Design-Build Statement of Work Summary
This is a Design-Build Statement of Work for a renovation and conversion project at Columbus Air Force Base (CAFB), Mississippi, with project number EEPZ260842. The project involves renovating and reconfiguring rooms 131, 135, 135A, and 140 in Building 730 to create one SAPR Storage room, one Reception/Waiting area, and six SAPR Offices from the existing spaces. The total period of performance is 300 calendar days from Notice to Proceed. The scope encompasses interior construction with new partitions and finishes, door installation and replacement, flooring (LVT plank and carpet tile), painting, cove base installation, and comprehensive updates to building systems including fire alarms, fire sprinklers, electrical, communications, HVAC, and a duress alarm system. Soundproofing materials must be installed to achieve Sound Transmission Class (STC) 50-55 for offices and STC 45-50 for corridors per UFC 3-450-01 and DAFI 90-6001.
The contractor must provide all design services including professionally sealed drawings prepared in AutoCAD Release 2020 and PDF formats, with submissions at 35%, 65%, 95%, and 100% design phases within specified timeframes. A Qualified Fire Protection Engineer must be involved in all fire protection design and testing. The contractor is responsible for HVAC load analysis, photometric analysis of lighting systems, and complete sequence of operations documentation. Key administrative requirements include submission of a Quality Control Plan, progress schedules using AF Forms 3064 and 3065, daily status reports, Material Approval Submittals with AF Form 3000, and comprehensive operations and maintenance manuals. The contractor must maintain a Contractor Project Manager, Site Superintendent, and Quality Control Manager on-site during construction, with weekly progress meetings and coordination with government inspectors. The contract requires compliance with UFC standards, NFPA codes, NEC electrical standards, and Columbus AFB Installation Facility Standards, with no deviations permitted without prior written Contracting Officer approval.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESIGN-BUILD STATEMENT OF WORK
PROJECT NUIMBER: EEPZ260842
RENOVATE CONVERT COMM TO SAPR, B730
COLUMBUS AFB, MISSISSIPPI
07 JULY 2026
COLUMBUS AFB, MS PROJECT NUMBER: EEPZ260842
TABLE OF CONTENTS
NOMENCLATURE
1.1 ACRONYMS & ABBREVIATIONS
1.2 BASIC TERMS
DESCRIPTION OF PROJECT
2.1 SUMMARY
2.2 BACKGROUND
2.3 SCOPE OF PROJECT
2.4 GOVERNMENT FURNISHED EQUIPMENT/MATERIALS
2.5 SALVAGE
DESIGN REQUIREMENTS
3.1 SUMMARY
3.2 NATURE/EXTENT OF DESIGN
3.3 RESPONSIBILITY
3.4 DESIGN STANDARDS
3.5 DRAWINGS
3.6 DESIGN SUBMITTALS
3.7 DESIGN REVIEWS
3.8 CONFERENCES
ADMINISTRATION OF CONSTRUCTION
4.1 PERFORMANCE CAPABILITIES
4.2 COMMENCEMENT, PROSECUTION & COMPLETION
4.3 SCHEDULING
4.4 MANAGING
4.5 MATERIAL SUBMITTALS AND SHOP DRAWINGS
4.6 WORK BY GOVERNMENT
4.7 PRE-FINAL AND FINAL INSPECTION
4.8 WARRANTY
4.9 CONTRACTOR OFFICE
4.10 CONSTRUCTION SITES
4.11 CONSTRUCTION EQUIPMENT
4.12 AVAILABILITY OF UTILITY SERVICES AT JOB SITES
4.13 TEMPORARY UTILITIES
4.14 CONSTRUCTION SECURITY
QUALITY REQUIREMENTS
5.1 QUALITY CONTROL PLAN
5.2 TESTING AND INSPECTION SERVICES
5.3 MANUFACTURERS' FIELD SERVICES
5.4 PRODUCT REQUIREMENTS
5.5 CLOSEOUT PROCEDURES
SAFETY, HEALTH AND ENVIRONMENTAL PROTECTION
6.1 SAFETY AND HEALTH
6.2 GENERAL
6.3 HAZARDOUS MATERIAL
6.4 PROJECT EXECUTION
6.5 HAZARDOUS WASTE GENERATION/DISPOSAL
6.6 RECYCLING
6.7 PROHIBITED MATERIAL/ACTIONS
6.8 SPILLS AND CLEANUP
6.9 AIR CONSIDERATIONS
6.10 AFFIRMATIVE/GREEN PROCUREMENT/BIO-BASED/ENERGY
6.11 ASBESTOS/LEAD BASED PAINT
6.12 DRINKING WATER
6.13 EMS
6.14 HISTORICAL AND CULTURAL ARTIFACTS
6.15 NATURAL RESOURCES
6.16 NOISE
6.17 PESTICIDES/FERTILIZERS
6.18 STORM WATER PROTECTION
6.19 REQUEST FOR CE SERVICE/ACTION/CLEARANCE; AF FORMS 332/813
6.20 TANKS
6.21 LIMITS AND EXCEPTIONS
6.22 LEGAL AUTHORITY
NOMENCLATURE
1.1 ACRONYMS & ABBREVIATIONS
AF Air Force AFI Air Force Instruction AFM Air Force Manual AFUE Annual Fuel Utilization Efficiency AHU Air Handling Unit ATFP Anti-terrorism/Force Protection BCE Base Civil Engineer CAD Computer Assisted (or Aided) Design CAFB Columbus Air Force Base CDs Construction Documents CEPM Civil Engineering Project Manager CES Civil Engineering Squadron cfm cubic feet per minute CFR Code of Federal Regulations CHW Chilled Water CMI 14CES Construction Manager Inspector CO Contracting Officer COR Contracting Officer Representative Comm Communications CPM Contractor’s Project Manager CSS Contractor’s Site Superintendent DP Design Professional EMCS Energy Management & Control System EMI Electromagnetic Interference EPA Environmental Protection Agency ETL Engineering Technical Letter FAR Federal Acquisition Regulation FCU Fan Coil Unit FM Factory Mutual
FOD Foreign Object Debris fps feet per second
ft. foot or feet GFCI Government Furnished Contractor Installed gpm gallons per minute Hazmat Hazardous Materials HMW Hazardous Material or Waste HTW Hazardous and Toxic Waste HVAC Heating, Ventilating and Air Conditioning NEC National Electrical Code NTP Notice to Proceed O&M Operation and Maintenance OSP Originally Specified Product PDF Portable Document Format PE Professional Engineer Ph Phase (electrical) PM Project Manager psi pounds per square inch QCP Quality Control Plan RFP Request for Proposal SOW Statement of Work TI Technical Instruction TL Technical Letter TM Technical Manual UFC Unified Facilities Criteria UPS Uninterruptible Power Supply VAV Variable Air Volume V Volts W Watts
1.2 BASIC TERMS
The following table provides many of the meanings of words or phrases commonly used in this document.
All directives, informative, etc. statements are directed to the Contractor even if the term “contractor” or the contractor name is not included (e.g. “Provide a nail.” is equivalent to “The contractor shall provide a nail.” And “remove” is equivalent to “The Contractor shall remove”). Also, the Contractor shall ably and competently execute all directives including all directly or indirectly related tasks required to safely and legally perform the directive (e.g. “remove debris from CAFB” includes “safe and legal removal, disposal and obtaining all necessary permits, etc.)
A device, equipment or system referred to in the singular (e.g. “the pump”, or “the ___ system”) includes all related devices, elements and components required to Provide (see below in this table) that device, equipment, or system.
The Term Shall Mean (*=Shall in Addition Mean) Approved (by CAFB) *without waiving or suspending the full force of Contractor obligation to fulfill the CDs Aspect Distinct feature or element of the project CAFB Government contracting Authority on Columbus Air Force Base
Construction Documents
Drawings, specifications and their references including all Design Criteria and Design & Construction Requirements for this Project.
Contractor The Design-Build entity holding a current Government contract including all personnel in direct or indirect employ of same entity servicing same contract including partners, consultants, subcontractors, suppliers, and manufacturers.
Design Professional (Abbreviated: DP) Professionals including Architects, Engineers and Landscape Architects licensed to practice in one or more states of the U.S.
Day Calendar day unless noted otherwise.
DP Licensed Design Professional fully responsible for all professional design on this project.
Engineer DP For example (e.g.) One among many possible examples Government Columbus Air Force Base Contracting Officer Including [Includes] Including, but not limited to [Includes, but is not limited to] Provide Furnish and install complete, functional, and ready for use without added government action Provision Furnishing & installation complete, functional, and ready for use without added government action Will, must, shall & similar Terms are mandatory directives whereby ‘Term’ = ‘Term + to CAFB satisfaction’ Work The whole or any part, product, system or subsystem of this project Replace Demolish and dispose of existing element. Provide new element of equal or greater value.
Review Review and, if and when acceptable to the government, approval Subcontractor Subcontractor and all personnel in Subcontractor’s direct or indirect employ on any given
Project including suppliers and manufacturers
DESCRIPTION OF PROJECT
2.1 SUMMARY
The Contractor must provide all plant, labor, equipment, transportation, and tools required to remodel and change the room layout of rooms 131, 135, 135A, and 140 in Building 730 at Columbus AFB Mississippi. The project involves creating one (1) SAPR Storage, one (1) Reception/Waiting, and six (6) SAPR Offices from the existing spaces in Building 730. The scope of includes constructing interior partitions, installing doors and frames, and updating room finishes as well as rework of supporting building systems including fire alarms, fire sprinklers, electrical, communications, and HVAC. Perform all work according to this Statement of Work (SOW), the Concept Design Drawings, and all related AF requirements and other codes and references.
2.2 BACKGROUND
Rooms 131, 135, 135A, and 140 of building 730 previously belonged to the Communications Squadron, and currently sit empty and vacant. This project will create several new rooms within existing rooms 131, 135, 135A and 140 to meet the SAPR mission and promote victim advocacy. This project also collocates SAPR with the newly implemented IPPW outlined in the Integrated Response Co-Location Pilot.
2.3 SCOPE OF PROJECT
INTERIOR CONSTRUCTION, FINISHES, AND ASSEMBLIES:
2.3.1 Furnish and install all materials needed to construct the new rooms as drawn in the Concept Drawings: one (1) SAPR Storage, one (1) Reception/Waiting, and six (6) SAPR Offices. This includes, but is not limited to, galvanized metal studs and wall braces, framing, furring channels, and gypsum wall board. Furnish and install new 2’ x 2’ acoustical ceiling grid and tile throughout the new rooms. Furnish and install cross tees, cross tee clips, lock clips, hangar wires, tiles and other components necessary for a complete, usable system. Wall and ceiling soundproofing materials are required including but not limited to ceiling tiles, iso-clips, mass loaded vinyl, sound attenuation blankets, and others. Soundproofing materials, design, and installation of building elements shall comply with UFC 3-450-01 and DAFI 90- 6001. UFC 3-450-01 requires confidential offices (SAPR is confidential) to achieve Sound Transmission Class (STC) 50-55 and corridors to achieve STC 45-50. The new non-load bearing interior walls’ studs and wallboards shall be terminated at the height of the existing walls.
2.3.2 Remove and replace the one (1) interior door between existing room 131 and the hallway with a new 3’x7’ opaque interior door.
2.3.3 Demolish the one (1) interior door, doorframe, sidelight, casing, and associated hardware between existing room 135 and the hallway. Repair the wall as necessary to prepare for framing the opening.
Furnish and install all materials necessary to close the opening, creating a continuous wall surface.
2.3.4 Demolish the one (1) interior door, doorframe, sidelight, casing, and associated hardware between existing room 135 and 135A. Repair the wall as necessary to prepare for one (1) new 3’x7’ opaque interior door, doorframe, and associated hardware to be installed.
2.3.5 Demolish the one (1) interior door, doorframe, sidelight, casing, and associated hardware between existing room 140 and the hallway. Repair the wall as necessary to prepare for one (1) new 3’x7’ opaque interior door, doorframe, kickplate, and associated hardware to be installed. Furnish and install door trim on the hallway side to match the existing door trim for uniformity with existing hallway-facing interior doors of B730.
2.3.6 Demolish an area on the wall between existing room 140 and the hallway to prepare for one (1) new 3’x7’ opaque interior door, doorframe, kickplate, and associated hardware to be installed. Repair the wall as necessary for installation of these items. Furnish and install door trim on the hallway side to match the existing door trim for uniformity with existing hallway-facing interior doors of B730.
2.3.7 Furnish and install one (1) interior door storefront located in the hallway, see concept drawing for location. Install the interior door storefront at a location that avoids existing HVAC, fire detection and suppression, and electrical systems. Prepare the floor, walls, and ceiling as necessary to install a complete and functional system. Furnish and install a new interior door, doorframe, sidelight(s), casing, and associated hardware that match existing interior door storefront 140 located down the hall between existing rooms 102 and 106.
2.3.8 Furnish and install all new interior doors, doorframes, and any other necessary components within the new rooms as indicated in the concept drawing. The doorframes, doors, and associated hardware shall match the existing doorframes, doors, and associated hardware in the facility. Doors and doorframes are to be added into the new and existing interior walls for the new 3’x’7 opaque interior doors.
2.3.9 All door hardware must be Best 7-pin core compatible. All interior doors are to receive hinges, handles, locksets, closers, and anything else required by base standards. Locks and hinges should be mortise.
2.3.10 Demolish existing carpet, carpet pad, adhesives, and any other materials and hardware necessary to prepare for new floor installation in existing rooms 131, 135, 135A, and 140. Furnish and install new 20 mil, 5mm thick, LVT plank flooring and associated installation materials in the new Reception/Waiting, SAPR Corridor, and SAPR Storage. Match dimensions and color similar to LVT plank flooring in existing IPPW corridors. Furnish and install transition strips under interior doors to create a smooth walkway throughout. Furnish and install new 24” x 24” carpet tile and associated installation materials in the new SAPR Offices. Color should conform to base standards.
2.3.11 Patch and repair all wall surfaces to achieve a level 4 finish. Paint interior walls and trims within the new rooms and all areas affected by construction work. Paint color(s) shall be Sherwin Williams’ Accessible Beige, or approved equal. At a minimum, painting should include one (1) coat of primer, two
(2) coats of paint, sanding and prepping of all surfaces, and placing drop cloths on the floor.
2.3.12 Demolish existing cove base throughout rooms 131, 135, 135A, and 140. Furnish and install all new 4” rubber cove base throughout the new rooms and all areas affected by construction work.
2.3.13 Sweep, remove debris, and damp mop the newly installed hard surface floors throughout the project’s construction areas. Sweep, remove debris, and damp mop the existing hard surface floors that received construction foot traffic. Remove debris and vacuum the newly installed carpet floors throughout the project’s construction areas. All clean-ups shall be performed at the completion of all construction activities.
COMMUNICATIONS:
2.3.14 Keep existing communications components to the maximum extent possible, including but not limited to jacks, receptacles, outlets, junction boxes, conduit, and wiring in their entirety, unless specified otherwise. The Contractor is not responsible for installing new wiring and jacks. Furnish and install conduit with pull strings and anything else necessary to extend existing communications components for the new room layouts. Pull, coil, and tie wiring/cables up into overhead (above suspended ceiling system) for future use. The Government will pull wiring and install jacks after this projects completion.
2.3.15 Demolish the existing communication outlet and accompanying components between the two (2) new windowless SAPR offices. Relocate and install new components inside the rightmost office.
2.3.16 Demolish the existing communication outlet and accompanying components between the rightmost new windowless SAPR office and corridor. Relocate and install new components inside the rightmost office.
2.3.17 Demolish existing communication outlets and receptacles at locations that are obstructed by new interior walls and doors/door swings and cannot be reused. Preform the same at locations that conflict with demolition of existing walls/doors or other actions because of this project.
ELECTRICAL:
2.3.18 Keep existing electrical systems and accompanying components including but not limited to junction boxes, conduit, and conductors unless specified otherwise. Furnish and install junction boxes, conductors, conduit, and anything else necessary to extend existing components. Furnish all new white cover plates, receptacles, switches, and any other similar devices throughout the project area.
2.3.19 Demolish existing receptacles and light switches at locations that are obstructed by new interior walls and doors/door swings and cannot be reused. Preform the same at locations that conflict with demolition of existing walls/doors or other actions because of this project, unless specified otherwise.
2.3.20 Keep the existing light switch in existing room 131. Rewire the lighting circuit so that the light switch will control the lights only within the new SAPR reception/waiting area and SAPR corridor.
2.3.21 Relocate the existing light switch and accompanying components in existing room 135 if demolition of existing door/installation of new door effects the light switch’s location. Relocate to be near the new entry door for the rightmost new windowless SAPR office. Rewire the lighting circuit so that the light switch will control the lights only within the rightmost new windowless SAPR office.
2.3.22 Relocate the existing light switch and accompanying components in existing room 135A if demolition of existing door/installation of new door effects the light switch’s location. Relocate to be near the entry door for the rightmost new SAPR office. Rewire the lighting circuit so that the light switch will control the lights only within the rightmost new SAPR office.
2.3.23 Relocate the existing light switch at the hallway entry door and accompanying components in existing room 140 if demolition of existing door/installation of new door effects the light switch’s location. Relocate to be near the entry door for the SAPR storage room. Rewire the lighting circuit so that the light switch will control the lights only within the new SAPR storage room.
2.3.24 Furnish and install light switches, junction boxes, conduit, conductors, faceplates, and any associated components necessary to supply the new SAPR rooms with individual, room specific light operation. Wire the new lighting circuits so that the light switch will control the lights only within the room specific to the light switch. New power connections are to be connected to existing distribution panels for operation.
2.3.25 Demolish existing 2’x4’ light fixtures and associated fixtures whips up to the junction boxes in existing rooms 131, 135, 135A, and 140. Furnish and install new 2’x2’ flat panel LED flat light fixtures (in the new SAPR rooms) and 8” round LED flat light fixtures (in the new SAPR corridor) recessed mounted to the structural deck with new fixture whips. Ensure light fixtures have necessary seismic support, including but not limited to being suspended from the underside of the floor structure above.
Place light fixtures in locations necessary for optimal lighting qualities for essential daily functions and occupant comfort. Light fixtures shall be placed in locations that ensure minimal disruptions (i.e.
relocating, demolishing, performance, etc.) to existing HVAC, fire detection and suppression, and electrical systems.
2.3.26 All overhead lights must be wired to accommodate occupancy sensors, and to be turned on and off by switches mounted on the walls at various locations through the project’s construction areas. Reuse existing components to the maximum extent possible. Furnish and install new switches, occupancy sensors, conduit, conductors, and anything else necessary if more materials are needed to be reused and extend existing components to supply the new SAPR rooms with occupancy sensor performance and power for lighting. New power connections are to be connected to existing distribution panels for operation.
2.3.27 Furnish and install emergency exit signs and egress lighting in accordance with NFPA 101.
Extend emergency exit signs and egress lighting to include the project’s construction areas.
FIRE PROTECTION:
2.3.28 Relocate smoke detectors, ADA compliant fire strobes and alarms, and mass notifications that obstruct locations of new interior walls, new flat panel LED light fixtures, and new HVAC components.
Extend items to include the new rooms. Furnish and install items in accordance with NFPA 101 and Air Force Occupational Safety and Health Standards 91-118, reusing existing components to the maximum extent possible and reprogram fire control panels accordingly. If these items are required in additional areas and/or existing items cannot be relocated to extend in these additional areas, furnish and install smoke detectors, ADA compliant fire strobes and alarms, and mass notifications to match those existing within the project’s construction areas. If this occurs, furnish and install conduit, wiring, associated components, and anything else required to install fire protection, identification, and alert systems.
Primary and secondary power for the smoke detectors must be provided from the fire alarm control panel. The facility’s fire alarm system must always remain operational throughout this project.
2.3.29 Design, furnish, and install all piping, components, and appurtenances necessary to modify the existing wet-pipe sprinkler system for the new rooms. Design, furnish, and install the system in accordance with NFPA 13, UFC 3-600-01, and all appliable codes and standards to ensure all components of the system are designed and installed as required. Install sprinkler heads to match the existing sprinkler heads within the project’s construction areas. Coordinate all fire protection work with the Government and Emergency Services to ensure proper disconnection, draining, testing and any other necessary components and aspects of the existing and new sprinkler systems to perform the modifications.
MECHANICAL:
2.3.30 Keep existing HVAC system and accompanying components including but not limited to supply air diffusers, return air grilles, transfer air grilles, variable air volume (VAV) boxes, ductwork, and piping in their entirety, unless specified otherwise.
2.3.31 Keep existing warmer/cooler temperature adjustment sensors and accompanying components.
Reuse existing components to the maximum extent possible. Furnish and install conduit and anything else necessary if more materials are needed to be reused and extend existing components. Move and extend to new locations if the existing sensors are obstructed by new interior walls. Perform the same at locations that conflict with any other new construction actions. Contractor shall use best practice location placement (sensors shall not be placed in storage rooms).
2.3.32 Demolish existing supply air diffusers and flex duct to the supply air diffusers at locations that are obstructed by new interior walls and cannot be reused. Perform the same at locations that conflict with new LED light fixture locations. Demolition shall occur up to the existing branch(es) coming from the accompanying VAV box.
2.3.33 Design, furnish, and install new supply air diffusers, return air grilles, transfer air grilles, branch ducts, and any other components necessary to supply the new rooms. Furnish items to match those existing for uniformity.
2.3.34 Supply air diffusers, return air grilles, transfer grilles, and branch ducts shall be placed in locations that ensure minimal disruptions (i.e. relocating, demolishing, performance, etc.) to existing HVAC, fire detection and suppression, and electrical systems. Install the new supply air diffusers, return air grilles, and transfer air grilles at locations that best serve each room and occupants. Fit the new branch ducts to be supplied by the best option VAV box. Run the new branch ducts to their accompanied diffuser and/or grille. Ensure the new diffusers, grilles, and branch ducts connect to and operate the existing VAV box and associated thermostat control.
2.3.35 Furnish and install new balancing dampers throughout the new SAPR areas and shared conference room unless balancing dampers already exist and are complete and functional.
2.3.36 Relocate thermostat for VAV-1-02 from its existing location facing inside the existing CS Commander office, room 135A, to a new location within one (1) of the new SAPR offices the thermostat serves. Contractor shall use best practice of location placement. Reuse existing components to the maximum extent possible, extending them to the new location. Furnish and install conductors, conduit, and any additional components necessary to have a complete and functional VAV and thermostat system.
Furnish and install material necessary to patch and repair the walls as necessary at the existing and new thermostat location.
2.3.37 Relocate thermostat for VAV-1-05 from its existing location to a new location within one (1) of the new SAPR rooms the thermostat serves. Contractor shall use best practice of location placement.
Furnish and install conductors, conduit, and any additional components necessary to have a complete and functional VAV and thermostat system. Reuse existing components to the maximum extent possible, extending them to the new location. Furnish and install material necessary to patch and repair the walls as necessary at the existing and new thermostat location.
2.3.38 Thermostats should be wall-mounted in each zone and have a set point coordinated with EMCS.
The users in the facility should retain the ability to adjust the temperature up or down 2 degrees from the set point.
2.3.39 All new ductwork must be externally insulated.
2.3.40 Test, adjust, and balance the HVAC system at each renovated room and throughout the new rooms as required and necessary. Provide a complete TAB report of the system (details including but not limited to those specified in UFC 1-200-02 and UFC 3-410-01). It is the responsibility of the Contractor to obtain this independent, third party service.
SAFETY
2.3.41 Design, furnish and install wiring, alarm trigger, and any other components necessary for a complete, useable electronic duress alarm notification system. See UFC 4-022-01 for details on the required design guidelines. Coordinate all duress alarm work with the Government to ensure proper connection to base security personnel, testing, and any other necessary components and aspects to perform installation. Contractor shall coordinate with the Government for location placement of the duress alarms throughout the project’s construction area. Building 730 utilizes a Honeywell Vindicator system located just across the main building lobby. All devices must be wired back to this location.
2.4 GOVERNMENT FURNISHED EQUIPMENT/MATERIALS
The Government will not furnish equipment and materials as part of this project.
2.5 SALVAGE
The Government will not salvage anything as part of this project.
DESIGN REQUIREMENTS
3.1 SUMMARY
Design will consist of all site investigations and design work associated with preparing complete contract documents for this project as described in this SOW. The design documents must be developed from the functional and technical data contained in this SOW and include construction drawings, schedules, and design analysis. The Contractor will also be required to submit design documents for review as described in Paragraph 3.6 as well as final contract documents. The Contractor will be required to attend review and conference meetings as needed and requested by the Government.
3.2 NATURE/EXTENT OF DESIGN
This project requires the services of licensed Design Professionals. Mechanical design and details are required for this project with new diffusers, grilles, ductwork, etc. being installed. Electrical design and details including power, conduit, wiring, etc. are required. Professionally sealed drawings are required.
Design/shop/coordination drawings, materials and equipment submittals, and final as-built record drawings are required for this project. Contractor must maintain accurate redline As-Builts throughout construction and must submit final As-Built drawings (with any of the redline changes updated on the drawings) upon project completion (see paragraph 4.7.2 for more information).
The services of a Qualified Fire Protection Engineer (QFPE), as defined in UFC 3-600-01, are required for this project and all applicable design documents and shop drawings must be stamped by the QFPE. Provide a Life Safety Plan for this facility to ensure means of egress are sufficient for occupant load. The QFPE must be involved in every aspect of design, construction, and testing/commissioning as it relates to fire protection and life safety. This includes, but is not limited to, building code analysis, life safety code analysis, design of automatic fire alarm, detection and suppression systems, water supply analysis, a multi-discipline review of the entire project, construction inspections, and witnessing of fire protection acceptance testing/commissioning. Applicable design documents and shop drawings requiring QFPE shall be provided at the 35% design.
Provide psychrometric/load design analysis of all renovated HVAC systems detailing the systems’ compliance with all applicable codes and standards. See UFC 3-401-01 for details on the required HVAC design analysis. Psychrometric/load design analysis is to be provided to the Government at the 35% design.
Base temperature set points for administrative areas are 76°F cooling and 68°F heating. Users in administrative areas are to have a ±2°F adjustment through warmer cooler adjust thermostats. HVAC systems for administrative areas are to be designed to meet 74°F cooling and 70°F heating.
Provide a complete sequence of operations for HVAC systems including, but not limited to, start up, occupied operation (heating and cooling), unoccupied operation (heating and cooling), nighttime setback, pump operation, boiler operation, and chiller operation.
Provide photometric analysis of all renovated lighting systems detailing compliance with all applicable codes and standards. See UFC 3-530-01 for details on the required photometric analysis. Photometric analysis is to be provided at the 35% design.
3.3 RESPONSIBILITY
3.3.1 Contractor must perform all services, including travel, required to prepare and to furnish complete design documents consisting of drawings, analysis, and addenda as required, for the construction of the project in accordance with this SOW.
3.3.2 Record drawings (attached) are provided to the Contractor as a courtesy at the discretion of the Government, but their accuracy is not guaranteed. The Contractor is responsible for doing his own field investigations of the utilities, existing conditions, and other items in the area.
3.3.3 The Government may provide conceptual drawings to the Contractor, but their accuracy is not guaranteed. The Contractor must do his own field investigations of the utilities, existing conditions, and other items in the area and base his design accordingly.
3.3.4 Although the sizing and specification of major equipment is suggested by this SOW, the Contractor is responsible for all remaining design and coordination to provide an acceptable final product that meets intent of this SOW. Contractor is responsible for ensuring constructability and code compliance.
3.3.5 The Contractor must immediately notify the contracting officer and secure any documents found with “Classified”, “Controlled Unclassified Information” (CUI) or personal information. The Contracting Officer will direct disposition of these documents.
3.4 DESIGN STANDARDS
All design and construction must be accomplished in accordance with applicable UFC’s, ETL’s, (UFC’s and ETL’s may be found on-line at www.wbdg.org.) local and national codes, Columbus AFB Installation Facility Standards (IFS) and all Appendices (Special Construction, Mechanical, and Electrical) and other guidance as modified by this SOW. The IFS document may be found at the following location:
http://www.wbdg.org/ffc/af-afcec/installation-facilities-standards-ifs/columbus-afb-ifs. The list of documents includes, but is not limited to, the latest editions of the following
• UFC 1-200-01 DoD Building Code (General Building Requirements)
• UFC 1-200-02 High Performance and Sustainable Building Requirements
• UFC 3-401-01 Mechanical Engineering
• UFC 3-410-01 Heating, Ventilating, and Air Conditioning Systems
• UFC 3-410-02 Direct Digital Control for HVAC and Other Building Control Systems
• UFC 3-410-04 Industrial Ventilation
• UFC 3-450-01 Noise and Vibration Control
• UFC 3-501-01 Electrical Engineering
• UFC 3-520-01 Interior Electrical Systems
• UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings
• UFC 4-022-01 Entry Control Facilities Access Control Points
• NFPA 101
• NFPA 72
• NEC 70
• ACGIH: Industrial Ventilation Manual
• Columbus AFB IFS
• CAFB Base Standards
The Contractor must submit a written request for approval of any deviations from the Government's established standards. No deviations from the Government's established standards will be permitted unless the Contracting Officer has issued prior written approval of such deviation.
3.5 DRAWINGS
Drawings under this Contract must be well prepared, complete, and accomplished in accordance with the best professional practice to show clearly and concisely the type and extent of work to be performed.
3.5.1 Drawings must be drawn to appropriate scales and dimensioned completely and accurately.
Lettering must be large enough to ensure legible half-size reduction and each dimensioned drawing must have a graphic scale. Use of fractions less than 1/8-inch for building dimensions must be avoided. Use standard building material indications and symbols for architectural items and for mechanical, electrical and plumbing equipment.
http://www.wbdg.org/ffc/af-afcec/installation-facilities-standards-ifs/columbus-afb-ifs
3.5.2 The Contractor will use paper sheets, 24" x 36". Each sheet will be numbered consecutively beginning with "1 of (x) Sheets" and continue to the last sheet. Number individual drawing sheets as follows:
Drawing Sheet Subject Notation Additional Sheets
Cover (Title Sheet, Map and Index)
T1 and following
Civil/Site Work C1 and following Demolition D1 and following Landscaping L1 and following Architectural A1 and following Structural S1 and following Plumbing P1 and following Mechanical M1 and following Electrical E1 and following
Note: All sheet subjects above may not be necessary for this project
3.5.3 Drawings must be prepared electronically in both AutoCAD (Release 2020) and PDF formats.
3.6 DESIGN SUBMITTALS
3.6.1 DELIVERY: Deliver two (2) hard copies of each submittal and one (1) digital copy via DoD SAFE containing each drawing sheet in PDF file format directly to the CO, along with AF Form 3000. For uploading to DoD SAFE, the Contractor must request an upload link from the CO and then upload the files using the details in the subsequent email from DoD SAFE. For the final design submittal (As-Builts in most cases), the contractor is to provide, in addition to the hard copies and digital copies via DoD SAFE, containing the PDF file as well as the associated CAD files in AutoCAD (Release 2020) .dwg file format. Hard copy submittals must be delivered to:
14th Contracting Squadron 495 Harpe Blvd, Suite 293 Columbus, MS 39710
3.6.2 SUBMITALS AT INTERMEDIATE STAGES OF DESIGN COMPLETION: To facilitate review and feedback throughout the design process, designs are submitted at various stages of completion as follows:
1) 35% DESIGN SUBMITTAL: Contractor must submit 35% design documents within 21 days after Notice to Proceed (NTP). The 35% design must include complete and thorough detailing to leave no question as to how demolition and construction is intended. All design documents must be clearly annotated (in both title block and revision block of drawings) with “35% REVIEW SET” and the date.
2) 65% DESIGN SUBMITTAL: Contractor must submit 65% design documents within 21 days after receipt of the “Approved” 35% design. The 65% design must include complete and thorough detailing to leave no question as to how demolition and construction is intended. All design documents must be clearly annotated (in both title block and revision block of drawings) with “65% REVIEW SET” and the date.
3) 95% DESIGN SUBMITTAL: Contractor must submit 95% design documents within 21 days after receipt of the “Approved” 65% design. The 95% design (essentially complete design and drawings, pending review and acceptance by Government as the 100% APPROVED CONSTRUCTION SET) must include complete and thorough detailing to leave no question as to how assembly is intended. All design documents must be clearly annotated (in both title block and revision block of drawings) with “95% REVIEW SET” and the date.
4) 100% DESIGN/APPROVED CONSTRUCTION SET: Contractor must submit the 100% DESIGN APPROVED CONSTRUCTION SET within 14 days after Contractor receipt of the “Approved” 95% design. The construction set must incorporate and/or address any Government comments on the 95% design and should leave no question to how demolition and construction will be done. If professionally stamped and sealed drawings are required for this project (paragraph 3.2), the approved construction set must include all stamped drawings. All final design documents must be clearly annotated (in both title block and revision block of drawings) with “APPROVED CONSTRUCTION SET” and the date.
5) For each holiday or extraordinary event in a submittal period, increase the required days for submittal by one day for each day in the event. Deliver no submittals within (before or after): one week of Thanksgiving; two weeks of Christmas; or one week of New Year’s Day. Extraordinary Events include: unscheduled holidays for base personnel; base-wide training exercises; etc. The Government may prohibit work during such events.
3.6.3 PARTIAL SUBMISSIONS: Partial submissions normally will not be accepted. However, under some circumstances, to expedite project execution, the Government may accept design/shop drawings or material submittals for major elements or long-lead-time equipment for review and approvals prior to 95% design submittal. Government approval of such items does not relieve the Contractor of his responsibility to ensure a complete, constructible, code-compliant design.
3.6.4 CONSTRUCTION PRIOR TO 100% DESIGN: Construction may not commence until Government approves the 100% design. Exception: To expedite contract completion, Contractor may petition CO for an Interim Notice to Proceed with specific elements of construction. Government review does not constitute approval or acceptance of any variations from this SOW, the Contractor’s Proposal, or the Contract unless authorized in writing by the CO. The Interim Notice to Proceed, if exercised, will in no way mitigate the responsibility of the Contractor to provide a complete, constructible, code-compliant design.
All drawings, specifications, design analyses and other project materials become the property of the Government.
3.7 DESIGN REVIEWS
3.7.1 DESIGN PHASE REVIEWS: Government review of each XX% design submittal (where XX = 95 or 100 as required per 3.6.2) will require up to fourteen (14) days after Government receipt. The Government will determine the sufficiency of each XX% design submittal as follows:
1) Approved as Submitted. If design is sufficient to proceed without correction to the next phase submittal, one (1) copy of AF FORM 3000 marked "Approved" will be returned to the Contractor.
Contractor must advance to the next stage design submittal.
2) Approved - Except as Noted. Design submittals that have only minor errors or deficiencies will be marked in red to indicate necessary corrections. Marked materials, along with one (1) copy of AF FORM 3000 indicating "Approved - Except as Noted" will be returned to the Contractor.
Contractor must revise the design documents, making the necessary corrections, and advance to the next stage design submittal.
3) Disapproved. Design submittals that are incomplete or require more than minor corrections will be marked in red to indicate necessary corrections. Marked materials, along with one (1) copy of AF FORM 3000 marked “Disapproved” will be returned to the Contractor. Contractor must revise the design documents, making the necessary corrections, and re-submit as the current stage “XX% Design – 2nd (or subsequent) Submittal”.
4) Disapproved – Major Deficiency. Examples include, but are not limited to, design submittals that fall significantly short of indicated level of completion, grossly deviate from or misinterpret the SOW, or contain errors of a nature or quantity that indicate failure of Contractor to review submittals for completeness, correctness, and coordination between trades. For such submittals, the Government will not complete a comprehensive review or provide an exhaustive list of needed corrections. Rather, one (1) copy of AF FORM 3000 marked “Disapproved – Major Deficiency” along with general reason(s) for disapproval will be returned to the contractor. The CO will issue a written warning to the Contractor that any subsequent grossly incorrect/incomplete submittals constitute evidence of inability to complete the project and may result in declaring the Contractor “In Default.” Contractor must correct deficiencies and resubmit as current stage “XX% Design – 2nd (or subsequent) Submittal”.
3.7.2 100% DESIGN REVIEW: The Government will have fourteen (14) days to verify that all review comments have been addressed and no unapproved changes have been made. Upon Government approval of the 100% design documents, the Contractor may begin construction.
3.7.3 IMPACT OF REVIEW ON PERIOD OF PERFORMANCE: Contract completion time includes time for Government review of drawings, specifications, and material submittals. Unless otherwise noted, the Government will use no more than 14 calendar days for review of each design submittal and each subsequent re-submittal of “Disapproved” submittals (paragraph 3.7.1, c or d). There will be no increase in the period of performance for review of re-submittals.
3.7.4 RESPONSE TO REVIEW COMMENTS: The Contractor is required to respond to all review comments and submit their annotated comments as a design analysis appendix in the subsequent design submittal. All comments must either be accepted and incorporated into the next design submittal or satisfactorily rebutted.
3.7.5 DESIGN ACCOUNTABILITY: The Contractor is solely responsible for accurately designing and constructing everything necessary to provide a fully functional product. Government approval of any design or design-related submittal does not waive or remove full liability from the Contractor to provide a design, facility, or final product that meets the intent of this SOW, performs as intended, and adheres to all applicable codes and standards.
3.8 CONFERENCES
3.8.1 PRECONSTRUCTION CONFERENCE: A Preconstruction Conference (Pre-Con) will be held at the Contracting Office as indicated.
3.8.2 COORDINATION/REVIEW CONFERENCES: Coordination/review conferences may be held from time to time as required. The Contractor may request such conferences when it is deemed necessary by both parties to clarify the work or expedite the preparation of plans, specifications or construction.
3.8.3 REVIEW/CONFERENCE MINUTES: The Contractor will be responsible for making memoranda of record of any conversations and minutes of any meeting with Government personnel concerning this project and forward one copy of these memoranda/minutes to each party concerned and one copy to the Contracting Officer within seven (7) days. The final version of the meeting minutes will be approved and filed at the CO’s discretion. Each copy will be numbered consecutively and chronologically.
3.8.4 MEETING LOCATIONS: Meetings will be held in person at Columbus Air Force Base. Contractor transportation costs for attending all conferences/reviews and meetings must be included in the Contractor’s Proposal. There will be no teleconferences unless permitted otherwise by the Contracting Officer.
End of Design Requirements
ADMINISTRATION OF CONSTRUCTION
4.1 PERFORMANCE CAPABILITIES
4.1.1 One week prior to the start of work under this contract, Contractor must submit in writing to the CO for review and possible approval the names and credentials of Contractor Project Manager, Contractor Site Superintendent, and Quality Control Manager. Subsequent proposed changes of approved personnel must be submitted in writing to and receive prior approval from the CO before working on the project.
Each of these personnel may upon CO approval hold additional onsite duties which must not diminish their required performance. Contractor must demonstrate to the Government’s satisfaction that proposed personnel exceed education, technical and experience levels of personnel described in this Contract including the following:
1) Contractor Project Manager (CPM) - Provide management of the prime contract to include subcontract purchasing and administration, review of material submittals and shop drawings. CPM must have full authority to develop cost proposals, negotiate with Government and subcontractors, sign awards and modifications, supervise project superintendents, attend weekly CO/CE/PM Contractor status meetings as well as pre-performance site visits, pre-final and final inspections.
The CPM must have a minimum of 5 years previous experience as primary contract manager or equivalent experience as a primary estimator and negotiator with a contracting firm engaged in similar multi-discipline commercial construction projects. CPM must also have not less than 5 years’ experience managing subcontractors.
2) Contractor Site Superintendent (CSS) - Provide on-site construction superintendent(s) to oversee all work under this contract. Site supervision must be daily (constant throughout each day) and includes submission of detailed weekly progress reports, scheduling and coordination of subcontractors and material suppliers, and attendance at all construction progress meetings, CO site visits, and pre-final and final inspections. Superintendents must have a minimum of 5 years previous experience as a project superintendent (exclusive of time employed as a tradesman or working foreman) for a general contracting firm overseeing one or more multi-discipline commercial construction projects. The superintendent must be available within 15 minutes during all normal working hours, except for such incidental errands as required by his duties. The superintendent must be responsible for the proper coordination and timeliness of the work, and for the proper workmanship of all trades; therefore, his absence from the project site without a suitable substitute Contractor representative must be considered as damaging to the Government.
3) Quality Control Manager (QCM) - Provide quality control management for the project. QCM must continually (constant throughout each day) ensure full compliance with all safety requirements, verification that work and materials in place and stored on site are in accordance with the approved construction documents, shop drawings and material submittals. QCM must submit daily status reports recording activities at each project site, prepare and coordinate material submittal sheets and shop drawing submittals, schedule and coordinate testing procedures, prepare quality control reports for construction progress and other required meetings, and attend all pre-final and final inspections. QCM must have a minimum of five years’ experience in Quality Control Management of multidiscipline construction projects.
4.1.2 Contractor must have additional personnel including management, technical, service, labor or subcontractor, available as necessary to fulfill all construction contract requirements. The Government may restrict employment under this contract of any personnel identified as a potential threat to the health, safety, security, well-being, or operational mission of CAFB and its population.
4.1.3 Contractor must be available by telephone 24-hours a day, 7-days a week and upon 15 minutes’ notice during normal duty hours and 30 minutes’ notice during non-duty hours must meet the CO at a CO designated location.
4.2 COMMENCEMENT, PROSECUTION & COMPLETION
4.2.1 Contractor must start design and various construction phases at times specified by CO issued Notice(s) to Proceed (NTP), prosecute the work, and complete the entire work within the Period of Performance.
4.2.2 Contractor must provide a Submittal Log (Schedule of Material Submittals), Progress Schedules, Progress reports and Status Reports.
1) Submittal Log: See Material Submittals and Shop Drawings below.
2) Progress Schedule: (AF Form 3064) Submit the progress schedule to the CO within 10 days after contract award, unless otherwise specified by the CO. Subdivide total schedule into individual work items. Show completed work percentages at the end of each two-week reporting period. Progress schedule should only be resubmitted during the project duration if there’s an issue with Period of Performance or if deemed necessary by the CO as described in 4.2.2.3.
3) Progress Reports: (AF Form 3065) Submit Project Progress reports to the CO minimum twice per month on the first working day of each month and again on the 15th. Describe the percentage of work completed during the report period. If behind schedule, report in writing what actions will be taken to regain the schedule. If the CO agrees to add days to the contract performance period, Contractor must provide an amended schedule.
4) Status Reports: Submit to the CO daily reports of the work status. In each report, list the tasks accomplished for that day, any deliveries received, equipment currently on-site, weather conditions for that day, and number of personnel working on each area listed by trade. Photos may be included.
4.2.3 Period of Performance: Is the period between the issuance of the NTP and the time all construction is complete, including all punch list items, and final inspection is approved by the Government. The total Period of Performance for this project is 300 days.
4.2.4 Contract Completion: At contract conclusion, vacate all work areas, including: Contractor offices, storage and staging areas, and individual work sites. Restore these areas to their condition prior to Contractor occupancy not more than 14 days from the earlier of: approved final inspection or CO notification.
4.2.5 Coordination and Project Conditions: Schedule and manage submittals, materials, products, equipment, manpower, etc. to control all parts of the work efficiently and orderly. Verify compatibility of existing building utilities with new operating equipment. Coordinate required space, supports, and mechanical and electrical work shown (even if via diagrams) on Drawings. Follow routing shown for pipes, ducts, and conduit; place runs parallel with building lines. Use space efficiently to maximize maintenance and for repair accessibility for other systems. Conceal wiring behind finish surfaces and locate fixtures and outlets with finish elements. Coordinate pre-Substantial Completion clean-up in separate building areas.
After CAFB occupancy, coordinate site access to correct defective (or non-compliant with CDs) to minimize disruption of Government activities.
4.2.6 Cutting and Patching: Only employ skilled and experienced workers to cut and patch. Report in writing to the CO wherever cutting and patching might degrade: safety; appearance, structure, weatherproofing, O&M, or separate Contractor or government construction. Prevent damage to existing or new construction and provide proper surfaces to receive patching and finishing.
This is the start of the file's text. The full file is on GovTribe.