SPK Design-Bid-Build (DBB) SPK Fuel Hydrant System Replacement at Beale Air Force Base, California
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W9123822R0041
- Agency
-
ENDIST Sacramento
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237120 Oil and Gas Pipeline and Related Structures Construction
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation from the Army Corps of Engineers Engineering District Sacramento seeks design-build-construction services for a new fuel hydrant system replacement at Beale Air Force Base in California. The contractor shall provide new aboveground storage tanks, pump shelters, truck offloading facilities, refueler truck loading stations, and seven new aircraft hydrant fueling pits along with associated piping, utilities, and electrical work. Proposals are due by August 31, 2022. The award will be made based on technical evaluation factors including design approach, past performance, and price.
There is no set-aside designated for this procurement. The anticipated NAICS code is 237120 for oil and gas pipeline and related structure construction, with a small business size standard of $39.5 million annual revenue. The estimated value of construction is between $25-100 million. The new system will include two 5,000 barrel vertical storage tanks and fueling infrastructure to support aircraft and refueling trucks on the base. The PSC code is Y1NA for construction of fuel supply facilities. Work will be performed at Beale Air Force Base in California.
Notice text
6 versions
Update #6 · Latest ·
Project Description: Work is anticipated to include Design-Bid-Build (DBB) construction services to construct a Fuel Hydrant System Replacement. The contractor shall provide the piping, equipment and supporting facilities for a new JP-8 fuel system. Storage tanks. The new system shall include aboveground storage tanks, a transfer pump shelter, truck off-loading, refueler truck loading, and aircraft hydrant fueling system. The two new 5,000 BBL storage tanks shall be field erected AFPI 650, vertical storage tanks with floating pans. Tanks shall be provided within a secondary concrete containment area. Pump shelter and control building. The pump shelter shall include four new 600 gpm pumps and six new filter/separators. The associated control building shall provide administrative functions such as control room and bathroom.Two 600 gpm ski mounted truck off-loading stations and two 600 gpm refueler truck fill stands. The truck fueling facilities shall include concrete containment areas and spill intercept structures to provide secondary containment for the truck off-loading or refueling operations. The project shall include seven new aircraft hydrant fueling pits on the existing parking apron, along with associated piping, insolation valves, vents and drains.All associated utilities, structures, and electrical service included emergency generator shall be provided.In accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 236.204(ii) the estimated magnitude of construction is expected to be between $25,000,000.00 and $100,000,000.00. The North American Industrial Classification System (NAICS) code for the potential requirement is anticipated to be 237120 (Oil and Gas Pipeline and Related Structures Construction). The small business size standard for this NAICS, as established by the U.S. Small Business Administration, is $39.5 Million annual revenue. The Product Service Code for the potential requirement is anticipated to be Y1NA (Construction of Fuel Supply Facilities). NOTICE: Use of PIEE for submitting and accepting offers. All prospective contractors and their subcontractors and suppliers must be registered in SAM.gov before they will be allowed to download solicitation information. Contractors must be registered in the System for Award Management (SAM) at https://sam.gov/content/home prior to award of this contract. Offeror registration and submission in PIEE instructions were provided with the Pre-Solicitation W9123822R0041 https://sam.gov/opp/7502b946f46e4492a9acdb013efbbaa8/view **********************************************************************************************************************************************************************************************************************************************************A0002 The purpose of this amendment is to: 1. Extend Projnet Question period through 19 August 2022. 2. Extend the Offer submission due date to 29 August 2022 12:00 p.m. PDT.************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************A00003 The purpose of this amendment is to: 1. Replace Attachment 03 Pricing Schedule 2. Add Attachment 09 Supplemental Drawings (Demolition) 3. Update Instructions to Offerors 00 22 00 4. Update Clauses 00 70 00.******************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************This is an informational providing Site Visit agenda, sign -in sheet, and site map. *********************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************A00004 The purpose of this amendment is to: 1. Replace Section 00 22 00. 2. Add Attachment 10 Drawings 3. Update Specifications **********************************************************************************************************************************************************************************************************************************************************A00005 The purpose of this amendment is to: 1. Extend Offer submission due date to 31 August 2022 3:00 p.m. PDT and Replace Attachment 04 Wage Determination Sacramento County dated 26 August 2022. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0041' to obtain more details.*
Update #5 ·
Project Description: Work is anticipated to include Design-Bid-Build (DBB) construction services to construct a Fuel Hydrant System Replacement. The contractor shall provide the piping, equipment and supporting facilities for a new JP-8 fuel system. Storage tanks. The new system shall include aboveground storage tanks, a transfer pump shelter, truck off-loading, refueler truck loading, and aircraft hydrant fueling system. The two new 5,000 BBL storage tanks shall be field erected AFPI 650, vertical storage tanks with floating pans. Tanks shall be provided within a secondary concrete containment area. Pump shelter and control building. The pump shelter shall include four new 600 gpm pumps and six new filter/separators. The associated control building shall provide administrative functions such as control room and bathroom.Two 600 gpm ski mounted truck off-loading stations and two 600 gpm refueler truck fill stands. The truck fueling facilities shall include concrete containment areas and spill intercept structures to provide secondary containment for the truck off-loading or refueling operations. The project shall include seven new aircraft hydrant fueling pits on the existing parking apron, along with associated piping, insolation valves, vents and drains.All associated utilities, structures, and electrical service included emergency generator shall be provided.In accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 236.204(ii) the estimated magnitude of construction is expected to be between $25,000,000.00 and $100,000,000.00. The North American Industrial Classification System (NAICS) code for the potential requirement is anticipated to be 237120 (Oil and Gas Pipeline and Related Structures Construction). The small business size standard for this NAICS, as established by the U.S. Small Business Administration, is $39.5 Million annual revenue. The Product Service Code for the potential requirement is anticipated to be Y1NA (Construction of Fuel Supply Facilities). NOTICE: Use of PIEE for submitting and accepting offers. All prospective contractors and their subcontractors and suppliers must be registered in SAM.gov before they will be allowed to download solicitation information. Contractors must be registered in the System for Award Management (SAM) at https://sam.gov/content/home prior to award of this contract. Offeror registration and submission in PIEE instructions were provided with the Pre-Solicitation W9123822R0041 https://sam.gov/opp/7502b946f46e4492a9acdb013efbbaa8/view **********************************************************************************************************************************************************************************************************************************************************A0002 The purpose of this amendment is to: 1. Extend Projnet Question period through 19 August 2022. 2. Extend the Offer submission due date to 29 August 2022 12:00 p.m. PDT.************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************A00003 The purpose of this amendment is to: 1. Replace Attachment 03 Pricing Schedule 2. Add Attachment 09 Supplemental Drawings (Demolition) 3. Update Instructions to Offerors 00 22 00 4. Update Clauses 00 70 00.******************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************This is an informational providing Site Visit agenda, sign -in sheet, and site map. *********************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************A00004 The purpose of this amendment is to: 1. Replace Section 00 22 00. 2. Add Attachment 10 Drawings 3. Update Specifications *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0041' to obtain more details.*
Update #4 ·
Project Description: Work is anticipated to include Design-Bid-Build (DBB) construction services to construct a Fuel Hydrant System Replacement. The contractor shall provide the piping, equipment and supporting facilities for a new JP-8 fuel system. Storage tanks. The new system shall include aboveground storage tanks, a transfer pump shelter, truck off-loading, refueler truck loading, and aircraft hydrant fueling system. The two new 5,000 BBL storage tanks shall be field erected AFPI 650, vertical storage tanks with floating pans. Tanks shall be provided within a secondary concrete containment area. Pump shelter and control building. The pump shelter shall include four new 600 gpm pumps and six new filter/separators. The associated control building shall provide administrative functions such as control room and bathroom.Two 600 gpm ski mounted truck off-loading stations and two 600 gpm refueler truck fill stands. The truck fueling facilities shall include concrete containment areas and spill intercept structures to provide secondary containment for the truck off-loading or refueling operations. The project shall include seven new aircraft hydrant fueling pits on the existing parking apron, along with associated piping, insolation valves, vents and drains.All associated utilities, structures, and electrical service included emergency generator shall be provided.In accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 236.204(ii) the estimated magnitude of construction is expected to be between $25,000,000.00 and $100,000,000.00. The North American Industrial Classification System (NAICS) code for the potential requirement is anticipated to be 237120 (Oil and Gas Pipeline and Related Structures Construction). The small business size standard for this NAICS, as established by the U.S. Small Business Administration, is $39.5 Million annual revenue. The Product Service Code for the potential requirement is anticipated to be Y1NA (Construction of Fuel Supply Facilities). NOTICE: Use of PIEE for submitting and accepting offers. All prospective contractors and their subcontractors and suppliers must be registered in SAM.gov before they will be allowed to download solicitation information. Contractors must be registered in the System for Award Management (SAM) at https://sam.gov/content/home prior to award of this contract. Offeror registration and submission in PIEE instructions were provided with the Pre-Solicitation W9123822R0041 https://sam.gov/opp/7502b946f46e4492a9acdb013efbbaa8/view **********************************************************************************************************************************************************************************************************************************************************A0002 The purpose of this amendment is to: 1. Extend Projnet Question period through 19 August 2022. 2. Extend the Offer submission due date to 29 August 2022 12:00 p.m. PDT.************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************A0003 The purpose of this amendment is to: 1. Replace Attachment 03 Pricing Schedule 2. Add Attachment 09 Supplemental Drawings (Demolition) 3. Update Instructions to Offerors 00 22 00 4. Update Clauses 00 70 00.******************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************ThiThis is an informational providing Site Visit agenda, sign -in sheet, and site map. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0041' to obtain more details.*
Update #3 ·
Project Description: Work is anticipated to include Design-Bid-Build (DBB) construction services to construct a Fuel Hydrant System Replacement. The contractor shall provide the piping, equipment and supporting facilities for a new JP-8 fuel system. Storage tanks. The new system shall include aboveground storage tanks, a transfer pump shelter, truck off-loading, refueler truck loading, and aircraft hydrant fueling system. The two new 5,000 BBL storage tanks shall be field erected AFPI 650, vertical storage tanks with floating pans. Tanks shall be provided within a secondary concrete containment area. Pump shelter and control building. The pump shelter shall include four new 600 gpm pumps and six new filter/separators. The associated control building shall provide administrative functions such as control room and bathroom.Two 600 gpm ski mounted truck off-loading stations and two 600 gpm refueler truck fill stands. The truck fueling facilities shall include concrete containment areas and spill intercept structures to provide secondary containment for the truck off-loading or refueling operations. The project shall include seven new aircraft hydrant fueling pits on the existing parking apron, along with associated piping, insolation valves, vents and drains.All associated utilities, structures, and electrical service included emergency generator shall be provided.In accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 236.204(ii) the estimated magnitude of construction is expected to be between $25,000,000.00 and $100,000,000.00. The North American Industrial Classification System (NAICS) code for the potential requirement is anticipated to be 237120 (Oil and Gas Pipeline and Related Structures Construction). The small business size standard for this NAICS, as established by the U.S. Small Business Administration, is $39.5 Million annual revenue. The Product Service Code for the potential requirement is anticipated to be Y1NA (Construction of Fuel Supply Facilities). NOTICE: Use of PIEE for submitting and accepting offers. All prospective contractors and their subcontractors and suppliers must be registered in SAM.gov before they will be allowed to download solicitation information. Contractors must be registered in the System for Award Management (SAM) at https://sam.gov/content/home prior to award of this contract. Offeror registration and submission in PIEE instructions were provided with the Pre-Solicitation W9123822R0041 https://sam.gov/opp/7502b946f46e4492a9acdb013efbbaa8/view **********************************************************************************************************************************************************************************************************************************************************A0002 The purpose of this amendment is to: 1. Extend Projnet Question period through 19 August 2022. 2. Extend the Offer submission due date to 29 August 2022 12:00 p.m. PDT.************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************A0003 The purpose of this amendment is to: 1. Replace Attachment 03 Pricing Schedule 2. Add Attachment 09 Supplemental Drawings (Demolition) 3. Update Instructions to Offerors 00 22 00 4. Update Clauses 00 70 00. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0041' to obtain more details.*
Update #2 ·
Project Description: Work is anticipated to include Design-Bid-Build (DBB) construction services to construct a Fuel Hydrant System Replacement. The contractor shall provide the piping, equipment and supporting facilities for a new JP-8 fuel system. Storage tanks. The new system shall include aboveground storage tanks, a transfer pump shelter, truck off-loading, refueler truck loading, and aircraft hydrant fueling system. The two new 5,000 BBL storage tanks shall be field erected AFPI 650, vertical storage tanks with floating pans. Tanks shall be provided within a secondary concrete containment area. Pump shelter and control building. The pump shelter shall include four new 600 gpm pumps and six new filter/separators. The associated control building shall provide administrative functions such as control room and bathroom.Two 600 gpm ski mounted truck off-loading stations and two 600 gpm refueler truck fill stands. The truck fueling facilities shall include concrete containment areas and spill intercept structures to provide secondary containment for the truck off-loading or refueling operations. The project shall include seven new aircraft hydrant fueling pits on the existing parking apron, along with associated piping, insolation valves, vents and drains.All associated utilities, structures, and electrical service included emergency generator shall be provided.In accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 236.204(ii) the estimated magnitude of construction is expected to be between $25,000,000.00 and $100,000,000.00. The North American Industrial Classification System (NAICS) code for the potential requirement is anticipated to be 237120 (Oil and Gas Pipeline and Related Structures Construction). The small business size standard for this NAICS, as established by the U.S. Small Business Administration, is $39.5 Million annual revenue. The Product Service Code for the potential requirement is anticipated to be Y1NA (Construction of Fuel Supply Facilities). NOTICE: Use of PIEE for submitting and accepting offers. All prospective contractors and their subcontractors and suppliers must be registered in SAM.gov before they will be allowed to download solicitation information. Contractors must be registered in the System for Award Management (SAM) at https://sam.gov/content/home prior to award of this contract. Offeror registration and submission in PIEE instructions were provided with the Pre-Solicitation W9123822R0041 https://sam.gov/opp/7502b946f46e4492a9acdb013efbbaa8/view **********************************************************************************************************************************************************************************************************************************************************A00002 The purpose of this amendment is to: 1. Extend Projnet Question period through 19 August 2022. 2. Extend the Offer submission due date to 29 August 2022 12:00 p.m. PDT. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0041' to obtain more details.*
Update #1 ·
Project Description: Work is anticipated to include Design-Bid-Build (DBB) construction services to construct a Fuel Hydrant System Replacement. The contractor shall provide the piping, equipment and supporting facilities for a new JP-8 fuel system. Storage tanks. The new system shall include aboveground storage tanks, a transfer pump shelter, truck off-loading, refueler truck loading, and aircraft hydrant fueling system. The two new 5,000 BBL storage tanks shall be field erected AFPI 650, vertical storage tanks with floating pans. Tanks shall be provided within a secondary concrete containment area. Pump shelter and control building. The pump shelter shall include four new 600 gpm pumps and six new filter/separators. The associated control building shall provide administrative functions such as control room and bathroom.Two 600 gpm ski mounted truck off-loading stations and two 600 gpm refueler truck fill stands. The truck fueling facilities shall include concrete containment areas and spill intercept structures to provide secondary containment for the truck off-loading or refueling operations. The project shall include seven new aircraft hydrant fueling pits on the existing parking apron, along with associated piping, insolation valves, vents and drains.All associated utilities, structures, and electrical service included emergency generator shall be provided.In accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 236.204(ii) the estimated magnitude of construction is expected to be between $25,000,000.00 and $100,000,000.00. The North American Industrial Classification System (NAICS) code for the potential requirement is anticipated to be 237120 (Oil and Gas Pipeline and Related Structures Construction). The small business size standard for this NAICS, as established by the U.S. Small Business Administration, is $39.5 Million annual revenue. The Product Service Code for the potential requirement is anticipated to be Y1NA (Construction of Fuel Supply Facilities). NOTICE: Use of PIEE for submitting and accepting offersAll prospective contractors and their subcontractors and suppliers must be registered in SAM.gov before they will be allowed to download solicitation information. Contractors must be registered in the System for Award Management (SAM) at https://sam.gov/content/home prior to award of this contract. Offeror registration and submission in PIEE instructions were provided with the Pre-Solicitation W9123822R0041 https://sam.gov/opp/7502b946f46e4492a9acdb013efbbaa8/view *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0041' to obtain more details.*
Notice history
| Notice | Type | Posted |
|---|---|---|
| SPK Fuel Hydrant System Replacement at Beale Air Force Base, California | Award Notice | |
| This notice | Solicitation | |
| Beale Fuel Hydrant Replacement | Pre-Solicitation | |
| SPK DBB Beale AFB, CA Fuel Hydrant Replacement | Special Notice | |
| SPK DBB Beale AFB, CA Fuel Hydrant Replacement | Pre-Solicitation | |
| Beale Fuel Hydrant Replacement | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan | ENDIST Japan | No set-aside | |
| Mather Fueling System Repairs | ENDIST Omaha | Total Small Business | |
| RWP - Test Site 2 (TS2) Improvements & Modernization, Aerospace Vehicle Survivability Facility (AVSF) | Air Force Test Center | No set-aside | |
| USACE SPK DB Construction - Natomas NPP Named Pumping Plants - Sacramento, CA | ENDIST Sacramento | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity