Barksdale RAPCON Misc. Repairs

Closed Solicitation Posted

Solicitation number
697DCK-20-R-00268
Agency
Southwestern Region Federal Aviation Administration, Department of Transportation
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
236220 Commercial and Institutional Building Construction
PSC
Z1BC Maintenance Of Radar And Navigational Facilities
Place of performance
Barksdale AFB, Louisiana 71110, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks a contractor to perform miscellaneous repairs at the Barksdale Radar Approach Control facility located on Barksdale Air Force Base in Louisiana. Work will include removing and replacing the roofing system and coping, installing a new roof top guard railing and access ladder, replacing exterior hollow metal doors and frames, installing new sealants and interior paint, repairing and installing a new lightning protection system to meet FAA standards, and removing all construction debris. Offerors must use specified materials and meet all applicable FAA, NFPA, and UL requirements. Proposals are due by June 18, 2021 and will be evaluated based on technical qualifications, past performance, and price.

This is a total small business set-aside. The primary NAICS code is 238210 and PSC code R499 applies. The work is estimated to cost between $300,000 and $500,000 and will be performed at the Barksdale RAPCON facility located at Barksdale Air Force Base in Louisiana. The period of performance is not specified but the solicitation was issued by the Federal Aviation Administration Southwestern Region seeking a contractor to support repairs at the facility.

Notice text

5 versions

Update #5 · Latest ·

Amendment 3: Posted 6/10/21

Amendment 2 posted 6/4/21. Due date extended, answer to received question. There will be another amendment as soon as a response is received regarding a roofing question.

****Clarification**** Due date for questions: The due date for questions is extended to Thursday May 27, 2021 at 1500 PST. Questions received after this date may not be answered.

Amendment 01 posted 5/17/21

The following is a summary of the work to be performed at the Barksdale RAPCON located on the Barksdale Air Force Base.

1. ALL FAA specified and Contractor supplied materials must require an approval by the

FAA through the submittal process prior to purchase and installation of such materials.

2. Contractor must use GE Sil Proof 2000 sealant, or an equivalent that meets the

specifications in the sealants section (All sealants and all materials listed as brand

names are acceptable or an equivalent if the substitute meets the specifications listed

in the products specification section). This product will be used to reseal where existing

sealant has deteriorated, or sealant was removed (Exterior only).

3. Contractor must Furnish and Install (F & I) new GE interior paintable sealant where

hollow metal door frames have been replaced with new doors, and frames.

4. Contractor must Repair & Replace (Typ. R & R) Radar Approach Control facility

(RAPCON): roofing and coping etc. system (Tear off to the deck),

5. F & I new roof top perimeter guard railing system. Railing must meet FAA (drawings

and specification sections) and OSHA

requirements.

6. F & I fabricated roof top access “ship ladder” per drawing location.

7. Remove (5-6) exterior hollow metal doors and frames.
8. F & I new exterior commercial hollow metal doors and full welded frames.

9. F & I DTM (direct to Metal) primer and paint for new and existing exterior doors.

10. Paint Colors must be chosen at a later date by the occupants ( FAA Personnel that daily

maintains and owns the structure) of the facility.

11. Contractor must remove all construction debris from the site, as to maintain a clean and

safe working environment.

12. PROVIDE AND INSTALL A NEW ROOF LIGHTNING PROTECTION SYSTEM FOR

THE RAPCON BLGD LIGHTNING PROTECTION SYSTEM TO MEET OR EXCEED

THE REQUIREMENTS OF FAA STANDARD, FAA-STD-019F (THROUGHOUT

THE SPECIFICATIONS, TYP), ORDERS, PROJECT DRAWINGS, AND THE

FOLLOWING:

13. STANDARDS FOR INSTALLATION OF LIGHTNING PROTECTION SYSTEMS

(NFPA 780)

14. INSTALLATION REQUIREMENTS FOR LIGHTNING PROTECTION SYSTEMS

(UL 96A)

15. PROVIDE CLASS II OR LARGER RATED MATERIALS, AS SPECIFIED IN NFPA

780 FOR AIR TERMINALS, MAIN AND DOWN CONDUCTORS AND BONDING

CONDUCTORS.

16. NUMBER OF DOWN CONDUCTORS MUST BE BASED ON FAA-STD-019F. MAKE

SURE DOWN CONDUCTORS FOLLOW THE MOST DIRECT PATH TO EARTH

AND MAIN AND BONDING CONDUCTORS MAINTAIN A HORIZONTAL OR

DOWNWARD PATH.

17. AIR TERMINALS MUST BE SOLID COPPER, BRONZE OR ALUMINUM, 12-IN

HIGH MINIMUM, WITH 1/2 –IN DIAMETER FOR COPPER AND 5/8-IN DIAMETER

FOR ALUMINUM AND INSTALLED AS PER NFPA 780 AND UL 96A.

18. ALL PRODUCTS MUST BE UL LISTED AND LABELED WITH THE UL

CERTIFICATION MARK IN ACCORDANCE WITH UL REQUIREMENTS.

19. PLEASE NOTE THAT INCLUSION OF A UL MASTER LABEL ALONE MUST NOT

BE SUFFICIENT TO INDICATE COMMPLIANCE WITH FAA-STD-019F.

Update #4 ·

Amendment 2 posted 6/4/21. Due date extended, answer to received question. There will be another amendment as soon as a response is received regarding a roofing question.

****Clarification**** Due date for questions: The due date for questions is extended to Thursday May 27, 2021 at 1500 PST. Questions received after this date may not be answered.

Amendment 01 posted 5/17/21

The following is a summary of the work to be performed at the Barksdale RAPCON located on the Barksdale Air Force Base.

1. ALL FAA specified and Contractor supplied materials must require an approval by the

FAA through the submittal process prior to purchase and installation of such materials.

2. Contractor must use GE Sil Proof 2000 sealant, or an equivalent that meets the

specifications in the sealants section (All sealants and all materials listed as brand

names are acceptable or an equivalent if the substitute meets the specifications listed

in the products specification section). This product will be used to reseal where existing

sealant has deteriorated, or sealant was removed (Exterior only).

3. Contractor must Furnish and Install (F & I) new GE interior paintable sealant where

hollow metal door frames have been replaced with new doors, and frames.

4. Contractor must Repair & Replace (Typ. R & R) Radar Approach Control facility

(RAPCON): roofing and coping etc. system (Tear off to the deck),

5. F & I new roof top perimeter guard railing system. Railing must meet FAA (drawings

and specification sections) and OSHA

requirements.

6. F & I fabricated roof top access “ship ladder” per drawing location.

7. Remove (5-6) exterior hollow metal doors and frames.
8. F & I new exterior commercial hollow metal doors and full welded frames.

9. F & I DTM (direct to Metal) primer and paint for new and existing exterior doors.

10. Paint Colors must be chosen at a later date by the occupants ( FAA Personnel that daily

maintains and owns the structure) of the facility.

11. Contractor must remove all construction debris from the site, as to maintain a clean and

safe working environment.

12. PROVIDE AND INSTALL A NEW ROOF LIGHTNING PROTECTION SYSTEM FOR

THE RAPCON BLGD LIGHTNING PROTECTION SYSTEM TO MEET OR EXCEED

THE REQUIREMENTS OF FAA STANDARD, FAA-STD-019F (THROUGHOUT

THE SPECIFICATIONS, TYP), ORDERS, PROJECT DRAWINGS, AND THE

FOLLOWING:

13. STANDARDS FOR INSTALLATION OF LIGHTNING PROTECTION SYSTEMS

(NFPA 780)

14. INSTALLATION REQUIREMENTS FOR LIGHTNING PROTECTION SYSTEMS

(UL 96A)

15. PROVIDE CLASS II OR LARGER RATED MATERIALS, AS SPECIFIED IN NFPA

780 FOR AIR TERMINALS, MAIN AND DOWN CONDUCTORS AND BONDING

CONDUCTORS.

16. NUMBER OF DOWN CONDUCTORS MUST BE BASED ON FAA-STD-019F. MAKE

SURE DOWN CONDUCTORS FOLLOW THE MOST DIRECT PATH TO EARTH

AND MAIN AND BONDING CONDUCTORS MAINTAIN A HORIZONTAL OR

DOWNWARD PATH.

17. AIR TERMINALS MUST BE SOLID COPPER, BRONZE OR ALUMINUM, 12-IN

HIGH MINIMUM, WITH 1/2 –IN DIAMETER FOR COPPER AND 5/8-IN DIAMETER

FOR ALUMINUM AND INSTALLED AS PER NFPA 780 AND UL 96A.

18. ALL PRODUCTS MUST BE UL LISTED AND LABELED WITH THE UL

CERTIFICATION MARK IN ACCORDANCE WITH UL REQUIREMENTS.

19. PLEASE NOTE THAT INCLUSION OF A UL MASTER LABEL ALONE MUST NOT

BE SUFFICIENT TO INDICATE COMMPLIANCE WITH FAA-STD-019F.

Update #3 ·

****Clarification**** Due date for questions: The due date for questions is extended to Thursday May 27, 2021 at 1500 PST. Questions received after this date may not be answered.

Amendment 01 posted 5/17/21

The following is a summary of the work to be performed at the Barksdale RAPCON located on the Barksdale Air Force Base.

1. ALL FAA specified and Contractor supplied materials must require an approval by the

FAA through the submittal process prior to purchase and installation of such materials.

2. Contractor must use GE Sil Proof 2000 sealant, or an equivalent that meets the

specifications in the sealants section (All sealants and all materials listed as brand

names are acceptable or an equivalent if the substitute meets the specifications listed

in the products specification section). This product will be used to reseal where existing

sealant has deteriorated, or sealant was removed (Exterior only).

3. Contractor must Furnish and Install (F & I) new GE interior paintable sealant where

hollow metal door frames have been replaced with new doors, and frames.

4. Contractor must Repair & Replace (Typ. R & R) Radar Approach Control facility

(RAPCON): roofing and coping etc. system (Tear off to the deck),

5. F & I new roof top perimeter guard railing system. Railing must meet FAA (drawings

and specification sections) and OSHA

requirements.

6. F & I fabricated roof top access “ship ladder” per drawing location.

7. Remove (5-6) exterior hollow metal doors and frames.
8. F & I new exterior commercial hollow metal doors and full welded frames.

9. F & I DTM (direct to Metal) primer and paint for new and existing exterior doors.

10. Paint Colors must be chosen at a later date by the occupants ( FAA Personnel that daily

maintains and owns the structure) of the facility.

11. Contractor must remove all construction debris from the site, as to maintain a clean and

safe working environment.

12. PROVIDE AND INSTALL A NEW ROOF LIGHTNING PROTECTION SYSTEM FOR

THE RAPCON BLGD LIGHTNING PROTECTION SYSTEM TO MEET OR EXCEED

THE REQUIREMENTS OF FAA STANDARD, FAA-STD-019F (THROUGHOUT

THE SPECIFICATIONS, TYP), ORDERS, PROJECT DRAWINGS, AND THE

FOLLOWING:

13. STANDARDS FOR INSTALLATION OF LIGHTNING PROTECTION SYSTEMS

(NFPA 780)

14. INSTALLATION REQUIREMENTS FOR LIGHTNING PROTECTION SYSTEMS

(UL 96A)

15. PROVIDE CLASS II OR LARGER RATED MATERIALS, AS SPECIFIED IN NFPA

780 FOR AIR TERMINALS, MAIN AND DOWN CONDUCTORS AND BONDING

CONDUCTORS.

16. NUMBER OF DOWN CONDUCTORS MUST BE BASED ON FAA-STD-019F. MAKE

SURE DOWN CONDUCTORS FOLLOW THE MOST DIRECT PATH TO EARTH

AND MAIN AND BONDING CONDUCTORS MAINTAIN A HORIZONTAL OR

DOWNWARD PATH.

17. AIR TERMINALS MUST BE SOLID COPPER, BRONZE OR ALUMINUM, 12-IN

HIGH MINIMUM, WITH 1/2 –IN DIAMETER FOR COPPER AND 5/8-IN DIAMETER

FOR ALUMINUM AND INSTALLED AS PER NFPA 780 AND UL 96A.

18. ALL PRODUCTS MUST BE UL LISTED AND LABELED WITH THE UL

CERTIFICATION MARK IN ACCORDANCE WITH UL REQUIREMENTS.

19. PLEASE NOTE THAT INCLUSION OF A UL MASTER LABEL ALONE MUST NOT

BE SUFFICIENT TO INDICATE COMMPLIANCE WITH FAA-STD-019F.

Update #2 ·

Amendment 01 posted 5/17/21

The following is a summary of the work to be performed at the Barksdale RAPCON located on the Barksdale Air Force Base.

1. ALL FAA specified and Contractor supplied materials must require an approval by the

FAA through the submittal process prior to purchase and installation of such materials.

2. Contractor must use GE Sil Proof 2000 sealant, or an equivalent that meets the

specifications in the sealants section (All sealants and all materials listed as brand

names are acceptable or an equivalent if the substitute meets the specifications listed

in the products specification section). This product will be used to reseal where existing

sealant has deteriorated, or sealant was removed (Exterior only).

3. Contractor must Furnish and Install (F & I) new GE interior paintable sealant where

hollow metal door frames have been replaced with new doors, and frames.

4. Contractor must Repair & Replace (Typ. R & R) Radar Approach Control facility

(RAPCON): roofing and coping etc. system (Tear off to the deck),

5. F & I new roof top perimeter guard railing system. Railing must meet FAA (drawings

and specification sections) and OSHA

requirements.

6. F & I fabricated roof top access “ship ladder” per drawing location.

7. Remove (5-6) exterior hollow metal doors and frames.
8. F & I new exterior commercial hollow metal doors and full welded frames.

9. F & I DTM (direct to Metal) primer and paint for new and existing exterior doors.

10. Paint Colors must be chosen at a later date by the occupants ( FAA Personnel that daily

maintains and owns the structure) of the facility.

11. Contractor must remove all construction debris from the site, as to maintain a clean and

safe working environment.

12. PROVIDE AND INSTALL A NEW ROOF LIGHTNING PROTECTION SYSTEM FOR

THE RAPCON BLGD LIGHTNING PROTECTION SYSTEM TO MEET OR EXCEED

THE REQUIREMENTS OF FAA STANDARD, FAA-STD-019F (THROUGHOUT

THE SPECIFICATIONS, TYP), ORDERS, PROJECT DRAWINGS, AND THE

FOLLOWING:

13. STANDARDS FOR INSTALLATION OF LIGHTNING PROTECTION SYSTEMS

(NFPA 780)

14. INSTALLATION REQUIREMENTS FOR LIGHTNING PROTECTION SYSTEMS

(UL 96A)

15. PROVIDE CLASS II OR LARGER RATED MATERIALS, AS SPECIFIED IN NFPA

780 FOR AIR TERMINALS, MAIN AND DOWN CONDUCTORS AND BONDING

CONDUCTORS.

16. NUMBER OF DOWN CONDUCTORS MUST BE BASED ON FAA-STD-019F. MAKE

SURE DOWN CONDUCTORS FOLLOW THE MOST DIRECT PATH TO EARTH

AND MAIN AND BONDING CONDUCTORS MAINTAIN A HORIZONTAL OR

DOWNWARD PATH.

17. AIR TERMINALS MUST BE SOLID COPPER, BRONZE OR ALUMINUM, 12-IN

HIGH MINIMUM, WITH 1/2 –IN DIAMETER FOR COPPER AND 5/8-IN DIAMETER

FOR ALUMINUM AND INSTALLED AS PER NFPA 780 AND UL 96A.

18. ALL PRODUCTS MUST BE UL LISTED AND LABELED WITH THE UL

CERTIFICATION MARK IN ACCORDANCE WITH UL REQUIREMENTS.

19. PLEASE NOTE THAT INCLUSION OF A UL MASTER LABEL ALONE MUST NOT

BE SUFFICIENT TO INDICATE COMMPLIANCE WITH FAA-STD-019F.

Update #1 ·

The following is a summary of the work to be performed at the Barksdale RAPCON located on the Barksdale Air Force Base.

1. ALL FAA specified and Contractor supplied materials must require an approval by the

FAA through the submittal process prior to purchase and installation of such materials.

2. Contractor must use GE Sil Proof 2000 sealant, or an equivalent that meets the

specifications in the sealants section (All sealants and all materials listed as brand

names are acceptable or an equivalent if the substitute meets the specifications listed

in the products specification section). This product will be used to reseal where existing

sealant has deteriorated, or sealant was removed (Exterior only).

3. Contractor must Furnish and Install (F & I) new GE interior paintable sealant where

hollow metal door frames have been replaced with new doors, and frames.

4. Contractor must Repair & Replace (Typ. R & R) Radar Approach Control facility

(RAPCON): roofing and coping etc. system (Tear off to the deck),

5. F & I new roof top perimeter guard railing system. Railing must meet FAA (drawings

and specification sections) and OSHA

requirements.

6. F & I fabricated roof top access “ship ladder” per drawing location.

7. Remove (5-6) exterior hollow metal doors and frames.
8. F & I new exterior commercial hollow metal doors and full welded frames.

9. F & I DTM (direct to Metal) primer and paint for new and existing exterior doors.

10. Paint Colors must be chosen at a later date by the occupants ( FAA Personnel that daily

maintains and owns the structure) of the facility.

11. Contractor must remove all construction debris from the site, as to maintain a clean and

safe working environment.

12. PROVIDE AND INSTALL A NEW ROOF LIGHTNING PROTECTION SYSTEM FOR

THE RAPCON BLGD LIGHTNING PROTECTION SYSTEM TO MEET OR EXCEED

THE REQUIREMENTS OF FAA STANDARD, FAA-STD-019F (THROUGHOUT

THE SPECIFICATIONS, TYP), ORDERS, PROJECT DRAWINGS, AND THE

FOLLOWING:

13. STANDARDS FOR INSTALLATION OF LIGHTNING PROTECTION SYSTEMS

(NFPA 780)

14. INSTALLATION REQUIREMENTS FOR LIGHTNING PROTECTION SYSTEMS

(UL 96A)

15. PROVIDE CLASS II OR LARGER RATED MATERIALS, AS SPECIFIED IN NFPA

780 FOR AIR TERMINALS, MAIN AND DOWN CONDUCTORS AND BONDING

CONDUCTORS.

16. NUMBER OF DOWN CONDUCTORS MUST BE BASED ON FAA-STD-019F. MAKE

SURE DOWN CONDUCTORS FOLLOW THE MOST DIRECT PATH TO EARTH

AND MAIN AND BONDING CONDUCTORS MAINTAIN A HORIZONTAL OR

DOWNWARD PATH.

17. AIR TERMINALS MUST BE SOLID COPPER, BRONZE OR ALUMINUM, 12-IN

HIGH MINIMUM, WITH 1/2 –IN DIAMETER FOR COPPER AND 5/8-IN DIAMETER

FOR ALUMINUM AND INSTALLED AS PER NFPA 780 AND UL 96A.

18. ALL PRODUCTS MUST BE UL LISTED AND LABELED WITH THE UL

CERTIFICATION MARK IN ACCORDANCE WITH UL REQUIREMENTS.

19. PLEASE NOTE THAT INCLUSION OF A UL MASTER LABEL ALONE MUST NOT

BE SUFFICIENT TO INDICATE COMMPLIANCE WITH FAA-STD-019F.

Attachments

Files attached to this notice, newest first
File Type Posted
Amendment 3.pdf PDF
Amendment 2.pdf PDF
Amendment 01.pdf PDF
wage.pdf PDF
DWG BAD Drawings.pdf PDF
COVID-19 Contractual Requirement Rev 2 04-28-2021.pdf PDF
697DCK-20-R-00268.pdf PDF
BAD Combined Specs 3-11-2021 rjm.pdf PDF
PPQ.pdf PDF

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Barksdale RAPCON Misc. Repairs This notice · Latest solicitation Solicitation
FAA Market Survey: Barksdale AFB RAPCON Building Repairs Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity