IBWC22M0005 MOA Country Club Floodgates.pdf

PDF 1 MB Posted

Attached to
Country Club west Stoplog Rehabilitation
Solicitation number
191BWC26B0013
Issued by

About this file

This is a Memorandum of Agreement (MOA) between the United States Section, International Boundary and Water Commission (USIBWC) and the City of El Paso, Texas for the construction, maintenance, and operation of a floodgate system at Country Club Bridge on the Upper Rio Grande Flood Control Project. The agreement is effective December 3, 2021, and remains in effect for twenty-five (25) years unless terminated in writing by either party.

Under the agreement, the USIBWC is responsible for providing design and construction plans for the floodgate system at no cost to the City, obtaining City approval prior to construction, and conducting all construction work as required by approved plans. The USIBWC further assumes all future maintenance, repair, and operation of the floodgate system, which may be subcontracted or performed directly, and must maintain the system in clean and sanitary condition. The USIBWC remains solely responsible for all traffic control arrangements, plans, implementation, and associated costs, with City approval required from the Streets and Maintenance Department prior to commencement of any work. The City's responsibilities are limited to approving the traffic control plan during construction, provided it complies with City and TxDOT standards and specifications, and restricting signage to only that required for proper installation. This is a no-cost MOA with no fiscal or funds obligation between parties; any future reimbursement or contribution of funds will be documented in separate agreements under the Economy Act. Liability is retained separately by each party under the Federal Tort Claims Act (for USIBWC) and the Texas Tort Claims Act (for the City), with no third-party beneficiary rights created.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

21-1004-1278 | 1137400 | OAR

MEMORANDUM OF AGREEMENT BETWEEN

UNITED STATES SECTION

INTERNATIONAL BOUNDARY AND WATER COMMISSION

UNITED STATES AND MEXICO

AND

CITY OF EL PASO, TEXAS

FOR THE

CONSTRUCTION, MAINTENANCE, AND OPERATION

OF THE FLOOD CONTROL SYSTEM

AT COUNTRY CLUB BRIDGE

TO PROVIDE FOR

THE UPPER RIO GRANDE FLOOD CONTROL PROJECT

This Memorandum of Agreement ("MOA'') is made by and between the

United States Section, International Boundary and Water Commission, United

States and Mexico, an independent agency of the United States federal government, hereinafter referred to as the "USIBWC" and the City of El Paso of the State of Texas, hereinafter referred to as "City". Collectively, the

USIBWC and the City are referred to hereinafter as the "PARTIES" to this

MOA.

WHEREAS, the purpose of this agreement between the PARTIES is for the USIBWC to design, construct, maintain, and operate a public Floodgate

System on its Upper Rio Grande Flood Control Project (URGFCP) west and east levees at the Country Club Bridge crossing the Rio Grande at Country

Club Road the (“Property”).

and

WHEREAS, The City has indicated its willingness to approve the establishment of such facilities and other uses conditioned upon the agreement between the USIBWC and the City for the purpose of determination of their respective responsibilities, which are set-forth in this document; and

WHEREAS, The City has indicated its willingness to approve the establishment of such facilities and other uses because such uses are in the public interest; and

IBWC22M0005

WHEREAS, The City attests that it has reviewed this design of the structure and has determined, based on that review, that the structure will not damage the highway facilities, impair safety, impede maintenance, or in any way restrict the operation of the highway structures, all as determined from engineering and traffic investigations conducted by the City; and

WHEREAS, the USIBWC is authorized to enter into this agreement pursuant to Title 22 U.S.C. § 277b and 277c et seq., within the URGFCP, as authorized by the Act of the 74th Congress, SESS. 1 CH. 561 [H.R. 6453 approved August 19, 1935 (49 Stat. 660) and codified at 22 U.S.C. § 277, 277a, 277b, and 277c, and Acts amendatory thereof and supplementary thereto, and

USIBWC shall provide without cost to the City, all engineering designs and plans, and shall construct for the Floodgate System on USIBWC's URGFCP levees at no cost to the City; and

WHEREAS, this MOA is intended to define each PARTY's duties and responsibilities with regard to the Floodgate System on USIBWC' s URGFCP levees.

NOW THEREFORE, THE USIBWC and the City hereby agree as follows:

ARTICLE I. USIBWC RESPONSIBILITIES

The USIBWC agrees to the following:

A. Construction. USIBWC has awarded the design of the Sunland Park-

Canutillo Levee Segment between Borderland Bridge and the El Paso

Electric Company Plant. The project was initially funded through the

American Recovery and Reinvestment Act of 2009. USIBWC agrees to (1) provide the City the design and construction plans for the

Floodgate System, (2) obtain the approval of the City prior to any construction, (3) and shall conduct the construction work as required by said plans at no cost to the City. The construction plans will become a part of this agreement and are attached as Attachment A.

B. Maintenance. Subject to the conditions in Article II herein, the

USIBWC agrees to provide future maintenance, repair, and operation of the floodgate system which may be subcontracted through a service agreement or performed by USIBWC. The USIBWC will be responsible for keeping the Floodgate System operating in a clean and sanitary condition. The USIBWC Flood Emergency Operations

Manual for the Upper Rio Grande Projects is attached as Attachment B.

1. Maintenance entails:

a. Inspection of exterior of floodgate to include fixed posts attached to the bridge concrete railing and approach slab.

b. Repair of any visible damage to the exterior of the floodgate discovered during inspection may include welding, concrete spall/crack repairs, replace of posts, replace missing bolts, and any other required repairs.

C. Coordination. USIBWC agrees to coordinate with the City in advance of any construction, maintenance, or repair for scheduling and traffic control arrangements.

D. Traffic Control. Notwithstanding anything to the contrary in this MOA, the USIBWC remains solely responsible for the traffic control arrangements, plans, implementation, and costs. USIBWC will perform adequate traffic control for all construction, maintenance, or repairs. The

USIBWC will obtain approval of all traffic control activities from the City’s

Streets and Maintenance Department prior to the start of any construction, maintenance, or repairs.

ARTICLE II. CITY OF EL PASO RESPONSIBILITIES

A. During the construction period, the City agrees to approve the Traffic

Control Plan prepared by USIBWC contractor(s) provided such plan compliesy with City and TxDOT standards and specifications. The erection of signs, other than those required for proper use of the area during installation of the floodgate system, will be prohibited. USIBWC will obtain approval of the city prior to placing or erecting any signs.

ARTICLE III. DURATION AND MODIFICATION OF MOA

This MOA shall take effect when signed by the PARTIES hereto and shall remain in effect for a period of twenty five (25) years unless terminated, in writing, by one or more of the PARTIES. This MOA may be modified at any time by written agreement of both PARTIES and does not restrict any PARTY from enforcing any laws within its authority or jurisdiction

ARTICLE IV. INTERAGENCY COMMUNICATIONS

To provide for consistent and effective communication between the

PARTIES, each PARTY shall immediately designate representatives to serve as the points of contact on all matters relating to this MOA. Each PARTY shall advise the other PARTY, in writing, of the names and telephone numbers of the representatives designated within ten (10) calendar days of the execution of this MOA.

ARTICLE V. PREVIOUS AGREEMENTS

It is understood that this agreement supersedes the terms and provisions of any existing agreements between the parties hereto.

ARTICLE VI. BUDGET & PAYMENTS

A. Neither Party will acquire any accountable property from the other Party under this MOA.

B. This is a no-cost MOA. This MOA is neither a fiscal nor funds obligation document between the PARTIES. This MOA defines in general terms the basis on which the PARTIES will cooperate, and as such, does not constitute a financial obligation or serve as a basis for expenditures.

Expenditures of funds, human resources, equipment, supplies, facilities, training, public information, and expertise will be provided by each

PARTY to the extent that their participation is required and resources are available.

C. This agreement does not obligate the City, the USIBWC, or the United

States to spend funds on any particular project or purpose even if funds are available.

D. This MOA in no way restricts the PARTIES from participating in similar activities or arrangements with other public or private agencies, organizations, or individuals.

E. This MOA does not obligate the PARTIES to enter into any agreements, contracts, or other obligations.

F. Nothing in this MOA may be construed to financially obligate the City, the

USIBWC, or the United States to any current or future expenditures of resources in advance of the availability of appropriations from Congress.

The obligations in this MOA are subject to federal laws, including but not limited to the Anti-Deficiency Act, 13 U.S.C 1341.

G. Any activities proposed that would involve reimbursement or contribution of funds between the PARTIES of this MOA will be handled in accordance with applicable laws, regulation, and procedures including the Economy

Act (31 U.S.C. § 1535). Such activities will be documented in separate agreements, with specific projects between the parties spelled out. The separate agreements will reference this MOA. This MOA does not establish authority for a noncompetitive award to any party of any contract or other agreement. Where appropriate and necessary, the PARTIES will enter into specific reimbursable agreements for work or services performed, or materials supplied by one PARTY on behalf of the other pursuant to the

Economy Act, 31 U.S.C. § 1535.

ARTICLE VII. LIABILITY PROVISIONS

The USIBWC acknowledges that it is not an agent or employee of the City of

El Paso, and that it is responsible for its own acts and deeds and for those of its agents or employees during the performance of contract work.

A. USIBWC Liability. The USIBWC does not assume any responsibility for any injury or damage to USIBWC, City, Contractor or third party property or equipment, or to any persons, unless such injury or damage is directly caused by or related to the performance of one of USIBWC’s responsibilities under this MOA. To the extent allowed by law, The

USIBWC and the City shall retain all applicable legal responsibility for their respective personnel or Contractors working pursuant to this MOA with respect to, inter alia, pay, personnel benefits, injuries, accidents, losses, damages, and civil liability. This MOA is not intended to change in any way the individual employee status or the liability or responsibility of any Party under federal or state law. Liability for injuries or damages shall be subject to the Texas Tort Claims Act for damages or injuries caused by the City of El Paso and the Federal Tort

Claims Act for damages or injuries USIBWC.

B. Rights and Remedies. Notwithstanding the above, this MOA does not confer any liability on the City that is legally attributable to the

USIBWC under the Federal Tort Claims Act nor does this confer liability on the USIBWC that is legally attributable to the City under the

Texas Tort Claims Act or a similar municipal or local law. Provided further that nothing in this MOA is intended or will be construed to create any rights or remedies for any third party and no third party is intended to be a beneficiary of this MOA.

C. No Waiver of Immunity. Nothing in this contract shall be construed to waive immunity of any kind or nature by either Party.

ARTICLE VIII. USIBWC TECHNICAL LEAD AND

MAINTENANCE CONTACT

The USIBWC technical lead and contact for the maintenance of the floodgate shall be the Chief of Operations and Maintenance who can be reached at 915-

832-4133 or the Area Operations Manager of the Upper Rio Grande Flood

Control Project who can be reached at 915-351-1030.

ARTICLE IX. CITY OF EL PASO POINT OF CONTACT

FOR ALL MATTERS RELATING TO THIS MOA

The point of contact for the City of El Paso for all matters relating to this MOA shall be Sam Rodriguez, P.E., City Engineer, who can be reached at 915-212-

1845 or Jerry DeMuro , Assistant Director of Design and Architecture, who can be reached at 915-212-1838.

File details come from the government source that posted it. Updated .