B.08.02 W912EP20R0021 CEPP South Contract 1 Volume 2.pdf
PDF 8 MB Posted
- Solicitation number
- W912EP20R0021
About this file
This solicitation document describes a construction services procurement for the Central Everglades Planning Project Contract 1 located in western Miami-Dade County, Florida. The scope of work includes installing three L-67A levee structures with gated box culverts, removing existing spoil islands, excavating a 3,000-foot gap in the L-67C levee, and backfilling an agricultural ditch. Work will be performed between Water Conservation Areas 3A and 3B, west of C-111 and north of the Tamiami Trail. The Jacksonville District of the U.S. Army Corps of Engineers is the contracting agency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0002.pdf | ||
| Amendment 0001.pdf | ||
| I.01.11 Site Visit Sign-In Sheet and Notes.pdf | ||
| B.08.02 Drawings.pdf | ||
| B.08.02 GDR.pdf | ||
| B.08.02 W912EP20R0021 CEPP South Contract 1 Volume 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912EP-20-R-0021
Jacksonville District
CENTRAL EVERGLADES PLANNING PROJECT (CEPP)
SOUTH CONTRACT 1,
L-67A STRUCTURES (S-631, S-632, and S-633), SPOIL PILE REMOVAL AND L-67C GAP
PROJECT
MIAMI-DADE COUNTY, FLORIDA
Construction Solicitation and Specifications Volume 2 of 2
22 July 2020
CEPP South Contract 1, L-67A Structures (S-631, S-632 & S-633), Spoil Pile Removal & L-67C Gap Project, Miami-Dade County, FL
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 31 21 CONTROL MONUMENT DESCRIPTIONS
00 31 32 GEOTECHNICAL DATA REPORT (SEE SEPARATE FILE)
00 33 50 WEATHER, WATER STAGE AND TIDE DATA
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 22 00 MEASUREMENT AND PAYMENT
01 30 00 ADMINISTRATIVE PROCEDURES
01 32 01 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 25 OWNER SAFETY REQUIREMENTS - DIVING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 45 00 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 04 CONTRACTOR QUALITY CONTROL
01 50 02 TEMPORARY CONSTRUCTION FACILITIES
01 52 10 CONTRACTING OFFICER'S FIELD OFFICE
01 55 26 TRAFFIC CONTROL
01 57 20 ENVIRONMENTAL PROTECTION
01 57 25 TURBIDITY AND DISPOSAL MONITORING
01 78 02 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
DI VI SI ON 03 - CONCRETE
03 11 13 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 15 00 CONCRETE ACCESSORIES
03 20 00 CONCRETE REINFORCING
03 31 01 CAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVIL WORKS
03 35 00 CONCRETE FINISHING
03 39 00 CONCRETE CURING
DI VI SI ON 05 - METALS
05 50 14 STRUCTURAL METAL FABRICATIONS
05 50 15 CIVIL WORKS FABRICATIONS
DI VI SI ON 08 - OPENI NGS
08 11 13 STEEL DOORS AND FRAMES
08 71 00 DOOR HARDWARE
DI VI SI ON 13 - SPECI AL CONSTRUCTI ON
13 34 23 PRECAST CONCRETE BUILDINGS
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
25 31 01 STRUCTURE REMOTE TERMINAL UNIT (RTU)
DI VI SI ON 26 - ELECTRI CAL
PROJECT TABLE OF CONTENTS Page 1
26 00 00 BASIC ELECTRICAL MATERIALS AND METHODS
26 24 16 PANELBOARDS
26 29 10 ELECTRIC MOTOR ACTUATOR FOR LIFT GATES
26 31 00 SOLAR PHOTOVOLTAIC (PV) COMPONENTS
26 32 16 PROPANE FUELED GENERATOR 50 KW
26 41 00 LIGHTNING PROTECTION SYSTEM
26 42 14 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 05 26 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY
28 33 00 FUEL-GAS DETECTION AND ALARM
DI VI SI ON 31 - EARTHWORK
31 05 19 GEOTEXTILE
31 11 00 CLEARING, GRUBBING AND STRIPPING
31 23 00 EXCAVATION AND FILL
31 23 16 BLASTING AND ROCK REMOVAL
31 41 16 METAL SHEET PILING
31 62 13 PRESTRESSED CONCRETE PILES
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 11 23 LIMEROCK BASE FOR ROADS
32 31 13 CHAIN LINK FENCES AND GATES
32 92 23 SODDING
DI VI SI ON 33 - UTI LI TI ES
33 11 23 LIQUID PETROLEUM PIPING
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
DI VI SI ON 35 - WATERWAY AND MARI NE CONSTRUCTI ON
35 20 16 SLIDE GATES AND ELECTRIC MOTOR ACTUATORS
35 31 19 STONE PROTECTION FOR STRUCTURES
35 41 00 LEVEE CONSTRUCTION
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2
SECTION 00 31 21
CONTROL MONUMENT DESCRIPTIONS
FOR
CENTRAL EVERGLADES PLANNING PROJECT (CEPP)
SOUTH CONTRACT 1,
L67A STRUCTURES (S-631, S-632, and S-633), SPOIL PILE REMOVAL AND L-67C GAP PROJECT
SECTION 00 31 21 CONTROL MONUMENT DESCRIPTIONS
DESIGNATION - N 237
PID - AC0511
STATE/COUNTY- FL/MIAMI-DADE
MARKER: BENCH MARK DISK SET IN TOP OF CONCRETE MONUMENT
STAMPING: N 237 1965
MARK LOGO: CGS
PROJECTION:RECESSED 8 CENTIMETERS
MAGNETIC: NO MAGNETIC MATERIAL
STABILITY: MAY HOLD, BUT OF TYPE COMMONLY SUBJECT TO SURFACE MOTION
SATELLITE: THE SITE LOCATION WAS REPORTED AS SUITABLE FOR SATELLITE
OBSERVATIONS - November 02, 2014
STATION DESCRIPTION BY MAPTECH INCORPORATED 2002 (CDP)
THE MARK IS ABOUT 76.03 MI SOUTHEAST OF NAPLES, ABOUT 24.41 MI WEST OF
WEST MIAMI IN DADE COUNTY, FLORIDA. OWNERSHIP – FLORIDA DEPARTMENT OF
TRANSPORTATION.
TO REACH THE MARK FROM THE INTERSECTION OF U.S. HIGHWAY 41 (TAMIAMI
TRAIL) AND THE FLORIDA TURNPIKE (ABOUT 5.25 MI WEST OF WEST MIAMI), GO
WEST ON U.S. HIGHWAY 41 (TAMIAMI TRAIL) 6.0 MI TO ITS INTERSECTION
WITH STATE ROAD 997, CONTINUE WEST ON U.S. HIGHWAY 41 12.48 MI TO
CONCRETE WEIR STRUCTURE S12D, CONTINUE WEST ON U.S. HIGHWAY 41 0.70 MI
TO THE MARK ON THE RIGHT.
THE MARK IS 52.0 FT EAST OF (PARELLEL WITH AND ACROSS THE HIGHWAY
FROM) ATT UNDERGROUND FIBER OPTIC WARNING SIGN NUMBER 1170, 33.5 FT
SOUTH OF THE SOUTH EDGE OF A CANAL, 33.0 FT NORTH OF THE CENTERLINE OF
THE HIGHWAY, AND 29.8 FT SOUTH OF A CARSONITE WITNESS POST. THE MARK
IS A DISK SET FLUSH IN THE TOP OF A CONCRETE MONUMENT RECESSED 25 FT
BELOW THE LEVEL OF THE GROUND AND ABOUT 3.0 FT BELOW THE HIGHWAY.
STATION RECOVERY NOTE BY GEOCACHING 2014 (KEN)
RECOVERED IN GOOD CONDITION 5 FT NORTH OF A 3-WIRE GUARD RAIL AND 30.1
FT SOUTH OF A SURVEY MARKER.
DESIGNATION - FCE 3888
PID - AC4775
STATE/COUNTY- FL/MIAMI-DADE
MARKER: SURVEY DISK
SETTING: SET IN TOP OF CONCRETE MONUMENT
STAMPING: FCE 3888 1980
MARK LOGO: USE
MAGNETIC: NO MAGNETIC MATERIAL
STABILITY: MAY HOLD, BUT OF TYPE COMMONLY SUBJECT TO SURFACE MOTION
SATELLITE: THE SITE LOCATION WAS REPORTED AS SUITABLE FOR SATELLITE
OBSERVATIONS - March 04, 1992
HISTORY - Date Condition Report By
HISTORY - 1980 MONUMENTED USE
HISTORY - 19920304 GOOD NGS
STATION DESCRIPTION BY NATIONAL GEODETIC SURVEY 1992
23.05 MI WESTERLY ALONG U.S. HIGHWAY 41 FROM THE POST OFFICE IN WEST
MIAMI, THENCE 6.50 MI NORTHERLY ALONG A ROAD ON TOP OF LEVEE NUMBER
67A, 30.8 FT EAST OF THE SOUTH END OF A TURN OUT, 24.3 FT SOUTHEAST OF
AND LEVEL WITH THE CENTER OF THE ROAD, 2.0 FT NORTHWEST OF A WITNESS
POST, AND THE MONUMENT IS FLUSH WITH THE GROUND SURFACE.
DESIGNATION - FCE 3889
PID - AC4776
STATE/COUNTY- FL/MIAMI-DADE
MARKER: SURVEY DISK SET IN TOP OF CONCRETE MONUMENT
STAMPING: FCE 3889 1980
MARK LOGO: USE
MAGNETIC: NO MAGNETIC MATERIAL
STABILITY: MAY HOLD, BUT OF TYPE COMMONLY SUBJECT TO SURFACE MOTION
SATELLITE: THE SITE LOCATION WAS REPORTED AS SUITABLE FOR SATELLITE
OBSERVATIONS - March 04, 1992
HISTORY - Date Condition Report By
23.05 MI WESTERLY ALONG U.S. HIGHWAY 41 FROM THE POST OFFICE IN WEST
MIAMI, THENCE 7.50 MI NORTHERLY ALONG A ROAD ON TOP OF LEVEE NUMBER
67A, 20.0 FT SOUTH OF THE NORTH END OF A TURN OUT, 16.1 FT SOUTHEAST
OF THE CENTER OF THE ROAD, 2.3 FT NORTHWEST OF A WITNESS POST, AND THE
MONUMENT IS FLUSH WITH THE GROUND SURFACE.
DESIGNATION - BUZZARD
PID - AC4421
STATE/COUNTY- FL/MIAMI-DADE
MARKER: TRIANGULATION STATION DISK SET IN TOP OF CONCRETE MONUMENT
STAMPING: BUZZARD 1971
MARK LOGO: CGS
PROJECTION:FLUSH
MAGNETIC: NO MAGNETIC MATERIAL
STABILITY: MAY HOLD, BUT OF TYPE COMMONLY SUBJECT TO SURFACE MOTION
SATELLITE: THE SITE LOCATION WAS REPORTED AS SUITABLE FOR SATELLITE
OBSERVATIONS - March 04, 1992
STATION DESCRIPTION BY NATIONAL GEODETIC SURVEY 1971 (NCA)
THE STATION IS 17 MI NORTHWEST OF SWEETWATER, 14.5 MI WEST OF HIALEAH
GARDENS, 7.5 MI NORTH OF U.S. HIGHWAY 41 AND ON PROPERTY OWNED BY THE
STATE.
TO REACH THE STATION FROM THE JUNCTION OF U.S. HIGHWAY 41 AND STATE
HIGHWAY 27 ABOUT 6.5 MI WEST OF SWEETWATER, GO WEST ON HIGHWAY 41 FOR
5.0 MILES TO COOPERTOWN BAIT AND TACKLE STORE AND A LARGE MICROWAVE
TOWER ON THE LEFT. CONTINUE WEST ON HIGHWAY 41 FOR 7.05 MILES TO A
SIDE ROAD RIGHT AT A CURVE IN THE HIGHWAY. TURN RIGHT AND GO NORTH ON
A GRAVELED ROAD FOR 0.5 MI TO A LOCKED METAL GATE. PASS THROUGH THE
GATE AND CONTINUE NORTH AND NORTHEAST ON A GRAVELED ROAD ATOP A LEVEE
FOR 7.6 MI TO A WIDE AREA ON THE LEVEE AND THE STATION ON THE LEFT AS
DESCRIBED.
STATION MARK, STAMPED BUZZARD 1971 IS A STANDARD DISK SET IN A ROUND
CONCRETE MONUMENT THAT IS FLUSH WITH THE GROUND SURFACE. IT IS 25 FT
NORTHWEST OF THE SOUTHEAST EDGE OF THE LEVEE, 18 FT NORTHWEST OF THE
CENTER OF THE LEVEE ROAD, 11 FT SOUTHEAST OF THE NORTHWEST EDGE OF THE
LEVEE AND 11 FT SOUTHEAST OF A METAL WITNESS POST.
NOTE--THE KEY NECESSARY TO ENTER CONSERVATION AREA 4 CAN BE OBTAINED
FROM THE FLORIDA FLOOD CONTROL.
STATION RECOVERY NOTE BY NATIONAL GEODETIC SURVEY 1992
23.05 MI WESTERLY ALONG U.S. HIGHWAY 41 FROM THE POST OFFICE IN WEST
MIAMI, THENCE 8.00 MI NORTHERLY ALONG A ROAD ON TOP OF LEVEE NUMBER
67A, 49.9 FT NORTHWEST OF THE CENTER OF THE ROAD, 38.4 FT NORTH OF
REFERENCE MARK 2, 3.3 FT SOUTHEAST OF A WITNESS POST, AND THE MONUMENT
IS FLUSH WITH THE GROUND SURFACE.
DESIGNATION - FCE 3890
PID - AC4779
STATE/COUNTY- FL/MIAMI-DADE
MARKER: SURVEY DISK SET IN A BOULDER
STAMPING: FCE 3890 1980
MARK LOGO: USE
MAGNETIC: NO MAGNETIC MATERIAL
STABILITY: MAY HOLD, BUT OF TYPE COMMONLY SUBJECT TO SURFACE MOTION
SATELLITE: THE SITE LOCATION WAS REPORTED AS SUITABLE FOR SATELLITE
OBSERVATIONS - March 04, 1992
HISTORY - Date Condition Report By
37.1 KM (23.05 MI) WESTERLY ALONG U.S. HIGHWAY 41 FROM THE POST
OFFICE IN WEST MIAMI, THENCE 13.6 KM (8.45 MI) NORTHERLY ALONG A ROAD
ON TOP OF LEVEE NUMBER 67A, 7.3 M (24.0 FT) SOUTHEAST OF THE CENTER
OF THE ROAD, 0.9 M (3.0 FT) NORTHWEST OF A WITNESS POST, AND THE
MONUMENT IS FLUSH WITH THE GROUND SURFACE.
DESIGNATION - FCE 3891
PID - AC4780
STATE/COUNTY- FL/MIAMI-DADE
MARKER: SURVEY DISK SET IN TOP OF CONCRETE MONUMENT
STAMPING: FCE 3891 1980
MARK LOGO: USE
MAGNETIC: NO MAGNETIC MATERIAL
STABILITY: MAY HOLD, BUT OF TYPE COMMONLY SUBJECT TO SURFACE MOTION
SATELLITE: THE SITE LOCATION WAS REPORTED AS SUITABLE FOR SATELLITE
OBSERVATIONS - March 04, 1992
HISTORY - Date Condition Report By
5.90 MI SOUTHERLY ALONG U.S. HIGHWAY 27 FROM THE JUNCTION OF EASTBOUND
INTERSTATE HIGHWAY 75 (ALLIGATOR ALLEY), THENCE 0.60 MI WESTERLY ALONG
STATE HIGHWAY 818 (GRIFFIN ROAD), THENCE 0.20 MI SOUTHWESTERLY ALONG A
PAVED ROAD THROUGH HOLIDAY PARK, THENCE 16.45 MI SOUTHWESTERLY ALONG A
ROAD ON TOP OF LEVEE NUMBER 67A, 23.6 FT SOUTHEAST OF THE CENTER OF
THE ROAD, 1.3 FT NORTHWEST OF A WITNESS POST, AND THE MONUMENT IS
FLUSH WITH THE GROUND SURFACE.
DESIGNATION - X 408
PID - AC4781
STATE/COUNTY- FL/MIAMI-DADE
MARKER: FLANGE-ENCASED STAINLESS STEEL ROD W/O SLEEVE (6.1 meters)
STAMPING: X 408 1992
MARK LOGO: NGS
PROJECTION:FLUSH
MAGNETIC: MARKER IS A STEEL ROD
STABILITY: PROBABLY HOLD POSITION/ELEVATION WELL
SATELLITE: THE SITE LOCATION WAS REPORTED AS SUITABLE FOR SATELLITE
OBSERVATIONS - March 03, 2015
HISTORY - Date Condition Report By
HISTORY - 1992 MONUMENTED NGS
HISTORY - 20050603 GOOD FLDEP
HISTORY - 20150303 GOOD USGS
STATION DESCRIPTION BY NATIONAL GEODETIC SURVEY 1992
5.90 MI SOUTHERLY ALONG U.S. HIGHWAY 27 FROM THE JUNCTION OF EASTBOUND
INTERSTATE HIGHWAY 75 (ALLIGATOR ALLEY), THENCE 0.60 MI WESTERLY ALONG
STATE HIGHWAY 818 (GRIFFIN ROAD), THENCE 0.20 MI SOUTHWESTERLY ALONG A
PAVED ROAD THROUGH HOLIDAY PARK, THENCE 15.65 MI SOUTHWESTERLY ALONG A
ROAD ON TOP OF LEVEE NUMBER 67A, 42.0 FT EAST-NORTHEAST OF THE SOUTH
END OF A TURN OUT, 23.0 FT SOUTHEAST OF THE CENTER OF THE ROAD, 3.3 FT
NORTHWEST OF A WITNESS POST, AND 1.0 FT BELOW THE LEVEL OF THE ROAD.
NOTE--ACCESS TO THE DATUM POINT IS THROUGH A 5-INCH LOGO CAP.
STATION RECOVERY NOTE BY US GEOLOGICAL SURVEY 2015 (CJW)
RECOVERED IN GOOD CONDITION.
FCE 4950
IN MIAMI DADE COUNTY, WEST OF MIAMI. FROM THE INTERSECTION OF US 41 AND KROME AVE. (SR 997), TRAVEL WEST 12.2 MILES TO STRUCTURE S-333. PROCEED NORTH 0.4 MILES TO YELLOW GATE (L-
67A CANAL). PROCEED EAST 0.1 MILE TO YELLOW GATE (L-67C), FROM SAID GATE PROCEED
NORTHEASTERLY 2 MILES TO MONUMENT.
MONUMENT LIES 235 FEET NORTH OF A TREE LINE, 17 FEET EAST OF THE CENTERLINE OF LEVEE, AND 25 FEET FROM THEINTERSECTION OF THE EAST TOP OF BANK OF LEVEE AND THE EAST TOP OF BANK OF A
GRAVEL ROAD.
MONUMENT IS A STANDARD USACE BRASS DISK SET IN AN 8 INCH CONCRETE MONUMENT FLUSH WITH
THE GROUND. DISK IS STAMPED “FCE 4950 2002, JAX DISTRICT.
FIELD BOOK “2002 DADE 521”.
FCE 4952
IN MIAMI DADE COUNTY, WEST OF MIAMI. FROM THE INTERSECTION OF US 41 AND KROME AVE. (SR 997), TRAVEL WEST 12.2 MILES TO STRUCTURE S-333. PROCEED NORTH 0.4 MILES TO YELLOW GATE (L-
67A CANAL). PROCEED EAST 0.1 MILE TO YELLOW GATE (L-67C), FROM SAID GATE PROCEED
NORTHEASTERLY 3 MILES TO MONUMENT.
MONUMENT LIES 17 FEET EAST OF THE CENTERLINE OF LEVEE, 4 FEET WEST OF THE EAST TOP OF BANK OF A GRAVEL ROAD, AND 23 FEET NORTH OF THE INTERSECTION OF THE EAST TOP OF BANK OFSAID
LEVEE AND EAST TOP OF BANK OF SAID GRAVEL RAMP.
MONUMENT IS A STANDARD USACE BRASS DISK SET IN AN 8 INCH CONCRETE MONUMENT FLUSH WITH
THE GROUND. DISK IS STAMPED “FCE 4952 2002, JAX DISTRICT.
FCE 4954
IN MIAMI DADE COUNTY, WEST OF MIAMI. FROM THE INTERSECTION OF US 41 AND KROME AVE. (SR 997), TRAVEL WEST 12.2 MILES TO STRUCTURE S-333. PROCEED NORTH 0.4 MILES TO YELLOW GATE (L-
67A CANAL). PROCEED EAST 0.1 MILE TO YELLOW GATE (L-67C), FROM SAID GATE PROCEED
NORTHEASTERLY 4 MILES TO MONUMENT.
MONUMENT LIES 19 FEET EAST OF THE CENTERLINE OF LEVEE, 2 FEET WEST OF THE EAST TOP OF FILL OF A GRAVEL ROAD, AND 34 FEET NORTH OF THE INTERSECTION OF THE EAST TOP OF LEVEE AND EAST
TOP OF FILL OF SAID GRAVEL RAMP.
MONUMENT IS A STANDARD USACE BRASS DISK SET IN AN 8 INCH CONCRETE MONUMENT FLUSH WITH
THE GROUND. DISK IS STAMPED “FCE 4954 2002, JAX DISTRICT.
FCE 4956
IN MIAMI DADE COUNTY, WEST OF MIAMI. FROM THE INTERSECTION OF US 41 AND KROME AVE. (SR 997), TRAVEL WEST 12.2 MILES TO STRUCTURE S-333. PROCEED NORTH 0.4 MILES TO YELLOW GATE (L-
67A CANAL). PROCEED EAST 0.1 MILE TO YELLOW GATE (L-67C), FROM SAID GATE PROCEED
NORTHEASTERLY 5 MILES TO MONUMENT.
MONUMENT LIES 16 FEET EAST OF THE CENTERLINE OF LEVEE, 3 FEET WEST OF THE EAST TOP OF FILL OF A GRAVEL ROAD, AND 59 FEET NORTH OF THE INTERSECTION OF THE EAST TOP OF LEVEE AND EAST
TOP OF FILL OF SAID GRAVEL RAMP.
MONUMENT IS A STANDARD USACE BRASS DISK SET IN AN 8 INCH CONCRETE MONUMENT FLUSH WITH
THE GROUND. DISK IS STAMPED “FCE 4956 2002, JAX DISTRICT.
FCE 4958
IN MIAMI DADE COUNTY, WEST OF MIAMI. FROM THE INTERSECTION OF US 41 AND KROME AVE. (SR 997), TRAVEL WEST 12.2 MILES TO STRUCTURE S-333. PROCEED NORTH 0.4 MILES TO YELLOW GATE (L-
67A CANAL). PROCEED EAST 0.1 MILE TO YELLOW GATE (L-67C), FROM SAID GATE PROCEED
NORTHEASTERLY 6 MILES TO MONUMENT.
MONUMENT LIES 35 FEET EAST OF THE CENTERLINE OF LEVEE, 2 FEET WEST OF THE EAST TOP OF FILL OF A GRAVEL RAMP, AND 11 FEET NORTH OF THE INTERSECTION OF THE EAST TOP OF LEVEE AND EAST
TOP OF FILL OF SAID GRAVEL RAMP.
MONUMENT IS A STANDARD USACE BRASS DISK SET IN AN 8 INCH CONCRETE MONUMENT FLUSH WITH
THE GROUND. DISK IS STAMPED “FCE 4958 2002, JAX DISTRICT.
FCE 4960
IN MIAMI DADE COUNTY, WEST OF MIAMI. FROM THE INTERSECTION OF US 41 AND KROME AVE. (SR 997), TRAVEL WEST 12.2 MILES TO STRUCTURE S-333. PROCEED NORTH 0.4 MILES TO YELLOW GATE (L-
67A CANAL). PROCEED EAST 0.1 MILE TO YELLOW GATE (L-67C), FROM SAID GATE PROCEED
NORTHEASTERLY 7 MILES TO MONUMENT.
MONUMENT LIES 11 FEET EAST OF THE CENTERLINE OF LEVEE, 3 FEET WEST OF THE EAST TOP OF FILL OF A GRAVEL RAMP, AND 41 FEET NORTH OF THE INTERSECTION OF THE EAST TOP OF LEVEE AND EAST
TOP OF FILL OF SAID GRAVEL RAMP.
MONUMENT IS A STANDARD USACE BRASS DISK SET IN AN 8 INCH CONCRETE MONUMENT FLUSH WITH
THE GROUND. DISK IS STAMPED “FCE 4960 2002, JAX DISTRICT.
FCE 4962
IN MIAMI DADE COUNTY, WEST OF MIAMI. FROM THE INTERSECTION OF US 41 AND KROME AVE. (SR 997), TRAVEL WEST 12.2 MILES TO STRUCTURE S-333. PROCEED NORTH 0.4 MILES TO YELLOW GATE (L-
67A CANAL). PROCEED EAST 0.1 MILE TO YELLOW GATE (L-67C), FROM SAID GATE PROCEED
NORTHEASTERLY 8 MILES TO MONUMENT.
MONUMENT LIES 14 FEET EAST OF THE CENTERLINE OF LEVEE, 33 FEET NORTH OF THE INTERSECTION OF THE EAST TOP OF LEVEE AND EAST TOP OF FILL OF A GRAVEL RAMP, SAID MONUMENT BEING 150
FEET NORTH OF THE CENTER OF A GRAVEL AREA.
MONUMENT IS A STANDARD USACE BRASS DISK SET IN AN 8 INCH CONCRETE MONUMENT FLUSH WITH
THE GROUND. DISK IS STAMPED “FCE 4962 2002, JAX DISTRICT.
SECTION 00 33 50
WEATHER, WATER STAGE AND TIDE DATA
CENTRAL EVERGLADES PLANNING PROJECT (CEPP)
SOUTH CONTRACT 1,
L-67A STRUCTURES (S-631, S-632, and S-633), SPOIL PILE REMOVAL AND L-67C GAP PROJECT
SECTION 00 33 50 WEATHER, WATER STAGE AND TIDE DATA
1. The below-stated water fluctuations are for informational purposes only and are not to be utilized in conjunction with any contract-related hydrographic surveying purposes as noted on the control drawing(s) of the contract plans. All elevations in this section are in feet, National Geodetic Vertical Datum of 1929 (feet, NGVD).
2. The Central Everglades Planning Project (CEPP) South Contract 1, Levee 67A (L-67A) is located in western Miami-Dade County, between Water Conservation Area 3A and 3B (WCA-3A and WCA-3B), west of Canal 111 (C-111), north of the Tamiami Trail (US-41) as indicated in the Plans and Specifications.
3. Water stages in the project area are mainly affected by rainfall, runoff, evapotranspiration, groundwater and the water management operation of the Central and Southern Florida (C&SF) Project structures. The structures in the project area, which are listed below, are operated by the U.S. Army Corps of Engineers (USACE) and South Florida Water Management District (SFWMD).
4. Structures 11A, 11B and 11C (S-11A, S-11B and S-11C, respectively) are reinforced concrete, gated spillways with the releases of each controlled by four vertical lift gates. The structures are located in Levee 38-W between WCA 2A and WCA 3A, upstream of the project area, about 20 miles west of Fort Lauderdale. The purpose of these three structures is to make releases via gravity from WCA-2A to WCA 3A. The structures operate according to the WCA-2A regulation schedule that varies seasonally from 11.0 to 13.0 feet, NGVD and may be found at the following link:
http://w3.saj.usace.army.mil/h2o/plots/wca2ahp.pdf.
5. Structure 151 (S-151) is a six-barreled corrugated metal pipe culvert located at the point where L-67A crosses the Miami Canal. This culvert has a design discharge of 1,105 cfs and is controlled by remotely operated sluice gates. S-151 is located within L-67A, approximately 20 miles west of Miami.
The purpose of S-151 is to release water from WCA-3A to South Miami-Dade County and along the Miami Canal to meet water supply needs and to release water into WCA-3B. S-151 also provides capacity for water releases through Structure 31 (S-31) to the east coast. S-151 is currently out of service, but is projected to return to service in Summer 2020. The new structure is a four eight by eight foot cast-in-place concrete box culvert and releases are controlled with single leaf slide gates.
6. Structure 340 (S-340) is a sheet pile barrier dam located across the Miami Canal (C-123) approximately 2.7 miles south of Alligator Alley (SR 84) with a design discharge of 1,100 cfs controlled by three manually-operated sluice gates. S-340 is located on C-123 upstream of the project area. The purpose of the structure is to prevent overdrainage of the northern portion of WCA-3A by forcing flows from C-123 out into the marsh. S-340 also provides the ability to transfer water to Everglades National Park (ENP), the Metropolitan Miami, and the South Dade County areas. The structure is closed most of the time, but may be opened fully in accordance with the WCA- 3A - Site 62 "Deer Gage" operations schedule. This schedule is governed primarily by the stage at Gage 62 (Deer Gage) and may be found at the following link: http://w3.saj.usace.army.mil/h2o/plots/st62hp.pdf.
7. Structure 152 (S-152) is a ten barreled, 60-inch diameter, high density polypropylene culvert located in the L-67A canal approximately 12.3 miles http://w3.saj.usace.army.mil/h2o/plots/wca2ahp.pdf http://w3.saj.usace.army.mil/h2o/plots/st62hp.pdf southwest of S-151. S-152 flow is controlled by manually-operated vertical slide gates and has a design discharge of 750 cfs. The purpose of S-152 is to move water from WCA-3A into WCA-3B. S-152 is meant to be a temporary structure constructed as part of the Decomp Physical Model (DPM) field test.
8. Structure 9 (S-9) is a three unit pump station with a design capacity of 2,880 cfs. S-9 is at the west end of Canal 11 in the alignment of
Levee 37, approximately 0.5 miles west of U.S. Highway 27 and consists of reinforced concrete and concrete block masonry superstructure. The purpose of the structure is to pump surplus water into WCA-3A via the South New River Canal from the Davie agricultural area west of control Structure 13A (S-13A) and to pump seepage under Levees 33 and 37 back into WCA-3A. at the rate of 3/4 inch per day from the tributary drainage area plus approximately the same quantity of seepage.
9. Structure 9A (S-9A) is a four unit pumping station with a design capacity of 500 cfs and is located just north of and directly adjacent to the S-9 Pump Station in Broward County. The purpose of S-9A is to improve the quality and timing of stormwater releases from the Western C-11 basin by back pumping seepage lost from WCA-3A back into WCA-3A. The use of the S-9A reduces the operational dependency placed on the larger S-9.
10. Structure 333 (S-333) is a reinforced concrete, gated spillway with releases controlled by one cable operated, vertical lift gate. The structure is located on L-67 at the southeast corner of WCA-3A and south of the project area about 30 miles west of Miami. The purpose of this structure is to make water deliveries from WCA-3A to south and east Miami-Dade County to Shark River Slough and Taylor Slough areas of the ENP.
11. Structures 12A, 12B, 12C and 12D(S-12A, S-12B, S-12C and S-12D, respectively) are reinforced concrete, gated spillways with the releases of each controlled by six vertical lift gates. The structures are located in Levee 29 (U.S. Highway 41) on the south perimeter of WCA-3A, southwest of the project area, approximately 30 miles west of Miami. The purpose of these four structures is to make releases from WCA-3A to ENP. The structures operate according to the WCA-3A regulation schedule that varies seasonally from 8.75 to 10.5 feet, NGVD and the Rain-driven Plan for Water Deliveries to Everglades National Park. These operational criteria are expected to change when the Combined Operating Plan (COP) is approved (currently estimated for Fall 2020).
12. Historical S-151 headwater elevations for the period of record from August 10, 1962 to April 27, 2020, were obtained from the SFWMD’s DBHYDRO site, and are provided in Figure 1. A maximum elevation of 13.02 feet, NGVD was recorded on December 23, 1994. SFWMD’s DBHYDRO site may be found at:
https://my.sfwmd.gov/dbhydroplsql/show_dbkey_info.main_menu.
13. Historical Site 71 gage elevations for the period of record from July 19, 1991 to April 26, 2020, were obtained from the SFWMD’s DBHYDRO site, and are provided in Figure 2. A maximum elevation of 9.76 feet, NGVD was recorded on October 16, 1999. SFWMD’s DBHYDRO site may be found at:
https://my.sfwmd.gov/dbhydroplsql/show_dbkey_info.main_menu.
14. All stage data provided in this Section 00 33 50 are provisional and subject to revision. In general, historic water levels and releases are not https://my.sfwmd.gov/dbhydroplsql/show_dbkey_info.main_menu https://my.sfwmd.gov/dbhydroplsql/show_dbkey_info.main_menu necessarily indicative of future water levels and releases. It is possible that historic water levels and releases will be exceeded during the contract period.
15. The contractor should not expect that water levels/flows will be manipulated for contractor. The contractor should not expect “no flow” or dry conditions during the contract period. The contractor may be able to obtain hydrometeorological data from the Jacksonville District, Water Management Section’s website, which can be found at:
https://www.saj.usace.army.mil/Missions/Civil-Works/Water-Management/ and also the SFWMD’s website which can be found at: https://www.sfwmd.gov.
16. It shall be the contractor's responsibility to obtain information concerning rain and wind. Reference is made to the National Oceanic and Atmospheric Administration (NOAA) publication entitled Local Climatological Data – Monthly Summary, which contains climatological and meteorological observations and data, including wind, rain, and temperature data for the project area. Subscription price and ordering information is available from the National Centers for Environmental Information, Federal Plaza, 151 Patton Avenue, Asheville, North Carolina 28801-5001. NOAA also has an internet information page at: http://www.ncdc.noaa.gov/.
17. The climate in the project area is subtropical and humid. The project area is subject to tropical storms and hurricanes from June through November and to windy and/or rainy weather during any time of the year. Temperatures below freezing are rare. May is generally a transitional month in which storms that typically occur in June through September may begin. The typical rainfall of October through May is associated with mid-latitude systems (fronts and low-pressure systems) and is distributed in a spatially uniform pattern. Typical June through September rainfall is closely associated with convective activity. These rainfall events are normally of short duration and amounts are quite variable spatially. Occasionally, daily rainfall during the typical rainfalls of October through May could be quite heavy as mid-latitude systems penetrate into Florida. Weather forecasts as well as actual rainfall information from the National Weather Service Miami-South Florida Forecast Office can be accessed at:
http://www.weather.gov/mfl/. The contractor may also obtain hydrometeorological data from the Jacksonville District, Water Management Section’s website, which can be found at:
https://www.saj.usace.army.mil/Missions/Civil-Works/Water-Management/ and the South Florida Water Management District’s (SFWMD) website which can be found at: https://www.sfwmd.gov.
18. Temporary deviations from the water management operating criteria for the above listed structures can be conducted from time to time. It is possible that historic water levels, historic releases, and design discharges will be exceeded from time to time. Historical hydrometeorological data is not necessarily indicative of future conditions.
The contractor should not expect that water levels and/or flows will be manipulated for the contractor. The contractor shall not attempt to operate any of the existing structures mentioned in this Section 00 33 50.
19. The following data are provided:
https://www.saj.usace.army.mil/Missions/Civil-Works/Water-Management/ https://www.sfwmd.gov/ http://www.ncdc.noaa.gov/ http://www.weather.gov/mfl/ https://www.saj.usace.army.mil/Missions/Civil-Works/Water-Management/ https://www.saj.usace.army.mil/Missions/Civil-Works/Water-Management/ https://www.sfwmd.gov/
MONTHLY ANTICIPATED ADVERSE WEATHER DELAY WORK DAYS
BASED ON 5-DAY WORK WEEK
The average number of days in each calendar month with precipitation greater than, or equal to 0.10 inches is provided for the project area in the following table. This information is based on data obtained from station Tamiami Trail 40 Mile Bend, located at latitude 25.7608 and longitude -80.8242. The data were obtained from Climatography of the United States No. 20 Monthly Station Climate Summaries for Florida, published by the National Climatic Data Center, NOAA, for the period of record 1981-2010.
The values in the table have been rounded to the nearest whole number.
Average Number of Days Per Month With
Precipitation >= 0.10 Inches
Gage Name Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Tamiami Trail 40 Mile Bend
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 REFERENCES
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
1.2.2 Location
1.2.3 Sequence Of Work
1.2.3.1 Phase 1
1.2.3.2 Phase 2
1.2.4 Safety Requirements
1.2.5 Work Performed by Others
1.3 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK
1.4 LIQUIDATED DAMAGES - CONSTRUCTION
1.5 PHYSICAL DATA
1.5.1 Physical Conditions
1.5.2 Weather, Water Stage and Tide Data
1.5.3 Contractor Investigation
1.5.4 Maritime Traffic
1.5.5 Obstruction of Channel (Canal)
1.6 LAYOUT OF WORK
1.6.1 Established Project Control
1.6.2 Layout
1.6.3 Survey
1.7 DAMAGE TO WORK
1.8 DAMAGE TO WORK -- COFFERDAM REQUIRED
1.9 EXISTING WORK
1.10 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER (31 OCT 1989)
1.10.1 Schedule of Monthly Anticipated Adverse Weather Delays
1.10.2 Contractor Responsibility
1.11 UNITS OF MEASURE
1.12 SOUTH FLORIDA WATER MANAGEMENT DISTRICT
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
-- End of Section Table of Contents --
SECTION 01 11 00 Page 1
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
GDR Section 00 31 32, Geotechnical Data Report for South Contract 1 - L 67 A Structures (S-631, S-632, & S-633) , Spoil Pile Removal, and L 67 C Gap for the Central Everglades Planning Project (CEPP)
EM 385-1-1 (2014) Safety and Health Requirements Manual
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
The Scope of Work for this project includes the construction of the following four items:
(A) Install three L 67 A levee structures; S-631, S-632, and S-633. Each structure location will have two 10 foot x 6 foot gated box culverts equipped with dewatering apparatus features. Each box culvert will have a vertical lift gate that can be operated remotely. Power for the lift gates will be provided by an on-site propane generator housed in a concrete building.
(B) Removal of the existing spoil piles directly to the northwest of the S-631 and S-632 structure locations on the opposite site of the L-67A canal, as indicated on the drawings.
(C) Excavate a 3000 foot gap within the L-67 C levee to convey water from WCA 3A to WCA 3B.
(D) Backfill the existing east-west agricultural ditch between the L 67 A and L 67 C levees. Backfill material will be generated on site by using the east-west agricultural ditch spoil pile located on the north side of the ditch. In addition, material from excavating the 3000 foot gap and spoil piles are other sources of backfill material.
Any excess excavated material will be disposed of along the L-67 Extension at the location shown in the contract drawings.
SECTION 01 11 00 Page 2
1.2.2 Location
The project is located in western Miami-Dade County, between WCA-3A and WCA-3B, west of L-30, north of the Tamiami Trail (US-41). The entrance to the project is from Tamiami Trail (US-41) and is approximately 18 miles west of State Road 821. The Contractor shall obtain access through South Florida Water Management District (SFWMD) gate by applying for a key permit at "http://my.sfwmd.gov/kpa/index.php". SFWMD point of contact is Ms. Christine Rock at crock@sfwmd.gov or (561) 682-2514. The Contractor is responsible for obtaining and complying with all requirements of State, County, and other jurisdictional agencies for permits and use."
1.2.3 Sequence Of Work
The contract is broken into construction phases: Phase 1 - S-633 Structure, and Phase 2 - S-631 and S-632. The sequence of the phases is mandatory.
The contractor shall complete the construction of the following items for each Phase:
1.2.3.1 Phase 1
A. Construct S-633 Structure and associated features. In this phase, the contractor has access to the six spoil piles as shown on C-14 and C-15 of the construction drawings. When the contractor is ready to remove the temporary earthen cofferdams, the material can be moved to S-631 and/or S-632.
B. Perform the required work on the 3000 foot L-67C Levee degrade.
C. Perform the required work for filling the Agricultural Ditch.
D. When S-633 is substantially completed, the contractor can begin phase 2 work.
1.2.3.2 Phase 2
A. Construct S-631 and S-632 Structures and associated features.
B. Dispose of all excess granular material as directed on Sheet G-05.
1.2.4 Safety Requirements
See Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS and EM 385-1-1 .
1.2.5 Work Performed by Others
See paragraph PROJECT COORDINATION of Section 01 30 00 ADMINISTRATIVE
PROCEDURES.
1.3 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK
a. Read this paragraph in conjunction with the Clause COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (FAR 52.211-10) of Section 00700 CONTRACT CLAUSES in Volume 1.
b. In addition to the above, the following shall apply: The time for completion does not include establishment of grass. Grass shall be
SECTION 01 11 00 Page 3 established not later than the time stated in the Clause COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (FAR 52.211-10) of Section 00700 CONTRACT CLAUSES in Volume 1 plus the time stated for the establishment of grass as set forth in the Section 32 92 23 SODDING.
1.4 LIQUIDATED DAMAGES - CONSTRUCTION
Refer to the Clause LIQUIDATED DAMAGES - CONSTRUCTION (FAR 52.211-12) of Section 00700 CONTRACT CLAUSES in Volume 1.
1.5 PHYSICAL DATA
Read this paragraph in conjunction with the Clause PHYSICAL DATA (FAR 52.236-4) of Section 00700 CONTRACT CLAUSES in Volume 1.
1.5.1 Physical Conditions
The indications of physical conditions on the drawings and in the specifications are the result of site investigations by surveys and/or by core borings. When the indicated physical conditions are the result of site investigations by core borings, the core boring logs and laboratory data are in Section 00 31 32 GEOTECHNICAL DATA REPORT and the core boring locations are shown on the drawings. Also, see the GDR for instructions concerning availability of core borings for inspection.
1.5.2 Weather, Water Stage and Tide Data
See Section 00 33 50 WEATHER, WATER STAGE AND TIDE DATA.
1.5.3 Contractor Investigation
Refer to the Clause SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (FAR 52.236-3) of Section 00700 CONTRACT CLAUSES in Volume 1.
1.5.4 Maritime Traffic
Canal traffic in the project area consists of pleasure and small recreational vessels of all types and sizes which can be accommodated by existing depths.
1.5.5 Obstruction of Channel (Canal)
The Government will not undertake to keep the channel (L-67A canal) free from vessels or other obstructions, except to the extent of such regulations, if any, as may be prescribed by the Secretary of the Army, in accordance with the provisions of Section 7 of the River and Harbor Act approved 8 August 1917. The Contractor will be required to conduct the work in such manner as to obstruct navigation as little as possible, and in case the Contractor's plant so obstructs the channel as to make difficult or endanger the passage of any vessels, said plant shall be promptly moved on the approach of any vessel to such an extent as may be necessary to afford a practicable passage. Upon completion of the work the Contractor shall promptly remove his plant, including ranges, buoys, piles, and other marks placed by him under the contract in navigable waters or on shore.
1.6 LAYOUT OF WORK
Read this paragraph in conjunction with the Clause LAYOUT OF WORK (FAR
SECTION 01 11 00 Page 4
52.236-17) of Section 00700 CONTRACT CLAUSES in Volume 1.
1.6.1 Established Project Control
The Government has established monuments along the work site(s). Each monument is represented in the contract drawings by a Designation and in most cases, an alphanumeric Permanent Identifier (PID). Information concerning the location and elevations can be found within the Survey Notes on the plan sheets. The Survey Notes for each included field survey will cite a particular survey number, and specify the control used to conduct that survey. Additional information is included in the Survey Notes that must be duplicated if an attempt to recreate the subject survey is desired.
See Section 00 31 21 CONTROL MONUMENT DESCRIPTIONS.
1.6.2 Layout
From the monuments, control data and elevations established by the Government, the Contractor shall complete the layout of the work and shall be responsible for all measurements that may be required for the execution of the work to the location and limit marks prescribed in the specifications or on the contract drawings, subject to such modifications as the Contracting Officer may require to meet changed conditions or as a result of necessary modifications to the contract work.
1.6.3 Survey
Provide equipment, tools, material, and all labor required in laying out any part of the work from the monuments, control data and elevations established by the Government. Maintain and preserve all stakes and other marks established by the Contracting Officer until authorized to remove them, and if such marks are destroyed by the Contractor or through his negligence, prior to their authorized removal, they may be replaced by the Contracting Officer, at their discretion, and the expense of replacement will be deducted from any amounts due or to become due the Contractor.
The Contracting Officer may require that work be suspended at any time when location and limit marks established by the Contractor are not reasonably adequate to permit checking of the work.
1.7 DAMAGE TO WORK
The responsibility for damage to any part of the permanent work shall be as set forth in Clause PERMITS AND RESPONSIBILITIES of Section 00700 CONTRACT CLAUSES in Volume 1. However, if, in the judgment of the Contracting Officer, any part of the permanent work performed by the Contractor is damaged by flood, earthquake, hurricane, or tornado, which damage is not due to the failure of the Contractor to take reasonable precautions or to exercise sound engineering and construction practices in the conduct of the work, the Contractor will make the repairs as ordered by the Contracting Officer and full compensation for such repairs will be made at the applicable contract unit or lump sum prices as fixed and established in the contract. If, in the opinion of the Contracting Officer, there are no contract unit or lump sum prices applicable to any part of such work, an equitable adjustment pursuant to Clause CHANGES of Section 00700 CONTRACT CLAUSES in Volume 1 will be made as full compensation for the repairs of that part of the permanent work for which there are no applicable contract unit or lump sum prices. Except as herein provided, damage to all work (including temporary construction), SECTION 01 11 00 Page 5 utilities, materials, equipment and plant shall be repaired to the satisfaction of the Contracting Officer at the Contractor's expense, regardless of the cause of such damage.
1.8 DAMAGE TO WORK -- COFFERDAM REQUIRED
a. The responsibility for damage to any part of the work to be performed under this contract shall be as set forth in Clause PERMITS AND RESPONSIBILITIES of Section 00700 CONTRACT CLAUSES in Volume 1.
However, if the cofferdam(s) is constructed in accordance with plans and progress schedules approved by the Contracting Officer, but is overtopped by flood and such flood causes damage to the cofferdam or if any part of the permanent work is damaged by flood, earthquake, hurricane, or tornado, which damage is not due to the failure of the Contractor to take reasonable precaution or to exercise sound engineering and construction practices in the conduct of the work, the Contractor will make the repairs ordered by the Contracting Officer.
The Contractor shall be compensated for any such repairs in accordance with the Clause CHANGES of Section 00700 CONTRACT CLAUSES in Volume
1. The equitable adjustment shall be based on the contract unit or lump sum prices applicable to any part of the damaged work.
b. The Contractor may, subject to approval of the Contracting Officer, or the Contracting Officer may order the Contractor to, flood or breach the cofferdam during a rise prior to, and in anticipation of, natural flooding due to overtopping. Such flooding or breach will be considered the same as though the cofferdam, if constructed in accordance with plans and progress schedules approved by the Contracting Officer, had been overtopped, in which event an equitable adjustment will be made for damages to the cofferdam and/or any part of the permanent work, as provided in subparagraph a. above.
1.9 EXISTING WORK
In addition to FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.
1.10 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER (31 OCT 1989)
This provision specifies the procedure for the determination of time extensions for unusually severe weather in accordance with the Clause DEFAULT (FIXED-PRICE CONSTRUCTION) of Section 00700 CONTRACT CLAUSES in Volume 1. In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:
a. The weather experienced at the project site during the contract period must be found to be unusually severe; that is, more severe than the adverse weather anticipated for the project location during any given month.
SECTION 01 11 00 Page 6
b. The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the Contractor.
1.10.1 Schedule of Monthly Anticipated Adverse Weather Delays
The schedule of monthly anticipated adverse weather delays is based upon National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The Contractor's progress schedule must reflect these anticipated adverse weather delays in all weather dependent activities.
See Section 00 33 50 WEATHER, WATER STAGE AND TIDE DATA to obtain MONTHLY
ANTICIPATED ADVERSE WEATHER DELAY WORK DAYS BASED ON 5-DAY WORK WEEK. A
reasonable number of anticipated weather delay work days is obtained from the average number of days per month with precipitation greater than that indicated in Section 00 33 50 WEATHER, WATER STAGE AND TIDE DATA rounded to the nearest whole number.
1.10.2 Contractor Responsibility
Upon acknowledgment of the Notice to Proceed (NTP) and continuing throughout the contract, the Contractor will record on the daily CQC report the occurrence of adverse weather and resultant impact to normally scheduled work. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more of the Contractor's scheduled work day. The number of actual adverse weather delay days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), be calculated chronologically from the first to the last day of each month, and be recorded as full days. If the number of actual adverse weather delay days exceeds the number of days anticipated in Section 00 33 50 WEATHER, WATER STAGE AND TIDE DATA (rounded to the nearest whole number), the Contracting Officer will convert any qualifying delays to calendar days, giving full consideration for equivalent fair weather work days, and issue a modification in accordance with the Clause DEFAULT (FIXED PRICE CONSTRUCTION) of Section 00700 CONTRACT CLAUSES in Volume 1.
1.11 UNITS OF MEASURE
The standard U.S. system of measure may be utilized by the Contractor in the performance of his work. All survey records, official documentation, engineering data, and all correspondence, including any submittals and shop drawings, shall clearly denote which system of measure is being utilized, referenced or discussed. Any omission, unprofessional or inaccurate use of a unit of measure on the part of the Contractor shall not relieve him of his responsibilities under the contract terms. The unit of measure used in this specification is the standard U.S. system.
If no unit of measure is indicated on the drawing such as on ranges, stations, slope elevations, and distance numbers, then they are to be considered the standard U.S. system.
1.12 SOUTH FLORIDA WATER MANAGEMENT DISTRICT
It is understood and agreed by the parties hereto that the project works being performed under this contract are for the benefit of the South Florida Water Management District, which agency, as the representative of the State of Florida, is responsible for acquisition of lands upon which the construction is to take place. This responsibility is pursuant to authorizing legislation of the Congress of the United States of America.
SECTION 01 11 00 Page 7
It is clearly understood that the project works to be constructed herein, upon completion, will be turned over to that agency for operation and maintenance as part of the Government's project agreement obligation.
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
-- End of Section --
SECTION 01 11 00 Page 8
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 SUMMARY
1.2 RESIDENT MANAGEMENT SYSTEM (RMS)
1.2.1 Definition
1.2.2 Instructions
1.3 SUBMITTALS
1.4 JOB PAYMENT ITEMS
1.4.1 Site Signage (Line Item 0001)
1.4.2 Traffic Control (Line Item 0004)
1.4.3 Environmental and Turbidity Monitoring (Line Item 0005)
1.4.4 Dewatering (Line Item 0008, 0032 & 0056)
1.4.5 Temporary Sheet Pile Cutoff Wall (Line Item 0012, 0036 & 0060)
1.4.6 Mud Mat(Line Item 0013, 0037 & 0061)
1.4.7 Structure Reinforced Concrete (Line Item 0014, 0038 & 0062)
1.4.8 Vertical Slide Gate with Actuator (Mechanical & Manual) (Line
Item 0015, 0039 & 0063)
1.4.9 Stilling Wells (Line Item 0016, 0040 & 0064)
1.4.10 Embedded Metals (Line Item 0017, 0041 & 0065)
1.4.11 Miscellaneous Metals, Guardrails & Posts (Line Item 0018, 0042 & 0066)
1.4.12 Control Building (Line Item 0022, 0046 & 0070)
1.4.13 Propane Gas System and Generator (Line Items 0023, 0047 &
0071)
1.4.14 Electrical and Telecommunications Work and Equipment for each
Structure (Line Item 0027, 0051 & 0075)
1.4.15 Erosion Protection & Sediment Control (Line Item 0028, 0052, 0076, 0080, 0083 & 0087)
1.4.16 Floating Debris Barrier (Line Item 0029, 0053 & 0077)
1.5 UNIT PRICE PAYMENT ITEMS
1.5.1 Contracting Officer's Field Office (Line Item 0002)
1.5.1.1 Payment
1.5.1.2 Measurement
1.5.1.3 Unit of Measure
1.5.2 Partnering Regroup (Line Item 0003)
1.5.2.1 Payment
1.5.2.2 Measurement
1.5.2.3 Unit of Measure
1.5.3 Clearing, Grubbing and Stripping (Line Item 0006, 0030, 0054, 0078, 0081 & 0084)
1.5.3.1 Payment
1.5.3.2 Measurement
1.5.3.3 Unit of Measure
1.5.4 Earthen Cofferdams (Line Item 0007, 0031, & 0055)
1.5.4.1 Payment
1.5.4.2 Measurement
SECTION 01 22 00 Page 1
1.5.4.3 Unit of Measure
1.5.5 Excavation (Line Item 0009, 0033, 0057, 0079, 0082 & 0085)
1.5.5.1 Payment
1.5.5.2 Measurement
1.5.5.3 Unit of Measure
1.5.6 Rock Excavation (Line Item 0010, 0034 & 0058)
1.5.6.1 Payment
1.5.6.2 Measurement
1.5.6.3 Unit of Measure
1.5.7 Concrete Filling of Voids(Line Item 0011, 0035 & 0059)
1.5.7.1 Payment
1.5.7.2 Measurement
1.5.7.3 Unit of Measure
1.5.8 Bedding Stone and Geotextile(Line Item 0019, 0043 & 0067)
1.5.8.1 Payment
1.5.8.2 Measurement
1.5.8.3 Unit of Measure
1.5.9 Rip Rap (Line Item 0020, 0044 & 0068)
1.5.9.1 Payment
1.5.9.2 Measurement
1.5.9.3 Unit of Measure
1.5.10 Embankment Fill (Line Item 0021, 0045 & 0069)
1.5.10.1 Payment
1.5.10.2 Measurement
1.5.10.3 Unit of Measure
1.5.11 # 57 Stone (Line Item 0024, 0048 & 0072)
1.5.11.1 Payment
1.5.11.2 Measurement
1.5.11.3 Unit of Measure
1.5.12 Limerock Surface (Line Item 0025, 0049 & 0073)
1.5.12.1 Payment
1.5.12.2 Measurement
1.5.12.3 Unit of Measure
1.5.13 Topsoil and Sod (Line Item 0026, 0050 & 0074)
1.5.13.1 Payment
1.5.13.2 Measurement
1.5.13.3 Unit of Measure
1.5.14 Common Fill (Line Item 0086)
1.5.14.1 Payment
1.5.14.2 Measurement
1.5.14.3 Unit of Measure
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION
3.1 PAYMENT PROCEDURES
3.1.1 Requesting Progress Payment
3.1.2 Options and Modification CLINS
-- End of Section Table of Contents --
SECTION 01 22 00 Page 2
SECTION 01 22 00
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 SUMMARY
This section describes how Line Items will be measured and paid for when making progress payments. Work to be measured is described in specification sections listed for each Line Item. Measurement procedures for payment, required quantity survey or procurement documentation and payment restrictions are described in applicable specification sections.
Allocate costs for work not specifically mentioned to the Line Item most closely associated with work involved. Unless there is a specific Line Item for administrative costs, such as Quality Control and Safety, allocate such costs proportionally across all Line Items.
1.2 RESIDENT MANAGEMENT SYSTEM (RMS)
1.2.1 Definition
The terms Contract Line Item Number (CLIN) and Line Item are interchangeable herein (e.g.: CLIN 0001 is Line Item 0001). The term CLIN is a contracting term used in the Resident Management System (RMS) payment data base.
1.2.2 Instructions
See Section 01 45 00 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM) for more information on CLINs, schedule of values of pay activities and construction schedule, and payment procedures. The Contractor mode user manual with in-depth instructions can be downloaded from the RMS web site indicated in Section 01 45 00 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE
(RMS CM).
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Transmit submittal items in accordance with Section 01 33 00 SUBMITTAL PROCEDURES. Submit the following preconstruction submittal items no later than 30 calendar days after Notice to Proceed:
SD-01 Preconstruction Submittals
Schedule of Values ; G, RO
SD-07 Certificates
Request for Progress Payment ; G, RO
SECTION 01 22 00 Page 3
1.4 JOB PAYMENT ITEMS
Payment items for the work of this contract for which contract lump sum payments will be made are listed in the LINE ITEMS AND PRICING SCHEDULE with the unit JOB and described below.