CO OMAD 300(71) Minuteman Missile Access

Closed Pre-Solicitation Posted

Not the latest version. See the latest pre-solicitation from .

Solicitation number
6982AF26SS0016
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Cheyenne, Wyoming, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Federal Highway Administration is determining interest in a set-aside opportunity for road construction work related to CO OMAD 300(71) Minuteman Missile Access, with response due by August 13, 2026. The notice requests expressions of interest from small businesses, HUBZone small businesses, women-owned small business concerns, 8(a) small businesses, or service-disabled veteran-owned small businesses to establish whether sufficient qualified prime contractors exist to support a small-business set-aside.

Respondents must submit by email to cflacquisitions@dot.gov (Attn: Eric Grosskreuz) a positive statement of intent to bid as prime contractor, a list of applicable socioeconomic certifications, and a letter from a bonding agent demonstrating capability to bond a single project of $10 million and stating aggregate bonding capacity. Firms must also provide a project list showing prior work of equal or greater value and scope involving roadway reconditioning and aggregate surface course placement. Proposals should specify whether the firm served as prime contractor or subcontractor on each project. Construction phasing, temporary traffic control, and timely completion experience are required.

The work involves highway, street, and bridge construction (NAICS 237310) and is not currently set-aside pending the outcome of this interest assessment. All respondents must be certified in SAM.gov. Firms should review 13 CFR 121.103 and 121.108 regarding SBA affiliation determinations and size-status misrepresentation penalties.

Notice text

THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.

THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT  INTEREST FROM QUALIFIED PRIME CONTRACTORS who are small businesses, HUBZone small businesses, woman owned small business concerns, 8(a) small businesses, or service disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs must submit the following by e-mail to cflacquisitions@dot.gov (Attn:  Eric Grosskreuz) for receipt by close of business (2 p.m. local Denver time) on August 13, 2026: 

(1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor;

(2) A list of all confirmed socioeconomic categories (i.e., 8(a), small disadvantaged business, HUBZone small business, service-disabled veteran-owned small business, EDWOSB, or WOSB status) that apply to your business;

(3) A letter from a bonding agent stating your firm’s capability to bond for a single project of $10 million, and your firm’s aggregate bonding capacity; and

(4)  Provide a list of road construction projects of equal or greater value and scope to the CO OMAD 300(71) project in which contractor performed work in roadway reconditioning and placing aggregate surface course on roadways.  Experience in construction phasing, temporary traffic control, and timely completion of construction is required.  State whether the firm was the prime contractor or subcontractor on the project. 

 DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK.

The size of a small business firm includes all parents, subsidiaries, affiliates, etc.  Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status.  All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/

Project Details:

CO OMAD 300(71) Minuteman Missile Access

The Office of Missile Air Defense Program (OMAD) is a Defense Access Road (DAR) program used by the Department of Defense (DoD) to fund the annual maintenance and improvements on certified gravel roads. FHWA works with the Military Surface Deployment and Distribution Command (SDDC) to support the Air Force Intercontinental Ballistic Missile Program (Minuteman). These Minuteman Missile Access Roads are located in southwestern Wyoming, southeastern Nebraska, and northeastern Colorado.

In cooperation with the F.E. Warren Air Force Base and Central Federal Lands Highway Division, this project includes re-graveling up to 85.75 miles of existing gravel Minuteman Missile Access Roads consisting entirely of unawarded roads from CO OMAD 300(71) in various counties within Colorado, Nebraska, and Wyoming. The intent of this project is to provide necessary aggregate road maintenance for select routes utilized by the United States Air Force.

The work includes roadway reconditioning and adding four inches of aggregate surface course as well as the replacement of up to 73 culverts.  All proposed work is to stay on the existing roadway bench. The proposed typical section consists of reconditioning the existing gravel roadway per Section 303 and adding an additional 4-inches of Aggregate Surface Course with a maximum width of 24-feet. A 4% crown is proposed or as approved by the CO. The Contractor will need to taper down the proposed aggregate surface, per the typical section, at applicable locations.

The project will be procured under the FPVS (Fixed-Price Variable Scope) contracting method and includes up to 85.75 miles of variable scope roadway reconditioning and re-graveling, and up to 73 culverts of variable scope in length. The project PS&E will provide a prioritized schedule of roadways to be improved that includes roadway reconditioning and re-graveling of existing aggregate surface roads within the existing roadway bench; as well as the replacement of up to 73 culverts.

PRINCIPAL WORK ITEMS:

67001-0000 Project Lump Sum (Section 152 – Survey and Staking Drainage Structure)

67001-0000 Project Lump Sum (Section 153 – Contractor Quality Control)

67001-0000 Project Lump Sum (Section 602 – Pipe Culvert)

67001-0000 Project Lump Sum (Section 301 – Aggregate Surface Course)

ANTICIPATED SCHEDULE:

It is anticipated that this project will be advertised in September 2026 and be under construction in April 2027.  The project has an estimated completion date of September 2027.

The estimated price range of the project work is between $5,000,000 and $10,000,000.

Notice history

Notice Type Posted
CO OMAD 300(71) Minuteman Missile Access Latest pre-solicitation Pre-Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
WY BR WYAO US20(1) US 20 and Hayden Arch Bridge Repairs Cody, Wyoming 82414, United States · NAICS 237310 Federal Highway Administration No set-aside
ND NP THRO 204(1) Buck Hill Road Medora, North Dakota, United States · NAICS 237310 Federal Highway Administration No set-aside
Northeast Region Pavement and Bridge Preservation Construction - NP NER PMS BMS FY24(1) New York, United States · NAICS 237310 Federal Highway Administration Total Small Business
UT NP ARCH 100(2) Bridges on Delicate Arch Road Moab, Utah 84532, United States · NAICS 237310 Federal Highway Administration No set-aside
Paving Acquisition Vehicle - Rockies (PAV-R) IDIQ Sources Sought Colorado Springs, Colorado, United States · NAICS 237310 Air Force Space Command Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity