This document is a Questions and Answers (Q&A) file for federal contract FA302226R0025, Building 730 Sexual Assault Prevention and Response (SAPR) project.
The Q&A addresses seven key inquiries regarding project execution and specifications. Personnel requirements clarify that a single superintendent may fulfill supervision, safety, and Quality Assurance/Quality Control (QA/QC) roles if fully qualified, with credentials submitted for government review post-award. Contractors must submit a contract-specific QA/QC Plan, though an existing company Safety Plan may substitute for a contract-specific safety plan. The project is not tax-exempt. Technical specifications address duress alarm system installation, requiring contractors to install two duress buttons—one in the larger SAPR Office on the North side of Building 730's hallway and one in the SAPR Office on the South side. The Vindicator Panel, located in room 152B across the lobby from button locations, serves as the termination point for duress signal cabling. The government provided an amended Statement of Work (SOW) and floor plans prior to bid due date clarifying these requirements. Door specifications indicate that new doors entering the hallway shall feature single-width frames without sidelights, differing from existing corridor doors with etched graphics.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA302226R0025
B730 SAPR RFIs
1. In executing this project, can one superintendent fulfill the supervision, safety, and
QAQC roles?
Yes, if the person filling all three roles is fully qualified to perform those tasks.
Credentials will need to be submitted for government review post contract award.
2. Are contractors required to issue a contract specific QA/QC Plan?
Yes, a contract specific QA/QC Plan is required.
3. Are contractors required to issue a contract specific Safety Plan?
If the contractor has a company Safety Plan, that can be used in place of a contract specific plan.
4. Is this project tax exempt?
This project is not tax exempt.
5. Please provide the location of the termination point for the duress signal cabling termination in the finance office. This area was not accessible during the site visit.
An additional floor plan will be included to show the location of the Vindicator
Panel, which is the termination point for duress signal cabling.
6. Will the duress alarm placement be provided by the government prior to the bid due date?
Yes, additional details regarding the duress system installation have been included in a new amended SOW and floor plan. The Vindicator panel is located within room 152B, which is across the lobby from the duress button locations. This project will require the Contractor to install two (2) duress buttons. One button shall be installed within the larger “SAPR Office” located on the North side of
Building 730’s hallway. The 2nd button shall be installed within the “SAPR
Office” located on the South side of Building 730’s hallway.
7. Existing doors in the corridor have a sidelight that has an etched graphic on it. Will the new doors include a sidelight that contains an etched graphic?
No, the new doors entering to the hallway shall receive single width frames with no sidelights.