Cloudburst Bridge Replacement

Closed Solicitation Posted

Solicitation number
1282B124R0079
Agency
Forest Service Department of Agriculture
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Z2LB Repair Or Alteration Of Highways/Roads/Streets/Bridges/Railways
Place of performance
Bridgeport, California 93517, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Department of Agriculture Forest Service is seeking proposals for the Cloudburst Bridgeport Bridge Replacement project in the Humboldt-Toiyabe National Park. The work will consist of supplying and constructing a 16' x 50' prefabricated bridge superstructure with concrete grade beam foundations to replace the existing bridge. The contract will be a firm-fixed-price with a period of performance from September 16, 2024 to December 31, 2025. The government will use a performance-price tradeoff evaluation to make a best value determination, and potential offerors must earn an acceptable technical rating. Proposals are due by September 5, 2024 at 12:00 PM CDT.

This solicitation is set aside for small businesses. The estimated contract value is between $500,000 and $1,000,000. The work will take place in Bridgeport, CA 93517. The existing bridge superstructure will be removed, and the new bridge will over-span the existing abutment walls, with both approach roads being built up to accommodate the over-span. All work must be executed in accordance with the Statement of Work, specifications, drawings, and all other attachments.

Notice text

Cloudburst Bridgeport Bridge Replacement, Humboldt-Toiyabe National Park.  The work will consist of supply and construction of a sixteen’ x 50’ prefabricated bridge superstructure with concrete grade beam foundations. The existing bridge superstructure shall be removed, and the top of the concrete abutments shall be cut and removed. The remainder of the abutments will be left in place, and the new bridge will over-span the existing abutment walls in the same location. Both approach roads will be built up to accommodate the over-span.  All work shall be executed IAW, SOW, SPECS, Drawings and all attachments. 

Attachments

Files attached to this notice, newest first
File Type Posted
A10_Q_A_1282B123R0004.pdf PDF
A10_QA_1282B123R0004.pdf PDF
Amd_0002_Extension.pdf PDF
A10_Amd_0001_Site Visit.pdf PDF
A9_SOI_CloudBurst.xls XLS spreadsheet
A10_RFP_1282B124R0079_Complete.pdf PDF

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity