CA NPS SEKI 10(12A) Generals Highway Hazard Tree Removal

Closed Solicitation Posted

Solicitation number
6982AF20B000033
Agency
Federal Highway Administration Department of Transportation
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
113310 Logging
PSC
F099 Natural Resources/Conservation- Other
Place of performance
Ca Usa

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks hazard tree removal services along Generals Highway in Sequoia and Kings Canyon National Park. The project includes removing hazard trees within 30 feet of the roadway along a 1.26 mile stretch from the "wye" intersection near Wilsonia east. There are also two options to extend the project up to an additional 1.48 miles. Trees will be grouped into four size ranges and some over 30 feet can remain after felling. The Department of Transportation Federal Highway Administration seeks these services with responses due by August 26, 2020.

This is a total small business set-aside. The project involves removing 354 trees under Schedule A, with options to add up to 225 more trees for a potential total of 579 across 2.74 miles. Bids were received between $504,408-550,909 with the engineer's estimate at $760,000. Performance will be in Sequoia and Kings Canyon National Parks, California.

Notice text

PROJECT NUMBER: CA NPS SEKI 10(12A)

PROJECT NAME: Generals Highway Hazard Tree Removal

PROJECT DESCRIPTION:  This project includes the removal of hazard trees along Generals Highway in Sequoia and Kings Canyon National Park from the “wye” intersection near Wilsonia east along the General’s Highway. The project has one Schedule and two Options, Schedule A contains tree felling from the “wye” proceeding east for 1.26 miles, Option X contains tree felling for an additional 0.65 miles proceeding east or 1.91 miles total and Option Y contains tree felling for an additional 0.83 miles proceeding east or 2.74 miles total.  The Project is within the limits of the SEKI 10(12) Roadway project currently under construction. 

SIGNIFICANT QUANTITIES: Tree removals are grouped by four ranges in size (4” to 10”, 10” to 24”, 24” to 40”, and greater than 40”), trees greater than 30 feet can be left in place after felling, trees within 30 feet of the road are to be removed.  Schedule A includes tree removals for 354 trees, Option X includes 118 additional trees or 472 total and Option Y includes 107 additional trees or 579 total.

This is a total small business set-aside.

Attachments

Files attached to this notice, newest first
File Type Posted
Bid Opening Summary.pdf PDF
QnA 8.25.2020.pdf PDF
A002.pdf PDF
Amendment A001.pdf PDF
QnA 8.5.2020.pdf PDF
CA NPS SEKI 10(12A) Plans_Final.pdf PDF
6982AF20B000033.pdf PDF

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
CA NPS SEKI 10(12A) Generals Highway Hazard Tree Removal This notice · Latest solicitation Solicitation
CA NPS SEKI 10(12A) Generals Highway Hazard Tree Removal Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity