Beale Fuel Hydrant Replacement
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- W91238-22-R-0041
- Agency
- ENDIST Sacramento US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237120 Oil and Gas Pipeline and Related Structures Construction
- Place of performance
- Beale AFB, California 95903, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers, Sacramento District seeks to replace the aging fuel hydrant system at Beale Air Force Base in California through a two-phase design-bid-build construction contract. Services will include installing two 5,000-barrel fuel tanks, a pump house, filter separators, piping, hydrant outlets and electrical and site work. A firm-fixed price contract is anticipated to be awarded by September 2022 on a best value tradeoff basis. Interested offerors must attend a mandatory site visit on July 14th and submit attendee information by July 6th.
There is no set-aside designation, with the requirement to be issued as unrestricted. The NAICS code is 237120 for oil and gas pipeline construction, with a small business size standard of $39.5 million in annual revenue. The project service code is Y1NA. The estimated value is between $25-100 million and work is to be completed within 720 calendar days of award. A site visit is scheduled for July 14th, with interested parties required to submit attendee information by July 6th.
Notice text
2 versions
Update #2 · Latest ·
W9123822S0013 W9123822R0041 - USACE SPK DBB Two-Phase Design-Bid-Build construction of the Fuel Hydrant System Replacement at Beale Air Force Base (AFB).
The Government intends to solicit a Request For Proposals (RFP) in a two phased acquisition awarded as Best Value- Lowest Price Technically Acceptable that will result in award of a Firm-Fixed Price contract. The Government estimates issuing the solicitation for Phase One of this Two-Phase Design-Bid-Build project on or around July 2022.
Project Description: Work is anticipated to include Design-Bid-Build (DBB) construction services to construct a Fuel Hydrant System Replacement. The contractor shall replace the current hydrant system by installing two-5,000 barrel tanks, a pump-house, five-600 gallon per minute pumps, seven filter separators (two receipts, five issue), two fill-stands and four hydrant outlet pits, and three position pantographs refueling arm positions 1,250 feet each. They shall install security lighting at the Hydrant Storage System, install electric product recover pumps for water draw off at tanks, install proper drainage around hydrant secondary containment berms, install all pipe supports, equipment, and appurtenances related to the new JP-8 fuel piping, and install audible alarms on tanks and pump-house.
The project will include hydrant outlets, piping and related pipe appurtenances, cathodic protection, fuel pump house control room and shelter with pumps, filter separators and related piping, valves and fittings, fuel storage with containment, access walks/stairs, truck fill stands, truck unloads, hydrant hose truck checkout stand, and product recovery tank. Supporting efforts include site clearing & grading, site improvements for access roads, parking, secondary containment, drainage, utility improvements, pig launcher and receiver stations, pavement and markings, and security fencing.
Electrical and communications work includes control systems, underground primary and secondary services, communications, pad mounted transformers, emergency generator, site lighting, automatic tank gauging system, grounding & lighting protection, emergency power down switches, pump connections and demolition/rerouting of existing electrical utilities.
A storage and pump station will be required to continue the operation of our flight line hydrant system. Two JP-8 tanks are required to be built to maintain current flying operations and future needs. The Repair Hydrant System MILCON repairs 1952-era facilities that have reached the end of their life. If project is not implemented, the Hydrant System shall be out of environmental compliance in less than five years. This project is at a yet- operational facility with quantified serious degradation of the eight 50K gallon underground storage tanks, indicating failure is imminent.
Beale AFB supports a squadron of eight KC-135R Stratotanker aircraft as well as a variety of smaller-framed aircraft from the Aeroclub. Provisions are also in place to simultaneously support two wide-body transient aircraft, which typically include C-17s or C-5s. Anti-Terrorism Force Protection, cyber-security and sustainable design principles will be incorporated into the design and construction.
The potential requirement may result in a solicitation issued approximately July 2022.
If solicited, the Government intends to award the contemplated requirement as a firm-fixed-price contract by approximately 30 September 2022. It is estimated that the potential requirement can be completed within 730 calendar days.
Additional Information.
In accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 236.204(ii) the estimated magnitude of construction is expected to be between $25,000,000.00 and $100,000,000.00.
The North American Industrial Classification System (NAICS) code for the potential requirement is anticipated to be 237120 (Oil and Gas Pipeline and Related Structures Construction). The small business size standard for this NAICS, as established by the U.S. Small Business Administration, is $39.5 Million annual revenue. The Product Service Code for the potential requirement is anticipated to be Y1NA (Construction of Fuel Supply Facilities).
The solicitation is anticipated to be issued through the Governmentwide Point of Entry (GPE) (www.SAM.gov) on or about July 2022 as an unrestricted requirement.
Please do not request a copy of the solicitation, or additional plans and specifications, as they are not currently available. Draft plans and specifications will be made available for inspection without charge after the solicitation is released, when requested and delivered by electronic mail and/or data interchange. The solicitation will be made available without charge when accessed through the GPE or requested and delivered by electronic mail and/or data interchange.
PLEASE NOTE: this project and/or the proposed solicitation and contract action may be changed, delayed, or canceled at any time.
The ONLY Interested Vendors / Plan Holders / Bidders List is available through SAM.gov. Contractors are responsible for self-identifying as interested vendors and contacting other interested vendors. USACE-SPK will not review capabilities statements submitted in response to this Notice or coordinate partnering arrangements between parties. Contractors should check SAM.gov frequently for changes to the interested vendors list and this Notice.
*************************************************************************************
Site Visit Scheduled Thursday 14 July 2022 at 08:00 am PST. Only Beale Air Force Base pre- approved participants (as followed up with by Uly Gomez) will be allowed on the site visit.
Entry Access List Excel Sheet (Attachment1 )
Map Provided (Attachment 2)
*** Coordination Deadline 6 July 2022 10:00 am PST ***************
Submit the Attached Entry Access List EAL spreadsheet by 10:00 a.m. PST, 6 July 2022 to:
Uly Gomez directlyUlysses.R.Gomez@usace.army.mil, or call him with questions or concerns 916-208-0734
Site Visit Coordination’s All participants require Pre-Coordination prior to arriving for the site visit. All Site Visit Participants must be indentified on attached “EAL” and return by 1000am PST, July 6 to Uly Gomez for futher processing at the Beale AFB Security Office.
Beale AFB requires all visitors that access the base to be Real ID compliant, If you do not yet have the new Real ID driver’s license, you will also need a second form of government issued identification. The most common is a valid US passport, but a certified birth certificate or social security card will also work. Questions or concerns can be directed to the 9th Security Forces Squadron Operations Section at 634-0542.
NOTICE: Use of PIEE for submiting and accepting offers
All prospective contractors and their subcontractors and suppliers must be registered in SAM.gov before they will be allowed to download solicitation information. Contractors must be registered in the System for Award Management (SAM) at https://sam.gov/content/home prior to award of this contract.
Solicitation documents, plans and specifications will only be available via the Procurement Integrated Enterprise Environment (PIEE) website https://wawf.eb.mil OR https://piee.eb.mil OR https://piee.eb.mil/xhtml/unauth/home/login.xhtml.
See attachments PIEE Solicitation Module Vendor Access Instructions and SOP PIEE Proposal Manager Offeror for instructions on getting access to the PIEE Solicitation Module and submitting your proposal. Registration for plans and specifications should be made via the Procurement Integrated Enterprise Environment (PIEE) website https://wawf.eb.mil.
If you are not registered, the United States Government is not responsible for providing you with notifications of any changes to this solicitation. The solicitation will be available only as a direct download. Registration should be completed one week prior to the issue date. It is therefore the Contractor’s responsibility to monitor the website daily for the solicitation to be posted, and for any posted changes or amendments to this solicitation. The plans and specifications and all notifications of changes to this solicitation shall only be made through this posting and modifications hereto. NOTE: This solicitation is in .pdf format and requires Adobe Acrobat Reader. Adobe Acrobat Reader may be downloaded free of charge at http://www.adobe.com/products/reader
The following attachments are to assist Offers in providing instructions to PIEE.
Attachment 3 PIEE Instructions to Vendors (Solicitation)
Attachment 4 PIEE Posting Offer (for Vendors)
Attachment 5 PIEE Proposal Manager Offeror (for Vendors)
Update #1 ·
W9123822S0013 W9123822R0041 - USACE SPK DBB Two-Phase Design-Bid-Build construction of the Fuel Hydrant System Replacement at Beale Air Force Base (AFB).
The U.S. Army Corps of Engineers (USACE), Sacramento District (SPK), anticipates a potential requirement to replace the fuel hydrant system at Beal Air Force Base (AFB).
The Government intends to solicit a Request For Proposals (RFP) in a two phased acquisition awarded as Best Value- Lowest Price Technically Acceptable that will result in award of a Firm-Fixed Price contract. The Government estimates issuing the solicitation for Phase One of this Two-Phase Design-Bid-Build project on or around June 2022.
Project Description: Work is anticipated to include Design-Bid-Build (DBB) construction services to construct a Fuel Hydrant System Replacement. The contractor shall replace the current hydrant system by installing two-5,000 barrel tanks, a pump-house, five-600 gallon per minute pumps, seven filter separators (two receipts, five issue), two fill-stands and four hydrant outlet pits, and three position pantographs refueling arm positions 1,250 feet each. They shall install security lighting at the Hydrant Storage System, install electric product recover pumps for water draw off at tanks, install proper drainage around hydrant secondary containment berms, install all pipe supports, equipment, and appurtenances related to the new JP-8 fuel piping, and install audible alarms on tanks and pump-house.
The project will include hydrant outlets, piping and related pipe appurtenances, cathodic protection, fuel pump house control room and shelter with pumps, filter separators and related piping, valves and fittings, fuel storage with containment, access walks/stairs, truck fill stands, truck unloads, hydrant hose truck checkout stand, and product recovery tank. Supporting efforts include site clearing & grading, site improvements for access roads, parking, secondary containment, drainage, utility improvements, pig launcher and receiver stations, pavement and markings, and security fencing.
Electrical and communications work includes control systems, underground primary and secondary services, communications, pad mounted transformers, emergency generator, site lighting, automatic tank gauging system, grounding & lighting protection, emergency power down switches, pump connections and demolition/rerouting of existing electrical utilities.
A storage and pump station will be required to continue the operation of our flight line hydrant system. Two JP-8 tanks are required to be built to maintain current flying operations and future needs. The Repair Hydrant System MILCON repairs 1952-era facilities that have reached the end of their life. If project is not implemented, the Hydrant System shall be out of environmental compliance in less than five years. This project is at a yet- operational facility with quantified serious degradation of the eight 50K gallon underground storage tanks, indicating failure is imminent.
Beale AFB supports a squadron of eight KC-135R Stratotanker aircraft as well as a variety of smaller-framed aircraft from the Aeroclub. Provisions are also in place to simultaneously support two wide-body transient aircraft, which typically include C-17s or C-5s. Anti-Terrorism Force Protection, cyber-security and sustainable design principles will be incorporated into the design and construction.
The potential requirement may result in a solicitation issued approximately June 2022.
If solicited, the Government intends to award the contemplated requirement as a firm-fixed-price contract by approximately 30 September 2022. It is estimated that the potential requirement can be completed within 720 calendar days.
Additional Information.
In accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 236.204(ii) the estimated magnitude of construction is expected to be between $25,000,000.00 and $100,000,000.00.
The North American Industrial Classification System (NAICS) code for the potential requirement is anticipated to be 237120 (Oil and Gas Pipeline and Related Structures Construction). The small business size standard for this NAICS, as established by the U.S. Small Business Administration, is $39.5 Million annual revenue. The Product Service Code for the potential requirement is anticipated to be Y1NA (Construction of Fuel Supply Facilities).
The solicitation is anticipated to be issued through the Governmentwide Point of Entry (GPE) (www.SAM.gov) on or about July 2022 as an unrestricted requirement.
Please do not request a copy of the solicitation, or additional plans and specifications, as they are not currently available. Draft plans and specifications will be made available for inspection without charge after the solicitation is released, when requested and delivered by electronic mail and/or data interchange. The solicitation will be made available without charge when accessed through the GPE or requested and delivered by electronic mail and/or data interchange.
PLEASE NOTE: this project and/or the proposed solicitation and contract action may be changed, delayed, or canceled at any time.
The ONLY Interested Vendors / Plan Holders / Bidders List is available through SAM.gov. Contractors are responsible for self-identifying as interested vendors and contacting other interested vendors. USACE-SPK will not review capabilities statements submitted in response to this Notice or coordinate partnering arrangements between parties. Contractors should check SAM.gov frequently for changes to the interested vendors list and this Notice.
*************************************************************************************
Site Visit Scheduled Thursday 14 July 2022 at 0800. Only Beale Air Force Base pre- approved participants (as followed up with by Uly Gomez) will be allowed on the site visit.
Entry Access List Excel Sheet (Attachment1 )
Map Provided (Attachment 2)
*** Coordination Deadline 6 July 2022 1000 ***************
Submit the Attached Entry Access List EAL spreadsheet by 1000 6 July 2022 to:
Uly Gomez directlyUlysses.R.Gomez@usace.army.mil, or call him with questions or concerns 916-208-0734
Site Visit Coordination’s All participants require Pre-Vetting prior to arriving for the site visit. Provide a list of all site visit participants on attached “EAL” and return by 1200 July 6 turn in EAL to Uly Gomez (by name list) turned in to Beale Security Office.
Beale AFB requires all visitors that access the base to be Real ID compliant, If you do not yet have the new Real ID driver’s license, you will also need a second form of government issued identification. The most common is a valid US passport, but a certified birth certificate or social security card will also work. Questions or concerns can be directed to the 9th Security Forces Squadron Operations Section at 634-0542.
Attachments
| File | Type | Posted |
|---|---|---|
| Attachment 2 Map Site Visit.pdf | ||
| Attachment 3 PIEE Instructions to Vendors (Solicitation).pdf | ||
| Attachment 1 Entry Access List EAL Form for ABC Construction Sample.xlsx | XLSX spreadsheet | |
| Attachment 4 Instructions for PIEE Posting Offer (for Vendors).pdf | ||
| Attachment 5 Instructions for PIEE Proposal Manager Offeror.pdf | ||
| B01 - Attachment 1 Entry Access List EAL Form for ABC Construction Sample.xlsx | XLSX spreadsheet | |
| Attachment 1 Map Site Visit and Timeline.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| SPK Fuel Hydrant System Replacement at Beale Air Force Base, California | Award Notice | |
| SPK Design-Bid-Build (DBB) SPK Fuel Hydrant System Replacement at Beale Air Force Base, California | Solicitation | |
| Beale Fuel Hydrant Replacement | Pre-Solicitation | |
| SPK DBB Beale AFB, CA Fuel Hydrant Replacement | Special Notice | |
| SPK DBB Beale AFB, CA Fuel Hydrant Replacement | Pre-Solicitation | |
| Beale Fuel Hydrant Replacement | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity