CO FLAP 102(1) and FTFW 112(2) Brainard Lake Road and Bridge

Award Notice Posted

Solicitation number
DTFH6817B00019
Agency
Awarded
to Kirkland Construction, L.L.L.P.
Set-aside
No set-aside

Opportunity facts

Contract number
6982AF18C000005 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
Arapaho & Roosevelt National Forest Boulder County, Colorado, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

PROJECT DETAILS:  CO FLAP 102(1) & FTFS 112(2), Brainard Lake Road and Bridge


This project is located in Arapaho Roosevelt National Forest , Boulder County, Colorado.  This project includes reconstruction and widening of 2.52 miles of Brainard Lake Road, as well as rehabilitation of a concrete bridge.  The project consists of grading, drainage, asphalt pavement pulverization, aggregate base, asphalt pavement, signing, striping, new guardrail, replacement of concrete wingwalls and a precast girder, and epoxy overlay of Brainard Lake Bridge.


Type of Construction: grading, widening, asphalt pulverization, drainage, aggregate base, asphalt paving, prefabricated bridge elements, cast in place concrete wingwalls, erosion control, signing and striping, and temporary traffic control.


This project consists of:


Schedule A:  Clearing, grading, Pulverization and paving 2.52 miles of Brainard Lake Road.


Significant Items for Schedule A Include: 6.1 miles of slope and grade finish staking,  3,700 LF of silt fence; 700 LF of sediment logs; 11 acres of clearing and grubbing; 32,000 CY of roadway excavation; 1200 cuyd of waste;  18,650 CY of waste, 8,150 tons of aggregate base: 1.5 miles of 24' wide asphalt pulverization;  6,850 tons of asphalt paving;  1,300 LF of pipe culvert placement;  725 lnft of concrete curb; 225 LF of guardrail; 14,800 sqyd of placing conserved topsoil; 7 acres of seeding and bonded fiber matrix;  106,000 lnft of waterborne pavement markings;  1,600 flagger hours ; 800 pilot car hours


Option X: Minor bridge rehabilitation of Brainard Lake Bridge


Significant Items for Option X include:  40 cuyd of excavation ; 30 cuyd of structure backfill; 1- Removal of precast concrete box girder; 1-placement of new concrete box girder; 21 tons of asphalt paving; 11 cuyd of structural concrete; 39 lnft of remove and reset bridge rail; 91 sqyd of concrete overlay (thin bonded epoxy);  10 lnft of remove and reset stone masonry wall;   


Estimated total cost for Schedule A and Option X is $3 to $5 million

Update #1 ·

THIS IS NOT AN INVITATION FOR BID.  PLANS AND SPECIFICATIONS ARE CURRENTLY NOT AVAILABLE. THE TENTATIVE ADVERTISEMENT DATE IS SEPTEMBER 5, 2017.  THIS PROJECT WILL BE ADVERTISED ON A FULL AND OPEN BASIS.


PROJECT DETAILS:  CO FLAP 102(1) & FTFS 112(2), Brainard Lake Road and Bridge


This project is located in Arapaho Roosevelt National Forest , Boulder County, Colorado.  This project includes reconstruction and widening of 2.52 miles of Brainard Lake Road, as well as rehabilitation of a concrete bridge.  The project consists of grading, drainage, asphalt pavement pulverization, aggregate base, asphalt pavement, signing, striping, new guardrail, replacement of concrete wingwalls and a precast girder, and epoxy overlay of Brainard Lake Bridge.


Type of Construction: grading, widening, asphalt pulverization, drainage, aggregate base, asphalt paving, prefabricated bridge elements, cast in place concrete wingwalls, erosion control, signing and striping, and temporary traffic control.


This project consists of:


Schedule A:  Clearing, grading, Pulverization and paving 2.52 miles of Brainard Lake Road.


Significant Items for Schedule A Include: 6.1 miles of slope and grade finish staking,  3,700 LF of silt fence; 700 LF of sediment logs; 11 acres of clearing and grubbing; 32,000 CY of roadway excavation; 1200 cuyd of waste;  18,650 CY of waste, 8,150 tons of aggregate base: 1.5 miles of 24' wide asphalt pulverization;  6,850 tons of asphalt paving;  1,300 LF of pipe culvert placement;  725 lnft of concrete curb; 225 LF of guardrail; 14,800 sqyd of placing conserved topsoil; 7 acres of seeding and bonded fiber matrix;  106,000 lnft of waterborne pavement markings;  1,600 flagger hours ; 800 pilot car hours


Option X: Minor bridge rehabilitation of Brainard Lake Bridge


Significant Items for Option X include:  40 cuyd of excavation ; 30 cuyd of structure backfill; 1- Removal of precast concrete box girder; 1-placement of new concrete box girder; 21 tons of asphalt paving; 11 cuyd of structural concrete; 39 lnft of remove and reset bridge rail; 91 sqyd of concrete overlay (thin bonded epoxy);  10 lnft of remove and reset stone masonry wall;   


Estimated total cost for Schedule A and Option X is $3 to $5 million

Files

File Type Posted
Bid_Opening_Summary_10.11.17.pdf PDF
2017-10-02_Q&A.pdf PDF
Pawnee_Campground_Water_System_As-Builts.pdf PDF
Amendment_A004.pdf PDF
A003_E_Section.pdf PDF
2017-09-29_Q&A.pdf PDF
Amendment_A003.pdf PDF
Option_Y_Waterline_Plans_Updated_92917.pdf PDF
2017-09-28_Q&A.pdf PDF
Amendment_A002.pdf PDF
2017-09-22_Q&A.pdf PDF
CO_102(1)_ExistingGround.xml XML file
3D_ALICO102(1).dgn —
2017-09-20_Q&A.pdf PDF
XSECO102(1)_Final.dgn —
2017-09-18_Q&A.pdf PDF
A001_E24.pdf PDF
SF_30_Amendment_Form.pdf PDF
Century_Link_Records_for_Brainard_Road.pdf PDF
Brainard_Lake_Bridge_Replacment_03_1987.pdf PDF
DTFH6817B00019_IFB.pdf PDF
Brainard_Lake_Bridge_Replacment_03_1987_3.pdf PDF
CO_102(1)_PDF.pdf PDF
CO_102(1)_PDF_XS.pdf PDF
Brainard_Lake_Bridge_Replacment_03_1987_4.pdf PDF
CO_FLAP_102(1)_Brainard_Lake_Road_Pavements_Report_2-25-2015.pdf PDF
Show all 26

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors