CO FLAP 102(1) and FTFW 112(2) Brainard Lake Road and Bridge
Award Notice Posted
- Solicitation number
- DTFH6817B00019
- Agency
-
Federal Highway Administration
Department of Transportation
- Awarded
- to Kirkland Construction, L.L.L.P.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- 6982AF18C000005 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- Arapaho & Roosevelt National Forest Boulder County, Colorado, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
PROJECT DETAILS: CO FLAP 102(1) & FTFS 112(2), Brainard Lake Road and Bridge
This project is located in Arapaho Roosevelt National Forest , Boulder County, Colorado. This project includes reconstruction and widening of 2.52 miles of Brainard Lake Road, as well as rehabilitation of a concrete bridge. The project consists of grading, drainage, asphalt pavement pulverization, aggregate base, asphalt pavement, signing, striping, new guardrail, replacement of concrete wingwalls and a precast girder, and epoxy overlay of Brainard Lake Bridge.
Type of Construction: grading, widening, asphalt pulverization, drainage, aggregate base, asphalt paving, prefabricated bridge elements, cast in place concrete wingwalls, erosion control, signing and striping, and temporary traffic control.
This project consists of:
Schedule A: Clearing, grading, Pulverization and paving 2.52 miles of Brainard Lake Road.
Significant Items for Schedule A Include: 6.1 miles of slope and grade finish staking, 3,700 LF of silt fence; 700 LF of sediment logs; 11 acres of clearing and grubbing; 32,000 CY of roadway excavation; 1200 cuyd of waste; 18,650 CY of waste, 8,150 tons of aggregate base: 1.5 miles of 24' wide asphalt pulverization; 6,850 tons of asphalt paving; 1,300 LF of pipe culvert placement; 725 lnft of concrete curb; 225 LF of guardrail; 14,800 sqyd of placing conserved topsoil; 7 acres of seeding and bonded fiber matrix; 106,000 lnft of waterborne pavement markings; 1,600 flagger hours ; 800 pilot car hours
Option X: Minor bridge rehabilitation of Brainard Lake Bridge
Significant Items for Option X include: 40 cuyd of excavation ; 30 cuyd of structure backfill; 1- Removal of precast concrete box girder; 1-placement of new concrete box girder; 21 tons of asphalt paving; 11 cuyd of structural concrete; 39 lnft of remove and reset bridge rail; 91 sqyd of concrete overlay (thin bonded epoxy); 10 lnft of remove and reset stone masonry wall;
Estimated total cost for Schedule A and Option X is $3 to $5 million
Update #1 ·
THIS IS NOT AN INVITATION FOR BID. PLANS AND SPECIFICATIONS ARE CURRENTLY NOT AVAILABLE. THE TENTATIVE ADVERTISEMENT DATE IS SEPTEMBER 5, 2017. THIS PROJECT WILL BE ADVERTISED ON A FULL AND OPEN BASIS.
PROJECT DETAILS: CO FLAP 102(1) & FTFS 112(2), Brainard Lake Road and Bridge
This project is located in Arapaho Roosevelt National Forest , Boulder County, Colorado. This project includes reconstruction and widening of 2.52 miles of Brainard Lake Road, as well as rehabilitation of a concrete bridge. The project consists of grading, drainage, asphalt pavement pulverization, aggregate base, asphalt pavement, signing, striping, new guardrail, replacement of concrete wingwalls and a precast girder, and epoxy overlay of Brainard Lake Bridge.
Type of Construction: grading, widening, asphalt pulverization, drainage, aggregate base, asphalt paving, prefabricated bridge elements, cast in place concrete wingwalls, erosion control, signing and striping, and temporary traffic control.
This project consists of:
Schedule A: Clearing, grading, Pulverization and paving 2.52 miles of Brainard Lake Road.
Significant Items for Schedule A Include: 6.1 miles of slope and grade finish staking, 3,700 LF of silt fence; 700 LF of sediment logs; 11 acres of clearing and grubbing; 32,000 CY of roadway excavation; 1200 cuyd of waste; 18,650 CY of waste, 8,150 tons of aggregate base: 1.5 miles of 24' wide asphalt pulverization; 6,850 tons of asphalt paving; 1,300 LF of pipe culvert placement; 725 lnft of concrete curb; 225 LF of guardrail; 14,800 sqyd of placing conserved topsoil; 7 acres of seeding and bonded fiber matrix; 106,000 lnft of waterborne pavement markings; 1,600 flagger hours ; 800 pilot car hours
Option X: Minor bridge rehabilitation of Brainard Lake Bridge
Significant Items for Option X include: 40 cuyd of excavation ; 30 cuyd of structure backfill; 1- Removal of precast concrete box girder; 1-placement of new concrete box girder; 21 tons of asphalt paving; 11 cuyd of structural concrete; 39 lnft of remove and reset bridge rail; 91 sqyd of concrete overlay (thin bonded epoxy); 10 lnft of remove and reset stone masonry wall;
Estimated total cost for Schedule A and Option X is $3 to $5 million