B190, Rpr Doors, Sprinklers, VCT, Carpet, New Briefing Rm
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- CZQZ160061
- Agency
-
Air Force Special Operations Command
Air Force, Department of Defense
- Responses due
- Set-aside
- HUBZone
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Clovis, New Mexico 88101, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
The scope of work includes removing and storing furniture (on-site) through phases and re-install upon floor completion. Work includes demolition, removal and disposal of the following: existing vinyl composite tile (VCT), north wall of RM S115A, magnetic closing mechanism for fire doors and select sprinklers within the vault of Building 190. New VCT and rubber cove base shall be installed in select areas throughout the building. Existing conference room S115A will be reconfigured to facilitate a new layout that will accommodate a larger mission briefing room area. New fluorescent light fixture shall be installed within the new extended conference room and relocation of one (1) fire sprinkler head and one (1) rotating blue light to accommodate reconfigured conference room space. New six (6) fire sprinkler heads shall be installed, in compliance with NFPA 101, in the vault to ensure proper head clearance from hard ceiling. A new magnetic closing system for fire doors and two (2) smoke detectors on either side of the fire doors shall be installed to ensure compliance with NFPA 101 requirements. The Government intends to post the Invitation for Bid on or about 17 March 2022.
Update #1 ·
The scope of work includes removing and storing furniture (on-site) through phases and re-install upon floor completion. Work includes demolition, removal and disposal of the following: existing vinyl composite tile (VCT), north wall of RM S115A, magnetic closing mechanism for fire doors and select sprinklers within the vault of Building 190. New VCT and rubber cove base shall be installed in select areas throughout the building as shown on the attached drawings. Existing conference room S115A will be reconfigured to facilitate a new layout that will accommodate a larger mission briefing room area, see drawings attached. New fluorescent light fixture shall be installed within the new extended conference room and relocation of one (1) fire sprinkler head and one (1) rotating blue light to accommodate reconfigured conference room space. New six (6) fire sprinkler heads shall be installed, in compliance with NFPA 101, in the vault to ensure proper head clearance from hard ceiling. A new magnetic closing system for fire doors and two (2) smoke detectors on either side of the fire doors shall be installed to ensure compliance with NFPA 101 requirements. The Government intends to post the Invitation for Bid on or about 17 March 2022.
Notice history
| Notice | Type | Posted |
|---|---|---|
| B190, Rpr Doors, Sprinklers, VCT, Carpet, New Briefing Rm | Award Notice | |
| B190, Rpr Doors, Sprinklers, VCT, Carpet, New Briefing Rm | Solicitation | |
| This notice | Pre-Solicitation | |
| B190, Repair Doors, Sprinklers, Tile Briefing Rm | Solicitation | |
| B190, Repair Doors, Sprinklers, Tile Briefing Rm | Solicitation | |
| B190, Repair Doors, Sprinklers, Tile Briefing Rm | Pre-Solicitation | |
| B190, Repair Doors, Sprinklers, Tile Briefing Rm | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity