This document appears to be a Request for Technical Proposals (RTP) for a two-step sealed bid solicitation to replace windows, doors, and paint at Building 1100 (Vehicle Maintenance Shop) at Mountain Home Air Force Base, Idaho. The project scope involves demolition of existing and installation of new pedestrian doors and windows, as well as repair and finishing of exterior CMU walls, with a duration of 120 calendar days after notice to proceed. The magnitude of construction is between $500,000 and $1,000,000, and the solicitation is set aside for Women-Owned Small Businesses under NAICS code 236220. Technical proposals are due on May 3, 2024, and a pre-proposal site visit is scheduled for April 18, 2024. The technical proposals will be evaluated on the offeror's approach to meeting the requirements, and only those found technically acceptable will be invited to submit priced bids in the second step. The contract will be awarded on a low bid basis.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET OF
Drawing No:
B U
IL
D
IN
G
V
E H
IC
L
E
M A
IN
T
E N
A N
C E
S H
O P
D
O O
R S
W
IN
D
O W
S A
N D
E X
T E
R
IO
R W
A L
S
R
P
A
IR
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C H
E C
K E
D B
Y
A
B
C
D
E
F
2 3 4 5 6 7 8
DEPARTMENT OF
THE AIR FORCE
AIR
COMBAT COMMAND
MOUNTAIN HOME AFB.
VEHICLE
MAINTENANCE
SHOP
S y m b o l
D e s c ri p ti o n
D a te
A p p ro v a l
D A
T E
P R
O J E
C T
W J
A P
R O
J E
C T
-2
FINAL DESIGN SUBMITTAL - NOVEMBER 7, 2022
/0
/2
G-001
T
IT
L E
S H
E E
T
S H
E E
T I
N D
E X
L D
Y
S
L D
Y
S
J B
Sheet List
SHEET NUMBER SHEET NAME
CURRENT
REVISION CURRENT REVISION DATE SHEET ISSUE DATE
001-GENERAL
G-001 TITLE SHEET, SHEET INDEX 11/07/22
G-002 PROJECT SITE MAP 11/07/22
003-STRUCTURAL
S-001 STRUCTURAL GENERAL NOTES 11/07/22
S-501 CMU REPAIR DETAILS 11/07/22
004-ARCHITECTURAL
A-001 ARCHITECTURAL GENERAL NOTES & LEGENDS 11/07/22
A-101 FIRST FLOOR PLAN 11/07/22
A-102 CLERESTORY 11/07/22
A-201 BUILDING ELEVATIONS 11/07/22
A-202 BUILDING ELEVATIONS 11/07/22
A-501 WINDOW TYPES 11/07/22
A-502 DETAILS 11/07/22
A-601 DOOR SCHEDULE AND LEGEND 11/07/22
BUILDING 1100 - VEHICLE
MAINTENANCE SHOP - DOORS,
WINDOWS AND EXTERIOR WALLS
REPAIR
CONTRACT # FA489720D0005
Architectural/Structural: WJA Design Collaborative Mechanical/Plumbing/Electrical: Musgrove Engineering Hazmat: MedTox Cost Estimating: Tetra Tech
DESIGN TEAM LIST
MOUNTAIN HOME AIR FORCE BASE, IDAHO
1 12
M
M
B
B
B
B
B
B
B
M
M
BB
M
AR
B1
A R
B
AR
B1
A R
B
A R
B
A R
B
A R
B 1
A R
B
A R
B
B 1R
B
B 1R
B
B1R
B1
B 1R
B
B1R
B1
B 1R
B
B 1R
B
E
D
D
D
D
D
D
C
C
C
C
B2
B2
B
B1
B1
B1
B
B1
B
B
B
B
B
B1
B
B
E
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X X X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
R
R
A
R
R
R
W
AT
ER
TA
N K
IN
ST
AL
L
B
AS
E E L E V
R
S T R E E T
FLIGHTLINE ROAD
P E R
IM
E
TE
R R
D
B ST.
R E
D F
IR
A
V E
F A
L C
O N
T
H
T
H
T
H
T
H
T
H
T
H
P H
A N
T O
M
G U
N F
IG
H
T E
R
R
D
N
D
S
T
DESERT
G U
N F
IG
H
T E
R
A A
R D
V A
R K
FALCON
LIBERATOR
ALPINEHAUL ROUTE. ACCESS VIA
MHAFB GRANDVIEW GATE.
COORDINATE ACCESS W/
CONTRACTING OFFICER
B ST.
PROJECT LOCATION
B1100
SHEET OF
Drawing No:
B U
IL
D
IN
G
V
E H
IC
IN
T
E N
A N
C E
S H
O P
D
O O
R S
W
IN
D
O W
S A
N D
E X
T E
R
IO
R W
A L
P
A
IR
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C H
E C
K E
D B
Y
A
B
C
D
E
F
2 3 4 5 6 7 8
DEPARTMENT OF
THE AIR FORCE
AIR
COMBAT COMMAND
MOUNTAIN HOME AFB.
VEHICLE
MAINTENANCE
SHOP
S y m b o l
D e s c ri p ti o n
D a te
A p p ro v a l
D A
T E
P R
O J E
C T
W J
A P
R O
J E
C T
-2
FINAL DESIGN SUBMITTAL - NOVEMBER 7, 2022
/0
/2
G-002
P R
O J E
C T
S
IT
E M
A P
D e s ig n e r
A u th o r
C h e c k e r
MHAFB AREA MAP
PLAN
NORTH
2 12
GENERAL:
THE STRUCTURAL GENERAL NOTES SHALL BE USED AS A
SUPPLEMENT TO THE PROJECT SPECIFICATIONS AND OTHER
CONTRACT DOCUMENTS. WHERE DIFFERENCES BETWEEN
CONTRACT DRAWINGS, SPECIFICATIONS, OR EXISTING CONDITIONS
OCCUR, THE CONTRACTOR SHALL REQUEST CLARIFICATION FROM
THE CONTRACTING OFFICER REPRESENTATIVE IMMEDIATELY UPON
DISCOVERY AND BEFORE PROCEEDING.
THE STRUCTURE HAS BEEN DESIGNED TO RESIST CODE REQUIRED
VERTICAL AND LATERAL FORCES AFTER ALL BUILDING ELEMENTS
ARE INSTALLED. THE STRUCTURE HAS NOT BEEN INTENTIONALLY
DESIGNED TO REMAIN STABLE DURING CONSTRUCTION. THE
GENERAL CONTRACTOR SHALL BE ENTIRELY RESPONSIBLE FOR
PROTECTING AND STABILIZING THE STRUCTURE DURING
CONSTRUCTION. THIS RESPONSIBILITY INCLUDES, BUT IS NOT
LIMITED TO JOB SITE SAFETY, TEMPORARY SHORING, ERECTION
MEANS AND METHODS, ERECTION SEQUENCING, FORMWORK,
TEMPORARY BRACING, USE OF CONSTRUCTION EQUIPMENT, AND
TEMPORARY FALL PROTECTION. AS A MINIMUM, THE CONTRACTOR
SHALL SHORE AND/OR BRACE THE STRUCTURE TO RESIST
TEMPORARY CONSTRUCTION LOADS DEFINED BY ASCE 37-14
"DESIGN LOADS ON STRUCTURES DURING CONSTRUCTION."
TYPICAL DETAILS MAY NOT BE NECESSARILY SHOWN ON THE PLANS,
BUT APPLY AS REFERENCED IN THE STRUCTURAL DRAWINGS AND
DETAILS UNLESS NOTED OTHERWISE. WHERE NO DETAIL IS
INDICATED, THE CONTRACTOR SHALL REQUEST CLARIFICATION
FROM THE ENGINEER PRIOR TO SHOP DRAWING PRODUCTION,
FABRICATION, AND CONSTRUCTION.
THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS
AND DIMENSIONS PRIOR TO CONSTRUCTION. ANY DISCREPANCIES
OR UNSOUND CONDITIONS SHALL BE REPORTED TO THE
CONTRACTING OFFICER REPRESENTATIVE FOR RESOLUTION.
THE CONTRACTOR SHALL ESTABLISH, COORDINATE, AND VERIFY ALL
OPENINGS AND INSERTS REQUIRED FOR ARCHITECTURAL,
MECHANICAL, ELECTRICAL, PLUMBING, SECURITY, AND OTHER
TRADES PRIOR TO CONSTRUCTION. NO PENETRATIONS THROUGH
STRUCTURAL MEMBERS ARE PERMITTED UNLESS SHOWN ON THE
STRUCTURAL DRAWINGS OR APPROVED BY THE STRUCTURAL
ENGINEER IN WRITING
CONSTRUCTION OBSERVATION BY THE STRUCTURAL ENGINEER IS
FOR VERIFICATION OF DESIGN ASPECTS ONLY, AND IS NOT INTENDED
IN ANY WAY TO REVIEW THE CONTRACTOR'S CONSTRUCTION
PROCEDURES.
ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE SPECIFIED
BUILDING CODE AND STANDARDS. IN THE CASE OF CONFLICTING
CODES AND STANDARDS, THE BUILDING CODE SHALL GOVERN.
DEFERRED ENGINEERED COMPONENT SYSTEMS SHALL BE
ENGINEERED BY A QUALIFIED PROFESSIONAL ENGINEER WHO IS
RETAINED BY THE PRODUCT MANUFACTURER. ALL ENGINEERED
COMPONENT DESIGN DRAWINGS AND CALCULATIONS SHALL BEAR
THE STAMP OF A LICENSED PROFESSIONAL ENGINEER, AND SHALL
BE SUBMITTED TO THE CONTRACTING OFFICER REPRESENTATIVE
FOR REVIEW PRIOR TO FABRICATION.
THE CONTRACTOR SHALL BE ENTIRELY RESPONSIBLE FOR
SELECTING PRODUCTS THAT MEET THE "BUY AMERICAN ACT" WHEN
REQUIRED BY THE CONTRACT.
CONSTRUCTION SEQUENCING AND STABILITY DURING ERECTION:
THE COMPLETED STRUCTURE IS DESIGNED TO RESIST CODE
REQUIRED GRAVITY AND LATERAL FORCES AFTER ALL PERMANENT
STRUCTURAL ELEMENTS, BRACING, AND SHEATHING ARE
INSTALLED. THE STRUCTURE MAY NOT BE STABLE UNTIL ALL
STRUCTURAL ELEMENTS AND SHEATHING ARE INSTALLED. THE
CONTRACTOR SHALL BE ENTIRELY RESPONSIBLE FOR DESIGNING
AND PROVIDING ALL TEMPORARY SHORING, TEMPORARY BRACING,
CONSTRUCTION SAFETY SYSTEMS, CONSTRUCTION SEQUENCING
AND/OR ALL OTHER MEANS AS NECESSARY TO PROVIDE STABILITY
AT ALL TIMES DURING CONSTRUCTION. THE CONTRACTOR SHALL
SUBMIT AN ERECTION PLAN TO INDICATE CONSTRUCTION
SEQUENCING AND TEMPORARY SHORING FOR REVIEW BY THE
CONTRACTING OFFICER REPRESENTATIVE PRIOR TO ERECTION.
PRODUCT SUBSTITUTIONS:
PRODUCT SUBSTITUTIONS MAY BE PERMITTED ONLY IF ALL
REQUIREMENTS OF THE CONTRACT DOCUMENTS ARE SATISFIED,
COMPLETE ENGINEERING DATA IS SUBMITTED TO THE STRUCTURAL
ENGINEER FOR REVIEW AT LEAST TWO WEEKS PRIOR TO
CONSTRUCTION, AND WRITTEN APPROVAL IS OBTAINED FROM THE
CONTRACTING OFFICER REPRESENTATIVE. ENGINEERING DATA SHALL
INCLUDE AS A MINIMUM THE ASSUMED BUILDING CODE, ALLOWABLE
STRESSES INCLUDING ASSUMED STRESS INCREASES (IF ANY), ACTUAL
MEMBER STRESSES, CONNECTION STRENGTHS, TOTAL DEFLECTION,
AND LIVE LOAD DEFLECTION. ALL INCREASED DESIGN AND
CONSTRUCTION COSTS WHICH RESULT FROM CONSIDERATION AND/OR
CONSTRUCTION OF ANY PRODUCT SUBSTITUTION, INCLUDING BUT NOT
LIMITED TO MECHANICAL/ELECTRICAL/STRUCTURAL/ARCHITECTURAL
COORDINATION, SHALL BE COMPENSATED BY THE GENERAL
CONTRACTOR.
DESIGN CRITERIA:
CODES AND STANDARDS:
BUILDING CODE:
UFC 1-200-01
"DOD BUILDING CODE", 8 OCT 2019 WITH CHANGE 1,
1 OCT 2020
IEBC 2018
"INTERNATIONAL EXISTING BUILDING CODE", 2018
DEPARTMENT OF DEFENSE STANDARDS:
UFC 3-301-01; 1 OCT 2019 WITH CHANGE 1, 4 FEB 2022
"STRUCTURAL ENGINEERING, WITH CHANGE 1"
UFC 4-010-01; 12 DEC 2018 WITH CHANGE 1, 19 AUG 2020
"DOD MINIMUM ANTITERRORISM STANDARDS FOR
BUILDINGS"
STANDARDS:
AISI S202
"CODE OF STANDARD PRACTICE FOR COLD-FORMED STEEL
FRAMING", 2015
AISI S240
"NORTH AMERICAN STANDARD FOR COLD-FORMED STEEL
STRUCTURAL FRAMING", 2015
ANSI/AISC 303
"CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS
AND BRIDGES"
ASCE 7
"MINIMUM DESIGN LOADS AND ASSOCIATED CRITERIA FOR
BUILDINGS AND OTHER STRUCTURES", 2016
AWS D1.1
"STRUCTURAL WELDING CODE-STEEL", 2015
ANTI-TERRORISM BLAST DESIGN CRITERIA:
DESIGN AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH UFC
4-010-01 "DoD MINIMUM ANTITERRORISM STANDARDS FOR
BUILDINGS"
EXTERIOR DOORS AND WINDOWS WILL SATISFY THE MINIMUM
REQUIREMENTS OF UFC 4-010-01
POST-INSTALLED CONCRETE ANCHORS:
POST-INSTALLED ANCHORS INTO HARDENED CONCRETE SHALL BE THE TYPE,
DIAMETER, AND MINIMUM EMBED DEPTH INDICATED ON THE CONTRACT
DRAWINGS. THE MINIMUM EMBEDMENT DEPTH SHALL BE 4 1/2 DIAMETERS
UNLESS INDICATED OTHERWISE.
DRILLED ANCHOR HOLES SHALL BE PREPARED IN STRICT ACCORDANCE WITH
THE MANUFACTURER'S RECOMMENDATIONS AND AS INDICATED ON THE
CONTRACT DOCUMENTS. DO NOT DRILL HOLES LARGER THAN SPECIFIED BY
THE MANUFACTURER.
ANCHORS SHALL SATISFY THE REQUIREMENTS OF ACI 318 APPENDIX D AS
MODIFIED BY IBC. ANCHORS SHALL BE SUITABLE FOR INSTALLATION INTO
UNCRACKED AND CRACKED CONCRETE FOR THE SEISMIC DESIGN CATEGORY
INDICATED ON THE STRUCTURAL GENERAL NOTES, AND SHALL BE
DOCUMENTED AS SUITABLE FOR USE BY ICC ENGINEERING REPORT. THE
CONTRACTOR SHALL SUBMIT PROPOSED ANCHORS TO THE STRUCTURAL
ENGINEER FOR REVIEW PRIOR TO INSTALLATION. ANCHORS SHALL BE
STAINLESS STEEL AISI 303, 304, OR 316 EXCEPT AT DRY, INTERIOR LOCATIONS
WHERE ANCHORS SHALL BE EITHER STAINLESS STEEL OR ZINC PLATED
CARBON STEEL.
EPOXY GROUT (DOWEL TYPE):
EPOXY GROUT SHALL BE A TWO-COMPONENT, 100% SOLIDS EPOXY, THAT IS
MANUFACTURED FOR THE PURPOSE OF ANCHORING DOWELS INTO HARDENED
CONCRETE. EPOXY SHALL BE MIXED AND DISPENSED IN STRICT ACCORDANCE
WITH THE MANUFACTURER'S RECOMMENDATIONS. EPOXY SHALL MEET THE
MINIMUM REQUIREMENTS OF ASTM C-881 SPECIFICATION FOR TYPE I, II, IV, AND
V, GRADE 3 (NON-SAGGING), CLASS "A" WHEN THE SURFACE OF THE HARDENED
CONCRETE TEMPERATURE IS LESS THAN 40 DEGREES FAHRENHEIT, CLASS "B"
WHEN THE HARDENED CONCRETE TEMPERATURE 40<T<60 DEGREES F, AND
CLASS "C" WHEN THE HARDENED CONCRETE TEMPERATURE EXCEEDS 60
DEGREE F. THE EPOXY MUST DEVELOP A MINIMUM BOND STRENGTH OF 1500
PSI AFTER A 14-DAY CURE (ASTM C-882), A MINIMUM COMPRESSIVE YIELD
STRENGTH OF 10,000 PSI AFTER A 7-DAY CURE (ASTM D-695), A MINIMUM
COMPRESSIVE MODULUS OF 200 KSI AFTER A 7-DAY CURE (ASTM D-695), AND A
MINIMUM TENSILE STRENGTH OF 6310 PSI AFTER A 7-DAY CURE (ASTM D-638).
EPOXY SHALL HAVE A HEAT DEFLECTION TEMPERATURE OF 120 DEGREES
FAHRENHEIT MINIMUM AFTER A 7-DAY CURE (ASTM D-648).
DESIGN LOADS:
RISK CATEGORY = II (UFC 3-301-01 TABLE 2-2)
LOCATION (LATITUDE/LONGITUDE) = 43.0444129 N, -115.8619784 W
SEISMIC LOADS FOR NONSTRUCTURAL COMPONENTS:
FP = .4 aP SDS WP (1 + 2 (z/h)) / (RP/IP)
FP MAX = 1.6 SDS IP WP
FP MIN = 0.3 SDS IP WP
SITE CLASS = D (ASSUMED)
SS = 0.259 g (.2 SECOND MCE SPECTRAL ACCELERATION) S1 = 0.094 g (1.0 SECOND MCE SPECTRAL ACCELERATION)
SEISMIC IMPORTANCE FACTOR IP = 1.0
SITE COEFFICIENT Fa = 1.592 SITE COEFFICIENT Fv = 2.4
SDS = 0.275
SD1 = 0.151
SEISMIC DESIGN CATEGORY = C
WIND LOADS:
BASIC WIND SPEED (3 SECOND GUST) = 115 (MPH)
WIND EXPOSURE = C
ENCLOSURE CLASSIFICATION = PARTIALLY OPEN
CONCRETE MASONRY UNITS (CMU) REPAIR:
CMU REPAIR WILL CONFORM TO SPECIFICATION 04 03 00
SHEET OF
Drawing No:
B U
IL
D
IN
G
V
E H
IC
IN
T
E N
A N
C E
S H
O P
D
O O
R S
W
IN
D
O W
S A
N D
E X
T E
R
IO
R W
A L
P
A
IR
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C H
E C
K E
D B
Y
A
B
C
D
E
F
2 3 4 5 6 7 8
DEPARTMENT OF
THE AIR FORCE
AIR
COMBAT COMMAND
MOUNTAIN HOME AFB.
VEHICLE
MAINTENANCE
SHOP
S y m b o l
D e s c ri p ti o n
D a te
A p p ro v a l
D A
T E
P R
O J E
C T
W J
A P
R O
J E
C T
-2
FINAL DESIGN SUBMITTAL - NOVEMBER 7, 2022
/0
/2
S-001
S T
R U
C T
U R
A L
G E
N E
R A
L N
O T
E S
D J H
D J H
C T
3 12
TYP CORNER PILASTER CONDITIONS
(N) AIR-ENTRAINED REPAIR MORTAR
PATCH-MATCH (E) BLOCK AND MORTAR
JOINT APPEARANCE AND TEXTURE
TYP FIELD PILASTER CONDITIONS
NOTES:
1) FOR ADDITIONAL CALLOUTS SEE SPECIFICATION 04 03 00 "MASONRY REPAIR"
2) REPAIR MORTAR PATCH WILL HAVE ENTRAINED AIR ADMIXTURE WITH 15 PERCENT TOTAL AIR CONTENT +/- 3 PERCENT BY VOLUME.
3) UNIT PRICE QUANTITY ESTIMATE = 9 LOCATIONS FOR BIDDING
REMOVE PAINT, CLEAN SURFACE-APPLY
WATER TO BRING SURFACE TO SATURATED
SURFACE DRY CONDITION IMMEDIATELY
PRIOR TO APPLYING PATCH
FOR ADDITIONAL CALLOUTS
SEE "TYP CORNER PILASTER
CONDITIONS" NOTES
TYP CMU OUTSIDE CORNER CONDITIONS
FOR ADDITIONAL CALLOUTS
SEE "TYP CORNER PILASTER
CONDITIONS" NOTES
DRILL 3/8" DIA X 3" HOLE-CLEAN AND FILL
W/EPOXY GROUT (DOWEL TYPE) EA
ANCHOR-DO NOT DRILL THROUGH REBAR
1/4" DIA STAINLESS STEEL ALL-THREAD
@ 3" OC EW (ASTM 193 AISI 316)
1/2" CLR TYP
M
IN
/2 E
M B
E D
TYP CMU CRACK REPAIR ELEVATION
NOTES:
1) FOR ADDITIONAL CALLOUTS SEE SPECIFICATION 04 03 00
"MASONRY REPAIR"
2) UNIT PRICE CRACK REPAIR QUANTITY ESTIMATE = 10 LINEAL
FEET FOR BIDDING
REMOVE SURFACE PAINT
AND CLEAN CMU-INJECT
CRACKS THAT HAVE WIDTH
BETWEEN 1/32" AND 1/8"
WIDE. APPLY (N) REPAIR
MORTAR COATING OVER (E)
CRACKS ON EXTERIOR
SURFACE-TOOL MORTAR
JOINTS TO MATCH
ADJACENT JOINT PATTERN
TYP. APPLY WALL PAINT
COATING SYSTEM AFTER
CRACK REPAIRS ARE
COMPLETED.
TYP CMU WALL INDENTATION REPAIR ELEVATION
NOTES:
1) FOR ADDITIONAL CALLOUTS SEE SPECIFICATION 04 03 00 "MASONRY REPAIR"
2) UNIT PRICE WALL INDENTATION QUANTITY ESTIMATE = 20 EA FOR BIDDING
EXISTING WALL
INDENTATION OR HOLE
WITH DEPTH THAT
EXCEEDS 3/8" RELATIVE
TO EXTERIOR FACE OF
CMU
REMOVE EXISTING PAINT
AND CLEAN CMU
SURFACE. PROVIDE NEW
REPAIR MORTAR FLUSH
WITH EXTERIOR CMU
SURFACE
SHEET OF
Drawing No:
B U
IL
D
IN
G
V
E H
IC
IN
T
E N
A N
C E
S H
O P
D
O O
R S
W
IN
D
O W
S A
N D
E X
T E
R
IO
R W
A L
P
A
IR
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C H
E C
K E
D B
Y
A
B
C
D
E
F
2 3 4 5 6 7 8
DEPARTMENT OF
THE AIR FORCE
AIR
COMBAT COMMAND
MOUNTAIN HOME AFB.
VEHICLE
MAINTENANCE
SHOP
S y m b o l
D e s c ri p ti o n
D a te
A p p ro v a l
D A
T E
P R
O J E
C T
W J
A P
R O
J E
C T
-2
FINAL DESIGN SUBMITTAL - NOVEMBER 7, 2022
/0
/2
S-501
C M
U R
E P
A
IR
D E
T A
IL
S
D J H
D J H
C T
S
1" = 1'-0"1
TYP EXTERIOR CMU PILASTER CORNER
REPAIR
0'
SCALE:
6" 1' 2' 4'
1" = 1'-0"
1" = 1'-0"2
TYP EXTERIOR CMU CRACK REPAIR
1" = 1'-0"3
TYP EXTERIOR CMU INDENTATION REPAIR
4 12
SYMBOLS
W33
P3
Room name
PLAN
NORTH
HATCH SYMBOLS
CG
FEC
CALL-OUTS
GENERAL NOTES
ELEVATION & BUILDING, WALL, SECTION SYMBOL
NUMBER INDICATES SECTION/ELEVATION
SHEET NUMBER WHERE SECTION/ELEVATION IS DRAWN
DETAIL SYMBOL
NUMBER INDICATES DETAIL
SHEET NUMBER WHERE DETAIL IS DRAWN
INTERIOR ELEVATION SYMBOL
NUMBER INDICATES INTERIOR ELEVATION
COMPASS POINTS INDICATES WHICH ELEVATIONS ARE DRAWN
SHEET NUMBER WHERE ELEVATION IS DRAWN
VERTICAL OR SPOT ELEVATION
A-301
A-501
A-211
1. REPETITIVE FEATURES NOT NOTED ON THE DRAWINGS SHALL BE COMPLETELY
PROVIDED AS IF DRAWN IN FULL.
2. DIMENSIONS ON DRAWINGS ARE TAKEN TO/FROM THE LOCATIONS LISTED BELOW
UNLESS OTHERWISE INDICATED:
GRID LINES
FACE OF WALL UNLESS CENTERED ON GRID
ROUGH OPENING FOR WINDOWS AND DOORS IN MASONRY WALLS
CENTERLINES OF DOORS IN METAL STUD WALLS
FACE OF MASONRY
3. PLAN VIEWS ARE CUT AT 4'-0" AFF.
4. MECHANICAL AND ELECTRICAL INFORMATION SHOWN ON THE ARCHITECTURAL
DRAWINGS ARE PROVIDED FOR CLARITY AND/OR LOCATIONAL PURPOSES ONLY.
SEE MECHANICAL AND ELECTRICAL DRAWINGS.
5. ALL WORK SHALL COMPLY WITH THE FOLLOWING:
• 2018 INTERNATIONAL BUILDING CODE (IBC)
• UFC 1-200-01 DOD BUILDING CODE
• UFC 1-200-02 HIGH PERFORMANCE AND SUSTAINABLE BUILDING REQUIREMENT
• UFC 3-010-01 ARCHITECTURE
• UFC 3-190-06 PROTECTIVE COATINGS AND PAINTS
• AIR FORCE BASE INTALLATION FACILITIES STANDARDS (AFCFS)
• MOUNTAIN HOME AIR FORCE BASE INSTALLATION FACILITIES STANDARDS (IFS)
FOR A GROUP 3 FACILITY
6. ROOM AND DOOR NUMBERS SHOWN ON DRAWINGS ARE FOR CONSTRUCTION
PURPOSES ONLY.
IDENTIFICATION
CONSTRUCTION GRID LINE
AND BUBBLE
WALL TYPE
KEYNOTE
WINDOW, LOUVER
GUARDRAILG33
REVISION
DOOR
ROOM NAME
FLOOR FINISH
TRANSITION
FIRE
EXTINGUISHER
CABINET - SEMI-
RECESSED
CORNER
GUARD
LOCATION
NORTH ARROW
ROOM NUMBER
(FOR CONSTRUCTION ONLY)
GD ?
FURNITURE,
FIXTURE,AND
EQUIPEMENT
FEB
FIRE
EXTINGUISHER
BRACKET -
SURFACE MOUNT
CPT LVT
LEVEL 1
100'-0"
ABBREVIATIONS
EXISTING BALLASTED
ASPHALT ROOF
CONCRETE
MASONRY
PLYWOOD
FINISH LUMBER
CONT. WOOD
STUDS
EXISTING METAL
PANEL ROOF
BLOCKING
EXISTING
A#
SHEET OF
Drawing No:
B U
IL
D
IN
G
V
E H
IC
IN
T
E N
A N
C E
S H
O P
D
O O
R S
W
IN
D
O W
S A
N D
E X
T E
R
IO
R W
A L
P
A
IR
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C H
E C
K E
D B
Y
A
B
C
D
E
F
2 3 4 5 6 7 8
DEPARTMENT OF
THE AIR FORCE
AIR
COMBAT COMMAND
MOUNTAIN HOME AFB.
VEHICLE
MAINTENANCE
SHOP
S y m b o l
D e s c ri p ti o n
D a te
A p p ro v a l
D A
T E
P R
O J E
C T
W J
A P
R O
J E
C T
-2
FINAL DESIGN SUBMITTAL - NOVEMBER 7, 2022
/0
/2
A-001
A R
C H
IT
E
C T
U R
A L
G E
N E
R A
L N
O T
E S
L
E G
E N
D S
L D
Y
S
L D
Y
S
J B
AB ANCHOR BOLT
ACT ACOUSTICAL CEILING TILE
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
AIB AIR INFILTRATION BARRIER
ALUM ALUMINUM
ARCH ARCHITECT (URAL)
AV AUDIO VISUAL
BD BOARD
BLDG BUILDING
BLK BLOCKING
BO BOTTOM OF
CBB CEMENTITIOUS BACKER BOARD
CF/CI CONTRACTOR FURNISHED/
CONTRACTOR INSTALLED
CF/OI CONTRACTOR FURNISHED/ OWNER
INSTALLED
CG CORNER GUARD
CI CONTINUOUS INSULATION
CIP CAST-IN-PLACE
CIRC CIRCULATION
CJ CONTROL JOINT
CLG CEILING
CLR CLEAR/ CLEARANCE
CMU CONCRETE MASONRY UNIT
CNTR CENTER
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
DBL DOUBLE
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIM DIMENSION
DS DOWNSPOUT
DWG DRAWING
E EAST
EA EACH
EJ EXPANSION JOINT
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EPS EXPANDED POLYSTYRENE
EPT EXTERIOR PAINT
EQ EQUAL
EQUIP EQUIPMENT
EW EACH WAY
EXIST EXISTING
EXT EXTERIOR
FA FIRE ALARM
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEB FIRE EXTINGUISHER BRACKET
FEC FIRE EXTINGUISHER CABINET
FF FINISHED FLOOR
FLR FLOOR (ING)
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FOS FACE OF STUD
FP FIRE PROTECTION
FRTW FIRE RETARDANT TREATED WOOD
FT FEET
FTG FOOTING
GA GAUGE
GALV GALVANIZED
GB GRAB BAR
GL GRID LINE
GWB GYPSUM WALL BOARD
GYP GYPSUM
HM HOLLOW METAL
HORIZ HORIZONTAL
HT HEIGHT
HW HARDWARE
IJ ISOLATION JOINT
INSUL INSULATION
INT INTERIOR
IPT INTERIOR PAINT
IT INFORMATION TECHNOLOGY
JAN JANITOR
JST JOIST
LH LEFT HAND
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
m METER
MAT MATERIAL
MAX MAXIMUM
MB MOISTURE BARRIER
MECH MECHANICAL
MEP MECHANICAL, ELECTRICAL,
PLUMBING
MFR MANUFACTURER
MIN MINIMUM
mm MILLIMETER
MO MASONRY OPENING
MR MOISTURE RESISTANT
MTD MOUNTED
MTL METAL
N NORTH
NE NORTH EAST
NIC NOT IN CONTRACT
NO NUMBER
NTS NOT TO SCALE
NW NORTHWEST
OC ON CENTER
OD OUTSIDE DIAMETER
OF/CI OWNER FURNISHED/ CONTRACTOR
INSTALLED
OF/OI OWNER FURNISHED/ OWNER
INSTALLED
OPH OPPOSITE HAND
OPP OPPOSITE
OSB ORIENTED STRAND BOARD
OTS OPEN TO STRUCTURE
PCF POUNDS PER CUBIC FOOT
PERP PERPENDICULAR
PLAM PLASTIC LAMINATE
PLYWD PLYWOOD
PNL PANEL
POLY POLYSTYRENE
PREFIN PREFINISHED
PT PAINT
PTDWR PAPER TOWEL DISPENSER/ WASTE
RECEPTACLE
PTL PORCELAIN TILE
PTWD PRESSURE TREATED WOOD
QT QUARRY TILE
R RISER
RB RUBBER BASE
RCP REFLECTED CEILING PLAN
REF REFERENCE
REQ'D REQUIRED
RES RESILIENT
REST RESTROOM
REV REVISION
RH RIGHT HAND
RM ROOM
RO ROUGH OPENING
S SOUTH
S2S SURFACED TWO SIDES
S4S SURFACED FOUR SIDES
SCWD SOLID CORE WOOD DOOR
SD SOAP DISPENSER
SE SOUTHEAST
SF SQUARE FOOT (FEET)
SH SOAP HOLDER
SIM SIMILAR
SM SQUARE METER
SND SANITARY NAPKIN & TAMPON
DISPOSAL RECEPTACLE
SPEC SPECIFICATION
SQ SQUARE
SST STAINLESS STEEL
STC SOUND TRANSMISSION CLASS
SW SOUTHWEST
T TREAD
T & G TONGUE AND GROOVE
TB TOWEL BAR
TBD TO BE DETERMINED
TO TOP OF
TOS TOP OF SLAB OR STEEL
TP TOILET PARTITION
TPD TOILET PAPER DISPENSER
TS TUBE STEEL
TSCD TOILET SEAT COVER DISPENSER
TV TELEVISION
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VR VAPOR RETARDER
W WEST
W/ WITH
WC WALL COVERING
WD WOOD
WF WIDE FLANGE
WOM WALK OFF MAT
WP WALL PANEL
WR WATER RESISTANT
WRB WEATHER RESISTIVE BARRIER
WT WINDOW TREATMENT
5 12
UP
UP
UP
UP
A-202
A-201
A-201
A-202
A
H
3 6
B
G
K
4 5
C
D
E
F
84'-9" 29'-5" 29'-3" 81'-6" 29'-3" 31'-9"
E
E
D
BBB
F
A A136 101
101B127131128130B
130A
116B
108107
104136
MAINTENANCE
AREA
A-201
21 7
M
285'-11"
A-202
A-201
A01
A01
A01
A01
A02
A02
A02 A02 A02 A02A02 A02
A02
A02
A02
A02
A02
A01
A01A01A01
A01
A02A02
A02
A02
A02
A02
FLOOR PLAN GENERAL NOTES
1. REFERENCE SHEET A-001 FOR ABBREVIATIONS, SYMBOL
LEGENDS, ADDITIONAL DRAWING CONVENTIONS AND
GENERAL NOTES.
2. REFERENCE SHEETS A-201/A-202/A-501 FOR WINDOW
TYPES AND A-601 FOR DOOR TYPES.
3. PLAN VIEWS ARE CUT AT 4'-0" AFF.
4. REMOVE EXISTING PRECASE WINDOW SILLS WHERE NEW
WINDOWS ARE INSTALLED.
5. AL WINDOW FRAME FINISHES TO BE DARK BRONZE
ANODIZED UNLESS OTHERWISE INDICATED.
6. FIELD VERIFY ALL ROUGH OPENINGS AND WINDOW TYPES.
SHEET OF
Drawing No:
B U
IL
D
IN
G
V
E H
IC
IN
T
E N
A N
C E
S H
O P
D
O O
R S
W
IN
D
O W
S A
N D
E X
T E
R
IO
R W
A L
P
A
IR
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C H
E C
K E
D B
Y
A
B
C
D
E
F
2 3 4 5 6 7 8
DEPARTMENT OF
THE AIR FORCE
AIR
COMBAT COMMAND
MOUNTAIN HOME AFB.
VEHICLE
MAINTENANCE
SHOP
S y m b o l
D e s c ri p ti o n
D a te
A p p ro v a l
D A
T E
P R
O J E
C T
W J
A P
R O
J E
C T
-2
FINAL DESIGN SUBMITTAL - NOVEMBER 7, 2022
/0
/2
A-101
F
IR
S T
F L
O O
R P
L A
N
L D
Y
S
L D
Y
S
J B
1/16" = 1'-0"1
FIRST FLOOR PLAN
0'
SCALE:
8' 16' 32' 64'
1/16" = 1'-0"
PLAN
NORTH
KEYNOTE LEGEND - NEW WORK
Key Value Keynote Text
A01 REMOVE EXISTING WINDOW. INSTALL NEW WINDOW
PER TYPE ON SHEET A-501.
A02 REMOVE EXISTING DOOR. INSTALL NEW DOOR PER
SCHEDULE ON SHEET A-601
6 12
A-202
A-201
A-201
A-202
A
H
3 6
B
G
K
4 5
C
D
E
F
OPEN TO BELOW
OPEN TO BELOW
OPEN TO BELOW
OPEN TO BELOW
A-201
21 7
M
285'-11"
84'-9" 29'-5" 29'-3" 81'-6" 29'-3" 31'-9"
A-202
A-201
A01
A01
A01
A01
A01 A01
A01
A01
A01
A01
A01
A01 A01
A01A01
L
L
L
L
L
H
J
J
J
J
C
KL
A A
G A01
FLOOR PLAN GENERAL NOTES
1. REFERENCE SHEET A-001 FOR ABBREVIATIONS,
SYMBOL LEGENDS, ADDITIONAL DRAWING
CONVENTIONS AND GENERAL NOTES.
2. REFERENCE SHEETS A-201/A-202/A-501 FOR WINDOW
TYPES AND A-601 FOR DOOR TYPES.
3. PLAN VIEWS ARE CUT AT 4'-0" AFF.
4. AL WINDOW FRAME FINISHES TO BE DARK BRONZE
ANODIZED UNLESS OTHERWISE INDICATED.
5. FIELD VERIFY ALL ROUGH OPENINGS AND WINDOW
TYPES.
SHEET OF
Drawing No:
B U
IL
D
IN
G
V
E H
IC
IN
T
E N
A N
C E
S H
O P
D
O O
R S
W
IN
D
O W
S A
N D
E X
T E
R
IO
R W
A L
P
A
IR
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C H
E C
K E
D B
Y
A
B
C
D
E
F
2 3 4 5 6 7 8
DEPARTMENT OF
THE AIR FORCE
AIR
COMBAT COMMAND
MOUNTAIN HOME AFB.
VEHICLE
MAINTENANCE
SHOP
S y m b o l
D e s c ri p ti o n
D a te
A p p ro v a l
D A
T E
P R
O J E
C T
W J
A P
R O
J E
C T
-2
FINAL DESIGN SUBMITTAL - NOVEMBER 7, 2022
/0
/2
A-102
C L
E R
E S
T O
R Y
L D
Y
S
L D
Y
S
J B
1/16" = 1'-0"1
CLERESTORY
0'
SCALE:
8' 16' 32' 64'
1/16" = 1'-0"
PLAN
NORTH
KEYNOTE LEGEND - NEW WORK
Key Value Keynote Text
A01 REMOVE EXISTING WINDOW. INSTALL NEW WINDOW
PER TYPE ON SHEET A-501.
7 12
DEEF
J H GK JJJ
A01 A01 A01 A01 A01 A01 A01
A01 A01 A01 A01
A02 A02A02A02
A02
C
BB B A A
A A
A02 A02A02
A01
A01A01
A01
A01
A01 A01A01 A02
A02
ELEVATION GENERAL NOTES
1. REFERENCE SHEET A-001 FOR ABBREVIATIONS,
SYMBOL LEGENDS, ADDITIONAL DRAWING
CONVENTIONS AND GENERAL NOTES.
2. FIELD VERIFY ALL ROUGH OPENINGS.
SHEET OF
Drawing No:
B U
IL
D
IN
G
V
E H
IC
IN
T
E N
A N
C E
S H
O P
D
O O
R S
W
IN
D
O W
S A
N D
E X
T E
R
IO
R W
A L
P
A
IR
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C H
E C
K E
D B
Y
A
B
C
D
E
F
2 3 4 5 6 7 8
DEPARTMENT OF
THE AIR FORCE
AIR
COMBAT COMMAND
MOUNTAIN HOME AFB.
VEHICLE
MAINTENANCE
SHOP
S y m b o l
D e s c ri p ti o n
D a te
A p p ro v a l
D A
T E
P R
O J E
C T
W J
A P
R O
J E
C T
-2
FINAL DESIGN SUBMITTAL - NOVEMBER 7, 2022
/0
/2
A-201
B U
IL
D
IN
G
E L
E V
A T
IO
N
S
L D
,Y S
L D
,Y S
J B
3/32" = 1'-0"3
EAST ELEVATION
3/32" = 1'-0"1
NORTH ELEVATION
0'
SCALE:
10' 20'
3/32" = 1'-0"
5'
3/32" = 1'-0"2
NORTH ELEVATION
3/32" = 1'-0"4
EAST ELEVATION
KEYNOTE LEGEND - NEW WORK
Key Value Keynote Text
A01 REMOVE EXISTING WINDOW. INSTALL NEW WINDOW
PER TYPE ON SHEET A-501.
A02 REMOVE EXISTING DOOR. INSTALL NEW DOOR PER
EXISTING GLASS
BLOCKS TO REMAIN
A02A02A02A02A02
L L LLL
A01 A01 A01 A01 A01
A02 A02
ELEVATION GENERAL NOTES
1. REFERENCE SHEET A-001 FOR ABBREVIATIONS,
SYMBOL LEGENDS, ADDITIONAL DRAWING
CONVENTIONS AND GENERAL NOTES.
2. FIELD VERIFY ALL ROUGH OPENINGS.
SHEET OF
Drawing No:
B U
IL
D
IN
G
V
E H
IC
IN
T
E N
A N
C E
S H
O P
D
O O
R S
W
IN
D
O W
S A
N D
E X
T E
R
IO
R W
A L
P
A
IR
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C H
E C
K E
D B
Y
A
B
C
D
E
F
2 3 4 5 6 7 8
DEPARTMENT OF
THE AIR FORCE
AIR
COMBAT COMMAND
MOUNTAIN HOME AFB.
VEHICLE
MAINTENANCE
SHOP
S y m b o l
D e s c ri p ti o n
D a te
A p p ro v a l
D A
T E
P R
O J E
C T
W J
A P
R O
J E
C T
-2
FINAL DESIGN SUBMITTAL - NOVEMBER 7, 2022
/0
/2
A-202
B U
IL
D
IN
G
E L
E V
A T
IO
N
S
L D
,Y S
L D
,Y S
J B
3/32" = 1'-0"1
SOUTH ELEVATION
3/32" = 1'-0"2
WEST ELEVATION
3/32" = 1'-0"3
WEST ELEVATION
0'
SCALE:
10' 20'
3/32" = 1'-0"
5'
KEYNOTE LEGEND - NEW WORK
Key Value Keynote Text
A01 REMOVE EXISTING WINDOW. INSTALL NEW WINDOW
PER TYPE ON SHEET A-501.
A02 REMOVE EXISTING DOOR. INSTALL NEW DOOR PER
9 12
8'-0"
8'-0"
8'-2"
16'-0"
12'-0"
4'-0"
LEVEL 1
100'-0"
/2
7'-6"
LEVEL 6
100'-0"
7'-6"
20'-0"
20'-0"
20'-0"
WINDOW GENERAL NOTES
1. REFERENCE SHEET A-001 FOR ABBREVIATIONS, SYMBOLS,
LEGENDS, ADDITIONAL DRAWING CONVENTIONS AND GENERAL
NOTES.
2. LOCATIONS OF OPENINGS ARE EXISTING AND DIMENSIONED HERE
FOR REFERENCE ONLY.
3. FIELD VERIFY ALL ROUGH OPENINGS.
SHEET OF
Drawing No:
B U
IL
D
IN
G
V
E H
IC
IN
T
E N
A N
C E
S H
O P
D
O O
R S
W
IN
D
O W
S A
N D
E X
T E
R
IO
R W
A L
P
A
IR
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C H
E C
K E
D B
Y
A
B
C
D
E
F
2 3 4 5 6 7 8
DEPARTMENT OF
THE AIR FORCE
AIR
COMBAT COMMAND
MOUNTAIN HOME AFB.
VEHICLE
MAINTENANCE
SHOP
S y m b o l
D e s c ri p ti o n
D a te
A p p ro v a l
D A
T E
P R
O J E
C T
W J
A P
R O
J E
C T
-2
FINAL DESIGN SUBMITTAL - NOVEMBER 7, 2022
/0
/2
A-501
W
IN
D O
W T
Y P
E S
L D
,Y S
L D
,Y S
J B
0'
SCALE:
2' 4' 8' 16'
1/4" = 1'-0"
SCALE : 1/4" = 1'-0"
TYPE A
SCALE : 1/4" = 1'-0"
TYPE F
SCALE : 1/4" = 1'-0"
TYPE B
SCALE : 1/4" = 1'-0"
TYPE C
SCALE : 1/4" = 1'-0"
TYPE D
SCALE : 1/4" = 1'-0"
TYPE E
SCALE : 1/4" = 1'-0"
TYPE G
SCALE : 1/4" = 1'-0"
TYPE H
SCALE : 1/4" = 1'-0"
TYPE J
SCALE : 1/4" = 1'-0"
TYPE K
SCALE : 1/4" = 1'-0"
TYPE L
10 12
INT. EXT.
(E) CONCRETE OR
CMU WALL
(E) INTERIOR FINISH
SEALANT AND
BACKER ROD, EA.
SIDE
FULLY-GROUTED
HOLLOW
METAL FRAME
DOOR PANEL PER
SCHEDULE
VARIES (VIF)
8" 2 1/2"
GWB, FINISH TO
MATCH EXISTING.
INT. EXT.
HM DOOR WITH
INSULATION,
WEATHERSTRIPPING
AND DOOR BOTTOM.
1:2 MAX SLOPE AND 1/4"
MAX VERTICAL
ELEVATION CHANGE AT
THRESHOLD
DOOR SHOE WITH
RAINDRIP
THRESHOLD SET IN
SEALANT
DOOR SWEEP
INT. EXT.
(E) MASONRY LINTEL
SEALANT AND
BACKER ROD
3/4" PLAM SILL
(E) CONCRETE OR
CMU WALL
VARIES (VIF)
8" 2 1/2"
INSTALL PER
MANUFACTURER'S
REQUIREMENTS
INT. EXT.
(E) CONCRETE OR
CMU WALL
(E) INTERIOR FINISH
SEALANT AND
BACKER ROD, EA.
SIDE
VARIES (VIF)
8" 2 1/2"
GWB, FINISH TO
MATCH EXISTING.
DETAIL LEGEND
EXISTING BUILDING ASSEMBLES.
VERIFY CONDITIONS IN FIELD,
VERIFY IN FIELD (VIF).
SHEET OF
Drawing No:
B U
IL
D
IN
G
V
E H
IC
IN
T
E N
A N
C E
S H
O P
D
O O
R S
W
IN
D
O W
S A
N D
E X
T E
R
IO
R W
A L
P
A
IR
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C H
E C
K E
D B
Y
A
B
C
D
E
F
2 3 4 5 6 7 8
DEPARTMENT OF
THE AIR FORCE
AIR
COMBAT COMMAND
MOUNTAIN HOME AFB.
VEHICLE
MAINTENANCE
SHOP
S y m b o l
D e s c ri p ti o n
D a te
A p p ro v a l
D A
T E
P R
O J E
C T
W J
A P
R O
J E
C T
-2
FINAL DESIGN SUBMITTAL - NOVEMBER 7, 2022
/0
/2
A-502
D E
T A
IL
S
D e s ig n e r
A u th o r
C h e c k e r
3" = 1'-0"1
EXT. DOOR HEAD (JAMB SIM.)
1 1/2" = 1'-0"2
EXT. DOOR THRESHOLD
3" = 1'-0"4
EXT. WINDOW SILL
3" = 1'-0"3
EXT. WINDOW HEAD (JAMB SIM.)
0'
SCALE:
3" 6" 9"
3" = 1'-0"
0'
SCALE:
1/2" 1' 1'-6"
1 1/2" = 1'-0"
11 12
1 2
2" 2"
PER SCHEDULE
WIDTH
3'-0" 2"
A B C D
G-1
DOOR GENERAL NOTES
1. REFERENCE SHEET A-001 FOR ABBREVIATIONS, SYMBOLS,
LEGENDS, ADDITIONAL DRAWING CONVENTIONS AND
GENERAL NOTES.
2. FIELD VERIFY ROUGH OPENINGS.
3. EGRESS DOORS SHALL BE READILY OPERABLE FROM EGRESS
SIDE WITHOUT USE OF KEY OR ANY SPECIAL KNOWLEDGE OR
EFFORT.
4. ALL EXTERIOR DOORS TO BE WEATHERSTRIPPED.
5. ALL EXTERIOR HM DOORS AND FRAMES TO BE GALVANIZED.
6. ALL EXTERIOR DOORS SHALL HAVE 10" MINIMUM BOTTOM
RAIL.
7. PROVIDE EXTERIOR DOORS WITH KEYED LOCKS WITH
HANDLE THAT WILL ACCEPT "BEST" CORES/LOCKS WITH
PANIC HARDWARE AND SURFACE MOUNTED DOOR CLOSERS.
8. ALL HM DOORS SHALL HAVE INSULATED CORE (U-VALUE 0.37
AT GLASS DOORS, U-VALUE 0.48 AT OPAQUE DOORS, R-
VALUE .
9. ALL EXTERIOR SWING DOORS SHALL HAVE A MAXIMUM AIR
RATE OF 0.20 CFM/SQ FT PER NFRC 400 OR
AAMA/WDMA/CSA101/I.S.2/A440
GLAZING TYPES
G-1 LAMINATED SAFTEY GLAZING
SHEET OF
Drawing No:
B U
IL
D
IN
G
V
E H
IC
IN
T
E N
A N
C E
S H
O P
D
O O
R S
W
IN
D
O W
S A
N D
E X
T E
R
IO
R W
A L
P
A
IR
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C H
E C
K E
D B
Y
A
B
C
D
E
F
2 3 4 5 6 7 8
DEPARTMENT OF
THE AIR FORCE
AIR
COMBAT COMMAND
MOUNTAIN HOME AFB.
VEHICLE
MAINTENANCE
SHOP
S y m b o l
D e s c ri p ti o n
D a te
A p p ro v a l
D A
T E
P R
O J E
C T
W J
A P
R O
J E
C T
-2
FINAL DESIGN SUBMITTAL - NOVEMBER 7, 2022
/0
/2
A-601
D O
O R
S C
H E
D U
L E
A N
D L
E G
E N
D
L D
Y
S
L D
Y
S
J B
SCALE : 1/4" = 1'-0"
DOOR FRAME LEGEND
SCALE : 1/4" = 1'-0"
DOOR PANEL LEGEND
Door Schedule
NUMBER
DOOR FRAME
Door - Rating Hardware CommentsTYPE
SIZE
MATERIAL FINISH TYPE MATERIAL FINISH
DETAIL
WIDTH HEIGHT THICKNESS HEAD JAMB THRESHOLD
101 B 3'-0" 7'-0" 1 3/4" HM MATCH (EXST) 1 HM MATCH (EXST) 1/A-502 1/A-502 SIM. 2/A-502
101B B 3'-0" 7'-0" 1 3/4" HM MATCH (EXST) 1 HM MATCH (EXST) 1/A-502 1/A-502 SIM. 2/A-502
103 B 3'-0" 7'-0" 1 3/4" HM MATCH (EXST) 1 HM MATCH (EXST) 1/A-502 1/A-502 SIM. 2/A-502
113 D 6'-0" 7'-0" 1 3/4" HM MATCH (EXST) 2 HM MATCH (EXST) 1/A-502 1/A-502 SIM. 2/A-502 -
115 B 3'-0" 7'-0" 1 3/4" HM MATCH (EXST) 1 HM MATCH (EXST) 1/A-502 1/A-502 SIM. 2/A-502
116 A 3'-0" 7'-0" 1 3/4" HM MATCH (EXST) 1 HM MATCH (EXST) 1/A-502 1/A-502 SIM. 2/A-502
119 B 3'-0" 7'-0" 1 3/4" HM MATCH (EXST) 1 HM MATCH (EXST) 1/A-502 1/A-502 SIM. 2/A-502
123 B 3'-0" 7'-0" 1 3/4" HM MATCH (EXST) 1 HM MATCH (EXST) 1/A-502 1/A-502 SIM. 2/A-502
127 A 3'-0" 7'-0" 1 3/4" HM MATCH (EXST) 1 HM MATCH (EXST) 1/A-502 1/A-502 SIM. 2/A-502
128 B 3'-0" 7'-0" 1 3/4" HM MATCH (EXST) 1 HM MATCH (EXST) 1/A-502 1/A-502 SIM. 2/A-502
129 B 3'-0" 7'-0" 1 3/4" HM MATCH (EXST) 1 HM MATCH (EXST) 1/A-502 1/A-502 SIM. 2/A-502
130A B 3'-0" 7'-0" 1 3/4" HM MATCH (EXST) 1 HM MATCH (EXST) 1/A-502 1/A-502 SIM. 2/A-502
130B B 3'-0" 7'-0" 1 3/4" HM MATCH (EXST) 1 HM MATCH (EXST) 1/A-502 1/A-502 SIM. 2/A-502
131 B 3'-0" 7'-0" 1 3/4" HM MATCH (EXST) 1 HM MATCH (EXST) 1/A-502 1/A-502 SIM. 2/A-502
133 C 6'-0" 7'-0" 1 3/4" HM MATCH (EXST) 2 HM MATCH (EXST) 1/A-502 1/A-502 SIM. 2/A-502 -
135 B 3'-0" 7'-0" 1 3/4" HM MATCH (EXST) 1 HM MATCH (EXST) 1/A-502 1/A-502 SIM. 2/A-502
136 B 3'-0" 7'-0" 1 3/4" HM MATCH (EXST) 1 HM MATCH (EXST) 1/A-502 1/A-502 SIM. 2/A-502
174 A 3'-0" 7'-0" 1 3/4" HM MATCH (EXST) 1 HM MATCH (EXST) 1/A-502 1/A-502 SIM. 2/A-502
182 B 3'-0" 7'-0" 1 3/4" HM MATCH (EXST) 1 HM MATCH (EXST) 1/A-502 1/A-502 SIM. 2/A-502
0'
SCALE:
2' 4' 8' 16'
1/4" = 1'-0"
G-1
12 12
| GENERAL |
| G-001 - TITLE SHEET, SHEET INDEX |
| G-002 - PROJECT SITE MAP |
| STRUCTURAL |
| S-001 - STRUCTURAL GENERAL NOTES |
| S-501 - CMU REPAIR DETAILS |
| ARCHITECTURAL |
| A-001 - ARCHITECTURAL GENERAL NOTES & LEGENDS |
| A-101 - FIRST FLOOR PLAN |
| A-102 - CLERESTORY |
| A-201 - BUILDING ELEVATIONS |
| A-202 - BUILDING ELEVATIONS |
| A-501 - WINDOW TYPES |
| A-502 - DETAILS |
| A-601 - DOOR SCHEDULE AND LEGEND |
A-201
File details come from the government source that posted it. Updated .