Sunland Bridge West Stoplog Shop Dwg_Flood Control Intl.pdf
PDF 494 KB Posted
- Attached to
- Country Club west Stoplog Rehabilitation
- Solicitation number
- 191BWC26B0013
About this file
These are technical engineering drawings for the Sunland Park Levee Repair project under Federal Contract Number 191BWC22C0011. The documents include Setting Out drawings (FB02 Setting Out - West) and Slot-in Barrier System drawings (FB02 Slot-in Barrier System - West) prepared by Flood Control International Inc. The drawings are marked "For Information" and "For Approval" status respectively, with the latest revision dated March 3, 2025.
The drawings provide detailed specifications for a removable aluminum flood barrier system to be installed across a 50'-10 5/8" structural opening. Key components include fully removable aluminum end supports (~14 lbs each), intermediate posts (~30 lbs), and aluminum dam boards (~53-56 lbs each) with spans ranging from 10'-0 3/4" to 10'-7 1/4". The system features cast-in anchor plates secured with M16x50 and M12x40 hex head bolts, extra-thick EPDM base gaskets, and extended compression clamps. Installation notes specify that embeds must be set per drawings, blanking bolts must seal couplings, posts are installed by hand only with no equipment, and boards are hand-placed to avoid damage. The documents include comprehensive fixing schedules, detailed sections showing system placement both with and without components in place, and notes regarding road crown slope accommodation (1.03%-1.86%) and surface finish tolerance requirements (±3/16"). Reference drawings CS105 and CS106 are cross-referenced throughout.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
X Y
40'-3 3/8"
50'-10 5/8"
10'-0 3/4" 10'-0 3/4" 10'-7 1/4"
2'-2 3/16" W
10'-1 3/8"
10'-0 1/2"10'-1 3/8"
FO
FO
FO
20'-1 7/8"
30'-2 5/8"
10'-0 1/2"10'-1 3/8" 9'-9 1/16"
Slope due to road crown
1.03% 1.86%
FLOOD
RevDrg No
Title
Project
Status
Page No
FLOOD CONTROL INTERNATIONAL INC operate a policy of continuous improvement & reserve the right to amend specifications without notice. All dimensions subject to manufacturers tolerances.
© Copyright of FLOOD CONTROL INTERNATIONAL INC. All rights reserved. No part of this drawing to be reproduced without their prior permission.
First Angle Projection enquiries@floodcontrolint.com
Status
FC22272-FCI-SET-2002 P07
S4 FB02 Setting Out - West
Sunland Park Levee Repair
For Information
Drn App'dDescriptionRev Date
P01 First Issue AL JD 10 Feb 23
P02
P03
P04
P05
P06
P07
Drawing file / project name amends
Amended as per comments 10MAR23
To match drawing revision P05
Updated to reflect barrier drawing
Minor ground profile amend
Spans adjusted as installed
AL
JD
JD
KM
KM
BJP
JD
AY
AY
HV
HV
HV
16 Feb 23
27 Mar 23
26 Jul 23
15 Dec 23
19 Dec 23
03 Mar 25
CS105 27250-000-00
CS106 27251-000-00
Reference Drawings
Contract Number 191BWC22C0011
Detail W
1/
8" 1'
-5
5/
2' -2
/1
6"
3 9/16"
1/
2"
1/
8"
5 5/16"
4"
Detail X
/4
5/
8" 4 5/16"
8 11/16"
Detail Y
Installation Notes:
1. Installation of embeds to be set out per these drawings.
2. Pre Placement inspection to verify location of embeds, and care is to be taken during placement to not disrupt embed placement.
3. Ensure embeds have blanking bolts installed and sealed to prevent concrete from entering couplings.
4. Clean embeds after concrete placement.
5. Trial fit instructions:
a. Measure embed centerlines after concrete placement to verify design dimensions.
b. Install posts by hand. No equipment will be used to install stop log arrangement. There is no possibility of damage to concrete.
c. If embed placement is correct, all stoplogs will be same length. One set of stoplogs to be shipped with field trim to account for embed placement variation.
d. If there is a need to trim or if varying lengths of boards is needed, drawings shall be as built and piece marks are to be developed and marked in the field and recorded in as built drawings, installation and operation manuals.
e. Once posts are set, boards are to be set by hand to avoid damage to materials and concreted. Installation manual to be followed.
f. Disassemble and store in stop log storage shed.
FLOOD
RevDrg No
Title
Project
Status
Page No
FLOOD CONTROL INTERNATIONAL INC operate a policy of continuous improvement & reserve the right to amend specifications without notice. All dimensions subject to manufacturers tolerances.
© Copyright of FLOOD CONTROL INTERNATIONAL INC. All rights reserved. No part of this drawing to be reproduced without their prior permission.
First Angle Projection enquiries@floodcontrolint.com
Status
FC22272-FCI-SET-2002 P07
S4 FB02 Setting Out - West
Sunland Park Levee Repair
For Information
FO
FO
FO
FO
FO
A
A
B
B
Water Direction
Fully removable Aluminum recess mount end supports fixed to cast in wall anchor plate with M12x40 hex head bolts and to cast in floor anchor plate with M16x50 hex head bolt
X
Extra thick EPDM base gasket
Aluminum dam boards, weight~53lb
Fully removable Aluminum intermediate post, weight ~30lbs
Intermediate post fixed to cast in anchor plate with M16x50 hex head bolt.
Extended compression clamp
2' -2
" 11 13/16"
Span 10'-1 3/8"
Board Length 9'-10 11/16"
Span 10'-0 1/2"
Board Length 9'-10 11/16"
3' -0
Span 10'-0 3/4"
Board Length 9'-10 11/16"
Span 10'-0 3/4"
Board Length 9'-10 11/16"
Span 10'-7 1/4"
Board Length 10'-6"
Structural Opening 50'-10 5/8"
Compression clamp (lockable available, 1 per span) Clear 1' - 1 3/4" appear above system to ensure board installation
Y
Fully removable Aluminum end support, weight ~14lbs
Slope due to road crown
1.03% 1.86%
Dam board spans crown of road, therefore gaps under the base seal may occur near posts
Aluminum dam boards, weight~56lb
Isometric view of clamp
FLOOD
RevDrg No
Title
Project
Status
Page No
FLOOD CONTROL INTERNATIONAL INC operate a policy of continuous improvement & reserve the right to amend specifications without notice. All dimensions subject to manufacturers tolerances.
© Copyright of FLOOD CONTROL INTERNATIONAL INC. All rights reserved. No part of this drawing to be reproduced without their prior permission.
First Angle Projection enquiries@floodcontrolint.com
Status
FC22272-FCI-SBS-0102 P11
S4 FB02 Slot-in Barrier System - West
Sunland Park Levee Repair
For Approval
Drn App'dDescriptionRev Date
P01 First Issue AL JD 21 Nov 22
P02
P03
P04
P05
P06
P07
P08
P09
P10
P11
Min foundation depth changed
Amended as per comments 10MAR23 Amended as client comments
Oversized beams and stickers removed
End Chanel Amended
Ground profile and width amended as VIF
Minor ground profile amend
Weights amended
Ground Fixings Updated
Spans/board lengths adjusted as installed
AL
AL
AL
AL
KM
KM
KM
KM
TD
BJP
JD
JD
JD
TC
HV
HV
HV
HV
HV
HV
16 Jan 23
27 Mar 23
28 Apr 23 25 Jul 23
25 Oct 23
15 Dec 23
19 Dec 23
18 Jan 24
07 Mar 24
03 Mar 25
CS105 27250-000-00
CS106 27251-000-00
Reference Drawings
Fixing Schedule Item Fixing Qty.
1 M16x50 hex bolt A4 18 2 M16 washer A4 18 3 M16 flat head blanking bolt A4 18 4 M12x40 hex bolt A4 4 5 M12 washer A4 4 6 M12 dome head blanking bolt A4 4
Tools required 24mm wrench for clamp & M16 bolts
17mm wrench for M12 bolts 8mm Allen key for clamp
Flat head screwdriver for blanking bolts
Contract Number 191BWC22C0011
1" 1/8" ~1 1/8"
Section B - BSection A - A
3' -0
/1
6"
2' -2
"2' -7
/2
LHS Elevation System not in place
Section B - B Post not in place m in
'-5
/8
" 8 7/
8"
1' -1
/4
" c le ar
Section A - A System not in place
M12 blanking bolt
Z
Detail Z
When removable posts are withdrawn, blanking bolts are used in the anchors to protect them from dirt.
1/4"
4"
7/
8"
1/
8"
3/
10 7/16" extended compression clamp
Cast in anchor base plate
Cast in anchor wall plate
M16 blanking bolt
2' -2
/1
6"
Aluminum dam boards symmetrical, no specific alignment wet/dry
1" 1/8" ~1 1/8"
Detail Z
When removable posts are withdrawn, blanking bolts are used in the anchors to protect them from dirt.
1/4" FLOOD
RevDrg No
Title
Project
Status
Page No
FLOOD CONTROL INTERNATIONAL INC operate a policy of continuous improvement & reserve the right to amend specifications without notice. All dimensions subject to manufacturers tolerances.
© Copyright of FLOOD CONTROL INTERNATIONAL INC. All rights reserved. No part of this drawing to be reproduced without their prior permission.
First Angle Projection enquiries@floodcontrolint.com
Status
FC22272-FCI-SBS-0102 P11
S4 FB02 Slot-in Barrier System - West
Sunland Park Levee Repair
For Approval
Reference DrawingsReference Drawings
CS105 27250-000-00
CS106 27251-000-00
M16 bolt into cast in anchor plate
Cast in wall anchor plate with M12 fixing
EPDM seal
3 9/16"
1/
/1 6"
2 3/8"
1 3/16"
3/
8"
5 1/8"
4"
1/
4"
1/
2"
3/
4"
Detail X
8 1/4"
5 7/8"
1/
4"
Detail Y
1/
2"
Detail X System not in place
3 9/16"
~3/16"
M16 flat head blanking bolt
M12 dome head blanking bolt
M12 dome head blanking bolt
1/
2"
5 11/16" 3/8"
1 3/8"
Detail Y Post not in place
M16 flat head blanking bolt
8 11/16"
/4
FLOOD
RevDrg No
Title
Project
Status
Page No
FLOOD CONTROL INTERNATIONAL INC operate a policy of continuous improvement & reserve the right to amend specifications without notice. All dimensions subject to manufacturers tolerances.
© Copyright of FLOOD CONTROL INTERNATIONAL INC. All rights reserved. No part of this drawing to be reproduced without their prior permission.
First Angle Projection enquiries@floodcontrolint.com
Status
FC22272-FCI-SBS-0102 P11
S4 FB02 Slot-in Barrier System - West
Sunland Park Levee Repair
For Approval
Reference Drawings
CS105 27250-000-00
CS106 27251-000-00
Installation Notes:
1. Installation of embeds to be set out per these drawings.
2. Pre Placement inspection to verify location of embeds, and care is to be taken during placement to not disrupt embed placement.
3. Ensure embeds have blanking bolts installed and sealed to prevent concrete from entering couplings.
4. Clean embeds after concrete placement.
5. Trial fit instructions:
a. Measure embed centerlines after concrete placement to verify design dimensions.
b. Install posts by hand. No equipment will be used to install stop log arrangement. There is no possibility of damage to concrete.
c. Once posts are set, boards are to be set by hand to avoid damage to materials and concreted. Installation manual to be followed.
d. Disassemble and store in stop log storage shed.
General Notes:
1. Walls & floor prepared with Sika Primer (if necessary) and sealed with grey Sealant at end support locations.
2. Structural foundations and/or walls required are to be built and checked by others. Dimensions shown are minimum for fixings criteria which does not include any structural check such as sliding, overturning and bearing checks which must be carried out by a third party/others.
3. It is the client's responsibility to check wall strength and stability to withstand flood loading. Loads available on request.
4. Finished floor and walls to have a smooth, flat, level, impervious surface. ±3/16" tolerance across barrier length off of plumb.
5. Base gasket to allow no gaps due to the road crown.
FLOOD
RevDrg No
Title
Project
Status
Page No
FLOOD CONTROL INTERNATIONAL INC operate a policy of continuous improvement & reserve the right to amend specifications without notice. All dimensions subject to manufacturers tolerances.
© Copyright of FLOOD CONTROL INTERNATIONAL INC. All rights reserved. No part of this drawing to be reproduced without their prior permission.
First Angle Projection enquiries@floodcontrolint.com
Status
FC22272-FCI-SBS-0102 P11
S4 FB02 Slot-in Barrier System - West
Sunland Park Levee Repair
For Approval
Reference Drawings
CS102 27247-000-00
CS103 27248-000-00
| 035I - Revised Stoplog Shop Drawings_cover_final |
| FC22272-FCI-SET-2002-P07 |
| Sheets and Views |
| FC22272-FCI-SET-2002-FB02 |
| FC22272-FCI-SET-2002-FB02 (2) |
| FC22272-FCI-SET-2001-P08 |
| Sheets and Views |
| FC22272-FCI-SET-2001-FB01 |
| FC22272-FCI-SET-2001-FB01 (2) |
| FC22272-FCI-SBS-0101-P10 |
| Sheets and Views |
| FC22272-FCI-SBS-0101-FB01 |
| FC22272-FCI-SBS-0101-FB01 (2) |
| FC22272-FCI-SBS-0101-FB01 (3) |
| FC22272-FCI-SBS-0101-FB01 (4) |
| FC22272-FCI-SBS-0102-P11 |
| Sheets and Views |
| FC22272-FCI-SBS-0102-FB02 |
| FC22272-FCI-SBS-0102-FB02 (2) |
| FC22272-FCI-SBS-0102-FB02 (3) |
| FC22272-FCI-SBS-0102-FB02 (4) |
File details come from the government source that posted it. Updated .