BBVC Lakefront Trail and Outhouse Replacement

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
1240BJ26Q0004
Agency
Forest Service Department of Agriculture
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Y1LB Construction Of Highways, Roads, Streets, Bridges, And Railways
Place of performance
Alaska, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Agriculture Forest Service is soliciting quotations for the BBVC Lakefront Trail and Outhouse Replacement project under Request for Quotation 1240BJ26Q0004. The project involves removal of an existing concrete trail along Portage Lake lakefront and construction of a new trail connecting the Trail of Blue Ice to the Begich Boggs Visitor Center, decommissioning two existing outhouses and installing one new double vault outhouse, and associated site work including demolition, earthwork, drainage, retaining walls, and erosion control measures. The solicitation includes two optional items: construction of a scenic outlook platform with interpretive panels and a trail connecting beach access to the parking lot. Quotations must be submitted via email to Eric Oldenkamp at eric.oldenkamp@usda.gov by 5:00 PM Alaska Daylight Time on April 23, 2026, with Amendment 1 extending the deadline from the original April 21 date and revising certain material quantities and specifications. Award evaluation will be based on pricing and past experience/past performance, with the government awarding the contract to the responsible quoter whose quote is most advantageous considering price and other evaluation factors. Contractors must provide acknowledgment of solicitation amendments, unit pricing with extended totals for each line item, and past performance information for no more than three similar projects completed within the last five years demonstrating comparable scope and complexity.

This acquisition is set-aside as a total small business contract under NAICS code 237990 (Other Heavy and Civil Engineering Construction) with a small business size standard of $45,000,000. No incumbent contractors are identified in the solicitation documents. The contract is structured as a firm-fixed price agreement with the period of performance running from June 1, 2026 through October 31, 2027. The project is located at the Begich Boggs Visitor Center in Portage Valley, Alaska, approximately 11.2 miles southeast of Girdwood on the Seward Highway. Bonding requirements include a 20 percent Bid Bond for quotes exceeding $150,000; a 100 percent Payment Bond for awards between $35,000 and $150,000; and Performance and Payment Bonds at 100 percent each for awards exceeding $150,000, with bond premiums to be included under mobilization costs. Prevailing wage rates established by General Decision AK20260001 apply to this project, with rates varying by trade classification and geographic location within Alaska.

Notice text

2 versions

Update #2 · Latest ·

Amendment 1 (posted 4/20/2026): The purpose of this amendment is to make the following changes:

1. Disregard the custom sheltered entrances on sheet G-02 of the plans.

2. The quantity for item 2 subitem 55202-B2 has been increased to 2300.

3. The quantity for item 3 subitem 55202-O1 has been increased to 450.

4. There will not be a charge for on-site borrow.

5. The due date for quotes is extended to 4/23/2026 at 1700 (5 pm) Alaska time.

Statement of Requirement

This project involves the removal of an existing concrete trail along the Portage Lake lakefront, and construction of a new trail that connects the existing Trail of Blue Ice to the Begich Boggs Visitor Center (BBVC). Additionally, two (2) existing outhouses will be decommissioned, and one (1) new double vault outhouse will be built in a new location.

  1. Option item: Work consists of constructing a scenic outlook platform with interpretive panels by the lakefront.
  2. Option item: Construction of a trail connecting the beach access near the building to the parking lot.

Project work will include demolition, earthwork, clearing and grubbing, small concrete structures, retaining wall installation, drainage, trail switchbacks, trail surfacing, outhouse installation, erosion control measures and re-seeding.

Period of performance: 6/1/2026 to 10/31/2027.

The project is located at the Begich Boggs Visitor Center in Portage Valley, Alaska. Latitude: 60°47'4.52"N, Longitude: 148°50'28.47"W.

Update #1 ·

Statement of Requirement

This project involves the removal of an existing concrete trail along the Portage Lake lakefront, and construction of a new trail that connects the existing Trail of Blue Ice to the Begich Boggs Visitor Center (BBVC). Additionally, two (2) existing outhouses will be decommissioned, and one (1) new double vault outhouse will be built in a new location.

  1. Option item: Work consists of constructing a scenic outlook platform with interpretive panels by the lakefront.
  2. Option item: Construction of a trail connecting the beach access near the building to the parking lot.

Project work will include demolition, earthwork, clearing and grubbing, small concrete structures, retaining wall installation, drainage, trail switchbacks, trail surfacing, outhouse installation, erosion control measures and re-seeding.

Period of performance: 6/1/2026 to 10/31/2027.

The project is located at the Begich Boggs Visitor Center in Portage Valley, Alaska. Latitude: 60°47'4.52"N, Longitude: 148°50'28.47"W.

Attachments

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
BBVC Lakefront Trail and Outhouse Replacement Award Award Notice
BBVC Lakefront Trail and Outhouse Replacement This notice · Latest solicitation Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity