SPK DBB Beale AFB, CA Fuel Hydrant Replacement

Closed Special Notice Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
W9123822R0041
Agency
ENDIST Sacramento US Army Corps of Engineers, Department of Defense
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
237120 Oil and Gas Pipeline and Related Structures Construction
PSC
Y1NA Construction Of Fuel Supply Facilities
Place of performance
Beale AFB, California 95903, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This Special Notice from the Department of the Army Corps of Engineers Engineering District Sacramento concerns a potential two-phase design-bid-build solicitation for the SPK DBB Beale Air Force Base, California Fuel Hydrant Replacement project. The notice provides contractors with advance information regarding the government's intent to replace over 60-year old fuel hydrant facilities at Beale Air Force Base to support ongoing flight line operations.

The notice informs contractors that the government intends to issue a solicitation in July 2022 for replacement of the hydrant system, including new fuel tanks, pumps, piping and related infrastructure. Interested contractors must submit an entry access list by July 6th to participate in a scheduled site visit on July 14th. The estimated project value is between $25-100 million, with a NAICS code of 237120. Contractors should monitor SAM.gov for any updates to timelines, details or changes to the solicitation, as project particulars may be adjusted prior to issuance.

Notice text

W9123822S0013 W9123822R0041  - USACE SPK DBB Two-Phase Design-Bid-Build construction of the Fuel Hydrant System Replacement at Beale Air Force Base (AFB).  

The Government intends to solicit a Request For Proposals (RFP) in a two phased acquisition awarded as Best Value- Lowest Price Technically Acceptable that will result in award of a Firm-Fixed Price contract. The Government estimates issuing the solicitation for Phase One of this Two-Phase Design-Bid-Build project on or around  July 2022. 

Project Description:  Work is anticipated to include Design-Bid-Build (DBB) construction services to construct a Fuel Hydrant System Replacement. The contractor shall replace the current hydrant system by installing two-5,000 barrel tanks, a pump-house, five-600 gallon per minute pumps, seven filter separators (two receipts, five issue), two fill-stands and four hydrant outlet pits, and three position pantographs refueling arm positions 1,250 feet each.  They shall install security lighting at the Hydrant Storage System, install electric product recover pumps for water draw off at tanks, install proper drainage around hydrant secondary containment berms, install all pipe supports, equipment, and appurtenances related to the new JP-8 fuel piping, and install audible alarms on tanks and pump-house. 

The project will include hydrant outlets, piping and related pipe appurtenances, cathodic protection, fuel pump house control room and shelter with pumps, filter separators and related piping, valves and fittings, fuel storage with containment, access walks/stairs, truck fill stands, truck unloads, hydrant hose truck checkout stand, and product recovery tank. Supporting efforts include site clearing & grading, site improvements for access roads, parking, secondary containment, drainage, utility improvements, pig launcher and receiver stations, pavement and markings, and security fencing. 

Electrical and communications work includes control systems, underground primary and secondary services, communications, pad mounted transformers, emergency generator, site lighting, automatic tank gauging system, grounding & lighting protection, emergency power down switches, pump connections and demolition/rerouting of existing electrical utilities. 

A storage and pump station will be required to continue the operation of our flight line hydrant system.  Two JP-8 tanks are required to be built to maintain current flying operations and future needs.  The Repair Hydrant System MILCON repairs 1952-era facilities that have reached the end of their life.  If project is not implemented, the Hydrant System shall be out of environmental compliance in less than five years.  This project is at a yet- operational facility with quantified serious degradation of the eight 50K gallon underground storage tanks, indicating failure is imminent. 

Beale AFB supports a squadron of eight KC-135R Stratotanker aircraft as well as a variety of smaller-framed aircraft from the Aeroclub.  Provisions are also in place to simultaneously support two wide-body transient aircraft, which typically include C-17s or C-5s.  Anti-Terrorism Force Protection, cyber-security and sustainable design principles will be incorporated into the design and construction. 

The potential requirement may result in a solicitation issued approximately  July 2022. 

If solicited, the Government intends to award the contemplated requirement as a firm-fixed-price contract by approximately 30 September 2022. It is estimated that the potential requirement can be completed within 720 calendar days. 

Additional Information:  

In accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 236.204(ii) the estimated magnitude of construction is expected to be between $25,000,000.00 and $100,000,000.00. 

The North American Industrial Classification System (NAICS) code for the potential requirement is anticipated to be 237120 (Oil and Gas Pipeline and Related Structures Construction). The small business size standard for this NAICS, as established by the U.S. Small Business Administration, is $39.5 Million annual revenue. The Product Service Code for the potential requirement is anticipated to be Y1NA (Construction of Fuel Supply Facilities). 

The solicitation is anticipated to be issued through the Governmentwide Point of Entry (GPE)  

(www.SAM.gov) in July 2022 as an unrestricted requirement.  

Please do not request a copy of the solicitation, or additional plans and specifications, as they are not currently available. Draft plans and specifications will be made available for inspection without charge after the solicitation is released, when requested and delivered by electronic mail and/or data interchange. The solicitation will be made available without charge when accessed through the GPE or requested and delivered by electronic mail and/or data interchange. 

 
PLEASE NOTE: this project and/or the proposed solicitation and contract action may be changed, delayed, or canceled at any time. 
 
The ONLY Interested Vendors / Plan Holders / Bidders List is available through SAM.gov. Contractors are responsible for self-identifying as interested vendors and contacting other interested vendors. USACE-SPK will not review capabilities statements submitted in response to this Notice or coordinate partnering arrangements between parties. Contractors should check SAM.gov frequently for changes to the interested vendors list and this Notice. 

************************************************************************************* 

Site Visit Scheduled Thursday 14 July 2022 at 08:00 am PST. Only Beale Air Force Base pre- approved participants (as followed up with by Uly Gomez) will be allowed on the site visit.

Entry Access List Excel Sheet (Attachment 1)

Map and timeline  (Attachment 2)

*** Coordination Deadline 6 July 2022 1000 a.m. PST ***************

Submit the Attached Entry Access List EAL spreadsheet by 1000 a.m. PST 6 July 2022 to:

Uly Gomez directlyUlysses.R.Gomez@usace.army.mil, or call him with questions or concerns 916-208-0734

Beale AFB requires all visitors that access the base to be Real ID compliant, If you do not yet have the new Real ID driver’s license, you will also need a second form of government issued identification. The most common is a valid US passport, but a certified birth certificate or social security card will also work. Questions or concerns can be directed to the 9th Security Forces Squadron Operations Section at 634-0542.

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
SPK Fuel Hydrant System Replacement at Beale Air Force Base, California Award Award Notice
SPK Design-Bid-Build (DBB) SPK Fuel Hydrant System Replacement at Beale Air Force Base, California Latest solicitation Solicitation
Beale Fuel Hydrant Replacement Pre-Solicitation
SPK DBB Beale AFB, CA Fuel Hydrant Replacement This notice Special Notice
SPK DBB Beale AFB, CA Fuel Hydrant Replacement Pre-Solicitation
Beale Fuel Hydrant Replacement Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity