Cloudburst Bridge Replacement
Closed Solicitation Posted
- Solicitation number
- 1282B124R0079
- Agency
- Forest Service Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Bridgeport, California 93517, United States
- Points of contact
-
- Crystal Amos crystal.amos@usda.gov (618) 467-8347
- Trinika Mason trinika.mason@usda.gov (618) 581-6970
- Beverly D. Hines beverly.hines@usda.gov (618) 467-8347
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Department of Agriculture Forest Service is seeking proposals for the Cloudburst Bridgeport Bridge Replacement project in the Humboldt-Toiyabe National Park. The work will consist of supplying and constructing a 16' x 50' prefabricated bridge superstructure with concrete grade beam foundations to replace the existing bridge. The contract will be a firm-fixed-price with a period of performance from September 16, 2024 to December 31, 2025. The government will use a performance-price tradeoff evaluation to make a best value determination, and potential offerors must earn an acceptable technical rating. Proposals are due by September 5, 2024 at 12:00 PM CDT.
This solicitation is set aside for small businesses. The estimated contract value is between $500,000 and $1,000,000. The work will take place in Bridgeport, CA 93517. The existing bridge superstructure will be removed, and the new bridge will over-span the existing abutment walls, with both approach roads being built up to accommodate the over-span. All work must be executed in accordance with the Statement of Work, specifications, drawings, and all other attachments.
Notice text
Cloudburst Bridgeport Bridge Replacement, Humboldt-Toiyabe National Park. The work will consist of supply and construction of a sixteen’ x 50’ prefabricated bridge superstructure with concrete grade beam foundations. The existing bridge superstructure shall be removed, and the top of the concrete abutments shall be cut and removed. The remainder of the abutments will be left in place, and the new bridge will over-span the existing abutment walls in the same location. Both approach roads will be built up to accommodate the over-span. All work shall be executed IAW, SOW, SPECS, Drawings and all attachments.
Attachments
| File | Type | Posted |
|---|---|---|
| A10_Q_A_1282B123R0004.pdf | ||
| A10_QA_1282B123R0004.pdf | ||
| Amd_0002_Extension.pdf | ||
| A10_Amd_0001_Site Visit.pdf | ||
| A9_SOI_CloudBurst.xls | XLS spreadsheet | |
| A10_RFP_1282B124R0079_Complete.pdf |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity