Amendment A001.pdf
PDF 2 MB Posted
- Attached to
- CA NPS SEKI 10(12A) Generals Highway Hazard Tree Removal Federal contract opportunity
- Solicitation number
- 6982AF20B000033
About this file
This document contains an amendment and related federal contract opportunity. Amendment A001 provides revisions to pages E-21 of solicitation 6982AF20B000033 for the Generals Highway Hazard Tree Removal project within Sequoia and Kings Canyon National Parks. The project includes removal of hazard trees along Generals Highway from the "wye" intersection near Wilsonia east for up to 2.74 miles depending on the option selected. Tree removals are grouped into four size ranges and some trees over 30 feet can be left in place after felling. Schedule A includes removal of 354 trees over 1.26 miles, Option X adds 118 trees over 0.65 additional miles, and Option Y adds 107 trees over 0.83 more miles. The total number of trees under the full project scope is estimated at 579. This opportunity is a total small business set-aside being administered by the Federal Highway Administration.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Opening Summary.pdf | ||
| QnA 8.25.2020.pdf | ||
| A002.pdf | ||
| QnA 8.5.2020.pdf | ||
| CA NPS SEKI 10(12A) Plans_Final.pdf | ||
| 6982AF20B000033.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
E-21
CA NPS SEKI 10(12A)
Generals Highway Hazard Tree Removal construction.
Notes:
1. Peak Season is defined as the Monday prior to Easter Sunday to the Friday following Easter Sunday, as well as the Monday one week prior to the Memorial Day holiday through the Friday following Labor Day.
- No work between 5pm Fri and 9pm Sun without prior approval of the CO.
Submit request for weekend work 14 days in advance.
2. Off-Peak Season is defined as the portion of the calendar year not included in the peak season, as defined above.
- No work allowed from 5pm Fri and 9pm Sun without prior approval of the CO.
Submit request for weekend work 14 days in advance.
Section 202. — ADDITIONAL CLEARING AND GRUBBING
202.07 Removal of Individual Trees or Stumps. Add the following:
Fell and/or remove designated trees at the locations shown in the plans and as directed by the CO. Stump removal is not required. Fell and remove designated trees within 30 feet of the roadway edge of pavement. Protect existing asphalt and utilities by use of bumper logs if a fall is directed towards the road. Down trees outside of 30 feet from the pavement edge to be left onsite with limbs lopped and scattered or chipped. Slash to be lopped to no greater than 24 inches in length and distributed so as not to accumulate a depth of 12 inches or greater.
Flush cut stumps to 6” from the ground.
Assume 5% of snags shall be cut “high stumping” to 10’-0” to 12’-0” above finish grade for Pacific Fisher dens. Specific snags will be coordinated, identified and marked by NPS staff prior to construction.
Treat all remaining conifer stumps 8 inches in diameter or greater with liquid disodium octaborate tetrahydrate to prevent the spread of fungus.
Section 622. — RENTAL EQUIPMENT
Description
622.01 Add the following:
It is anticipated that equipment hours will be used to pay for roadway cleanup activities as directed by the CO.
Amendment A001
| topmostSubform[0]: |
| Page1[0]: |
| AmendmentNo[0]: A001 |
| Code[0]: 6905001 |
| Code[1]: |
| AccountingData[0]: |
| A13[0]: |
| C13[0]: |
| D13[0]: |
| NameandTitleSigner[0]: |
| NameandTitleOfficer[0]: |
| Description[0]: SECTION E |
Remove and replace page E-21 with the attached corresponding page.
*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.)
| FacilityCode[0]: |
| Code[2]: |
| IssuedBy[0]: FEDERAL HIGHWAY ADMINISTRATION |
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENUE, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION: RYAN PHILLIPS
| NameandAddress[0]: |
| AdministeredBy[0]: |
| ContractIDCode[0]: |
| ReqNumber[0]: |
| AmendmentNo[1]: 6982AF20B000033 |
| ModificationNo[0]: |
| ProjectNo[0]: CA NPS SEKI 10(12A) |
| Page[0]: 1 |
| Pages[0]: 2 |
| EffectiveDate[0]: 08/10/2020 |
| Dated9B[0]: 7/27/2020 |
| Dated10B[0]: |
| CheckBox9[0]: 1 |
| CheckBox10[0]: Off |
| CheckBox11[0]: 1 |
| CheckBox13A[0]: Off |
| CheckBox13B[0]: Off |
| CheckBox13C[0]: Off |
| CheckBox13D[0]: Off |
| IsNot[0]: Off |
| Is[0]: 1 |
| Extended[0]: Off |
| NotExtended[0]: 1 |
| DateSigned[0]: |
| DateSigned[1]: |
| Copies[0]: 0* |
| CopiesReturned[0]: *See Item 14 |
File details come from the government source that posted it. Updated .