Country Club west Stoplog Rehabilitation

Closed Solicitation Posted

Solicitation number
191BWC26B0013
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
El Paso, Texas 79902, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The United States Section of the International Boundary and Water Commission seeks rehabilitation of the Country Club Bridge West Stoplog Structure in El Paso, Texas, with sealed bids due September 10, 2026, at 5:00 PM MDT. This is a 100% small business set-aside with a $45 million size standard, firm fixed-price contract estimated at $25,000 to $100,000.

Place of performance is El Paso, Texas. Work includes mobilization and traffic control, removal and replacement of the existing expansion joint, repair of deteriorated concrete, roadway restoration, disposal of construction debris, and final cleanup. The contract duration is 120 calendar days after notice to proceed (90 days construction, 30 days closeout). NAICS code is 237310 (Highway, Street, and Bridge Construction).

Contractors must meet minimum qualifications: minimum five years of similar roadway construction experience within the last five years; prior experience as a prime contractor with the federal government on highway or roadway projects within the last ten years; highway construction experience including concrete work and repair of comparable scope and complexity; adequate personnel, equipment, and resources to complete work within the required duration; successful completion of at least one project within the last five years involving traffic control for construction adjacent to active roadways while maintaining vehicular traffic; and a Dun & Bradstreet PAYDEX score of 65 or greater or an Experian Business Credit Score of 65 or greater. Joint venture participants must individually satisfy the first two qualifications; at least one joint venture participant must satisfy the technical qualifications and credit score requirement. Contractors must submit IBWC Forms 245 or 245A with Form 245B backup documentation and current credit reports.

Contractors must comply with Davis-Bacon prevailing wage requirements for all subcontractors, obtain a traffic control plan and permit from the City of El Paso, maintain a full-time Project Superintendent onsite, and provide a statement of equipment. Performance and payment bonds are not required. Liquidated damages are $149.93 per day. A mandatory pre-bid conference and site visit is scheduled for August 18, 2026, at 9:30 AM MDT at USIBWC American Dam Field Office, 2616 W Paisano Drive, El Paso, Texas 79922; attendance confirmation is due August 17, 2026, to Philip.johnson@ibwc.gov. Standard Form 1442 and Amendment I (adding pre-bid conference notes and sign-in log) are attached.

Notice text

3 versions

Update #3 · Latest ·

Added Amendment I 

This is a 100% small business set-aside with a small business size standard of $45M.
An offer guarantee is not required.
Add pre-bid conference notes and sign-in log.

Added SF 1442 to attachements

The United States Section of the International Boundary and Water Commission (USIBWC) requires rehabilitation of the Country Club Bridge West Stoplog Structure located in El Paso, TX. The project includes mobilization, traffic control, removal and replacement of the existing expansion joint, repair of deteriorated concrete, roadway restoration, disposal of construction debris, and final cleanup. These repairs are necessary to restore movement between the roadway and stoplog structure, reduce continued deterioration, and maintain a safe and serviceable bridge approach.

See attachments

Standard Form 1442 will be added by amendment. 

The Contractor shall furnish all labor, material, and equipment necessary to complete Country Club West Stoplog Rehabilitation. This is a FIRM FIXED PRICE CONTRACT.The estimated magnitude of this project will be $25,000.00 to $100,000.00.

L.01 - Pre-Bid Conference and Site Visit
L.01.A. All potential bidders are requested to attend the Pre-Bid Conference/Site Visit to be held at: USIBWC AmericanDam Field Office, Conference Room, 2616 W Paisano Dr., El Paso, TX 79922 Tuesday, August 18, 2026, at 9:30 AMMDT.

L.01.B. Names of individuals who plan to attend shall be furnished before 12:00 PM MDT on Monday, August 17, 2026 byemail submission to Philip.johnson@ibwc.gov .

Update #2 ·

Added SF 1442 to attachements

The United States Section of the International Boundary and Water Commission (USIBWC) requires rehabilitation of the Country Club Bridge West Stoplog Structure located in El Paso, TX. The project includes mobilization, traffic control, removal and replacement of the existing expansion joint, repair of deteriorated concrete, roadway restoration, disposal of construction debris, and final cleanup. These repairs are necessary to restore movement between the roadway and stoplog structure, reduce continued deterioration, and maintain a safe and serviceable bridge approach.

See attachments

Standard Form 1442 will be added by amendment. 

The Contractor shall furnish all labor, material, and equipment necessary to complete Country Club West Stoplog Rehabilitation. This is a FIRM FIXED PRICE CONTRACT.The estimated magnitude of this project will be $25,000.00 to $100,000.00.

L.01 - Pre-Bid Conference and Site Visit
L.01.A. All potential bidders are requested to attend the Pre-Bid Conference/Site Visit to be held at: USIBWC AmericanDam Field Office, Conference Room, 2616 W Paisano Dr., El Paso, TX 79922 Tuesday, August 18, 2026, at 9:30 AMMDT.

L.01.B. Names of individuals who plan to attend shall be furnished before 12:00 PM MDT on Monday, August 17, 2026 byemail submission to Philip.johnson@ibwc.gov .

Update #1 ·

The United States Section of the International Boundary and Water Commission (USIBWC) requires rehabilitation of the Country Club Bridge West Stoplog Structure located in El Paso, TX. The project includes mobilization, traffic control, removal and replacement of the existing expansion joint, repair of deteriorated concrete, roadway restoration, disposal of construction debris, and final cleanup. These repairs are necessary to restore movement between the roadway and stoplog structure, reduce continued deterioration, and maintain a safe and serviceable bridge approach.

See attachments

Standard Form 1442 will be added by amendment. 

The Contractor shall furnish all labor, material, and equipment necessary to complete Country Club West Stoplog Rehabilitation. This is a FIRM FIXED PRICE CONTRACT.The estimated magnitude of this project will be $25,000.00 to $100,000.00.

L.01 - Pre-Bid Conference and Site Visit
L.01.A. All potential bidders are requested to attend the Pre-Bid Conference/Site Visit to be held at: USIBWC AmericanDam Field Office, Conference Room, 2616 W Paisano Dr., El Paso, TX 79922 Tuesday, August 18, 2026, at 9:30 AMMDT.

L.01.B. Names of individuals who plan to attend shall be furnished before 12:00 PM MDT on Monday, August 17, 2026 byemail submission to Philip.johnson@ibwc.gov .

Files

Show all 17

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Country Club west Stoplog Rehabilitation Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
UT NP ARCH 100(2) Bridges on Delicate Arch Road Moab, Utah 84532, United States · NAICS 237310 Federal Highway Administration No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors