C. AF 3000 Template.pdf

PDF 2 MB Posted

Attached to
B190, Rpr Doors, Sprinklers, VCT, Carpet, New Briefing Rm
Solicitation number
FA485522B0002
Issued by

View the file

Other files

File Type Posted
SF 1409 Abstract 20 Apr 22.pdf PDF
Site Visit Questions B190 Updated 13 Apr 22.xlsx XLSX spreadsheet
Amendment 2 - FA485522B00020002 SF 30.pdf PDF
Atch 1 SOW - CZQZ160061 6 April 22 (Amend 1).pdf PDF
A. B190 35% Revised Drawings (Amend 1).pdf PDF
Amendment 1 - FA485522B00020001.pdf PDF
Site Visit Questions B190 28 Mar 22 (Amend 1).xlsx XLSX spreadsheet
B190 Site Visit Sign In 25 Mar 22 (Amend 1).pdf PDF
Solicitation - FA485522B0002-17 Mar 22.pdf PDF
C. CZQZ160061 Draft DD 1354.pdf PDF
D. CAFB Architectural Compatibilty Guide-2013.pdf PDF
C. RFI FORM Template.pdf PDF
Atch 1 SOW CZQZ160061-15 Mar 22.pdf PDF
C. AF 3065 Progress Report Template.xlsx XLSX spreadsheet
D. AEC CAD Standards 6_1-Aug 2019.pdf PDF
A. Pic 3.jpg JPG image
A. Pic 2.jpg JPG image
B. Specifications-16 Mar 22.pdf PDF
D. Contractor Base Briefing Pamphlet-Mar 16.pdf PDF
A. Pic 1.jpg JPG image
D. CAFBI 32-201, June 2020.pdf PDF
A. Pic 4.jpg JPG image
C. AF3064 Schedule Template.xls XLS spreadsheet
A. Existing SPRINKLER (2).jpg JPG image
A. Existing SPRINKLER (3).jpg JPG image
A. Existing SPRINKLER (1).jpg JPG image
A. B190 35% Drawings.pdf PDF
A. As-Built Riser_Diagrams_Details.pdf PDF
D. As-Built Submittal Guidelines-2014.pdf PDF
Atch 2 SOMS - CZQZ160061.xls XLS spreadsheet
D. WD_NM20220016-25 Feb 22.pdf PDF
A. As-Built Fire_Protect_Floor_Plan.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

MATERIAL APPROVAL SUBMITTAL

(See Instructions on Reverse) Form Approved OMB No 9000-062 Expires May 31, 2005 Public reporting burden for this collection of information is estimated to average 20 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project OMB No 9000-0062, Washington D.C. 20593. Please DO NOT RETURN your form to either of the addresses Send your completed for to: SAF/AQCP, 1050 Air Force Pentagon, Washington, D.C. 20330

SUBMITTAL

TO BE COMPLETED BY CONTRACTOR

FOR GOVERNMENT USE ONLY

ITEM NO.

SPECIFICATION SECTION/PARA NO./DRAWING NO

DESCRIPTION OF MATERIAL

(Include Type, Model Number, Catalog Number, Mfg., etc.)

AP-PROVED

DISAP- PROVED

SEE REVERSE

INITIAL

BY COMPLETING THIS FORM, THE UNDERSIGNED CONTRACTOR CERTIFIES THAT

THE MATERIAL COMPLIES WITH ALL SPECIFICIFICATIONS OF SUBJECT CONTRACT

FOR GOVERNMENT USE ONLY

RECOMMEND

AF IMT 3000, 20030901, V1 PREVIOUS EDITION IS OBSOLETE

RESUBMITTAL ON DISAPPROVED ITEMS WITHIN ____ DAYS OF DATE SHOWN BELOW.

1.The term “material” is defined as articles, supplies, raw materials, equipment, parts, components, and end items that are to be incorporated into the work required by the contract.
2.This form is to be used by contractors for submitting Shop Drawings, Equipment Data, Manufacturer's Literature and Certificates and sample of Materials to the Government for approval in accordance with the provisions of this contract. Unless otherwise specified, it is to be prepared in 4 copies, signed, and provided to the contracting officer with appropriate attachments.

3. Item(s) to be approved will be clearly tabbed or identified. Data pertaining to items(s) to be approved will be clearly identified or tabbed, particularly where documents are voluminous, in order to properly evaluate the materials or articles to be incorporated in the work. Each attachment will be numbered to correspond with the item number shown on the face of the form.

4. Request submitted shall be numbered consecutively, by contract, in the space entitled “Submission No.”. This number, in addition to the Contract No., will be used to identify each Material Approval Submittal. Resubmissions will be indicated in the appropriate block and the insertion of previous submission number data in addition to a new submission number. A single submission should be used for all work of a section of the specifications, but in NO instance should the submission include work for more than (1) one contract. Submittals requiring priority handling will be submitted by separate submittal using the form and so marked across the face of the form.

5. This material Approval Submittal is not valid unless it is signed by the contracting officer. This approval is required as called for by the contracting officer under the terms of this contract.

INSTRUCTIONS TO CONTRACTORS

AF IMT 3000, 20030901, V1 (REVERSE)

11.0.1.20130826.2.901444.899636

To:
From:
Date_1:
Contract_Number:
New:
Resubmittal:
Previous_Contract_Number:
Cell1:
Cell2:
Cell3:
ApprovedCheckBox: 0
DispprovedCheckBox: 0
SeeReverseCheckBox: 0
Initials:
Cell4: 0
Cell4: 0
Cell4: 0
Cell4: 0
Cell5: 0
Cell5: 0
Cell5: 0
Cell5: 0
Cell5: 0
Cell6: 0
Cell6: 0
Cell6: 0
Cell6: 0
Cell6: 0
:
CheckBox1: 0
Cntractr_Date:
Contractor_Name:
Contractor:
Civil_Engineer:
To_Eval:
Contract_Officer:
To_Cntrt_Office:
Base:
Base_Civil:
APPROVED_CHECK: 0
DISAPPROVED_CHECK: 0
TextField1:
SignatureField1:
For_Eval_Action:
TextField2:

File details come from the government source that posted it. Updated .