About this opportunity

The Department of the Army Corps of Engineers Engineering District New York has published a Notice of Intent for a sole source procurement to upgrade the wells control system at Fort Drum. This special notice, posted on March 18, 2026, announces the government's intent to procure control system hardware, software, and integration services under Federal Acquisition Regulation (FAR) 6.302-1 authority, which permits procurement from a single source when no other supplies or services will satisfy agency requirements. The procurement is justified based on the existing infrastructure's proprietary nature and the need to maintain seamless compatibility with the incumbent Trane-based SCADA system. The notice is categorized under Other Heavy and Civil Engineering Construction (NAICS 237990) and has a due date of April 2, 2026 for interested parties to submit comments or documentation regarding the proposed sole source determination.

The objective of this procurement is to expand and modernize the existing Supervisory Control and Data Acquisition (SCADA) system that controls Fort Drum's water wells while maintaining operational integrity, system stability, and cybersecurity. The government's market research determined that only Trane and its authorized representatives can provide the required proprietary programmable logic controllers, input/output modules, SCADA software licenses, and engineering services necessary for integration without substantial cost duplication or unacceptable delays. Any alternative manufacturer would necessitate the wholesale replacement of central SCADA servers, operator workstations, network hardware, and complete reprogramming and retraining efforts. Interested parties have until April 2, 2026 to respond to this notice. The sole source justification is based on three primary factors: the proprietary architecture preventing third-party integration, the prohibitive costs of system replacement, and the mission-critical nature of the utility infrastructure requiring rapid implementation without extended redesign and testing periods.

Notice text

1.0 Introduction & Background

This document provides the justification for using other than full and open competition for the procurement of control system hardware, software, and integration services for the wells control system upgrade project at Fort Drum. The project requires the expansion and modernization of the existing Supervisory Control and Data Acquisition (SCADA) system controlling the facility's water wells.

The existing wells are operated by a proprietary control system. To maintain operational integrity, system stability, and cybersecurity posture, the new controls must seamlessly integrate with the incumbent manufacturer's platform. 

2.0 Justification for Other Than Full and Open Competition

2.1 Authority Cited

The proposed procurement is justified under the authority of FAR 6.302-1, "Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements." This authority is applicable because the required supplies and services must be procured from a specific manufacturer to ensure compatibility with the existing installed infrastructure, thereby avoiding substantial duplication of cost and unacceptable delays.

2.2 Description of Supplies/Services

The required supplies and services include proprietary programmable logic controllers (PLCs), input/output (I/O) modules, SCADA software licenses, and the associated engineering services for programming, configuration, and integration. These components must be fully compatible with the existing Fort Drum wells control system, which is based on the Trane platform. Only this manufacturer and its authorized representatives can provide the hardware, firmware, and software required to expand the system without compromising its integrity while maintaining the full functionality required by the Fort Drum licensed water operator.

2.3 Demonstration of Sole Source Necessity

The existing SCADA system for the wells at Fort Drum is a highly integrated and proprietary platform. Key components, including the central servers, communication protocols, and programming environment, are specific to the incumbent manufacturer. Awarding a contract to another source would prevent the new well controls from integrating into the existing system for the following reasons:

  • Proprietary Architecture: The system's communication bus and software are not open-protocol, preventing third-party controllers from being recognized or functioning within the established network.
  • Data Analysis: The system’s proprietary data analysis would be unable to fully integrate with non-Trane equipment.
  • Data & Alarm Consistency: An alternative system would be unable to integrate into the existing alarm, trending, and historical data logging schemas, creating operational inefficiencies and information gaps.
  • Cybersecurity: Introducing a different platform would require a completely new cybersecurity evaluation and Authority to Operate (ATO), creating a separate, less secure control network or a risky and unproven integration gateway.

2.4 Rationale for Substantial Duplication of Cost

Utilizing a different controls manufacturer would result in substantial duplication of costs that would not be recovered through competition. These sunk costs would include:

  • System Replacement: A wholesale replacement of the existing central SCADA servers, operator workstations, and network hardware would be required.
  • Reprogramming: All existing sequences of operation for the current wells would need to be reprogrammed and recommissioned on the new platform.
  • Operator Training: Facility operators would need to be retrained on an entirely new system, leading to lost productivity and the potential for operational errors.

These duplicated costs are estimated to far exceed any potential savings from a competitive procurement for the new expansion scope alone.

2.5 Rationale for Unacceptable Delays

Introducing an alternate controls brand would cause unacceptable delays to a mission-critical utility infrastructure project. Specific delays would include:

  • Extended Redesign: The control system architecture would require a complete redesign to accommodate a new platform.
  • Complex Integration & Testing: Significant time would be spent developing and testing a new integration method, with no guarantee of success.
  • Commissioning Delays: Commissioning and functional performance testing would be significantly extended to validate the performance of a non-standard, multi-vendor system.

These delays would jeopardize the project schedule and impact the operational readiness of the facility's water supply.

2.6 Market Research

Market research confirmed that while multiple vendors manufacture control systems, no other vendor can provide components that are fully and seamlessly compatible with the proprietary architecture of the installed system at Fort Drum. Research confirmed that any attempt to use an alternative would require the costly and time-consuming replacement of the existing system, validating the conclusion that only the incumbent manufacturer can meet the agency's requirements without causing unacceptable delays and cost duplication.

3.0 Conclusion

Based on the technical constraints of the existing proprietary system, the only viable path to meet the government's needs is to procure controls from the incumbent manufacturer. Therefore, a sole-source justification pursuant to FAR 6.302-1 is appropriate and necessary to ensure the successful, timely, and cost-effective completion of the Fort Drum wells control system upgrade.

Files

File Type Posted
Trane NOI_Rev 1.docx DOCX document

Notice history

Notice Type Posted
Construction of the ERCIP Wellfield Expansion at Fort Drum, NY Latest solicitation Solicitation
Construction of the ERCIP Wellfield Expansion at Fort Drum, NY Pre-Solicitation
Notice of Intent to Sole Source Procurement for Wells Data Switches at Fort Drum Special Notice
This notice Special Notice
Construction of the ERCIP Wellfield Expansion at Fort Drum, NY Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
US Army assessment of Thermal Power Station Operations Aberdeen Proving Ground, Maryland 21005, United States · NAICS 611430 ACC Aberdeen Proving Ground No set-aside
Generation and Delivery of Meteorological and Hydrological Forecasts for the Western Washington and Northwest Montana River Basins Seattle, Washington 98134, United States · NAICS 541990 ENDIST Seattle No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity