About this opportunity
This pre-solicitation notice is seeking hazard tree removal services along Generals Highway in Sequoia and Kings Canyon National Parks. The Department of Transportation Federal Highway Administration will procure these services to promote safety along the roadway. The contractor will be required to fell and remove trees between 4-40 inches in diameter within 30 feet of the road, leaving some larger trees in place. The work is divided into Schedule A and two Options extending the work area. Evaluation will consider total tree removal quantities by diameter range and distance from the road. No other dates are provided in the pre-solicitation.
This will be a total small business set-aside. Schedule A work involves removal of 354 trees while Options X and Y add 118 and 107 trees respectively for potential totals of 472 and 579 trees. The project value is estimated between $500,000 to $1,000,000. Key numerical details include tree removal quantities grouped by diameter and distance from the road along 1.26 miles for Schedule A and additional 0.65 and 0.83 mile stretches for the Options.
Notice text
THIS IS NOT AN INVITATION FOR BID. PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.
PROJECT NUMBER: CA NPS SEKI 10(12A)
PROJECT NAME: Generals Highway Hazard Tree Removal
PROJECT DESCRIPTION: This project includes the removal of hazard trees along Generals Highway in Sequoia and Kings Canyon National Park from the “wye” intersection near Wilsonia east along the General’s Highway. The project has one Schedule and two Options, Schedule A contains tree felling from the “wye” proceeding east for 1.26 miles, Option X contains tree felling for an additional 0.65 miles proceeding east or 1.91 miles total and Option Y contains tree felling for an additional 0.83 miles proceeding east or 2.74 miles total. The Project is within the limits of the SEKI 10(12) Roadway project currently under construction.
SIGNIFICANT QUANTITIES: Tree removals are grouped by four ranges in size (4” to 10”, 10” to 24”, 24” to 40”, and greater than 40”), trees greater than 30 feet can be left in place after felling, trees within 30 feet of the road are to be removed. Schedule A includes tree removals for 354 trees, Option X includes 118 additional trees or 472 total and Option Y includes 107 additional trees or 579 total.
The project is estimated to be between $500,000 to $1,000,000.
This will bet set-aside for small business concerns.
Notice history
| Notice | Type | Posted |
|---|---|---|
| CA NPS SEKI 10(12A) Generals Highway Hazard Tree Removal | Solicitation | |
| CA NPS SEKI 10(12A) Generals Highway Hazard Tree Removal | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity