Sheet 1 of 2
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
A2
ABBREVIATIONS DRAINAGE SYMBOLS
GEOLOGIC SYMBOLS
DI
FENCE & CATTLEGUARD SYMBOLS
Cattleguard (Existing, Proposed)
Fence w/ Gate (Existing, Proposed)
Fence (Existing, Proposed)
Material Source
Boring Location (Existing, Proposed)
Riprap Apron (Proposed)
Underdrain (Existing, Proposed)
With Drop Inlet (Existing, Proposed)
With Headwalls (Existing, Proposed)
With End Sections (Existing, Proposed)
Pipe Culvert (Existing, Proposed)
Box Culvert (Existing, Proposed)
Bridge (Existing, Proposed)
Spring
River
Wetland
Large Creek
Lake, Pond or Reservoir
Drainage or Small Creek
Flow Arrow
Ditch (Existing, Proposed)
SPRING
D jt.J int.
incr.
incl.
IDI
hwy.
HW
horiz.
hex.
HES
hdwl.H gdr.
galv.
ga.G ftg.
fin.
FES
Fed.
f.f.F ext.
exp. jt.
exc.
EW
et ux et al
ER
EQ or eq.
EOP
engr(s).
emb.
elev.
El. 94.066 e
EE
dwg(s).
DLC
Dist.
dist.
diaph.
diag.
dia. or D
DI
DHV
decr.D culv.
CTSM
ctrs.
CS
cr.
corr.
cont.
constr. jt.
constr.
conc.
col.
Co.
CMP
clr.
c-c
CBCC
brg.
br.
BP
BM
BK
beg.
b.f.B asph.
appr.
alt.
AH
aggr.
ADT
abut.A west vertical point of intersection vehicles per hour vertical design speed typical point of tangent to spiral transverse temporary construction easement temporary bench mark tangent township tangent length symmetrical structural straight stiffener standard station point of spiral to tangent street specification spacing, Spaces or Spaced shoulder section point of spiral to curve seasonal average daily traffic south route right reference hub retaining wall
Reservation reservoir required reinforcement reconstruction roadway road right-of-way range radius quantities pavement point of tangent pounds per square inch project point on tangent point on spiral point on curve plate point of intersection perforate point of compound curve point of curve outside diameter other face on centers number negative normal crown north mountain(s) monument minimum maximum material maintenance magnetic low water left lump sum longitudinal latitude lamination length of curve
WW
VPI
vph vert.
VV
typ.
TS
transv.
TCE
TBM
tan.
T.
TT
sym.
struc.
str.
stiff.
std.
sta.
ST
st.
spec.
spa.
shldr.
sec.
SC
SADT
SS
rte.
Rt. or RT
RH
ret. wall
Res.
res.
reqd.
reinf.
reconst.
rdwy.
rd.
R/W
R.
RR
quant., QtyQ pvmt.
PT
psi proj.
POT
POS
POC
pl.
PI
perf.
PCC
PCP
OD
o.f.
o.c.O
no. or # neg.
NC
NN
mtn(s).
mon.
min.
max.
matl.
maint.
mag.M
LW
Lt. or LT
LPSM
long.
lat.
lam.
LL
EROSION & SEDIMENT CONTROL SYMBOLS
joint interior increment inclusive,including inside diameter highway high water horizontal hexagon homestead entry survey headwall girder galvanized gage (gauge) footing finish flared end section federal fill face exterior expansion joint excavation edge of water and wife and others edge of road equation edge of pavement
Engineer(s) embankment elevation elevation with number superelevation rate east drawing(s) donation land claim district distance diaphragm diagonal diameter drop inlet design hour volume decrement culvert contingent sum centers point of curve to spiral creek corrugated continuous construction joint construction concrete column county corrugated metal pipe clear center to center concrete box culvert bearing bridge balance point bench mark back beginning,begin both faces asphalt approach alternate ahead aggregate average daily traffic abutment diameter curve delta centerline
Ø
Riprap
Rolled Erosion Control Product
Diversion Berm
Check Dam
Bonded Fiber Matrix Mulching
Fiber Roll (Slope Protection)
Temporary Inlet Protection
Silt Fence
Fiber Roll (Ditch and/or Cut Slope)
STATE PROJECT
P
M N C
O R o a d w a y C
A D
D S h e e ts A G e n s h t\
S Y
M
C O
.d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r r y a n .m a th is
NUMBER
SHEET
CO
Brainard Lake Road
CO FLAP 102(1)
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
Sheet 2 of 2
A3
36 31
36 31
6 1
ˆ
Treeline
Tree
MAPPING SYMBOLS
LANDSCAPING & VEGETATION SYMBOLS PROJECT SPECIFIC SYMBOLS
RIGHT-OF-WAY SYMBOLS
ROADWAY SYMBOLS
SIGN SYMBOLS
UTILITY SYMBOLS
Retaining Wall (Existing, Proposed)
Median & Side Barrier (Existing, Proposed)
Guardwall (Existing, Proposed)
Guardrail (Existing, Proposed)
GUARDRAIL, BARRIER & WALL SYMBOLS
Post Mounted (Existing, Proposed)
Portable (Proposed)
Delineator (Existing, Proposed)
Commercial (Existing, Proposed)
Signs
Telephone
Power
Fiber Optic
CATV
Overhead Utility Line (Existing, Proposed)
Water
Telephone
Sanitary Sewer
Power
Oil
Gas
Fiber Optic
CATV
Underground Utility (Existing, Proposed)
Telephone Pedestal (Existing, Proposed)
Telephone Booth (Existing, Proposed)
Street Light (Existing, Proposed)
Support Pole Anchor (Existing, Proposed)
Support Pole (Existing, Proposed)
Surface (Existing, Proposed)
Underground (Existing, Proposed)
Irrigation Ditch
999.9
Roadway Obliteration
Roadway Centerline (With Station ticks)
Proposed
Existing
Edge of Roadway
Toe of Fill
Transition
Top of Cut
Slope Stake Limits
Clearing/Construction Limits
Survey Control Point
Trail
Spot Elevation
Double Track
Single Track
Railroad
North Arrow
Coordinate Grid Tick
Building (Existing, Proposed)
Section Corner (Found)
Section Corner (Found, Projected)
Section Corner (Found, Projected)
Right-of-Way Line (Proposed)
Right-of-Way Line (Existing)
Property Line
Parcel Number
Monument (As described)
Temporary (Proposed)
Permanent (Proposed)
Permanent (Existing)
Easements
National Wildlife Refuge
National Park
National Forest
Bureau of Land Management
Bureau of Indian Affairs
Section
Section
Section
Township or Range Line
City
County
State
National
Boundaries
STATE PROJECT
P
M N C
O R o a d w a y C
A D
D S h e e ts A G e n s h t\
S Y
M
C O
.d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r r y a n .m a th is
NUMBER
SHEET
CO
STATE PROJECT
P
M N C
O R o a d w a y C
A D
D S h e e ts A G e n s h t\
P L
N S it e .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r r y a n .m a th is
NUMBER
SHEET
CO
Brainard Lake Road
CO FLAP 102(1)
A
A
A
A
A
A
A
A
Creek
Station 12+00.00
Brainard Lake Road
Begin Project CO FLAP 102(1)
Station 145+25.00
Brainard Lake Road
End Project CO FLAP 102(1)
F O
R E S
T B
O U
N D
A R
Y
FOREST BOUNDARY
SITE MAP
A4
Left Hand Reservoir Road
+00
40+00
+00
120+
4 3 2
35 36
9 10 11
13141516
T 2 N
T 1 N
Chip munk
Gulch
Left
H and
Red Rock
Lake
Sou th
St.
Vr ain
Tra il
Brainard Lake
C re e k
WARD
4000'2000'0
Scale in FeetFOREST
NATIONAL
ROOSEVELT
(See Sheet F2)
Site
Waste Disposal
Station 200+20.00 - 201+20.00
(Option X)
CO FTFS 112(2)
Brainard Lake Bridge
(See Sheet F2)
Site
Waste Disposal
(See Sheet F2)
Site
Waste Disposal
Lake Road) from Brainard
(Approx. 1.2 Mi.
Site
Waste Disposal
REVISIONS (OR CHANGE NOTICES)
DESCRIPTION
NO.
DATE INIT.
Created 8/4/14 klw
SURVEY CONTROL
A5
STATE PROJECT
P
M N C
O R o a d w a y C
A D
D S h e e ts A G e n s h t\
C T
L
C o n tr o lS h e e t.
d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r r y a n .m a th is
NUMBER
SHEET
CO
See plans for locations of curves and superelevations
METHOD OF SUPERELEVATION ON CURVES
NO SCALE
NOTE:
Min. superelevation 2% 6% Max. superele vation
Normal crown -2% -2% Normal crown grade
Profile superelevation
Pivot point for ground
Existing
18' 15'
11' Clear zone
11' 11'
Hinge point
Hinge point
1:4 2%
Cut slope
(variable) 2% asphalt lifts)
(applied between
Tack coat top asphalt lift)
(applied to
Fog seal and seeding limits
Topsoil
SubgradeSubgrade
Traveled way Traveled way ditch
Graded Shldr.
pavement)
(top of
Profile grade
Shldr.
(variable)
Fill slope
1.
3.
2.
2.
cut slope
Rounded limit stake
Slope
1:4
5'
Clearing and construction limits
5' limit
Slope stake 4' 1'3' 3'4'
B=5'F=5'
Station to Station
LENGTH OF PROJECT
TOTAL (mi)
TOTALS (ft)
(ft)
Roadway
1:4
DETAIL A
base
Aggregate
30° - 35°
2.52 from 20' to 22'
Existing width varies
Average 21'
See Detail A
A6
12+00 to 145+25
12+00 to 145+25
EXISTING TYPICAL SECTION
curve widening to coincide with the superelevation transitions.
the inside of curves throughout the superelevated sections. Transition the
Construct curve widening as shown in the table below. Apply the widening on reduce the B and F dimensions to the actual cut height.
Round all earth slopes and all rippable rock slopes. For cut heights less than B, See the cross sections for cut and fill slope ratios.
slope ratios may be adjusted by the CO to assure adequate drainage and stability.
The gradient and width of roadway ditches and the excavation and embankment
4.
3.
2.
1.
13,325
13,325
TYPICAL SECTION - RECONSTRUCTION
WIDENING ON CURVES
(ft)
Radius
(ft)
Widening
4.
Over 100
75 to 99
MAINLINE
TYPICAL SECTIONS
(Placed in 2 lifts) pavement, type 1
3" Asphalt concrete
GUARDRAIL DETAIL
Va ria ble
Ex ist ing Sl op e section details
See Typical for structural
1:
Edge of shoulder
GUARDRAIL DETAIL
2'
2'
Method 2
6" Roadway Aggregate, type 1 pavement, Asphalt concrete zone
7' min. Clear
Seeding limits
141+00 to 145+25
99+50 to 110+00
70+00 to 86+00
39+00 to 56+00
12+00 to 19+00
Existing aggregate base depth varies.
Existing asphalt pavement depth varies 4.5 - 7 inches.
Refer to C sheets for location sides of roadway)
(Detail applies to both right and left or pulverized material
Shoulder up with Roadway Aggregate, Method 2
Construct 30° - 35° pavement edge (safety edge)
STATE PROJECT
P
M N C
O R o a d w a y C
A D
D S h e e ts A G e n s h t\
T Y P
C O
.d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r r y a n .m a th is
NUMBER
SHEET
CO
18'
11' Clear zone
11' 11'
Hinge point
1:4
Cut slope
(variable) asphalt lifts)
(applied between
Tack coat top asphalt lift)
(applied to
Fog seal
Subgrade
Traveled way Traveled way ditch
Graded Shldr.
NO SCALE
NOTE:
pavement)
(top of
Profile grade
Shldr.
1.
4.
3.
2.
cut slope
Rounded
5' limit
Slope stake 4' 1'3'4' zone
Clear
4' min.
B=5'F=5'
1:4
DETAIL A
30° - 35° ground
Existing pavement and base course
8" Pulverize existing
Varies
A7
See Detail A
Clearing and grading limits
110+00 to 141+00
86+00 to 99+50
56+00 to 70+00
19+00 to 39+00
4.
3.
2.
1.
MAINLINE
TYPICAL SECTIONS
pavement, type 1
Asphalt concrete
(Placed in 2 lifts) pavement, type 1
3" Asphalt concrete
Pulverized width
Variable
Existing Slope material
Pulverized depth of 8 inches.
Pulverize the existing paved width plus 1 foot of new aggregate. Pulverize to a reduce the B and F dimensions to the actual cut height.
Round all earth slopes and all rippable rock slopes. For cut heights less than B, See the cross sections for cut and fill slope ratios.
slope ratios may be adjusted by the CO to assure adequate drainage and stability.
The gradient and width of roadway ditches and the excavation and embankment
TYPICAL SECTION - REHABILITATION
Method 2
6" Roadway aggregate, Seeding limits
Existing Match
Existing
Match
Shoulder up with
Roadway Aggregate, Method 2 or pulverized material
(Detail applies to both sides of roadway) or pulverized material
Shoulder up with Roadway Aggregate, Method 2
Construct 30° - 35° pavement edge (safety edge)
STATE PROJECT
P
M N C
O R o a d w a y C
A D
D S h e e ts A G e n s h t\
T Y P
C O
.d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r r y a n .m a th is
NUMBER
SHEET
CO
STATION
CLASS
TYPE1.
(ft)
LENGTH
PAVED
(ft)
LENGTH
TOTAL
s = 1:4 for type 2 approach s = 1:3 for type 1 approach d = 3' for type 2 approach d = 2' for type 1 approach x = 15' Minimum for type 2 approach x = 0' for type 1 approach
(ft)
R
(ft)
R
(ft)
W 1 2
Standard Drawing 602-9).
roadway, use safety end sections (see placed within the clear zone of the mainline mainline recovery area. When a culvert must be radius to provide a flatter foreslope and increased
Place culverts at the end of the approach road
Variable
W
Variable
3' minimum
16'x
20' desired
15' min.
1.3'
W
1.3' d
4' (typ.)
4' (typ.)
APPROACH ROADS
TYPICAL SECTIONS
widths greater than 15 feet.
Apply the normal crown to approach roads with
CLASSTYPE
APPLICATION
SAMPLE
Paved apron
ADT ≥ 200
100 ≤ ADT < 199
25 ≤ ADT < 100
ADT < 25
Minimum 2-Way Use
Logging Truck Use
Farm Equipment
Minimum 1-Way Use
Field Access
A
E
D
C
B
A
D
C
B
A
* Match existing
(ft)
W
WIDTH
MIN.
(ft)
R
RADIUS
MIN.
N/A
5' (typ.)
U s e r r y a n .m a th is
_ A8
15 10
6" Aggregate base
126+87 Lt.
113+55 Lt.
102+68 Lt.
98+35 Lt.
93+71 Rt.
88+21 Lt.
87+15 Rt.
74+78 Lt.
1+50 Lt.
3A
3A
3A
3A
3A
3A
3A
3A
1A
Variable
V a ria b le
A s
B
A
B
M a in li e
Mainline
±2%
TYPICAL PROFILE
SECTION B-B
Shoulder edge
A
V a ria b le
(1:6 desi rable )1:4 o r flat ter
TYPICAL SYMBOL
M a in li
A
A B
B
SECTION A-A
b y t h e C o n tr a c ti n g O ff ic e r
R ig h t-o f-w a y o r a s s ta k d
NOTE:Paved length
(1:6 desirable)
1:4 or flatter base edge
Aggregate thicknesses and foreslopes.
Refer to mainline typical sections for structural section
Approach Road
TYPICAL PLAN
TYPES 1 & 2
APPROACH ROAD
TYPICAL PLAN
TYPE 3
APPROACH ROAD
REMARKS
APPROACH ROAD SUMMARY
base edge
Aggregate b y t h e C o n tr a c ti n g O ff ic e r
R ig h t-o f-w a y o r a s s ta k d
Approach Road
Flatten slope road connection on plan and profile sheet
Example of symbol showing standard approach shown may be varied ±20°.
Under special conditions, the approach road angle 8.
4.
3.
8.
2.
3.
6.
2.
6.
2.
6.
7.
Subgrade edge
Aggregate base edge
End Section A-A
End Section A-A
Total length
Paved length
90° W
Type
Class
Typical maximum grade ±10%VPI
VPC
90°
Typical culvert location edge subgrade
Normal
Aggregate base edge
R
Total length
R1
WW
with mainline roadway construction.
Construct cut and fill slopes for approach roads to match locations to be field verified.
Stations shown are approximate locations. Actual
8.
7.
6.
5.
4.
3.
2.
1.
maximum.
0% to -2% grade. Under special conditions, use 6% grades within ±2%. In snowy regions restrict this to a
Construct approach roads with landing areas having approach road centerline.
existing radii or widths. R is on the left side of the
Vary radii to fit unusual field conditions. Do not reduce
5. 5.
pavement edge
Asphalt concrete pavement edge
Asphalt concrete
STATE PROJECT
P
M N C
O R o a d w a y C
A D
D S h e e ts A G e n s h t\
T Y P
A P
C O
.d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r r y a n .m a th is
NUMBER
SHEET
CO
Sheet and Description
B5 B6-B9 S2
Grading/ Surfacing
Summaries
Misc.
Summaries
Brainard Lake
Bridge ALLOWANCE Bid
Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15206-0000 SLOPE, REFERENCE, AND
CLEARING AND GRUBBING STAKE MILE 2.520 2.520
A0060 15215-1000 SURVEY AND STAKING, APPROACH
ROAD EACH 1 1
A0080 15215-3000 SURVEY AND STAKING, DRAINAGE
STRUCTURE EACH 22 22
A0100 15216-2000 SURVEY AND STAKING, GRADE
FINISHING STAKES MILE 3.560 3.560
A0120 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0140 15401-0000 CONTRACTOR TESTING LPSM ALL
A0160 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0180 15705-0100 SOIL EROSION CONTROL, SILT
FENCE LNFT 3,542 158 3,700
A0200 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 660 40 700
A0220 15706-0200 SOIL EROSION CONTROL, CHECK
DAM EACH 122 8 130
A0240 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
A0260 20101-0000 CLEARING AND GRUBBING ACRE 10.0 1.0 11.0
A0280 20220-1000 REMOVAL, INDIVIDUAL TREE EACH 40 40 Per CO Direction
A0300 20301-1900 REMOVAL OF PIPE CULVERT EACH 17 1 18
A0320 20301-2400 REMOVAL OF SIGN EACH 8 2 10
A0340 20401-0000 ROADWAY EXCAVATION CUYD 31,508 642 32,150
A0360 20402-0000 SUBEXCAVATION CUYD 1,000 1,000 Per CO Direction
A0380 20441-0000 WASTE CUYD 18,285 365 18,650
A0400 25101-0200 PLACED RIPRAP, METHOD A,
CLASS 2 CUYD 99 6 105
A0420 25126-0000 REMOVE AND RESET BOULDER EACH 8 8
A0440 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 7,926 224 8,150
A0460 30401-1500 FULL DEPTH RECLAMATION,
METHOD 1, 8-INCH DEPTH MILE 1.490 0.110 1.600
A0480 40301-0100 ASPHALT CONCRETE PAVEMENT,
TYPE 1 TON 6,644 206 6,850
A0500 40601-0000 FOG SEAL TON 18 1 19
A0520 41201-0000 TACK COAT TON 18 1 19
A0540 60201-0800 24-INCH PIPE CULVERT LNFT 1,152 148 1,300
A0560 60210-0800 END SECTION FOR 24-INCH PIPE
CULVERT EACH 44 6 50
-A ug -2
1:
P M
N
C O
\1
(1
Pr oj ec tM an ag er s\
A dv er tis em en t\
.2
E E
(S ch ed ul es
O pt io ns
Am ou nt s)
Sc he du le
A
Es tim at e-
.x ls x]
Sh ee t SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B1FLAP 102(1)CO
SHEET
NUMBER
Grading/ Surfacing
Summaries
Misc.
Summaries
Brainard Lake
Bridge ALLOWANCE Bid
Schedule
A0580 60902-0800 CURB AND GUTTER, CONCRETE,
10-INCH DEPTH LNFT 700 25 725
A0600 61701-3900 GUARDRAIL SYSTEM SBTA LNFT 200 25 225
A0620 61702-0510 TERMINAL SECTION, TYPE SBT-FAT EACH 2 2
A0640 62201-0250 DUMP TRUCK, 10 CUBIC YARD
MINIMUM CAPACITY HOUR 40 40
A0660 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT
MINIMUM RATED CAPACITY
BUCKET, 24-INCH WIDTH HOUR 40 40
A0680 62201-1000 WHEEL LOADER, 4 CUBIC YARD
MINIMUM RATED CAPACITY HOUR 40 40
A0700 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM
BLADE HOUR 40 40
A0720 62301-0000 GENERAL LABOR HOUR 40 40
A0740 62302-1000 SPECIAL LABOR, HIRED
TECHNICAL SERVICES HOUR 20 20
A0760 62302-1100 SPECIAL LABOR, HIRED SURVEY
SERVICES HOUR 40 40
A0780 62405-0200 PLACING CONSERVED TOPSOIL,
3-INCH DEPTH SQYD 14,082 718 14,800
A0800 62510-2000 SEEDING, HYDRAULIC METHOD ACRE 6.6 0.4 7.0
A0820 62515-3000 MULCHING, HYDRAULIC METHOD,
BONDED FIBER MATRIX ACRE 6.6 0.4 7.0
A0840 63301-0000 SIGN SYSTEM EACH 48 4 52
A0860 63308-2000 OBJECT MARKER, TYPE 2 EACH 44 6 50
A0880 63312-0000 SPEED HUMP EACH 6 6
A0900 63401-0900 PAVEMENT MARKINGS, TYPE E,
SOLID LNFT 106,666 1,334 108,000
A0920 63405-2100 PAVEMENT MARKINGS, TYPE E,
SPEED HUMP MARKINGS EACH 12 12
A0940 63502-0600 TEMPORARY TRAFFIC CONTROL,
BARRICADE TYPE 3 EACH 2 2
A0960 63502-0700 TEMPORARY TRAFFIC CONTROL,
CONE EACH 100 100
A0980 63502-1300 TEMPORARY TRAFFIC CONTROL,
DRUM EACH 100 100
A1000 63502-1500 TEMPORARY TRAFFIC CONTROL,
WARNING LIGHT TYPE A EACH 25 25
A1020 63502-1600 TEMPORARY TRAFFIC CONTROL,
WARNING LIGHT TYPE B EACH 25 25
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-A ug -2
1:
P M
N
C O
\1
(1
Pr oj ec tM an ag er s\
A dv er tis em en t\
.2
E E
(S ch ed ul es
O pt io ns
Am ou nt s)
Sc he du le
A
Es tim at e-
.x ls x]
Sh ee t (2
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B2FLAP 102(1)CO
Grading/ Surfacing
Summaries
Misc.
Summaries
Brainard Lake
Bridge ALLOWANCE Bid
Schedule
A1040 63502-2000 TEMPORARY TRAFFIC CONTROL,
PORTABLE CHANGEABLE MESSAGE
SIGN EACH 3 3
A1060 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 204 36 240
A1080 63505-1000 TEMPORARY TRAFFIC CONTROL,
PAVEMENT MARKINGS MILE 5.0 5.0
A1100 63506-0500 TEMPORARY TRAFFIC CONTROL,
FLAGGER HOUR 1,600 1,600
A1120 63506-0600 TEMPORARY TRAFFIC CONTROL,
PILOT CAR HOUR 800 800
A1140 63701-0000 FIELD OFFICE EACH 1
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-A ug -2
1:
P M
N
C O
\1
(1
Pr oj ec tM an ag er s\
A dv er tis em en t\
.2
E E
(S ch ed ul es
O pt io ns
Am ou nt s)
Sc he du le
A
Es tim at e-
.x ls x]
Sh ee t (3
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B3FLAP 102(1)CO
Grading/ Surfacing
Summaries
Misc.
Summaries
Brainard Lake
Bridge ALLOWANCE Bid
Schedule
X0020 15101-0000 MOBILIZATION LPSM ALL
X0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
X0060 15214-1000 SURVEY AND STAKING, BRIDGE LPSM ALL
X0080 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
X0100 15401-0000 CONTRACTOR TESTING LPSM ALL
X0120 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
X0140 20304-1000 REMOVAL OF STRUCTURES AND
OBSTRUCTIONS LPSM ALL
X0160 20315-0000 SAWCUTTING PAVEMENT LNFT 58 12 70
X0180 20801-0000 STRUCTURE EXCAVATION CUYD 40 40
X0200 20803-0000 STRUCTURAL BACKFILL CUYD 30 30
X0220 20815-0000 COFFERDAMS LPSM ALL
X0240 20820-0000 DEWATERING LPSM ALL
X0260 40301-0100 ASPHALT CONCRETE PAVEMENT,
TYPE 1 TON 20 1 21
X0280 55201-0200 STRUCTURAL CONCRETE, CLASS A Contract Quantity
(AE) CUYD 11 11
X0300 55302-0500 PRECAST, PRESTRESSED CONCRETE
SLABS, 48-INCH VOIDED LNFT 41.2 41.2
X0320 55401-2000 REINFORCING STEEL, EPOXY Contract Quantity
COATED LB 1,250 1,250
X0340 55602-1000 REMOVE AND RESET BRIDGE
RAILING LNFT 126 126
X0360 56901-0000 CONCRETE OVERLAY(THIN BONDED Contract Quantity
EPOXY OVERLAY) SQYD 91 91
X0380 62027-1000 REMOVE AND RESET STONE
MASONRY GUARDWALL LNFT 10 10
X0400 63401-0900 PAVEMENT MARKINGS, TYPE E,
SOLID LNFT 400 400
X0420 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL
X0440 63503-1000 TEMPORARY TRAFFIC CONTROL,
PLASTIC FENCE LNFT 200 200
SUMMARY OF QUANTITIES - Option X
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-A ug -2
1:
P M
N
C O
\1
(1
Pr oj ec tM an ag er s\
A dv er tis em en t\
.2
E E
(S ch ed ul es
O pt io ns
Am ou nt s)
O pt io n
X
E st im at e-
.x ls x] Sh ee t
STATE PROJECT
B4FLAP 102(1)CO
B5
SUMMARIES
GRADING/SURFACING
STATE PROJECT
P
M N C
O R o a d w a y C
A D
D S h e e ts B S u m m S
U M
C
O .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r r y a n .m a th is
NUMBER
SHEET
CO
B6
MISCELLANEOUS
STATE PROJECT
P
M N C
O R o a d w a y C
A D
D S h e e ts B S u m m S
U M
C
O .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r r y a n .m a th is
NUMBER
SHEET
CO
B7
STATE PROJECT
P
M N C
O R o a d w a y C
A D
D S h e e ts B S u m m S
U M
C
O .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r r y a n .m a th is
NUMBER
SHEET
CO
B8
NOTE:
meet 718.04(a) specifications.
Use sign posts that are designated as wood that1.
STATE PROJECT
P
M N C
O R o a d w a y C
A D
D S h e e ts B S u m m S
U M
C
O .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r r y a n .m a th is
NUMBER
SHEET
CO
B9
STATE PROJECT
P
M N C
O R o a d w a y C
A D
D S h e e ts B S u m m S
U M
C
O .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r r y a n .m a th is
NUMBER
SHEET
CO
65997
10035
10040
10045
10060
CARSONIT
E
CP7
CP1CP1
PO
T .0
PC
.7
P T
.6
P C
.1
P T
.3
P C
.0
P T
.9
0 P
C
.5
P T
.8
,0
.3
V P I
E L
,0
.2
-6.523%
-7.309%
300' VC
K = 381
SSD = 1522'
,0
.3
STATE PROJECT
P
M N C
O R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P C .d g n
U s e r r y a n .m a th is
NUMBER
SHEET
Superelevation Diagram
CO
Brainard Lake Road
CO FLAP 102(1)
,0
.3
15+07
3.40%
-3.40%
15+81
6.00%
-6.00%
12+42
3.40%
-3.40%
17+93
17+93 18+94 19+00
3.06%
-3.06%
12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00
10020
10030
10040
10050
10000
10010
10020
C1
E = 2990538.143
N = 1271843.371
Station 12+00.00
Reconstruction
Begin Project FLAP 102(1)
200'100'0
Scale in Feet
6th P.M.
T1N, R73W
SEC 2
1, NW4
1SE
6th P.M.
T1N, R73W
SEC 2
1, NE4
1SW
6th P.M.
T1N, R73W
SEC 2
1, SW4
1NE
6th P.M.
T1N, R73W
SEC 2
1, SE4
1NW
APN: 145700000046
US GOVERNMENT
APN: 145700000046
US GOVERNMENT
Ground
Existing
Ground
Existing
Grade
Profile
10010
10000
10060
BRAINARD LAKE ROAD STA. 12+00 - 24+00
E = 2991201.826
N = 1271633.382
Station 19+00.00
Begin Rehabilitation
End Reconstruction
6%
0%
-6%
6%
0%
-6%
LT EOP
RT EOP
Axis of rotation
Profile grade &
Curve = 102(1)-1
PI 12+18.51
R = 180.00'
T = 88.76'
L = 164.93'
Curve = 102(1)-2
PI 15+44.36
R = 850.00'
T = 67.25'
L = 134.22'
Curve = 102(1)-3
PI 18+43.79
R = 790.00'
T = 80.76'
L = 160.96'
D D D Remove existing pipe culvert
Class 2 Riprap
2-End Sections
Concrete Pipe Culvert
16+07, Install 24"x66'
Remove existing pipe culvert
Class 2 Riprap
2-End Sections
Concrete Pipe Culvert
20+26, Install 24"x44'
987598
9920992
BLM AC MS9798
P T
.8
P C
.6
P T
.0
P C
.1
P T
.2
P C
.5
P T
.3
P C
.4
PCC 38+
71.99
40+00
P T
.9
P C
.3
P T
.0
0P C
.7
STATE PROJECT
P
M N C
O R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P C .d g n
U s e r r y a n .m a th is
NUMBER
SHEET
Superelevation Diagram
CO
Brainard Lake Road
CO FLAP 102(1)
24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00
C2
6th P.M.
T73N, R73W
SEC 2
1, SE4
1NE
6th P.M.
T1N, R73W
SEC 2
1, SE4
1NW
APN: 145700000046
US GOVERNMENT
APN: 145700000046
US GOVERNMENT
APN: 145700000046
US GOVERNMENT
200'100'0
Scale in Feet
BRAINARD LAKE ROAD STA. 24+00 - 38+00
Ground
Existing
Ground
Existing
Class 2 Riprap
2-End Sections
Concrete Pipe Culvert
31+00, Install 24"x45'
Class 2 Riprap
2-End Sections
Concrete Pipe Culvert
32+00, Install 24"x48'
See Sheet F2
Place waste material
37+40 - 40+90, Lt.
See Special 633-B
31+00, Install Speed Hump
See Special 633-B
34+00, Install Speed Hump
Remove existing pipe culvert
Class 2 Riprap
2-End Sections
Concrete Pipe Culvert
26+11, Install 24"x48'
Remove existing pipe culvert
Class 2 Riprap
2-End Sections
36+91, Install 24"x53'
97659765
98009
45985
SP
RI
NG
W
ATE
R
W
ATE
R
D
IP
CONC
VAULT
BLM
A
C M S9
P C
.4
PCC 38
+71.9
P T
.9
P C
.3
P T
.0
P C
.7
PT 49+
90.90
50+
PC 51+
13.87
P T
.8
P C
.2
P T
.4
,8
.0
V P I
E L
,8
.2
-5.200%
-6.814%
100' VC
K = 62
SSD = 718'
STATE PROJECT
P
M N C
O R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P C .d g n
U s e r r y a n .m a th is
NUMBER
SHEET
Superelevation Diagram
CO
Brainard Lake Road
CO FLAP 102(1)
V P I
E L
,8
.9
-6.814%
-4.248%
300' VC
K = 117
V P I
E L
,8
.3
-4.248%
-8.562%
250' VC
K = 58
SSD = 375'
-8.562%
6.00%
40+4239+00
2.00%
-2.00%
41+12
44+24
44+24
3.00%
-3.00%
44+40
44+40
46+70
48+54
6.00%
49+38
50+08
50+96
2.00%
51+60
51+57
5.48%
-5.48%
38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00
C3
APN
: 145701000026
AD
AM
S AN
N M
IC
H
IAL V
APN: 145701000027
CARDINALE THOMAS A & VIRGINIA L
APN: 145700000046
US GOVERNMENT
APN: 145700000046
US GOVERNMENT
APN: 145700000046
US GOVERNMENT
200'100'0
Scale in Feet
Install curb and gutter, Lt.
Ground
Existing
Ground
Existing
Grade
Profile
Grade
Profile
BRAINARD LAKE ROAD STA. 38+00 - 52+00
E = 2993116.908
N = 1271674.462
Station 39+00.00
Begin Reconstruction
End Rehabilitation
LT EOP
RT EOP
Axis of rotation
Profile grade &
-6%
6%
0%
6%
0%
-6%
Install guardrail, Lt.
Class 2 Riprap
2-End Sections
Concrete Pipe Culvert
52+53, Install 24"x62'
Curve = 102(1)-9
PI 40+32.60
R = 120.00'
T = 160.61'
L = 222.99' L = 279.66'
Curve = 102(1)-10
PI 45+56.04
R = 1,025.00'
T = 140.71'
R = 100.00'
Curve = 102(1)-12
PI 51+60.30
T = 46.44'
L = 86.95'
Curve = 102(1)-11
PI 50+35.93
R = 75.00'
T = 234.16'
L = 189.12'
D D D D
4' Curve Widening
48+00 - 50+00, Lt.
(10'x30'x1.5')
Class 2 Riprap Rundown
2-End Sections
Concrete Pipe Culvert
50+22, Install 24"x62' contractor parking wellhead,and no
Protect existing waterline, See Sheet F2
Place waste material
51+85, Rt.
Remove existing pipe culvert
Class 2 Riprap
2-End Sections
Concrete Pipe Culvert
41+08, Install 24"x52'
APN: 145700000046
US GOVERNMENT
9795 9800
WATER
WATER
12" D
IP
CONC VAULT
P C
.8
P T
.8
P C
.2
P T
.4
P C
.4
P T
.6
P C
.0
STATE PROJECT
P
M N C
O R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P C .d g n
U s e r r y a n .m a th is
NUMBER
SHEET
Superelevation Diagram
CO
Brainard Lake Road
CO FLAP 102(1)
V P I
E L
,7
.8
-8.562%
-6.421%
300' VC
K = 140
,7
.5
51+60
5.48%
-5.48%
54+40
54+18
5.60%
-5.60% 56+00
55+69 55+01
-2.00%
52+00 53+00 54+00 55+00 56+00 57+00 58+00 59+00 60+00 61+00 62+00 63+00 64+00 65+00 66+00
C4
200'100'0
Scale in Feet
APN: 145700000046
US GOVERNMENT
APN: 145700000046
US GOVERNMENT
APN: 145701000049
TOWN OF WARD
APN: 145701000046
COUNTY OF BOULDER
APN: 145701000027
CARDINALE THOMAS A & VIRGINIA L
6th P.M.
T1N, R73W
SEC 1
1, SW4
1NW
Grade
Profile
Ground
Existing
Ground
Existing
BRAINARD LAKE ROAD STA. 52+00 - 66+00
E = 2992954.213
N = 1271150.442
Station 56+00.00
Begin Rehabilitation
End Reconstruction
Curve = 102(1)-13
PI 54+30.20
R = 225.00'
T = 59.98'
L = 117.24'
LT EOP
RT EOP
Axis of rotation
Profile grade &
-6%
6%
0%
6%
0%
-6%
Special 251-A boulders. See
Remove and reset existing waterline
Do not disturb
Class 2 Riprap
2-End Sections
Concrete Pipe Culvert
59+78, Install 24"x42' pipe culvert
55+00, Remove existing
D
See Special 633-B
59+00, Install Speed Hump
See Special 633-B
63+00, Install Speed Hump
Remove existing pipe culvert
Class 2 Riprap
2-End Sections
Concrete Pipe Culvert
66+04, Install 24"x44' hours per CO direction
Scaling done by equipment
0 P C
.0
P T
.4
P C
.7
P T
.0
P C
.0
PT 79+96.55
80+
PC 8
0+64.
A
,6
.9
STATE PROJECT
P
M N C
O R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P C .d g n
U s e r r y a n .m a th is
NUMBER
SHEET
Superelevation Diagram
CO
Brainard Lake Road
CO FLAP 102(1)
V P I
E L
,6
.0
-6.239%
-2.466%
300' VC
K = 80
-2.466%
70+00
72+54 71+86
74+78
74+53
74+53 73+15
73+15
5.60%
-5.60%
2.00%
79+47
5.80%
-5.80%
78+77
78+11
66+00 67+00 68+00 69+00 70+00 71+00 72+00 73+00 74+00 75+00 76+00 77+00 78+00 79+00 80+00
C5
BRAINARD LAKE ROAD STA. 66+00 - 80+00
APN: 145701000049
TOWN OF WARD
APN: 145701000049
TOWN OF WARD
APN: 145701000046
COUNTY OF BOULDER
APN: 145701000025
POSSUM POINT LTD
DUNCAN-TWO LTD
APN: 145701000046
COUNTY OF BOULDER
APN: 145701000027
CARDINALE THOMAS A & VIRGINIA L
6th P.M.
T1N, R73W
SEC 1
1, SW4
1NE
200'100'0
Scale in Feet
Ground
Existing
Ground
Existing
Grade
Profile
Grade
Profile
E = 2994295.242
N = 1271362.698
Station 70+00.00
Begin Reconstruction
End Rehabilitation
L = 232.35'
Curve = 102(1)-16
PI 73+94.36
R = 235.00'
T = 126.67'
PI 79+17.25
Curve = 102(1)-17
R = 200.00'
T = 90.25'
L = 169.55'
-6%
6%
0%
6%
0%
-6%
Axis of rotation
Profile grade &
LT EOP
RT EOP
D D
APN: 145701000027
CARDINALE THOMAS A & VIRGINIA L
APN: 145701000046
COUNTY OF BOULDER
Remove existing pipe culvert
Class 2 Riprap
2-End Sections
71+96, Install 24"x55'
965596
T
CABLE
ALUMINUM CAP
GATE POST
GATE POST
STONE
PT 79+96.55
80+
PC 8
0+
64.
P T
.0
P C
.1
P T
.8
P C
.8
P T
.5
P C
.4
P T .8
0 P
C .4
A
A
A
V P I
E L
,6
.7
-2.466%
-4.995%
300' VC
K = 119
SSD = 577'
,6
.7
STATE PROJECT
P
M N C
O R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P C .d g n
U s e r r y a n .m a th is
NUMBER
SHEET
Superelevation Diagram
CO
81+12 79+47
5.40%
-5.40%
84+14
86+00
86+00
-2.08%
2.08%
80+00 81+00 82+00 83+00 84+00 85+00 86+00 87+00 88+00 89+00 90+00 91+00 92+00 93+00 94+00
C6
BRAINARD LAKE ROAD STA. 80+00 - 94+00
APN: 145701000025
POSSUM POINT LTD
DUNCAN-TWO LTD
APN: 145701000046
COUNTY OF BOULDER
APN: 145701000049
TOWN OF WARD
6th P.M.
T1N, R73W
SEC 1
1, SW4
1NE
6th P.M.
T1N, R73W
SEC 1
1, SE4
1NW
APN: 145701000049
TOWN OF WARD
APN: 145701000022
BRISCOE ANN ADAMS OR MICHAEL V
200'100'0
Scale in Feet
Ground
Existing
Ground
Existing
Grade
Profile
E = 2995626.951
N = 1271117.546
Station 86+00.00
Begin Rehabilitation
End Reconstruction
Curve = 102(1)-18
PI 83+18.42
R = 250.00'
T = 253.54'
L = 396.21'
-6%
6%
0%
6%
0%
-6%
LT EOP
RT EOP
Axis of rotation
Profile grade &
Class 2 Riprap
2-End Sections
Concrete Pipe Culvert
86+35, Install 24"x42'
D
APN: 145701000025
POSSUM POINT LTD
DUNCAN-TWO LTD
APN: 145701000046
COUNTY OF BOULDER
(By Others) telephone pedestal existing cable and
Remove and reset
Remove existing pipe culvert
Class 2 Riprap
2-End Sections
80+91, Install 24"x62'
65947
59480
TCABLE
T
T
CABLE
PT
4+
.8
PC
96+
29.45
P T
.7
P C
.7
PT 102+86.42
PC
3+ .7
P T
.1
P C
.3
P T
.3
A
A
A
,5
.9
STATE PROJECT
P
M N C
O R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P C .d g n
U s e r r y a n .m a th is
NUMBER
SHEET
Superelevation Diagram
CO
Brainard Lake Road
CO FLAP 102(1)
V P I
E L
,5
.1
-7.752%
-6.657%
300' VC
K = 274
99+50
-4.49%
4.49%
100+54
100+54
-5.20%
5.20%2.00%
-2.00%
99+93 101+10 102+41
101+10
5.40%
-5.40%
103+52 106+33
107+94
94+00 95+00 96+00 97+00 98+00 99+00 100+00 101+00 102+00 103+00 104+00 105+00 106+00 107+00 108+00
C7
BRAINARD LAKE ROAD STA. 94+00 - 108+00
APN: 145701000019
PETERS BROOKE H & SUSAN J
APN: 145701000049
TOWN OF WARD
APN: 145701000046
COUNTY OF BOULDER
APN: 145701000017
BIRMINGHAM JANET L LIVING TRUST ET AL
BIRMINGHAM JOHN M ET AL
6th P.M.
T1N, R73W
SEC 1
1, SE4
1NW
6th P.M.
T1N, R73W
SEC 1
1, SE4
1NE
200'100'0
Scale in Feet
Ground
Existing Ground
Existing
Grade
Profile
Grade
Profile
E = 2996839.143
N = 1271402.844
Station 99+50.00
Begin Reconstruction
End Rehabilitation
R = 290.00'
Curve = 102(1)-23
PI 101+81.30
T = 116.59'
L = 221.72'
R = 255.00'
Curve = 102(1)-24
PI 105+35.77
T = 231.00'
L = 375.39' L = 243.00'
Curve = 102(1)-25
PI 108+83.32
R = 500.00'
T = 123.95'
4.20%
-4.20%
6%
0%
6%
6%
0%
6%
LT EOP
RT EOP
Axis of rotation
Profile grade &
D D D
APN: 145701000025
POSSUM POINT LTD
DUNCAN-TWO LTD
APN: 145701000017
BIRMINGHAM JANET L LIVING TRUST ET AL
BIRMINGHAM JOHN M ET AL
APN: 145701000049
TOWN OF WARD
existing condition Grade to fit
CR 102N
Remove existing pipe culvert
Class 2 Riprap
2-End Sections
Concrete Pipe Culvert
98+15, Install 24"x40'
Remove existing pipe culvert
Class 2 Riprap
2-End Sections
102+50, Install 24"x55'
T
P T
.1
P C
.3
P T
.3
P C
.0
P T
.2
P C
.0
PT
+55.
PC 1
19+
88.
120+00
P T
.0
P C
.2
PT
.3
A
,4
.1
,4
.1
STATE PROJECT
P
M N C
O R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P C .d g n
U s e r r y a n .m a th is
NUMBER
SHEET
Superelevation Diagram
CO
107+94
4.20%
-4.20%
109+67
-2.24%
110+00
2.24%
110+00
108+00 109+00 110+00 111+00 112+00 113+00 114+00 115+00 116+00 117+00 118+00 119+00 120+00 121+00 122+00
C8
BRAINARD LAKE ROAD STA. 108+00 - 122+00
APN: 145701000017
BIRMINGHAM JANET L LIVING TRUST ET AL
BIRMINGHAM JOHN M ET AL
APN: 145701000018
BIRMINGHAM JOHN & JANET L BIRMINGHAM
APN: 145701000049
TOWN OF WARD APN: 145906000043
MALDE HAROLD E FAMILY TRUST ET AL
MALDE CAROLINE E ET AL
200'100'0
Scale in Feet
Grade
Profile
Ground
Existing Ground
Existing
E = 2997725.373
N = 1271073.035
Station 110+00.00
Begin Rehabilitation
End Reconstruction
L = 243.00'
Curve = 102(1)-25
PI 108+83.32
R = 500.00'
T = 123.95'
-6%
6%
0%
6%
0%
-6%
Axis of rotation
Profile grade &
LT EOP
RT EOP
Class 2 Riprap
2-End Sections
Concrete Pipe Culvert
121+86, Install 24"x52'
107+94
D
APN: 145701000046
COUNTY OF BOULDER
(By Others) pedestal existing telephone
Remove and reset
See Special 633-B
112+00, Install Speed Hump
See Special 633-B
115+00, Install Speed Hump
Remove existing pipe culvert
Class 2 Riprap
2-End Sections
113+15, Install 24"x41'
9335934
.2
P T
.3
120+00
P T
.0
P C
.7
P T
.5
P C
.2
P T
.3
P C
.3
P T
.7
P C
.2
PT
.3
P C
.1
P
T
.2
A
STATE PROJECT
P
M N C
O R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P C .d g n
U s e r r y a n .m a th is
NUMBER
SHEET
Superelevation Diagram
CO
Brainard Lake Road
CO FLAP 102(1)
122+00 123+00 124+00 125+00 126+00 127+00 128+00 129+00 130+00 131+00 132+00 133+00 134+00 135+00 136+00
C9
BRAINARD LAKE ROAD STA. 122+00 - 136+00
APN: 145701400022
TOWN OF WARD
6th P.M.
T1N, R73W
SEC 1
1, SE4
1NE
6th P.M.
T1N, R73W
SEC 1
1, SE4
1SE
APN: 145701400022
TOWN OF WARD
200'100'0
Scale in Feet
APN: 145906000080
EVANGELISTA PETER DJ & DEBORA MJ
Ground
Existing
Ground
Existing
2' Curve Widening
127+50 - 129+20, Lt.
Class 2 Riprap
2-End Sections
Concrete Pipe Culvert
134+86, Install 24"x52'
APN:
COUNTY
OF B
OULDER
S T O P
C O
N C
R E T E
O/H WIRE HT. 26'
O/H WIRE HT. 34'
O/H WIRE HT. 27'
.2
P C
.2
P T
.3
P
C
.1
P T
.2
P O
T
.1
PO
T
1+ .8
1+
PO
T
0+ .0
0+
,2
.1
STATE PROJECT
P
M N C
O R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P C .d g n
U s e r r y a n .m a th is
NUMBER
SHEET
Superelevation Diagram
CO
Brainard Lake Road
CO FLAP 102(1)
,2
.1
V P I
E L
,2
.0
-7.016%
-7.614%
100' VC
K = 167
SSD = 1856'
V P I
E L
,2
.4
-7.614%
-2.779%
50' VC
K = 10
,2
.9
,2
.9
,2
.9
+1.000%
142+04
142+04
141+00
4.20%
-4.20%
144+63
4.98%
-4.98%
144+74
-2.00% 145+30
145+26
1.76%
136+00 137+00 138+00 139+00 140+00 141+00 142+00 143+00 144+00
C10
,2
.5
APN: 145701400022
TOWN OF WARD
200'100'0
Scale in Feet
R = 75'
R = 25'
Ground
Existing
Ground
Existing
Grade
Profile
150+00 151+00
Profile
Existing Ditch
See Sheet D1.
Road, Lt.
Construct Approach
E = 2998827.214
N = 1270315.312
Station 141+00.00
Begin Reconstruction
End Rehabilitation
E = 2999183.478
N = 1270508.117
Station 145+25.00
End Project CO FLAP 102(1)
T = 38.98'
Curve = 102(1)-33
PI 144+78.12
R = 60.00'
L = 69.14'
R = 500.00'
Curve = 102(1)-32
PI 140+40.17
T = 226.95'
L = 426.10'
BRAINARD LAKE ROAD STA. 136+00 - 145+25
145+00
LT EOP
RT EOP
Axis of rotation
Profile grade &
-6%
6%
0%
6%
0%
-6%
Class 2 Riprap
2-End Sections
Concrete Pipe Culvert
145+08, Install 24"x70'
D D
APN: 145906000043
MALDE HAROLD E FAMILY TRUST ET AL
MALDE CAROLINE E ET AL
APN: 145906000080
EVANGELISTA PETER DJ & DEBORA MJ
APN: 145906000048
MANS DAVID R & JOHN R MANS
Grade
Ditch Profile
APN: 145701400022
TOWN OF WARD
drain
Grade to drain
Grade to
(Grade to drain) back to a 1:2 slope.
depth. Lay cut slope to mainline width and
Construct ditch similar
150+20 - 151+00, Lt.
(Do Not Disturb)
Pole of Existing Power
No work within 5'
(Do Not Disturb)
Pole of Existing Power
No work within 5' approach road alignment existing gate to new
Remove and reset
Remove existing pipe culvert
Class 2 Riprap
2-End Sections
Concrete Pipe Culvert
142+27, Install 24"x59'
Remove existing pipe culvert
Class 2 Riprap
2-End Sections
140+97, Install 24"x58'
P
M N C
O R o a d w a y C
A D
D S h e e ts D
M in o r P
P P
N P D
.d g n
U s e r r y a n .m a th is
NUMBER
SHEET
CO
Brainard Lake Road
CO FLAP 102(1)
,2
.7
V P I
E L
,2
.0
-2.000%
+1.120%
50' VC
K = 16
V P I
E L
,2
.8
-0.312%
100' VC
K = 70
SSD = 804'
,2
.4
STOP
CO
NCRETE
O /H W
IRE HT. 26'
O /H W
IRE HT. 34'
O /H W
IRE HT. 27'
POT 1+00.00
1+00
PC 1+14.38
P T
.0
7 2
P C
.5
P T
.8
P O T
.7
APN: 145906000048
MANS DAVID R & JOHN R MANS
100'50'0
Scale in Feet
1+00 2+00 3+00 4+00
APPROACH ROAD 1+00
M a in li n e
E L ,2
.7
A p p r o a c h R o a d
Grade
Profile
Ground
Existing
R=10'
R=15'
D1
E = 2998872.399
N = 1270336.670
Mainline Station 141+50.00
Station 1+00.00 =
Begin Approach Road
E = 2999079.575
N = 1270599.104
Station 4+60.00
End Approach Road e = 0.031 e = 0.030 foundation existing concrete
Do Not Disturb
L = 100.22'
Curve = 102(1)_AP-2
PI 4+15.65
D
R = 150.00'
T = 52.06'
Curve = 102(1)_AP-1
PI 1+47.80
D
R = 40.00'
T = 33.42'
L = 55.69'
(Do Not Disturb)
Pole of Existing Power
No work within 5'
P
M N C
O R o a d w a y C
A D
D S h e e ts D
M in o r P
P P
L N
D
B r id g e .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r r y a n .m a th is
NUMBER
SHEET
CO
Brainard Lake Road
CO FLAP 102(1)
M E T
A L P
IP
E
STONE
.6
W
IN
G W
A
LL
S T E E L-
O V E R
FL
O W
SPILLWAY
CONC
W
IN
G W
A
LL
4" PVC-UNK UTIL
O N
E L
A N
E R
O A
D
D
IR
O
N
LY
STO
N E
W
ATE
R
ASPHALT RAMP
T R
A I L
H E
A D
S
ASPHALT RAMP
D
IR
O
N L Y
C O
N C
M O
T O
R B
O A
T
B R
A I N
A R
D L
A K
E E
L E
V
,3
N
O
WOODEN
STONE
S T
O N
E
HANDRAIL
HANDRAIL
10345
10350
10350
40'20'0
Scale in Feet
P O
T
.0
P I
.2
P O
T
.6
(Approx. 18 LF) pavement
Sawcut existing
200+20, (Approx. 40 LF) pavement
Sawcut existing
201+20, (Approx. 72 LF) existing wooden handrail
Remove and reset
200+36 - 201+08, Lt.
(Approx. 54 LF) existing wooden handrail
Remove and reset
200+49 - 201+03, Lt.
See S sheets for details
Brainard Lake Bridge
(OPTION X)
BRIDGE REPAIR
BRAINARD LAKE
NOTE:
to the existing wooden sidewalks to be removed.
Completely remove existing asphalt ramps leading1.
edge stripe
4" Solid white
D2
E= 2979764.484
N= 1271392.634
Station 201+20.00
Option X
End Project CO FTFS 112(2)
E= 2979675.171
N= 1271462.318
Station 200+20.00
Option X
Begin Project CO FTFS 112(2) existing concrete wingwall
Remove and replace
200+89, Lt. & Rt.existing concrete wingwall
Remove and replace
200+51, Lt. & Rt.
concrete spillway wall
Do not disrurb existing
(Approx. 80 LF)
' wide sidewalk2
Remove existing wooden
200+50 - 200+90, Lt. & Rt.
existing masonry wall.
Do not disturb
SCR's
See Section 620 of the
(Approx. 10 LF) existing Masonry Wall
Remove and reset
200+39 - 200+49, Rt.
masonry wall around existing construction fence
Place temporary
See Note 1.
(Approx. 59 SY) existing depth
3" depth or match existing pavement, Remove and replace
200+20 - 200+50
See Note 1.
(Approx. 60 SY) existing depth
3" depth or match existing pavment, Remove and replace
200+90 - 201+20 along edge of waterway construction fence
Place temporary existing wooden handrail
Subsidiary to remove and reset
(Approx. 46 LF) waterline onto existing bridge
4" PVC utility sleeve and raise existing
Remove and reset and
200+48 - 200+94, Lt.
E1
200'100'0
Scale in Feet
200'100'0
Scale in Feet
12+00 to 38+00
CONTROL
EROSION AND SEDIMENT
E = 2990538.143
N = 1271843.371
Station 12+00.00
Begin Project CO FLAP 102(1)
3.
2.
1.
NOTE:
Erosion and sediment control devices not to scale.
sheet for erosion and sediment control symbols.
Refer to the Conventional Pan Symbols and Abbreviations
Place bonded fiber matrix on all slopes.
10035
10045
10045
10060 CP7
P E
D X I N
G
CP1CP1
STATE PROJECT
P
M N C
O R o a d w a y C
A D
D S h e e ts E E
C P .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r r y a n .m a th is
NUMBER
SHEET
CO
Brainard Lake Road
CO FLAP 102(1)
9920992
C U
R V
E G
L Y P
H
M
P H
BLM AC MS9798
B R
A I N
A R
D R
E C A
R E
A
S
PR
IN
G
W A
TE
R
W A
TE
R
C O
N C V
A U
LT
50+00
STATE PROJECT
P
M N C
O R o a d w a y C
A D
D S h e e ts E E
C P .d g n
U s e r r y a n .m a th is
NUMBER
SHEET
CO
Brainard Lake Road
CO FLAP 102(1)
759780
WATER
WATER
12" D
IP
CONC VAULT
E2
200'100'0
Scale in Feet
200'100'0
Scale in Feet
38+00 to 66+00
CONTROL
EROSION AND SEDIMENT
3.
2.
1.
NOTE:
Erosion and sediment control devices not to scale.
sheet for erosion and sediment control symbols.
Refer to the Conventional Pan Symbols and Abbreviations
Place bonded fiber matrix on all slopes.
80+
A
STATE PROJECT
P
M N C
O R o a d w a y C
A D
D S h e e ts E E
C P .d g n
U s e r r y a n .m a th is
NUMBER
SHEET
CO
Brainard Lake Road
CO FLAP 102(1)
965596
T
CABLE
ALUMINUM CAP
GATE POST
GATE POST
STONE
R
IG
H T C
U R
V E
.7
.7
C M P
+00
A
A
A
E3
200'100'0
Scale in Feet
200'100'0
Scale in Feet
66+00 to 94+00
CONTROL
EROSION AND SEDIMENT
3.
2.
1.
NOTE:
Erosion and sediment control devices not to scale.
sheet for erosion and sediment control symbols.
Refer to the Conventional Pan Symbols and Abbreviations
Place bonded fiber matrix on all slopes.
E4
Scale in Feet
200'100'0
Scale in Feet
94+00 to 122+00
CONTROL
EROSION AND SEDIMENT
3.
2.
1.
NOTE:
Erosion and sediment control devices not to scale.
sheet for erosion and sediment control symbols.
Refer to the Conventional Pan Symbols and Abbreviations
Place bonded fiber matrix on all slopes.
65947
TCABLE
T
T
CABLE
A
A
A
.6
C
M P
T
.9
120+00
A
STATE PROJECT
P
M N C
O R o a d w a y C
A D
D S h e e ts E E
C P .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r r y a n .m a th is
NUMBER
SHEET
CO
E5
Scale in Feet
200'100'0
Scale in Feet
122+00 to 145+25
CONTROL
EROSION AND SEDIMENT
E = 2999183.478
N = 1270508.117
Station 145+25.00
End Project CO FLAP 102(1)
3.
2.
1.
NOTE:
Erosion and sediment control devices not to scale.
sheet for erosion and sediment control symbols.
Refer to the Conventional Pan Symbols and Abbreviations
Place bonded fiber matrix on all slopes.
0 9
R
IG
H T C
U R
V E
B R A
IN
A R D L
A K E N
R A
120+00
A
S T
O P
O/H WIRE HT. 26'
O/H WIRE HT. 34'
O/H WIRE HT. 27'
.2
36'
1+
0+
STATE PROJECT
P
M N C
O R o a d w a y C
A D
D S h e e ts E E
C P .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r r y a n .m a th is
NUMBER
SHEET
CO
6" min. trench
6" min.
18" min.
30" min.
24" min.
NOTE:
4.
3.
2.
1.
6 ft. (max.)
fence support mesh = withoutPost spacing
10 ft. (max.)
fence support mesh =withPost spacing running around the ends.
fence up the slope to prevent water from
As the slope is constructed, curve the silt contours as closely as possible.
Install silt fence to follow the ground manufacturer's recommendations.
machine-sliced silt fence according to the slicing as approved by the CO. Install
Silt fence may be installed using machine
DETAIL
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY DETAIL
DETAIL APPROVED FOR USE
REVISED: 08/2014
SILT FENCE
C157-50
E6
ELEVATION
PLAN
POST AND GEOTEXTILE INSTALLATION DETAIL
SILT FENCE INSTALLATION AT TOE OF FILL
Flow Fi ll slo pe
Flow
T o e o f s lo p e
Flow
(undisturbed)
Existing ground
END POSTS DETAIL
PLAN
PLAN
END DETAIL
ELEVATION
Fi ll sl op e
Steel or wood post
Backfilled and compacted soil
Limits of clearing
Steel or wood post
Varies
Varies
See Note 3 for spacing
See Note 4
Fasten fabric to posts.
around each post one full turn.
Fold geotextile fabric
NO SCALE
PLAN
T o e o f s lo p
Note 3See
Staple or tie
Top of posts tied together.
Posts driven tightly together.
Steel or wood posts
POSTS AT JOINTS
See End Posts Detail
End posts
Geotextile fabric
Staple or tie
SILT FENCE AS PERIMETER CONTROL
Fill
Existing ground
Sheet flow Silt fence
PLAN
SECTION A-A
A
A
Roadway
Edge of shoulder
Edge of shoulder
Toe of slope
Toe of slope
Posts Detail
See End
End posts
Silt fence
Fence support mesh (optional)
Section A fabric
Geotextile
Section B
Geotextile fabric
Geotextile
See Typical Section Sheet
STATE PROJECT
P
M N C
O R o a d w a y C
A D
D S h e e ts E C .d
U s e r r y a n .m a th is
NUMBER
SHEET
CO
CHECK DAM
U.S. DEPARTMENT OF TRANSPORTATION
6"
6''
(ft)
12" (min.)
DETAILDETAIL APPROVED FOR USE 01/2011
C157-53
NOTE:
(ft)
6" min.
16" min
Trench 2" min.
steeper than 5%.
log check dams on ditch grades sediment log. Do not use sediment
* Spacing calculated based on 9" Ø min
12" (min.)
7.
6.
5.
4.
3.
2.
1.
Adjust check dam spacing based on site-specific conditions.
around the ends of the fiber roll.
Provide sufficient length to prevent water from flowing
Expose stakes 2" (min.) above top of fiber roll.
Drive stakes into undisturbed soil of trench bottom 16" (min).
2' (max) spacing.
Drive stakes at each end of the fiber roll and at
Stake fiber rolls in place with 1⅛" x 1⅛" wood stakes.
Install check dams in ditches perpendicular to the flowline.
Repair all rills or gullies and properly compact prior to installation.
requirements of the check dam device.
may be used as approved by the CO, to meet the functional
Check dams of fiber rolls, riprap, or gravel bags
9" Ø min.
Fiber roll
Trench 2" min.
E7
6%
5%
4%
3%
2%
RIPRAP CHECK DAM
PLAN
Flow
Flow
Se e
Not e
GRADE
DITCH
CROSS SECTION
CROSS SECTION
V-DITCH
See Note 6 the ends to prevent flow around
Curve ends upstream similar for flat-bottom ditches.
Check dam installation details are
V-ditch design shown.
5%
4%
3%
2%
See Note 5
Flow Line
Class 1 riprap
STAKING DETAIL
FIBER ROLL
uphill side of fiber roll
Place excavated material on
(See Note 7)
CHECK DAM SPACING*
FIBER ROLL
(See Note 7)
CHECK DAM SPACING
RIPRAP
FIBER ROLL CHECK DAM
CROSS SECTION
FLAT-BOTTOM DITCH
SPACING (max.)
CHECK DAM
SPACING (max.)
CHECK DAM
GRADE
DITCH
Class 1 riprap
STATE PROJECT
P
M N C
O R o a d w a y C
A D
D S h e e ts E C .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
DETAIL
U s e r r y a n .m a th is
NUMBER
SHEET
CO
NOTE:
12" min.
12" max.
Trench 2" min.
12" min.
See Note 3
Stake Spacing
DETAIL
6.
5.
4.
3.
2.
1.
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY DETAIL
DETAIL
FIBER ROLL
Maximum spacing (ft)
9" Ø Fiber Roll
Spacing Table
See Fiber Roll manufacturer's recommendations.
Fiber rolls may be overlapped according to the fiber roll rather than under it.
roll to ensure storm water is forced to flow through
Tamp soil backfill against upstream side of fiber continuous contact with trench bottom and sides.
parallel to the contour. Place fiber rolls in
For fiber rolls on bare soil, construct trenches of fiber roll.
12" deep. Expose stakes 2" above top
Drive stakes into undisturbed soil at least
Stake fiber rolls at each end.
1" Ø wood stakes. Space stakes 4' o.c. max.
Stake fiber rolls in place with 1" x 1" or roll to vary more than 5% from level.
20' section of fiber roll, do not allow the fiber
Install fiber rolls along slope contours. For any prior to installation.
Repair all rills or gullies and properly compact flared end section
Culvert inlet with
2" min.
Trench
AT CULVERT INLET
FIBER ROLL
inlets fiber rolls around culvert
Install 3 - 9" Ø min. x 10'
See Note 3
See Note 3
Flow
12" min.
Fill slope
C le a r in g
L im it
S lo p
S ta k e
INSTALLATION DETAIL
FIBER ROLL AS PERIMETER CONTROL
Trench 2" min.
uphill side of fiber roll
Place excavated material on
C157-55
DETAIL APPROVED FOR USE 01/2011
E8
Flow
NO SCALE
1V:4H or flatter
1V:4H to 1V:3H
1V:3H to 1V:2H
Slope Gradient
1V:2H or steeper
Stagger joints (typ.)
STAKE DETAIL
uphill side of fiber roll
Place excavated material on
Fiber roll
Install fiber rolls along contour
SLOPE LAYOUT
FIBER ROLL
uphill side of fiber roll
Place excavated material on gaps. See Note 6.
Tie ends if necessary to eliminate
Abut fiber roll ends tightly together.
FIBER ROLL JOINT DETAIL
Tightly abut joints (typ.)
Fill or cut slope
FIBER ROLL SPACING TABLE*
project-specific conditions.
*Approximate spacing shown. Adjust spacing as needed due to
STATE PROJECT
P
M N C
O R o a d w a y C
A D
D S h e e ts E C .d
U s e r r y a n .m a th is
NUMBER
SHEET
CO
F1
EMBANKMENT BENCHING
204-A
U s e r r y a n .m a th is
NOTE:
2.
1.
EMBANKMENT BENCHING
8' bench height (typ.)
Top of subgrade bench height.
meet 12' minimum bench width and 8' typical
Bench into existing slope as necessary to
1V:3H or flatter.
Benching is not required for ground sloped at
12' (min.)
See Note 2
Proposed em bankm ent slope
Existing ground
Height varies pattern benching
Typical
STATE PROJECT
P
M N C
O R o a d w a y C
A D
D S h e e ts F C e m b a n k b e n c h in g .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
SPECIAL
U.S. CUSTOMARY SPECIAL
U s e r r y a n .m a th is
NUMBER
SHEET
CO
F2
204-B
SITE
WASTE DISPOSAL
PLAN
NO SCALE
ground
Existing
A A
SECTION A-A
1.4 Mi.
To Beginning of Project
0.7 Mi.
To Brainard Lake
Waste MaterialV a r ie s
Varies 25'-30' approximate Limits are
B
B
SECTION B-B
Waste Material V a r ie s
Varies 25'-30' seed and mulch
Scatter boulders, seed and mulch
Scatter boulders, to remain 4'-6' trail Existing to trail Maintain access
WASTE AREA
HORSESHOE
CL
Varies
MAINLINE WASTE AREA
to block entrance from watse material Stack boulders
1:4 slope max.
(Waste) at rock material
Place earth and
Sta. 51+85, Rt.
Sta. 37+40 - 40+90, Lt.
ground
Existing
NOTE:
mostly covered with soil.
they are either fully or
Bury boulders so that2.
undulations.
appears to have natural
Shape material so that it1.
STATE PROJECT
P
M N C
O R o a d w a y C
A D
D S h e e ts F S p e c ia l B W a s te .d
U.S. DEPARTMENT OF TRANSPORTATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U s e r r y a n .m a th is
NUMBER
SHEET
CO
DETAIL APPROVED FOR USE 12/2012
SUBEXCAVATION
NO SCALE C204-51
See bench detail than 2 ft Bench if greater Varies (2 ft typ.)
max.
2 ft
1 ft min.
6.
5.
4.
3.
2.
1.
NOTE:
the CO.
not construct slopes steeper than 1:2 unless approved by slope adjustments to match the subgrade hinge point. Do
At daylight locations, match the existing fill slope or make roadway cross slope when steeper than 2%.
toward the daylight for drainage, or match the existing subgrade hinge point. Slope the excavation bottom 2%
Daylight to drain when the excavation is within 4 ft of the every 2 ft of subexcavation depth.
in bottom layers. Provide a 1 ft min. bench width for
Widen top of subexcavation area to allow for bench width
Do not place backfill material within the structural section.
Minimum subexcavation dimensions are 6 ft wide x 6 ft long.
unless otherwise specified.
Replace unsuitable material according to Subsection 204.07
F3
See typical sections for structural section
Finished grade
Backfill with material according to Section 204
TYPICAL SECTION
SUBEXCAVATION
Geotextile
BENCH DETAIL
Total subexcavation width
Width of need according to Section 204
Backfill with material structural section
See typical sections for
Finished grade
STATE PROJECT
P
M N C
O R o a d w a y C
A D
D S h e e ts F C .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
REVISED:
U.S. CUSTOMARY DETAIL
U s e r r y a n .m a th is
NUMBER
SHEET
NM
Lincoln
NM FTFS 107(1)
C251-50
CLASS
RIPRAP
SECTION
END
WITH
SECTION
END
WITHOUT
(CY)
QUANTITY
RIPRAP
ESTIMATED
(SY)
QUANTITY
GEOTEXTILE
ESTIMATED
(inches) D
SIZE
CULVERT
(feet) L
APRON
OF
LENGTH
(feet) H
APRON
OF
DEPTH
CLASS
RIPRAP
SECTION
END
WITH
SECTION
END
WITHOUT
PROTECTIVE APRON DIMENSIONS AND ESTIMATED QUANTITIES
OUTLET WITHOUT DITCH
(CY)
QUANTITY
RIPRAP
ESTIMATED
(SY)
QUANTITY
GEOTEXTILE
ESTIMATED
(inches) D
SIZE
CULVERT
(feet) L
APRON
OF
LENGTH
(feet) H
APRON
OF
DEPTH
PROTECTIVE APRON DIMENSIONS AND ESTIMATED QUANTITIES
OUTLET WITH DITCH
AT CULVERT OUTLETS
PLACED RIPRAP
14.5
12.5
2.5
2.5
1.5
1.5
1.5
2.5
2.5
1.5
1.5
1.5
14.5
12.5
2.5
2.5
1.5
1.5
1.5
2.5
2.5
1.5
1.5
1.5
2'
49.8
38.7
18.5
13.3
5.2
3.2
1.7
44.5
34.1
15.6
10.9
3.9
2.2
2'
38.6
29.9
15.2
10.8
4.5
2.7
1.4
35.6
27.3
13.4
9.3
3.6
0.9
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAILDETAIL APPROVED FOR USE
F4
C
PLAN VIEW PLAN VIEW
Geotextile
END SECTION
CULVERT WITHOUT STANDARD
SECTION C-C
END SECTION
CULVERT WITH STANDARD
S p a n
D ia o r m in
S p a n
D ia o r
L
A A
B B
PLAN VIEW
Variable slope ground Original
Geotextile
END SECTION
CULVERT WITHOUT STANDARD
SECTION B-BSECTION A-A
END SECTION
CULVERT WITH STANDARD
S p a n
D ia o r
S p a n
D ia o r m in
Geotextile
Variable slope ground Original m in
L
D D
D
H
H
D D
D
WITHOUT DITCH
PROTECTIVE APRON AT CULVERT OUTLET
WITH DITCH
PROTECTIVE APRON AT CULVERT OUTLET
L
C C
C
NOTE:
L
H
D
Geotextile
SECTION E-ESECTION D-D
Geotextile ground Original m in ditch slope
Match existing
D
H m in ground Original m in
D m in
H ditch slope
Match existing
D D EE
ground
Original
D
D it c h B o tt o m
W id th
D it c h B o tt o m
W id th
D
4D
PLAN VIEW
or…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .