Construction of the ERCIP Wellfield Expansion at Fort Drum, NY
Closed Pre-Solicitation Posted
Not the latest version. See the latest solicitation from .
- Solicitation number
- W912DS-26-S-0018
- Agency
-
ENDIST New York
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Not on record
- Place of performance
- Fort Drum, New York 13602, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers, New York District, is conducting market research through this Sources Sought notice to identify potential contractors capable of performing design-build construction services for the ERCIP Wellfield Expansion at Fort Drum, NY. The project encompasses the construction of five new water wells, associated well houses, SCADA systems and controls, site work, grading, utilities, storm water management features, approximately 5 miles of waterline, communications infrastructure, duct bank, overhead powerlines, and related work. The Government is specifically seeking to assess the capability and interest of small business concerns, including 8(a) firms, HUBZone small businesses, service-disabled veteran-owned small businesses, women-owned small businesses, and other small business concerns under the applicable NAICS size standard of $45,000,000 in annual revenue (NAICS 237990). Interested firms must submit capability statements limited to ten pages that include company information, business size designation and SBA socioeconomic program status, and two sample projects demonstrating relevant qualifications by February 26, 2026, at 2:00 PM EST. The Government will use responses to develop an acquisition strategy and determine whether to set aside the contract for small business concerns or proceed as unrestricted.
This opportunity carries no current set-aside designation, and no incumbent contractors are identified in this pre-solicitation phase. The anticipated contract value ranges from $10,000,000 to $25,000,000, with an estimated 24-month timeline from Notice to Proceed for completion of both design and construction. The Government has requested that respondents provide specific information regarding potential timeline concerns, such as equipment lead times, if market conditions suggest the 24-month estimate may be unrealistic. Other-than-small-business contractors are requested to address their subcontracting practices and provide estimated subcontracting percentages for various small business categories. All responses must come from U.S. firms registered in SAM.gov, with 8(a) and HUBZone firms requiring current SBA certification, and inquiries should be directed to Brian Winters, Contract Specialist, at brian.h.winters@usace.army.mil.
Notice text
This is a SOURCES SOUGHT for the purpose of obtaining market research only. No proposals are being requested nor accepted under this synopsis. The U.S. Army Corps of Engineers, New York District, will use information obtained under this source sought to develop an acquisition strategy to meet the requirements for the Gas Alley ACP Modernization construction project at Fort Drum, NY.
The purpose of this Sources Sought notice is to conduct market research to assess the capability and interest of small business concerns— including participants in the U.S. Small Business Administration (SBA) 8(a) Business Development Program, HUBZone small business concerns, service-disabled veteran-owned small business (SDVOSB) concerns, women-owned small business (WOSB) concerns (including EDWOSBs, as applicable), and other small business concerns that are small under the applicable NAICS size standard—to perform a design-build construction project at Fort Drum in support of the United States Army.
The United States Army Corps of Engineers (USACE) New York District (NAN) anticipates a potential requirement for Design-Build (DB) construction services for the construction of five (5) new water wells. This will include well houses, SCATA systems/controls, site work and grading, utilities, and storm water management features. The project also includes approximately 5 miles of waterline, comms, duct bank, overhead powerlines, and other related work at Fort Drum.
The Government estimates that design and construction of the potential requirement can be completed within twenty-four (24) months from receipt of Notice to Proceed (NTP). If market conditions indicate this estimate may be unrealistic, respondents are encouraged to provide specific information (such as known equipment lead times or other timeline concerns) for Government consideration when responding to this Sources Sought Notice.
The anticipated magnitude of construction is between 10,000,000 and $25,000,000.
The North American Industrial Classification System (NAICS) code for the potential requirement is anticipated to be 237990, Other Heavy and Civil Engineering Construction. The small business size standard for the NAICS, as established by the U.S. Small Business Administration, is $45,000,000 annual revenue.
Contractors with the skill, capabilities, workload capacity, and ability to obtain bonding to complete the project described above are invited to provide capability statements to the primary point of contact listed below. Other than small businesses are also encouraged to submit Capability Statements.
Capability Statement Submission Requirements:
All interested firms are encouraged to respond to this notice and may do so by submitting a capabilities statement. The capabilities statement is limited to ten (10) pages total and should include the following information:
a. Firm’s name, address, point of contact, phone number and email address.
b. Identify your business size (small or other than small) under the applicable NAICS code and size standard. If you are a small business, indicate any applicable SBA socioeconomic program/status (e.g., 8(a) participant, HUBZone small business concern, small disadvantaged business, women-owned small business, veteran-owned small business, or service-disabled veteran-owned small business).
c. Demonstration of the firm’s qualifications. Include two (2) sample projects indicating the following:
- Title, location, description and dollar amount of the project. Also include a statement regarding relevancy to the qualifications being sought.
- The response must be specific to the qualifications listed above to show that the respondent meets the requirements and possesses the necessary skills and experience. If a response does not show that the respondent meets the qualifications and/or does not possess the necessary skills and experience, the respondent will not be considered by the Government. Again, this is NOT a request for proposal or quotation; there is no solicitation available currently. A determination by the Government to proceed with the acquisition as a set-aside for 8(a) program, HUBZone, Small Business, etc. or unrestricted is within the discretion of the Government.
Subcontracting Opportunities for Other-Than-SB Only:
To foster inclusive opportunities and ensure broad participation of small businesses in federal contracting, we are seeking information from Other Than Small Business (OTSB) vendors on their subcontracting practices and goals. This inquiry is designed to assess the feasibility and extent of subcontracting possibilities in alignment with federal guidelines and to support the economic growth of small businesses through meaningful subcontracting opportunities. In your response, please address the following considerations by providing estimated subcontracting percentages for each of the socioeconomic categories (small business, small disadvantaged business, women-owned small business,
HUBZone small business, veteran-owned small business, and service-disabled veteran-owned small business):
- Business Practices: Describe whether your firm customarily contracts for part of the work to be performed or maintains in-house capability sufficient to perform the work. Provide two (2) examples or explain your approach.
- Prequalification Requirements: Identify if there are likely to be product or service prequalification requirements and how you intend to manage these in relation to subcontracting opportunities.
- Feasibility of Subcontracting: Discuss the feasibility of acquiring any portion of the work through subcontracting, considering the time until contract completion and the impact on performance. Address how subcontracting decisions will be made to ensure fair market value and minimal disruption.
- Subcontracting Goals: Please provide estimated percentage goals for subcontracting to each of the following socioeconomic categories:
- a. Small Business (SB)
- b. Small Disadvantaged Business (SDB)
- c.Women-Owned Small Business (WOSB)
- d. HUBZone Small Business
- e. Veteran-Owned Small Business (VOSB)
- f. Service-Disabled Veteran-Owned Small Business (SDVOSB)
We are looking for vendors who demonstrate a clear understanding of the importance of small business subcontracting and have strategies in place to achieve these goals effectively. Responses are restricted to U.S. firms that are established and registered in the System for Award Management (SAM), www.sam.gov. For 8(a) and HUBZONE, firms must be certified by the Small Business Administration (SBA). All responses to this Market Research by interested businesses shall be limited to the information required above and shall be submitted via email no later than 1400 (2:00 PM) EST on February 26, 2026.
Contracting Office Address:
Attn: CENAN-CT
26 Federal Plaza
New York, New York 10278-0090 United States
Place of Performance:
Fort Drum, NY 13602 United States
Primary Point of Contact.:
Brian Winters Contract Specialist
brian.h.winters@usace.army.mil
Files
| File | Type | Posted |
|---|---|---|
| Sources Sought -Wellfield.docx | DOCX document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Construction of the ERCIP Wellfield Expansion at Fort Drum, NY | Solicitation | |
| Construction of the ERCIP Wellfield Expansion at Fort Drum, NY | Pre-Solicitation | |
| Notice of Intent to Sole Source Procurement for Wells Data Switches at Fort Drum | Special Notice | |
| Notice of Intent - Sole Source Procurement for Wells Control System Upgrade at Fort Drum | Special Notice | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| FY23-28 General Construction Services BPA - W911S223S8000 | MICC Fort Drum | HUBZone | |
| Blanket Purchase Agreement Porta John Services | MICC Fort Drum | Total Small Business | |
| Fort Eustis Dredge Material Management Area Construction in Newport News, Virginia | ENDIST Norfolk | No set-aside | |
| Municipal Separate Storm Sewer System (MS4) | MICC Fort Drum | Woman-Owned Small Business | |
| Stone and Soil MBPA on Fort Drum | MICC Fort Drum | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity