The scope of work includes removing and storing furniture (on-site) through phases and re-install upon floor completion. Work includes demolition, removal and disposal of the following: existing vinyl composite tile (VCT), north wall of room S115A, pre-fabricated walls by room S115A, hard ceiling in rooms S128 & S128A, select sprinklers within the vault of Building 190. New VCT and rubber cove base shall be installed in select areas throughout the building as shown on the attached drawings. Existing conference room S115A will be reconfigured to facilitate a new layout that will accommodate a larger mission briefing room area, see drawings attached. New (2) outlets, fluorescent light fixture shall be installed within the new extended conference room and relocation one (1) rotating blue light to accommodate reconfigured conference room space. New suspended lay-in ceiling tile to replace hard ceiling in rooms S128 & S128A. Nine (9) fire sprinklers shall be repaired/installed (as necessary) to ensure compliance with NFPA 101. Sprinklers are located in rooms S128 & S128A; ensure sprinklers meet proper head clearance from new suspended lay-in ceiling. A new electromagnetic closing system and door hardware for existing fire doors and two (2) smoke detectors shall be installed, see drawings for location. New fire exit signs shall be installed on its own circuit to ensure compliance with NFPA 101, see drawings for locations. Lastly, relocate fire extinguishers to meet NFPA 10 standards.

- Amendment 1 adds updated SOW, Drawings (35%), Site Visit Sign-in Sheet, and Government Response to Site Visit Request for Information - 7 Apr 22

- Amendment 2 adds updated Government Response to Site Visit Request for Information and bid due date extended to 20 Apr 22 / 2:00 P.M. MST - 13 Apr 22

Update #2 ·

The scope of work includes removing and storing furniture (on-site) through phases and re-install upon floor completion. Work includes demolition, removal and disposal of the following: existing vinyl composite tile (VCT), north wall of room S115A, pre-fabricated walls by room S115A, hard ceiling in rooms S128 & S128A, select sprinklers within the vault of Building 190. New VCT and rubber cove base shall be installed in select areas throughout the building as shown on the attached drawings. Existing conference room S115A will be reconfigured to facilitate a new layout that will accommodate a larger mission briefing room area, see drawings attached. New (2) outlets, fluorescent light fixture shall be installed within the new extended conference room and relocation one (1) rotating blue light to accommodate reconfigured conference room space. New suspended lay-in ceiling tile to replace hard ceiling in rooms S128 & S128A. Nine (9) fire sprinklers shall be repaired/installed (as necessary) to ensure compliance with NFPA 101. Sprinklers are located in rooms S128 & S128A; ensure sprinklers meet proper head clearance from new suspended lay-in ceiling. A new electromagnetic closing system and door hardware for existing fire doors and two (2) smoke detectors shall be installed, see drawings for location. New fire exit signs shall be installed on its own circuit to ensure compliance with NFPA 101, see drawings for locations. Lastly, relocate fire extinguishers to meet NFPA 10 standards.

- Amendment 1 adds updated SOW, Drawings (35%), Site Visit Sign-in Sheet, and Answers to Site Vist questions

Update #1 ·

The scope of work includes removing and storing furniture (on-site) through phases and re-install upon floor completion. Work includes demolition, removal and disposal of the following: existing vinyl composite tile (VCT), north wall of room S115A, pre-fabricated walls by room S115A, hard ceiling in rooms S128 & S128A, select sprinklers within the vault of Building 190. New VCT and rubber cove base shall be installed in select areas throughout the building as shown on the attached drawings. Existing conference room S115A will be reconfigured to facilitate a new layout that will accommodate a larger mission briefing room area, see drawings attached. New (2) outlets, fluorescent light fixture shall be installed within the new extended conference room and relocation one (1) rotating blue light to accommodate reconfigured conference room space. New suspended lay-in ceiling tile to replace hard ceiling in rooms S128 & S128A. Nine (9) fire sprinklers shall be repaired/installed (as necessary) to ensure compliance with NFPA 101. Sprinklers are located in rooms S128 & S128A; ensure sprinklers meet proper head clearance from new suspended lay-in ceiling. A new electromagnetic closing system and door hardware for existing fire doors and two (2) smoke detectors shall be installed, see drawings for location. New fire exit signs shall be installed on its own circuit to ensure compliance with NFPA 101, see drawings for locations. Lastly, relocate fire extinguishers to meet NFPA 10 standards.

Files

File Type Posted
SF 1409 Abstract 20 Apr 22.pdf PDF
Amendment 2 - FA485522B00020002 SF 30.pdf PDF
Site Visit Questions B190 Updated 13 Apr 22.xlsx XLSX spreadsheet
Atch 1 SOW - CZQZ160061 6 April 22 (Amend 1).pdf PDF
B190 Site Visit Sign In 25 Mar 22 (Amend 1).pdf PDF
A. B190 35% Revised Drawings (Amend 1).pdf PDF
Amendment 1 - FA485522B00020001.pdf PDF
Site Visit Questions B190 28 Mar 22 (Amend 1).xlsx XLSX spreadsheet
Solicitation - FA485522B0002-17 Mar 22.pdf PDF
A. Pic 3.jpg JPG image
A. Existing SPRINKLER (3).jpg JPG image
A. Existing SPRINKLER (1).jpg JPG image
A. Existing SPRINKLER (2).jpg JPG image
C. AF3064 Schedule Template.xls XLS spreadsheet
C. CZQZ160061 Draft DD 1354.pdf PDF
Atch 1 SOW CZQZ160061-15 Mar 22.pdf PDF
Atch 2 SOMS - CZQZ160061.xls XLS spreadsheet
A. As-Built Fire_Protect_Floor_Plan.pdf PDF
C. RFI FORM Template.pdf PDF
D. As-Built Submittal Guidelines-2014.pdf PDF
D. WD_NM20220016-25 Feb 22.pdf PDF
C. AF 3065 Progress Report Template.xlsx XLSX spreadsheet
D. CAFB Architectural Compatibilty Guide-2013.pdf PDF
A. B190 35% Drawings.pdf PDF
A. As-Built Riser_Diagrams_Details.pdf PDF
A. Pic 1.jpg JPG image
A. Pic 4.jpg JPG image
A. Pic 2.jpg JPG image
B. Specifications-16 Mar 22.pdf PDF
C. AF 3000 Template.pdf PDF
D. AEC CAD Standards 6_1-Aug 2019.pdf PDF
D. CAFBI 32-201, June 2020.pdf PDF
D. Contractor Base Briefing Pamphlet-Mar 16.pdf PDF
Show all 33

Notice history

Notice Type Posted
B190, Rpr Doors, Sprinklers, VCT, Carpet, New Briefing Rm Award Award Notice
This notice Latest solicitation Solicitation
B190, Rpr Doors, Sprinklers, VCT, Carpet, New Briefing Rm Pre-Solicitation
B190, Repair Doors, Sprinklers, Tile Briefing Rm Solicitation
B190, Repair Doors, Sprinklers, Tile Briefing Rm Solicitation
B190, Repair Doors, Sprinklers, Tile Briefing Rm Pre-Solicitation
B190, Repair Doors, Sprinklers, Tile Briefing Rm Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity