Central Everglades Planning Project (CEPP) Contract 1 L-67a Structures (S-631, S-632, and S-633), Spoil Pile Removal and L-67C Gap, Miami-Dade County, Florida

Closed Solicitation Posted

Solicitation number
W912EP20R0021
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Fl Usa

Notice details come from SAM.gov. Updated .

About this opportunity

The Jacksonville District of the U.S. Army Corps of Engineers is soliciting proposals for construction services for Central Everglades Planning Project Contract 1 located in western Miami-Dade County, Florida. The scope of work includes installing three L-67A levee structures equipped with gated box culverts and dewatering apparatus, removing existing spoil islands, excavating a 3,000-foot gap in the L-67C levee to connect water conservation areas, and backfilling an agricultural ditch using on-site materials. Proposals will be evaluated based on technical merit, past performance, small business participation, and price. Questions are due by August 12th and proposals are due by September 1st.

The solicitation has no set-aside designation. The primary NAICS code is 237990 and PSC code is R499. Work will be performed between July 2021 and December 2023 in western Miami-Dade County, Florida. The estimated award value is between $25-35 million. Construction will include installing three levee structures, removing six spoil islands, excavating 3,000 linear feet, and backfilling an agricultural ditch using on-site materials to connect water conservation areas.

Notice text

5 versions

Update #5 · Latest ·

Amendment 0002 has been posted.  See attachments

Amendment 0001 has been posted.  See attachments

The site visit summary and sign in sheet has been included in this posting.

This notice has been amended to include an extension to the ProjNet due date.  The due date for inquiries has been extended to close of business 13 August 2020.  This change will be included in a future amendment.

Please refer to the attached solicitation documents for the following project description:

The Jacksonville District is procuring construction services for CEPP South Contract 1, located in western Miami-Dade County, between Water Conservation Area (WCA) 3A (Everglades Wildlife Management Area) and WCA 3B (Francis S. Taylor Wildlife Management Area), west of C-111, and north of the Tamiami Trail (US-41).

The Scope of Work for this project includes the construction of the following four (4) project features: (A) Install three (3) required L 67 A levee structures; S-631, S-632, and S-633. Each structure location will have two (2) 6’ x 6’ gated box culverts equipped with dewatering apparatus features. Each box culvert will have a vertical lift gate that can be operated remotely. Power for the lift gates will be provide by an on-site propane generator housed in a concrete building; (B) Removal of the existing spoil islands directly to the northwest of the proposed S-631 and S-632 structure locations on the opposite site of the L-67A canal; (C) Excavate a 3000’ gap within the L-67 C levee to convey water from WCA 3A to WCA 3B; and (D) Backfill the existing east-west agricultural ditch between the L 67 A and L 67 C levees. Backfill material will be generated on site by using the east-west agricultural ditch spoil pile located on the north side of the ditch. In addition, material from excavating the 3000’ gap and spoil islands are other sources of backfill material.

Any excess excavated material will be disposed of by filling in a portion of the L-67A Extension canal. 

Update #4 ·

Amendment 0001 has been posted.  See attachments

The site visit summary and sign in sheet has been included in this posting.

This notice has been amended to include an extension to the ProjNet due date.  The due date for inquiries has been extended to close of business 13 August 2020.  This change will be included in a future amendment.

Please refer to the attached solicitation documents for the following project description:

The Jacksonville District is procuring construction services for CEPP South Contract 1, located in western Miami-Dade County, between Water Conservation Area (WCA) 3A (Everglades Wildlife Management Area) and WCA 3B (Francis S. Taylor Wildlife Management Area), west of C-111, and north of the Tamiami Trail (US-41).

The Scope of Work for this project includes the construction of the following four (4) project features: (A) Install three (3) required L 67 A levee structures; S-631, S-632, and S-633. Each structure location will have two (2) 6’ x 6’ gated box culverts equipped with dewatering apparatus features. Each box culvert will have a vertical lift gate that can be operated remotely. Power for the lift gates will be provide by an on-site propane generator housed in a concrete building; (B) Removal of the existing spoil islands directly to the northwest of the proposed S-631 and S-632 structure locations on the opposite site of the L-67A canal; (C) Excavate a 3000’ gap within the L-67 C levee to convey water from WCA 3A to WCA 3B; and (D) Backfill the existing east-west agricultural ditch between the L 67 A and L 67 C levees. Backfill material will be generated on site by using the east-west agricultural ditch spoil pile located on the north side of the ditch. In addition, material from excavating the 3000’ gap and spoil islands are other sources of backfill material.

Any excess excavated material will be disposed of by filling in a portion of the L-67A Extension canal. 

Update #3 ·

The site visit summary and sign in sheet has been included in this posting.

This notice has been amended to include an extension to the ProjNet due date.  The due date for inquiries has been extended to close of business 13 August 2020.  This change will be included in a future amendment.

Please refer to the attached solicitation documents for the following project description:

The Jacksonville District is procuring construction services for CEPP South Contract 1, located in western Miami-Dade County, between Water Conservation Area (WCA) 3A (Everglades Wildlife Management Area) and WCA 3B (Francis S. Taylor Wildlife Management Area), west of C-111, and north of the Tamiami Trail (US-41).

The Scope of Work for this project includes the construction of the following four (4) project features: (A) Install three (3) required L 67 A levee structures; S-631, S-632, and S-633. Each structure location will have two (2) 6’ x 6’ gated box culverts equipped with dewatering apparatus features. Each box culvert will have a vertical lift gate that can be operated remotely. Power for the lift gates will be provide by an on-site propane generator housed in a concrete building; (B) Removal of the existing spoil islands directly to the northwest of the proposed S-631 and S-632 structure locations on the opposite site of the L-67A canal; (C) Excavate a 3000’ gap within the L-67 C levee to convey water from WCA 3A to WCA 3B; and (D) Backfill the existing east-west agricultural ditch between the L 67 A and L 67 C levees. Backfill material will be generated on site by using the east-west agricultural ditch spoil pile located on the north side of the ditch. In addition, material from excavating the 3000’ gap and spoil islands are other sources of backfill material.

Any excess excavated material will be disposed of by filling in a portion of the L-67A Extension canal. 

Update #2 ·

This notice has been amended to include an extension to the ProjNet due date.  The due date for inquiries has been extended to close of business 13 August 2020.  This change will be included in a future amendment.

Please refer to the attached solicitation documents for the following project description:

The Jacksonville District is procuring construction services for CEPP South Contract 1, located in western Miami-Dade County, between Water Conservation Area (WCA) 3A (Everglades Wildlife Management Area) and WCA 3B (Francis S. Taylor Wildlife Management Area), west of C-111, and north of the Tamiami Trail (US-41).

The Scope of Work for this project includes the construction of the following four (4) project features: (A) Install three (3) required L 67 A levee structures; S-631, S-632, and S-633. Each structure location will have two (2) 6’ x 6’ gated box culverts equipped with dewatering apparatus features. Each box culvert will have a vertical lift gate that can be operated remotely. Power for the lift gates will be provide by an on-site propane generator housed in a concrete building; (B) Removal of the existing spoil islands directly to the northwest of the proposed S-631 and S-632 structure locations on the opposite site of the L-67A canal; (C) Excavate a 3000’ gap within the L-67 C levee to convey water from WCA 3A to WCA 3B; and (D) Backfill the existing east-west agricultural ditch between the L 67 A and L 67 C levees. Backfill material will be generated on site by using the east-west agricultural ditch spoil pile located on the north side of the ditch. In addition, material from excavating the 3000’ gap and spoil islands are other sources of backfill material.

Any excess excavated material will be disposed of by filling in a portion of the L-67A Extension canal. 

Update #1 ·

Please refer to the attached solicitation documents for the following project description:

The Jacksonville District is procuring construction services for CEPP South Contract 1, located in western Miami-Dade County, between Water Conservation Area (WCA) 3A (Everglades Wildlife Management Area) and WCA 3B (Francis S. Taylor Wildlife Management Area), west of C-111, and north of the Tamiami Trail (US-41).

The Scope of Work for this project includes the construction of the following four (4) project features: (A) Install three (3) required L 67 A levee structures; S-631, S-632, and S-633. Each structure location will have two (2) 6’ x 6’ gated box culverts equipped with dewatering apparatus features. Each box culvert will have a vertical lift gate that can be operated remotely. Power for the lift gates will be provide by an on-site propane generator housed in a concrete building; (B) Removal of the existing spoil islands directly to the northwest of the proposed S-631 and S-632 structure locations on the opposite site of the L-67A canal; (C) Excavate a 3000’ gap within the L-67 C levee to convey water from WCA 3A to WCA 3B; and (D) Backfill the existing east-west agricultural ditch between the L 67 A and L 67 C levees. Backfill material will be generated on site by using the east-west agricultural ditch spoil pile located on the north side of the ditch. In addition, material from excavating the 3000’ gap and spoil islands are other sources of backfill material.

Any excess excavated material will be disposed of by filling in a portion of the L-67A Extension canal. 

Files

Notice history

Similar open opportunities

Opportunity Agency Set-aside Responses due
Kissimmee River Restoration (KRR) Project, S-69 Weir Repair Okeechobee, Florida, United States · NAICS 237990 ENDIST Jacksonville No set-aside
Mill Creek Section 205 Flood Risk Management Improvements Mill Creek Flood Control ChannelWalla Walla, WA 99362Walla Walla County 99362 · NAICS 237990 ENDIST Walla Walla No set-aside
Jacksonville Harbor Maintenance Dredging 32202 · NAICS 237990 ENDIST Wilmington No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors