Bldg 1100 New Windows, Doors, and Exterior Wall Repair

Closed Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest special notice from .

Solicitation number
FA489724RC003
Agency
Responses due
Set-aside
Woman-Owned Small Business

Opportunity facts

Place of performance
Mountain Home AFB, Idaho 83648, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Air Force Air Combat Command is issuing a two-step sealed bid solicitation for the acquisition of updated windows, doors, and exterior wall repair at the Vehicle Maintenance Shop, Building 1100 at Mountain Home Air Force Base, Idaho. The project scope involves the demolition of existing and installation of new pedestrian doors and windows, as well as repair and finishing of exterior CMU walls. Technical proposals are due by May 3, 2024, and will be evaluated on the offeror's technical approach and compliance with the requirements outlined in the Statement of Work. The government may request additional information from offerors whose proposals are reasonably susceptible of being made acceptable.

This solicitation is set-aside for women-owned small businesses under NAICS code 236220, with a small business size standard of $45 million. The magnitude of construction is estimated between $500,000 and $1,000,000, and the period of performance is 120 calendar days after notice to proceed. Only offerors with technically acceptable proposals from the first step will be invited to submit priced bids in the second step of the two-step sealed bid process, which will be awarded on a low bid basis.

Notice text

6 versions

Update #6 · Latest ·

Amendment 03

This amendment incorporates the following changes:

1.  Added contractor questions and answers, "Attch 11 - B100 Windows Doors and Wall RFIs - 2May24"

2.  Technical Proposal Due Date changed to 10 May 2024 at 1200 MDT from 03 May 2024 at 1200 MDT

Amendment 02

This amendment clarifies important information to the offerors regarding the Step 2 expected issue due and subsequent IFB due date. See Part I General Information, Step-two Issue Date.

Amendment 01

This amendment incorporates the following changes: 

  1. Additional information regarding the estimated issue date of step two, Invitation for Bids. See Part I, Step-two Issue Date.
  2. A statement requiring the electronic submission of technical proposals. See Part II, Instructions to Offerors.
  3. A statement considering non-conforming technical proposals to be considered nonresponsive. See Part II paragraph 2, Written Technical Proposals.
  4. Updated site visit requirements to include submission of the Driver's License State of Issue. See Part II paragraph 3.
  5. Updated site visit requirements to limit the number of attendees per offeror. See Part II paragraph 3.
  6. Significant changes to the Evaluation Criteria - added several essential elements of the Technical Factor. See Part III.
  7. Added attachment 10, 1_01 57 19 Temporary Environmental Controls_MHAFB Env Spec 20220614.

11 April 2024

Two-Step Sealed Bid Solicitation

Windows, Doors & Paint - Vehicle Maintenance Shop, B1100

Step 1: Request for Technical Proposals

FA489724RC003

Pursuant to Federal Acquisition Regulation (FAR) 14.5, this document is a Request for Technical

Proposals (RTP), step one of a two-step sealed bid solicitation for the acquisition of updated Windows, Doors & Paint for the Vehicle Maintenance Shop, B1100 on Mountain Home AFB, ID.

Required components of technical proposals are outlined in Part III of this document. Offerors should submit technical proposals that are acceptable without additional explanation or information. The Government may make a final determination regarding a proposal’s acceptability solely on the basis of the proposal as submitted. The Government may proceed with the second step without requesting further information from any offeror; however, the Government may request additional information from offerors of proposals that it considers reasonably susceptible of being made acceptable and may discuss proposals with their offerors.

Each offeror may submit multiple technical proposals, though a maximum of one proposal per offeror may be chosen by the Government for step two of the two-step sealed bid process. Offerors are cautioned against submitting multiple technical proposals that have large differences in prices between them, since step two will be awarded on a low bid basis.

The Government will forward a notice of unacceptability to an offeror when, upon completion of the proposal evaluation, there is a final determination of unacceptability. This will be done in accordance with the dates outlined in Part I below.

In the second step of this two-step sealed bid solicitation process, only those offerors whose technical proposals were determined to be acceptable, either initially, or as a result of discussions, will be considered for award and allowed to place priced bids. Bids in the second step will be evaluated based on price. Each bid in the second step must be based on the bidder’s own technical proposals.

This document is organized into the following parts:

  • Part I    General Information
  • Part II   Instructions to Offerors
    1. Cover Letter
    2. Requirements of the technical proposal
    3. Site Visit Attendance and Base Access Information
    4. Question Due Dates
    5. Bid guarantee (Step 2)
  • Part III  Evaluation Criteria
  • Part IV Attachments

Part I   General Information

Description:                             Windows, Doors & Paint - Vehicle Maintenance Shop, B1100

Project Scope:                          The Government is seeking a qualified, experienced, woman-owned small business to replace  Windows, Doors, and Paint at the Vehicle Maintenance Shop, B1100 at Mountain Home AFB, Idaho. This project involves the demolition of existing and installation of new pedestrian doors and windows, as well as repair and finishing of exterior CMU walls in accordance with the Statement of Work.

Project Duration:                      120 calendar days after NTP

Magnitude of Construction:       Between $500,000 and $1,000,000.

Acquisition Method:                 Two-Step Sealed Bid

Set-Aside Type:                        Women-Owned Small Businesses

NAICS:                                         236220

Small Business Size Standard:   $45M

Solicitation Number:                 FA489724RC003

Step-one Issue Date:                 03 April 2024

Site Visit Date:                            18 April 2024 at 1000 MDT

Technical Proposals Due:          10 May 2024 at 1200 MDT

Step-two Issue Date:                 To be determined after review of technical proposals received in step one. Review of technical proposals will be dependent on the number of proposals received but is not expected to take more than two weeks. The Step Two Invitation for Bid issue date is anticipated to be released 10 May 2024 with a two-week solicitation period (i.e. if the IFB is released on 10 May 2024, bids will be due 24 May 2024.) Offerors invited to step two will be permitted a second site visit to aid in building their priced bids if requested 24 hours in advance.

Primary Point of Contact:          JEREMIAH L. BURNS, SSgt, USAF

                                                  Contracting Officer, 366 Financial Acquisition Squadron

                                                  Mountain Home AFB, Idaho

                                                  jeremiah.burns.1@us.af.mil

Secondary Point of Contact:      MATTHEW L. FOX, SSgt, USAF

                                                  Contract Specialist, 366 Financial Acquisition Squadron

                                                  Mountain Home AFB, Idaho

                                                  matthew.fox.19@us.af.mil

Part II    Instructions to Offerors

Technical proposals must be submitted electronically to the contacts listed above by the technical proposal due date and shall include, at a minimum:

1. Cover letter.

Provide an introductory page to include company name, small business type classification (offerors must be certified WOSB registered under NAICS 236220), CAGE Code, SAM UEI Number, points of contact, authorized negotiators, contact phone, and email addresses. Cover letter shall also acknowledge all amendments issued.

2. Written technical proposal.

Technical proposals shall include only technical information. Proposals shall not include pricing information or cost breakdowns. The written technical proposal shall be clear, concise, and include all the information in sufficient detail for effective evaluation. The proposal should not simply rephrase or restate the Government’s requirements, but rather shall provide convincing rationale to address how the offeror intends to meet these requirements. Offerors shall assume the Government has no prior knowledge of their capabilities, work processes, facilities, and experience and will base its evaluation on the information presented in the offeror’s technical proposal. Any proposal which modifies or fails to conform to the essential requirements or specifications of this request for technical proposals shall be considered nonresponsive and categorized as unacceptable.

3. Site visit attendance and base access information.

A pre-proposal site visit will be held on 18 April 2024 at 1000. Offerors must submit full names, driver’s license numbers and state of issue, company name, and vehicle type (personal or commercial vehicle) of all attendees to the contracting officer and contract specialist no later than 1200 MDT on 17 April 2024. Personal vehicles will be permitted to enter the main visitor’s gate, but commercial vehicles will be redirected to the commercial vehicle gate. It is important the contracting officer knows what type of vehicle your attendee(s) will be driving so that base access can be properly coordinated. No more than three (3) attendees per offeror may be permitted.

4. Questions.

All questions to this RTP, including questions arising from the contractor site visit, must be submitted to both the contracting officer and contract specialist no later than close of business on 19 April 2024. There is no preferred format or document required to submit questions.

5. Bid guarantee.

Offerors who are invited to submit a priced bid during Step 2 of this two-step sealed bidding will be required to furnish a bid guarantee IAW FAR 28.101-1(a). Bid guarantees are not required for the Request for Technical Proposals step of this solicitation.

Part III   Evaluation Criteria

This acquisition will be evaluated IAW FAR Part 14.

1. Technical Factor.

As used in this context, the word "technical" has a broad connotation and includes, among other things, the engineering approach, special manufacturing processes, and special testing techniques.

Each offeror’s written technical proposal shall be evaluated to determine if the offeror provides a sound, compliant approach that meets the requirements of the Statement of Work and demonstrates a thorough knowledge and understanding of those requirements and their associated risks. If no risks/mitigations are  identified in the offeror’s proposal, it indicates the offeror does not consider there to be any risk associated with their proposed approach. Offerors should submit technical proposals that are acceptable without additional explanation or information. Technical proposals will be evaluated based on the following essential elements:

      A. Technical Proficiency – Clearly demonstrate your team’s expertise and qualifications related to the project.

      B. Technical Manpower – Describe the personnel who will be working on the project. Include qualifications, roles, and responsibilities.

      C. Clarity of Approach – Clearly outline your approach to addressing the project’s technical challenges and how you plan to meet the contract requirements and manage risks, costs, and schedule.

            1. The technical Proposal must sufficiently address:

                 a. Logistical approach and realistic schedule for the occupied building during construction.

                  b. Utility interruption procedure, notification requirements.

                  c. A general understanding and approach to the specification section 01 57 19 Mt. Home AFB specific Environmental requirements and procedures (attachment 10).

                  d. Abatement procedure including disposal and documentation.

                  e. General problem/solution to restore the structural properties for the damaged CMU wall at door number 101.

                   f. Masonry preparation and repair.

                   g. Window installation, properties, and windowsills.

                   h. Vehicular safety requirements and applications to include black and yellow reflective tape and bollards.

                   i. Exterior paint, preparation, and application.

Part IV    Attachments

  1. Attch 1 - SOW-Windows Doors and Paint B1100-QYZH240024
  2. Attch 2 - GENERAL REQUIREMENTS
  3. Attch 3 - B1100 Project Specific HBMS MTNW 8883.6 090122
  4. Attch 4 - MH1100-DA-DW-100pct
  5. Attch 5 - D-Specs-Final
  6. Attch 6 - MH-B1100-DoorsWindows-Final Design
  7. Attch 7a - ADAL VEHICLE MAINTENACE SHOP
  8. Attch 7b - ADDITION TO TRANSPORTATION REPAIR TRANSPORTATION
  9. Attch 7c - AUTO MAINTENANCE SHOP BASE
  10. Attch 8 - Wage Determinations - Construction - Building
  11. Attch 9 - Provisions and Clauses
  12. Attch 10 - 1_01 57 19 Temporary Environmental Controls_MHAFB Env Spec 20220614
  13. Attch 11 - B100 Windows Doors and Wall RFIs - 2May24
Update #5 ·

Amendment 02

This amendment clarifies important information to the offerors regarding the Step 2 expected issue due and subsequent IFB due date. See Part I General Information, Step-two Issue Date.

Amendment 01

This amendment incorporates the following changes: 

  1. Additional information regarding the estimated issue date of step two, Invitation for Bids. See Part I, Step-two Issue Date.
  2. A statement requiring the electronic submission of technical proposals. See Part II, Instructions to Offerors.
  3. A statement considering non-conforming technical proposals to be considered nonresponsive. See Part II paragraph 2, Written Technical Proposals.
  4. Updated site visit requirements to include submission of the Driver's License State of Issue. See Part II paragraph 3.
  5. Updated site visit requirements to limit the number of attendees per offeror. See Part II paragraph 3.
  6. Significant changes to the Evaluation Criteria - added several essential elements of the Technical Factor. See Part III.
  7. Added attachment 10, 1_01 57 19 Temporary Environmental Controls_MHAFB Env Spec 20220614.

11 April 2024

Two-Step Sealed Bid Solicitation

Windows, Doors & Paint - Vehicle Maintenance Shop, B1100

Step 1: Request for Technical Proposals

FA489724RC003

Pursuant to Federal Acquisition Regulation (FAR) 14.5, this document is a Request for Technical

Proposals (RTP), step one of a two-step sealed bid solicitation for the acquisition of updated Windows, Doors & Paint for the Vehicle Maintenance Shop, B1100 on Mountain Home AFB, ID.

Required components of technical proposals are outlined in Part III of this document. Offerors should submit technical proposals that are acceptable without additional explanation or information. The Government may make a final determination regarding a proposal’s acceptability solely on the basis of the proposal as submitted. The Government may proceed with the second step without requesting further information from any offeror; however, the Government may request additional information from offerors of proposals that it considers reasonably susceptible of being made acceptable and may discuss proposals with their offerors.

Each offeror may submit multiple technical proposals, though a maximum of one proposal per offeror may be chosen by the Government for step two of the two-step sealed bid process. Offerors are cautioned against submitting multiple technical proposals that have large differences in prices between them, since step two will be awarded on a low bid basis.

The Government will forward a notice of unacceptability to an offeror when, upon completion of the proposal evaluation, there is a final determination of unacceptability. This will be done in accordance with the dates outlined in Part I below.

In the second step of this two-step sealed bid solicitation process, only those offerors whose technical proposals were determined to be acceptable, either initially, or as a result of discussions, will be considered for award and allowed to place priced bids. Bids in the second step will be evaluated based on price. Each bid in the second step must be based on the bidder’s own technical proposals.

This document is organized into the following parts:

  • Part I    General Information
  • Part II   Instructions to Offerors
    1. Cover Letter
    2. Requirements of the technical proposal
    3. Site Visit Attendance and Base Access Information
    4. Question Due Dates
    5. Bid guarantee (Step 2)
  • Part III  Evaluation Criteria
  • Part IV Attachments

Part I   General Information

Description:                             Windows, Doors & Paint - Vehicle Maintenance Shop, B1100

Project Scope:                          The Government is seeking a qualified, experienced, woman-owned small business to replace  Windows, Doors, and Paint at the Vehicle Maintenance Shop, B1100 at Mountain Home AFB, Idaho. This project involves the demolition of existing and installation of new pedestrian doors and windows, as well as repair and finishing of exterior CMU walls in accordance with the Statement of Work.

Project Duration:                      120 calendar days after NTP

Magnitude of Construction:       Between $500,000 and $1,000,000.

Acquisition Method:                 Two-Step Sealed Bid

Set-Aside Type:                        Women-Owned Small Businesses

NAICS:                                         236220

Small Business Size Standard:   $45M

Solicitation Number:                 FA489724RC003

Step-one Issue Date:                 03 April 2024

Site Visit Date:                            18 April 2024 at 1000 MDT

Technical Proposals Due:          03 May 2024 at 1200 MDT

Step-two Issue Date:                 To be determined after review of technical proposals received in step one. Review of technical proposals will be dependent on the number of proposals received but is not expected to take more than two weeks. The Step Two Invitation for Bid issue date is anticipated to be released 10 May 2024 with a two-week solicitation period (i.e. if the IFB is released on 10 May 2024, bids will be due 24 May 2024.) Offerors invited to step two will be permitted a second site visit to aid in building their priced bids if requested 24 hours in advance.

Primary Point of Contact:          JEREMIAH L. BURNS, SSgt, USAF

                                                  Contracting Officer, 366 Financial Acquisition Squadron

                                                  Mountain Home AFB, Idaho

                                                  jeremiah.burns.1@us.af.mil

Secondary Point of Contact:      MATTHEW L. FOX, SSgt, USAF

                                                  Contract Specialist, 366 Financial Acquisition Squadron

                                                  Mountain Home AFB, Idaho

                                                  matthew.fox.19@us.af.mil

Part II    Instructions to Offerors

Technical proposals must be submitted electronically to the contacts listed above by the technical proposal due date and shall include, at a minimum:

1. Cover letter.

Provide an introductory page to include company name, small business type classification (offerors must be certified WOSB registered under NAICS 236220), CAGE Code, SAM UEI Number, points of contact, authorized negotiators, contact phone, and email addresses. Cover letter shall also acknowledge all amendments issued.

2. Written technical proposal.

Technical proposals shall include only technical information. Proposals shall not include pricing information or cost breakdowns. The written technical proposal shall be clear, concise, and include all the information in sufficient detail for effective evaluation. The proposal should not simply rephrase or restate the Government’s requirements, but rather shall provide convincing rationale to address how the offeror intends to meet these requirements. Offerors shall assume the Government has no prior knowledge of their capabilities, work processes, facilities, and experience and will base its evaluation on the information presented in the offeror’s technical proposal. Any proposal which modifies or fails to conform to the essential requirements or specifications of this request for technical proposals shall be considered nonresponsive and categorized as unacceptable.

3. Site visit attendance and base access information.

A pre-proposal site visit will be held on 18 April 2024 at 1000. Offerors must submit full names, driver’s license numbers and state of issue, company name, and vehicle type (personal or commercial vehicle) of all attendees to the contracting officer and contract specialist no later than 1200 MDT on 17 April 2024. Personal vehicles will be permitted to enter the main visitor’s gate, but commercial vehicles will be redirected to the commercial vehicle gate. It is important the contracting officer knows what type of vehicle your attendee(s) will be driving so that base access can be properly coordinated. No more than three (3) attendees per offeror may be permitted.

4. Questions.

All questions to this RTP, including questions arising from the contractor site visit, must be submitted to both the contracting officer and contract specialist no later than close of business on 19 April 2024. There is no preferred format or document required to submit questions.

5. Bid guarantee.

Offerors who are invited to submit a priced bid during Step 2 of this two-step sealed bidding will be required to furnish a bid guarantee IAW FAR 28.101-1(a). Bid guarantees are not required for the Request for Technical Proposals step of this solicitation.

Part III   Evaluation Criteria

This acquisition will be evaluated IAW FAR Part 14.

1. Technical Factor.

As used in this context, the word "technical" has a broad connotation and includes, among other things, the engineering approach, special manufacturing processes, and special testing techniques.

Each offeror’s written technical proposal shall be evaluated to determine if the offeror provides a sound, compliant approach that meets the requirements of the Statement of Work and demonstrates a thorough knowledge and understanding of those requirements and their associated risks. If no risks/mitigations are  identified in the offeror’s proposal, it indicates the offeror does not consider there to be any risk associated with their proposed approach. Offerors should submit technical proposals that are acceptable without additional explanation or information. Technical proposals will be evaluated based on the following essential elements:

      A. Technical Proficiency – Clearly demonstrate your team’s expertise and qualifications related to the project.

      B. Technical Manpower – Describe the personnel who will be working on the project. Include qualifications, roles, and responsibilities.

      C. Clarity of Approach – Clearly outline your approach to addressing the project’s technical challenges and how you plan to meet the contract requirements and manage risks, costs, and schedule.

            1. The technical Proposal must sufficiently address:

                 a. Logistical approach and realistic schedule for the occupied building during construction.

                  b. Utility interruption procedure, notification requirements.

                  c. A general understanding and approach to the specification section 01 57 19 Mt. Home AFB specific Environmental requirements and procedures (attachment 10).

                  d. Abatement procedure including disposal and documentation.

                  e. General problem/solution to restore the structural properties for the damaged CMU wall at door number 101.

                   f. Masonry preparation and repair.

                   g. Window installation, properties, and windowsills.

                   h. Vehicular safety requirements and applications to include black and yellow reflective tape and bollards.

                   i. Exterior paint, preparation, and application.

Part IV    Attachments

  1. Attch 1 - SOW-Windows Doors and Paint B1100-QYZH240024
  2. Attch 2 - GENERAL REQUIREMENTS
  3. Attch 3 - B1100 Project Specific HBMS MTNW 8883.6 090122
  4. Attch 4 - MH1100-DA-DW-100pct
  5. Attch 5 - D-Specs-Final
  6. Attch 6 - MH-B1100-DoorsWindows-Final Design
  7. Attch 7a - ADAL VEHICLE MAINTENACE SHOP
  8. Attch 7b - ADDITION TO TRANSPORTATION REPAIR TRANSPORTATION
  9. Attch 7c - AUTO MAINTENANCE SHOP BASE
  10. Attch 8 - Wage Determinations - Construction - Building
  11. Attch 9 - Provisions and Clauses
  12. Attch 10 - 1_01 57 19 Temporary Environmental Controls_MHAFB Env Spec 20220614
Update #4 ·

Amendment 01

This amendment incorporates the following changes: 

  1. Additional information regarding the estimated issue date of step two, Invitation for Bids. See Part I, Step-two Issue Date.
  2. A statement requiring the electronic submission of technical proposals. See Part II, Instructions to Offerors.
  3. A statement considering non-conforming technical proposals to be considered nonresponsive. See Part II paragraph 2, Written Technical Proposals.
  4. Updated site visit requirements to include submission of the Driver's License State of Issue. See Part II paragraph 3.
  5. Updated site visit requirements to limit the number of attendees per offeror. See Part II paragraph 3.
  6. Significant changes to the Evaluation Criteria - added several essential elements of the Technical Factor. See Part III.
  7. Added attachment 10, 1_01 57 19 Temporary Environmental Controls_MHAFB Env Spec 20220614.

11 April 2024

Two-Step Sealed Bid Solicitation

Windows, Doors & Paint - Vehicle Maintenance Shop, B1100

Step 1: Request for Technical Proposals

FA489724RC003

Pursuant to Federal Acquisition Regulation (FAR) 14.5, this document is a Request for Technical

Proposals (RTP), step one of a two-step sealed bid solicitation for the acquisition of updated Windows, Doors & Paint for the Vehicle Maintenance Shop, B1100 on Mountain Home AFB, ID.

Required components of technical proposals are outlined in Part III of this document. Offerors should submit technical proposals that are acceptable without additional explanation or information. The Government may make a final determination regarding a proposal’s acceptability solely on the basis of the proposal as submitted. The Government may proceed with the second step without requesting further information from any offeror; however, the Government may request additional information from offerors of proposals that it considers reasonably susceptible of being made acceptable and may discuss proposals with their offerors.

Each offeror may submit multiple technical proposals, though a maximum of one proposal per offeror may be chosen by the Government for step two of the two-step sealed bid process. Offerors are cautioned against submitting multiple technical proposals that have large differences in prices between them, since step two will be awarded on a low bid basis.

The Government will forward a notice of unacceptability to an offeror when, upon completion of the proposal evaluation, there is a final determination of unacceptability. This will be done in accordance with the dates outlined in Part I below.

In the second step of this two-step sealed bid solicitation process, only those offerors whose technical proposals were determined to be acceptable, either initially, or as a result of discussions, will be considered for award and allowed to place priced bids. Bids in the second step will be evaluated based on price. Each bid in the second step must be based on the bidder’s own technical proposals.

This document is organized into the following parts:

  • Part I    General Information
  • Part II   Instructions to Offerors
    1. Cover Letter
    2. Requirements of the technical proposal
    3. Site Visit Attendance and Base Access Information
    4. Question Due Dates
    5. Bid guarantee (Step 2)
  • Part III  Evaluation Criteria
  • Part IV Attachments

Part I   General Information

Description:                             Windows, Doors & Paint - Vehicle Maintenance Shop, B1100

Project Scope:                          The Government is seeking a qualified, experienced, woman-owned small business to replace  Windows, Doors, and Paint at the Vehicle Maintenance Shop, B1100 at Mountain Home AFB, Idaho. This project involves the demolition of existing and installation of new pedestrian doors and windows, as well as repair and finishing of exterior CMU walls in accordance with the Statement of Work.

Project Duration:                      120 calendar days after NTP

Magnitude of Construction:       Between $500,000 and $1,000,000.

Acquisition Method:                 Two-Step Sealed Bid

Set-Aside Type:                        Women-Owned Small Businesses

NAICS:                                         236220

Small Business Size Standard:   $45M

Solicitation Number:                 FA489724RC003

Step-one Issue Date:                 03 April 2024

Site Visit Date:                            18 April 2024 at 1000 MDT

Technical Proposals Due:          03 May 2024 at 1200 MDT

Step-two Issue Date:                 To be determined after review of technical proposals received in step one. Review of technical proposals will be dependent on the number of proposals received but is not expected to take more than three weeks.

Primary Point of Contact:          JEREMIAH L. BURNS, SSgt, USAF

                                                  Contracting Officer, 366 Financial Acquisition Squadron

                                                  Mountain Home AFB, Idaho

                                                  jeremiah.burns.1@us.af.mil

Secondary Point of Contact:      MATTHEW L. FOX, SSgt, USAF

                                                  Contract Specialist, 366 Financial Acquisition Squadron

                                                  Mountain Home AFB, Idaho

                                                  matthew.fox.19@us.af.mil

Part II    Instructions to Offerors

Technical proposals must be submitted electronically to the contacts listed above by the technical proposal due date and shall include, at a minimum:

1. Cover letter.

Provide an introductory page to include company name, small business type classification (offerors must be certified WOSB registered under NAICS 236220), CAGE Code, SAM UEI Number, points of contact, authorized negotiators, contact phone, and email addresses. Cover letter shall also acknowledge all amendments issued.

2. Written technical proposal.

Technical proposals shall include only technical information. Proposals shall not include pricing information or cost breakdowns. The written technical proposal shall be clear, concise, and include all the information in sufficient detail for effective evaluation. The proposal should not simply rephrase or restate the Government’s requirements, but rather shall provide convincing rationale to address how the offeror intends to meet these requirements. Offerors shall assume the Government has no prior knowledge of their capabilities, work processes, facilities, and experience and will base its evaluation on the information presented in the offeror’s technical proposal. Any proposal which modifies or fails to conform to the essential requirements or specifications of this request for technical proposals shall be considered nonresponsive and categorized as unacceptable.

3. Site visit attendance and base access information.

A pre-proposal site visit will be held on 18 April 2024 at 1000. Offerors must submit full names, driver’s license numbers and state of issue, company name, and vehicle type (personal or commercial vehicle) of all attendees to the contracting officer and contract specialist no later than 1200 MDT on 17 April 2024. Personal vehicles will be permitted to enter the main visitor’s gate, but commercial vehicles will be redirected to the commercial vehicle gate. It is important the contracting officer knows what type of vehicle your attendee(s) will be driving so that base access can be properly coordinated. No more than three (3) attendees per offeror may be permitted.

4. Questions.

All questions to this RTP, including questions arising from the contractor site visit, must be submitted to both the contracting officer and contract specialist no later than close of business on 19 April 2024. There is no preferred format or document required to submit questions.

5. Bid guarantee.

Offerors who are invited to submit a priced bid during Step 2 of this two-step sealed bidding will be required to furnish a bid guarantee IAW FAR 28.101-1(a). Bid guarantees are not required for the Request for Technical Proposals step of this solicitation.

Part III   Evaluation Criteria

This acquisition will be evaluated IAW FAR Part 14.

1. Technical Factor.

As used in this context, the word "technical" has a broad connotation and includes, among other things, the engineering approach, special manufacturing processes, and special testing techniques.

Each offeror’s written technical proposal shall be evaluated to determine if the offeror provides a sound, compliant approach that meets the requirements of the Statement of Work and demonstrates a thorough knowledge and understanding of those requirements and their associated risks. If no risks/mitigations are  identified in the offeror’s proposal, it indicates the offeror does not consider there to be any risk associated with their proposed approach. Offerors should submit technical proposals that are acceptable without additional explanation or information. Technical proposals will be evaluated based on the following essential elements:

      A. Technical Proficiency – Clearly demonstrate your team’s expertise and qualifications related to the project.

      B. Technical Manpower – Describe the personnel who will be working on the project. Include qualifications, roles, and responsibilities.

      C. Clarity of Approach – Clearly outline your approach to addressing the project’s technical challenges and how you plan to meet the contract requirements and manage risks, costs, and schedule.

            1. The technical Proposal must sufficiently address:

                 a. Logistical approach and realistic schedule for the occupied building during construction.

                  b. Utility interruption procedure, notification requirements.

                  c. A general understanding and approach to the specification section 01 57 19 Mt. Home AFB specific Environmental requirements and procedures (attachment 10).

                  d. Abatement procedure including disposal and documentation.

                  e. General problem/solution to restore the structural properties for the damaged CMU wall at door number 101.

                   f. Masonry preparation and repair.

                   g. Window installation, properties, and windowsills.

                   h. Vehicular safety requirements and applications to include black and yellow reflective tape and bollards.

                   i. Exterior paint, preparation, and application.

Part IV    Attachments

  1. Attch 1 - SOW-Windows Doors and Paint B1100-QYZH240024
  2. Attch 2 - GENERAL REQUIREMENTS
  3. Attch 3 - B1100 Project Specific HBMS MTNW 8883.6 090122
  4. Attch 4 - MH1100-DA-DW-100pct
  5. Attch 5 - D-Specs-Final
  6. Attch 6 - MH-B1100-DoorsWindows-Final Design
  7. Attch 7a - ADAL VEHICLE MAINTENACE SHOP
  8. Attch 7b - ADDITION TO TRANSPORTATION REPAIR TRANSPORTATION
  9. Attch 7c - AUTO MAINTENANCE SHOP BASE
  10. Attch 8 - Wage Determinations - Construction - Building
  11. Attch 9 - Provisions and Clauses
  12. Attch 10 - 1_01 57 19 Temporary Environmental Controls_MHAFB Env Spec 20220614
Update #3 ·

Amendment 01

This amendment incorporates the following changes: 

  1. Additional information regarding the estimated issue date of step two, Invitation for Bids. See Part I, Step-two Issue Date.
  2. A statement requiring the electronic submission of technical proposals. See Part II, Instructions to Offerors.
  3. A statement considering non-conforming technical proposals to be considered nonresponsive. See Part II paragraph 2, Written Technical Proposals.
  4. Updated site visit requirements to include submission of the Driver's License State of Issue. See Part II paragraph 3.
  5. Updated site visit requirements to limit the number of attendees per offeror. See Part II paragraph 3.
  6. Significant changes to the Evaluation Criteria - added several essential elements of the Technical Factor. See Part III.
  7. Added attachment 10, 1_01 57 19 Temporary Environmental Controls_MHAFB Env Spec 20220614.

11 April 2024

Two-Step Sealed Bid Solicitation

Windows, Doors & Paint - Vehicle Maintenance Shop, B1100

Step 1: Request for Technical Proposals

FA489724RC003

Pursuant to Federal Acquisition Regulation (FAR) 14.5, this document is a Request for Technical

Proposals (RTP), step one of a two-step sealed bid solicitation for the acquisition of updated Windows, Doors & Paint for the Vehicle Maintenance Shop, B1100 on Mountain Home AFB, ID.

Required components of technical proposals are outlined in Part III of this document. Offerors should submit technical proposals that are acceptable without additional explanation or information. The Government may make a final determination regarding a proposal’s acceptability solely on the basis of the proposal as submitted. The Government may proceed with the second step without requesting further information from any offeror; however, the Government may request additional information from offerors of proposals that it considers reasonably susceptible of being made acceptable and may discuss proposals with their offerors.

Each offeror may submit multiple technical proposals, though a maximum of one proposal per offeror may be chosen by the Government for step two of the two-step sealed bid process. Offerors are cautioned against submitting multiple technical proposals that have large differences in prices between them, since step two will be awarded on a low bid basis.

The Government will forward a notice of unacceptability to an offeror when, upon completion of the proposal evaluation, there is a final determination of unacceptability. This will be done in accordance with the dates outlined in Part I below.

In the second step of this two-step sealed bid solicitation process, only those offerors whose technical proposals were determined to be acceptable, either initially, or as a result of discussions, will be considered for award and allowed to place priced bids. Bids in the second step will be evaluated based on price. Each bid in the second step must be based on the bidder’s own technical proposals.

This document is organized into the following parts:

  • Part I    General Information
  • Part II   Instructions to Offerors
    1. Cover Letter
    2. Requirements of the technical proposal
    3. Site Visit Attendance and Base Access Information
    4. Question Due Dates
    5. Bid guarantee (Step 2)
  • Part III  Evaluation Criteria
  • Part IV Attachments

Part I   General Information

Description:                             Windows, Doors & Paint - Vehicle Maintenance Shop, B1100

Project Scope:                          The Government is seeking a qualified, experienced, woman-owned small business to replace  Windows, Doors, and Paint at the Vehicle Maintenance Shop, B1100 at Mountain Home AFB, Idaho. This project involves the demolition of existing and installation of new pedestrian doors and windows, as well as repair and finishing of exterior CMU walls in accordance with the Statement of Work.

Project Duration:                      120 calendar days after NTP

Magnitude of Construction:       Between $500,000 and $1,000,000.

Acquisition Method:                 Two-Step Sealed Bid

Set-Aside Type:                        Women-Owned Small Businesses

NAICS:                                         236220

Small Business Size Standard:   $45M

Solicitation Number:                 FA489724RC003

Step-one Issue Date:                 03 April 2024

Site Visit Date:                            18 April 2024 at 1000 MDT

Technical Proposals Due:          03 May 2024 at 1200 MDT

Step-two Issue Date:                 To be determined after review of technical proposals received in step one. Review of technical proposals will be dependent on the number of proposals received but is not expected to take more than three weeks.

Primary Point of Contact:          JEREMIAH L. BURNS, SSgt, USAF

                                                  Contracting Officer, 366 Financial Acquisition Squadron

                                                  Mountain Home AFB, Idaho

                                                  jeremiah.burns.1@us.af.mil

Secondary Point of Contact:      MATTHEW L. FOX, SSgt, USAF

                                                  Contract Specialist, 366 Financial Acquisition Squadron

                                                  Mountain Home AFB, Idaho

                                                  matthew.fox.19@us.af.mil

Part II    Instructions to Offerors

Technical proposals must be submitted electronically to the contacts listed above by the technical proposal due date and shall include, at a minimum:

1. Cover letter.

Provide an introductory page to include company name, small business type classification (offerors must be certified WOSB registered under NAICS 236220), CAGE Code, SAM UEI Number, points of contact, authorized negotiators, contact phone, and email addresses. Cover letter shall also acknowledge all amendments issued.

2. Written technical proposal.

Technical proposals shall include only technical information. Proposals shall not include pricing information or cost breakdowns. The written technical proposal shall be clear, concise, and include all the information in sufficient detail for effective evaluation. The proposal should not simply rephrase or restate the Government’s requirements, but rather shall provide convincing rationale to address how the offeror intends to meet these requirements. Offerors shall assume the Government has no prior knowledge of their capabilities, work processes, facilities, and experience and will base its evaluation on the information presented in the offeror’s technical proposal. Any proposal which modifies or fails to conform to the essential requirements or specifications of this request for technical proposals shall be considered nonresponsive and categorized as unacceptable.

3. Site visit attendance and base access information.

A pre-proposal site visit will be held on 18 April 2024 at 1000. Offerors must submit full names, driver’s license numbers and state of issue, company name, and vehicle type (personal or commercial vehicle) of all attendees to the contracting officer and contract specialist no later than 1200 MDT on 17 April 2024. Personal vehicles will be permitted to enter the main visitor’s gate, but commercial vehicles will be redirected to the commercial vehicle gate. It is important the contracting officer knows what type of vehicle your attendee(s) will be driving so that base access can be properly coordinated. No more than three (3) attendees per offeror may be permitted.

4. Questions.

All questions to this RTP, including questions arising from the contractor site visit, must be submitted to both the contracting officer and contract specialist no later than close of business on 19 April 2024. There is no preferred format or document required to submit questions.

5. Bid guarantee.

Offerors who are invited to submit a priced bid during Step 2 of this two-step sealed bidding will be required to furnish a bid guarantee IAW FAR 28.101-1(a). Bid guarantees are not required for the Request for Technical Proposals step of this solicitation.

Part III   Evaluation Criteria

This acquisition will be evaluated IAW FAR Part 14.

1. Technical Factor.

As used in this context, the word "technical" has a broad connotation and includes, among other things, the engineering approach, special manufacturing processes, and special testing techniques.

Each offeror’s written technical proposal shall be evaluated to determine if the offeror provides a sound, compliant approach that meets the requirements of the Statement of Work and demonstrates a thorough knowledge and understanding of those requirements and their associated risks. If no risks/mitigations are  identified in the offeror’s proposal, it indicates the offeror does not consider there to be any risk associated with their proposed approach. Offerors should submit technical proposals that are acceptable without additional explanation or information. Technical proposals will be evaluated based on the following essential elements:

      A. Technical Proficiency – Clearly demonstrate your team’s expertise and qualifications related to the project.

      B. Technical Manpower – Describe the personnel who will be working on the project. Include qualifications, roles, and responsibilities.

      C. Clarity of Approach – Clearly outline your approach to addressing the project’s technical challenges and how you plan to meet the contract requirements and manage risks, costs, and schedule.

            1. The technical Proposal must sufficiently address:

                 a. Logistical approach and realistic schedule for the occupied building during construction.

                  b. Utility interruption procedure, notification requirements.

                  c. A general understanding and approach to the specification section 01 57 19 Mt. Home AFB specific Environmental requirements and procedures (attachment 10).

                  d. Abatement procedure including disposal and documentation.

                  e. General problem/solution to restore the structural properties for the damaged CMU wall at door number 101.

                   f. Masonry preparation and repair.

                   g. Window installation, properties, and windowsills.

                   h. Procedures for proper application of black and yellow reflective tape at openings and bollard requirements.

                   i. Exterior paint, preparation, and application.

Part IV    Attachments

  1. Attch 1 - SOW-Windows Doors and Paint B1100-QYZH240024
  2. Attch 2 - GENERAL REQUIREMENTS
  3. Attch 3 - B1100 Project Specific HBMS MTNW 8883.6 090122
  4. Attch 4 - MH1100-DA-DW-100pct
  5. Attch 5 - D-Specs-Final
  6. Attch 6 - MH-B1100-DoorsWindows-Final Design
  7. Attch 7a - ADAL VEHICLE MAINTENACE SHOP
  8. Attch 7b - ADDITION TO TRANSPORTATION REPAIR TRANSPORTATION
  9. Attch 7c - AUTO MAINTENANCE SHOP BASE
  10. Attch 8 - Wage Determinations - Construction - Building
  11. Attch 9 - Provisions and Clauses
  12. Attch 10 - 1_01 57 19 Temporary Environmental Controls_MHAFB Env Spec 20220614
Update #2 ·

3 April 2024

Two-Step Sealed Bid Solicitation

Windows, Doors & Paint - Vehicle Maintenance Shop, B1100

Step 1: Request for Technical Proposals

FA489724RC003

Pursuant to Federal Acquisition Regulation (FAR) 14.5, this document is a Request for Technical

Proposals (RTP), step one of a two-step sealed bid solicitation for the acquisition of updated Windows, Doors & Paint for the Vehicle Maintenance Shop, B1100 on Mountain Home AFB, ID.

Required components of technical proposals are outlined in Part III of this document. Offerors should submit technical proposals that are acceptable without additional explanation or information. The Government may make a final determination regarding a proposal’s acceptability solely on the basis of the proposal as submitted. The Government may proceed with the second step without requesting further information from any offeror; however, the Government may request additional information from offerors of proposals that it considers reasonably susceptible of being made acceptable and may discuss proposals with their offerors.

Each offeror may submit multiple technical proposals, though a maximum of one proposal per offeror may be chosen by the Government for step two of the two-step sealed bid process. Offerors are cautioned against submitting multiple technical proposals that have large differences in prices between them, since step two will be awarded on a low bid basis.

The Government will forward a notice of unacceptability to an offeror when, upon completion of the proposal evaluation, there is a final determination of unacceptability. This will be done in accordance with the dates outlined in Part I below.

In the second step of this two-step sealed bid solicitation process, only those offerors whose technical proposals were determined to be acceptable, either initially, or as a result of discussions, will be considered for award and allowed to place priced bids. Bids in the second step will be evaluated based on price. Each bid in the second step must be based on the bidder’s own technical proposals.

This document is organized into the following parts:

  • Part I    General Information
  • Part II   Instructions to Offerors
    1. Cover Letter
    2. Requirements of the technical proposal
    3. Site Visit Attendance and Base Access Information
    4. Bid guarantee (Step 2)
  • Part III  Evaluation Criteria
  • Part V Attachments

Part I   General Information

Description:                             Windows, Doors & Paint - Vehicle Maintenance Shop, B1100

Project Scope:                          The Government is seeking a qualified, experienced, woman-owned small business to replace  Windows, Doors, and Paint at the Vehicle Maintenance Shop, B1100 at Mountain Home AFB, Idaho. This project involves the demolition of existing and installation of new pedestrian doors and windows, as well as repair and finishing of exterior CMU walls in accordance with the Statement of Work.

Project Duration:                      120 calendar days after NTP

Magnitude of Construction:       Between $500,000 and $1,000,000.

           

Acquisition Method:                 Two-Step Sealed Bid

Set-Aside Type:                        Women-Owned Small Businesses

NAICS:                                    236220

Small Business Size Standard:   $45M

Solicitation Number:                 FA489724RC003

Step-one Issue Date:                 03 April 2024

Site Visit Date:                         18 April 2024 at 1000 MDT

Technical Proposals Due:          03 May 2024 at 1200 MDT

Step-two Issue Date:                 To be determined after review of technical proposals received in step one.

Primary Point of Contact:          JEREMIAH L. BURNS, SSgt, USAF

                                                Contracting Officer, 366 Financial Acquisition Squadron

                                                Mountain Home AFB, Idaho

                                                jeremiah.burns.1@us.af.mil

Secondary Point of Contact:      MATTHEW L. FOX, SSgt, USAF

                                                Contract Specialist, 366 Financial Acquisition Squadron

                                                Mountain Home AFB, Idaho

                                                matthew.fox.19@us.af.mil

Part II    Instructions to Offerors

Technical proposals must be submitted electronically to the contacts listed above by the technical proposal due date and shall include, at a minimum:

1. Cover letter.

Provide an introductory page to include company name, small business type classification (offerors must be certified WOSB registered under NAICS 236220), CAGE Code, SAM UEI Number, points of contact, authorized negotiators, contact phone, and email addresses. Cover letter shall also acknowledge all amendments issued.

2. Written technical proposal.

Technical proposals shall include only technical information. Proposals shall not include pricing information or cost breakdowns. The written technical proposal shall be clear, concise, and include all the information in sufficient detail for effective evaluation. The proposal should not simply rephrase or restate the Government’s requirements, but rather shall provide convincing rationale to address how the offeror intends to meet these requirements. Offerors shall assume the Government has no prior knowledge of their capabilities, work processes, facilities, and experience and will base its evaluation on the information presented in the offeror’s technical proposal.

3. Site visit attendance and base access information.

A pre-proposal site visit will be held on 18 April 2024 at 1000. Offerors must submit full names, driver’s license numbers, company name, and vehicle type (personal or commercial vehicle) of all attendees to the contracting officer and contract specialist no later than 1200 MDT on 17 April 2024. Personal vehicles will be permitted to enter the main visitor’s gate, but commercial vehicles will be redirected to the commercial vehicle gate. It is important the contracting officer knows what type of vehicle your attendee(s) will be driving so that base access can be properly coordinated.

4. Questions.

All questions to this RTP, including questions arising from the contractor site visit, must be submitted to both the contracting officer and contract specialist no later than close of business on 19 April 2024. There is no preferred format or document required to submit questions.

5. Bid guarantee.

Offerors who are invited to submit a priced bid during Step 2 of this two-step sealed bidding will be required to furnish a bid guarantee IAW FAR 28.101-1(a). Bid guarantees are not required for the Request for Technical Proposals step of this solicitation.

Part III   Evaluation Criteria

This acquisition will be evaluated IAW FAR Part 14.

1. Technical Factor.

As used in this context, the word "technical" has a broad connotation and includes, among other things, the engineering approach, special manufacturing processes, and special testing techniques.

Each offeror’s written technical proposal shall be evaluated to determine if the offeror provides a sound, compliant approach that meets the requirements of the Statement of Work and demonstrates a thorough knowledge and understanding of those requirements and their associated risks. If no risks/mitigations are identified in the offeror’s proposal, it indicates the offeror does not consider there to be any risk associated with their proposed approach. Offerors should submit technical proposals that are acceptable without additional explanation or information. The Government may make a final determination regarding a proposal’s acceptability solely on the basis of the proposal as submitted or may proceed with the second step without requesting further information from any offeror; however, the Government may request additional information from offerors of proposals that it considers reasonably susceptible of being made acceptable and may discuss proposals with their offerors.

Part IV    Attachments

  1. Attch 1 - SOW-Windows Doors and Paint B1100-QYZH240024
  2. Attch 2 - GENERAL REQUIREMENTS
  3. Attch 3 - B1100 Project Specific HBMS MTNW 8883.6 090122
  4. Attch 4 - MH1100-DA-DW-100pct
  5. Attch 5 - D-Specs-Final
  6. Attch 6 - MH-B1100-DoorsWindows-Final Design
  7. Attch 7a - ADAL VEHICLE MAINTENACE SHOP
  8. Attch 7b - ADDITION TO TRANSPORTATION REPAIR TRANSPORTATION
  9. Attch 7c - AUTO MAINTENANCE SHOP BASE
  10. Attch 8 - Wage Determinations - Construction - Building
  11. Attch 9 - Provisions and Clauses
Update #1 ·

3 April 2024

Two-Step Sealed Bid Solicitation

Windows, Doors & Paint - Vehicle Maintenance Shop, B1100

Step 1: Request for Technical Proposals

FA489724RC003

Pursuant to Federal Acquisition Regulation (FAR) 14.5, this document is a Request for Technical

Proposals (RTP), step one of a two-step sealed bid solicitation for the acquisition of updated Windows, Doors & Paint for the Vehicle Maintenance Shop, B1100 on Mountain Home AFB, ID.

Required components of technical proposals are outlined in Part III of this document. Offerors should submit technical proposals that are acceptable without additional explanation or information. The Government may make a final determination regarding a proposal’s acceptability solely on the basis of the proposal as submitted. The Government may proceed with the second step without requesting further information from any offeror; however, the Government may request additional information from offerors of proposals that it considers reasonably susceptible of being made acceptable and may discuss proposals with their offerors.

Each offeror may submit multiple technical proposals, though a maximum of one proposal per offeror may be chosen by the Government for step two of the two-step sealed bid process. Offerors are cautioned against submitting multiple technical proposals that have large differences in prices between them, since step two will be awarded on a low bid basis.

The Government will forward a notice of unacceptability to an offeror when, upon completion of the proposal evaluation, there is a final determination of unacceptability. This will be done in accordance with the dates outlined in Part I below.

In the second step of this two-step sealed bid solicitation process, only those offerors whose technical proposals were determined to be acceptable, either initially, or as a result of discussions, will be considered for award and allowed to place priced bids. Bids in the second step will be evaluated based on price. Each bid in the second step must be based on the bidder’s own technical proposals.

This document is organized into the following parts:

  • Part I    General Information
  • Part II   Instructions to Offerors
    1. Cover Letter
    2. Requirements of the technical proposal
    3. Site Visit Attendance and Base Access Information
    4. Bid guarantee (Step 2)
  • Part III  Evaluation Criteria
  • Part V Attachments

Part I   General Information

Description:                             Windows, Doors & Paint - Vehicle Maintenance Shop, B1100

Project Scope:                          The Government is seeking a qualified, experienced, woman-owned small business to replace  Windows, Doors, and Paint at the Vehicle Maintenance Shop, B1100 at Mountain Home AFB, Idaho. This project involves the demolition of existing and installation of new pedestrian doors and windows, as well as repair and finishing of exterior CMU walls in accordance with the Statement of Work.

Project Duration:                      120 calendar days after NTP

Magnitude of Construction:       Between $500,000 and $1,000,000.

           

Acquisition Method:                 Two-Step Sealed Bid

Set-Aside Type:                        Women-Owned Small Businesses

NAICS:                                    236220

Small Business Size Standard:   $45M

Solicitation Number:                 FA489724RC003

Step-one Issue Date:                 03 April 2024

Site Visit Date:                         18 April 2024 at 1000 MDT

Technical Proposals Due:          03 May 2024 at 1200 MDT

Step-two Issue Date:                 To be determined after review of technical proposals received in step one.

Primary Point of Contact:          JEREMIAH L. BURNS, SSgt, USAF

                                                Contracting Officer, 366 Financial Acquisition Squadron

                                                Mountain Home AFB, Idaho

                                                jeremiah.burns.1@us.af.mil

Secondary Point of Contact:      MATTHEW L. FOX, SSgt, USAF

                                                Contract Specialist, 366 Financial Acquisition Squadron

                                                Mountain Home AFB, Idaho

                                                matthew.fox.19@us.af.mil

Part II    Instructions to Offerors

Technical proposals must be submitted electronically to the contacts listed above by the technical proposal due date and shall include, at a minimum:

1. Cover letter.

Provide an introductory page to include company name, small business type classification (offerors must be certified WOSB registered under NAICS 236220), CAGE Code, SAM UEI Number, points of contact, authorized negotiators, contact phone, and email addresses. Cover letter shall also acknowledge all amendments issued.

2. Written technical proposal.

Technical proposals shall include only technical information. Proposals shall not include pricing information or cost breakdowns. The written technical proposal shall be clear, concise, and include all the information in sufficient detail for effective evaluation. The proposal should not simply rephrase or restate the Government’s requirements, but rather shall provide convincing rationale to address how the offeror intends to meet these requirements. Offerors shall assume the Government has no prior knowledge of their capabilities, work processes, facilities, and experience and will base its evaluation on the information presented in the offeror’s technical proposal.

3. Site visit attendance and base access information.

A pre-proposal site visit will be held on 18 April 2024 at 1000. Offerors must submit full names, driver’s license numbers, company name, and vehicle type (personal or commercial vehicle) of all attendees to the contracting officer and contract specialist no later than 1200 MDT on 17 April 2024. Personal vehicles will be permitted to enter the main visitor’s gate, but commercial vehicles will be redirected to the commercial vehicle gate. It is important the contracting officer knows what type of vehicle your attendee(s) will be driving so that base access can be properly coordinated.

4. Questions.

All questions to this RTP, including questions arising from the contractor site visit, must be submitted to both the contracting officer and contract specialist no later than close of business on 19 April 2024. There is no preferred format or document required to submit questions.

5. Bid guarantee.

Offerors who are invited to submit a priced bid during Step 2 of this two-step sealed bidding will be required to furnish a bid guarantee IAW FAR 28.101-1(a). Bid guarantees are not required for the Request for Technical Proposals step of this solicitation.

Part III   Evaluation Criteria

This acquisition will be evaluated IAW FAR Part 14.

1. Technical Factor.

As used in this context, the word "technical" has a broad connotation and includes, among other things, the engineering approach, special manufacturing processes, and special testing techniques.

Each offeror’s written technical proposal shall be evaluated to determine if the offeror provides a sound, compliant approach that meets the requirements of the Statement of Work and demonstrates a thorough knowledge and understanding of those requirements and their associated risks. If no risks/mitigations are identified in the offeror’s proposal, it indicates the offeror does not consider there to be any risk associated with their proposed approach. Offerors should submit technical proposals that are acceptable without additional explanation or information. The Government may make a final determination regarding a proposal’s acceptability solely on the basis of the proposal as submitted or may proceed with the second step without requesting further information from any offeror; however, the Government may request additional information from offerors of proposals that it considers reasonably susceptible of being made acceptable and may discuss proposals with their offerors.

Part IV    Attachments

  1. Attch 1 - SOW-Windows Doors and Paint B1100-QYZH240024
  2. Attch 2 - GENERAL REQUIREMENTS
  3. Attch 3 - B1100 Project Specific HBMS MTNW 8883.6 090122
  4. Attch 4 - MH1100-DA-DW-100pct
  5. Attch 5 - D-Specs-Final
  6. Attch 6 - MH-B1100-DoorsWindows-Final Design
  7. Attch 7a - ADAL VEHICLE MAINTENACE SHOP
  8. Attch 7b - ADDITION TO TRANSPORTATION REPAIR TRANSPORTATION
  9. Attch 7c - AUTO MAINTENANCE SHOP BASE
  10. Attch 8 - Wage Determinations - Construction - Building
  11. Attch 9 - Provisions and Clauses

Files

Show all 19

Notice history

Notice Type Posted
Bldg 1100 New Windows, Doors, and Exterior Wall Repair Award Award Notice
Notice For Prospective Subcontractors - Bldg 1100 New Windows, Doors, and Exterior Wall Repair Latest special notice Special Notice
This notice Solicitation
Bldg 1100 New Windows, Doors, and Exterior Wall Repair Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
WWYK260004 - repair structural integrity, B1134, post 34 & north wall Tinker AFB, Oklahoma 73145, United States · NAICS 238190 Air Force Sustainment Center Total Small Business
Demolish Dormitory 2425 Mountain Home AFB, Idaho 83648, United States · NAICS 238910 Air Combat Command No set-aside
WWYK250063 - install react VII facility, B9001, post V19 Tinker AFB, Oklahoma 73145, United States · NAICS 236220 Air Force Sustainment Center Woman-Owned Small Business
HAFB Multiple Award Construction Contract V (MACC V) Hill AFB, UT (Davis County) Utah Test and Training Range (Uttr) Little Mountain Test Facility (Lmtf) Utah Air National Guard (Utang) Base Boulder Seismic Site, WY Other: Geographically separated units (GSU) under the responsibility of 75 ABW/CC · NAICS 236220 Air Force Sustainment Center Total Small Business
Protective Coating Maintenance IDIQ Sheppard AFB, TX 76311 · NAICS 238320 Air Education and Training Command Economically Disadvantaged Woman-Owned Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity