural at $46.20), Laborers with rates between $32.08 and $34.45, and Cement Mason/Concrete Finishers at $40.61. The wage determination also includes provisions for Executive Order 13706 on Paid Sick Leave, which applies to federal contracts subject to the Davis-Bacon Act, requiring contractors to provide 1 hour of paid sick leave for every 30 hours worked, up to 56 hours per year.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A06_Specifications.doc | DOC document | |
| A06_Maps.pdf | ||
| A06_Drawings.pdf | ||
| Bid_Schedule.docx | DOCX document | |
| A04_SOW.docx | DOCX document | |
| Sol_140L3925Q0047.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .